Pitt Chiller Plant - Drawings - Part II Structural.pdf
PDF 2 MB Posted
- Attached to
- Z2DA--NRM| 646-20-109 UD Chiller Capacity and Controls Upgrade (VA-26-00044970) (VA-26-00044970)
- Solicitation number
- 36C24426R0062
About this file
This document is a set of structural engineering drawings for a renovation and upgrade project at a U.S. Department of Veterans Affairs facility. The drawings are prepared by Miller Remick LLC, a professional engineering firm located in Cherry Hill, New Jersey, and include detailed plans for demolition, foundation work, structural framing, and concrete and steel construction details across multiple building levels.
The drawings encompass comprehensive demolition plans for the first, second, and roof levels, indicating selective removal of existing masonry walls, concrete bearing walls, steel framing, roof slabs, and related structural elements. Foundation plans detail the installation of new concrete equipment pads and column foundations with specific elevation and coordinate information. Structural framing plans for the first level, second level, roof level, roof dunnage, and cooling tower platform show the placement of new concrete and steel framing members, including beams, columns, decking, and bracing systems. The document also includes detailed sections and construction details for concrete pads, continuous footings, column bases, foundation elements, equipment pads, beam-to-column moment connections, wall connections, platform sections, and roof details. All drawings reference existing conditions to be preserved, specify material grades and specifications, provide anchor and equipment lift details, and include schedules for footings and beam reactions. The project appears to support upgrades to building infrastructure including a cooling tower installation, with work coordinated across multiple structural systems and building components.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Project Director
2022-05-11
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
E
F
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
6" 6"
6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
PLAN
NORTH
ACTUAL
NORTH
STRUCTURAL
DEMOLITION PLAN
FIRST LEVEL
UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Project Director
2022-05-11
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
6" 6"
6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
PLAN
NORTH
ACTUAL
NORTH
STRUCTURAL
DEMOLITION PLAN
SECOND LEVEL
UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
6" 6"
6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
PLAN
NORTH
ACTUAL
NORTH
STRUCTURAL
DEMOLITION PLAN
ROOF LEVEL
UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Project Director
2022-05-11
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
6" 6"
6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
PLAN
NORTH
ACTUAL
NORTH
STRUCTURAL
FOUNDATION PLAN
UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
6" 6"
6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
PLAN
NORTH
ACTUAL
NORTH
STRUCTURAL
FRAMING PLAN
FIRST LEVEL
UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
6" 6"
6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
PLAN
NORTH
ACTUAL
NORTH
STRUCTURAL
FRAMING PLAN
SECOND LEVEL
UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
6" 6"
6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
PLAN
NORTH
ACTUAL
NORTH
STRUCTURAL
FRAMING PLAN
ROOF LEVEL
UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
6" 6"
6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
PLAN
NORTH
ACTUAL
NORTH
STRUCTURAL
FRAMING PLAN
ROOF DUNNAGE
UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
6" 6"
6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
PLAN
NORTH
ACTUAL
NORTH
STRUCTURAL
FRAMING PLAN
TOP OF COOLING TOWER PLATFORM
UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
6" 6"
6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
STRUCTURAL
BRACE FRAME ELEVATIONS
UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Project Director
2022-05-11
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Project Director
2022-05-11
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Project Director
2022-05-11
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Project Director
2022-05-11
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
File details come from the government source that posted it. Updated .