Pitt Chiller Plant - Drawings - Part II Structural.pdf

PDF 2 MB Posted

Attached to
Z2DA--NRM| 646-20-109 UD Chiller Capacity and Controls Upgrade (VA-26-00044970) (VA-26-00044970)
Solicitation number
36C24426R0062
Issued by

About this file

This document is a set of structural engineering drawings for a renovation and upgrade project at a U.S. Department of Veterans Affairs facility. The drawings are prepared by Miller Remick LLC, a professional engineering firm located in Cherry Hill, New Jersey, and include detailed plans for demolition, foundation work, structural framing, and concrete and steel construction details across multiple building levels.

The drawings encompass comprehensive demolition plans for the first, second, and roof levels, indicating selective removal of existing masonry walls, concrete bearing walls, steel framing, roof slabs, and related structural elements. Foundation plans detail the installation of new concrete equipment pads and column foundations with specific elevation and coordinate information. Structural framing plans for the first level, second level, roof level, roof dunnage, and cooling tower platform show the placement of new concrete and steel framing members, including beams, columns, decking, and bracing systems. The document also includes detailed sections and construction details for concrete pads, continuous footings, column bases, foundation elements, equipment pads, beam-to-column moment connections, wall connections, platform sections, and roof details. All drawings reference existing conditions to be preserved, specify material grades and specifications, provide anchor and equipment lift details, and include schedules for footings and beam reactions. The project appears to support upgrades to building infrastructure including a cooling tower installation, with work coordinated across multiple structural systems and building components.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Project Director

2022-05-11

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

E

F

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

PLAN

NORTH

ACTUAL

NORTH

STRUCTURAL

DEMOLITION PLAN

FIRST LEVEL

UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Project Director

2022-05-11

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

PLAN

NORTH

ACTUAL

NORTH

STRUCTURAL

DEMOLITION PLAN

SECOND LEVEL

UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

PLAN

NORTH

ACTUAL

NORTH

STRUCTURAL

DEMOLITION PLAN

ROOF LEVEL

UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Project Director

2022-05-11

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

PLAN

NORTH

ACTUAL

NORTH

STRUCTURAL

FOUNDATION PLAN

UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

PLAN

NORTH

ACTUAL

NORTH

STRUCTURAL

FRAMING PLAN

FIRST LEVEL

UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

PLAN

NORTH

ACTUAL

NORTH

STRUCTURAL

FRAMING PLAN

SECOND LEVEL

UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

PLAN

NORTH

ACTUAL

NORTH

STRUCTURAL

FRAMING PLAN

ROOF LEVEL

UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

PLAN

NORTH

ACTUAL

NORTH

STRUCTURAL

FRAMING PLAN

ROOF DUNNAGE

UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

PLAN

NORTH

ACTUAL

NORTH

STRUCTURAL

FRAMING PLAN

TOP OF COOLING TOWER PLATFORM

UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

STRUCTURAL

BRACE FRAME ELEVATIONS

UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Project Director

2022-05-11

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Project Director

2022-05-11

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Project Director

2022-05-11

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Project Director

2022-05-11

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

File details come from the government source that posted it. Updated .