PILE SCHEDULE.xlsx

XLSX spreadsheet 11 KB Posted

Attached to
WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
Solicitation number
FA813726R0026
Issued by

About this file

This is a Pile Schedule spreadsheet detailing structural specifications for foundation elements required under solicitation FA813726R0026 for the installation of a REACT VII Facility at Building 9001.

The schedule specifies two pile cap configurations, both measuring 24 inches by 24 inches by 2 feet in height, reinforced with eight #4 vertical bars and six #4 tie bars. Pile cap P1 is designed to support axial loads of 33 kips (ASD) or 45 kips (LRFD), with vertical shear loads of 0.1 kips (ASD) or 0.2 kips (LRFD), and bending moments of 0.4 kip-feet (ASD) or 0.9 kip-feet (LRFD). Pile cap P2 accommodates higher bending moments of 15 kip-feet (ASD) or 21 kip-feet (LRFD) while supporting lower axial loads of 21 kips (ASD) or 29 kips (LRFD), with identical vertical shear specifications. Both configurations include helical pier foundations and are designed using both Allowable Stress Design (ASD) and Load and Resistance Factor Design (LRFD) methodologies. This document serves as a technical specification appendix supporting the structural design requirements for the facility installation project.

View the file

Other files

File Type Posted
250063_ATT 10_Submittal Register.xlsx XLSX spreadsheet
26 05 73 POWER STUDIES.pdf PDF
26 20 00.pdf PDF
09 90 00.pdf PDF
23 09 13.pdf PDF
23 36 00.00 40.pdf PDF
08 71 00.pdf PDF
05 40 00.pdf PDF
10 14 00.10.pdf PDF
08 33 23.pdf PDF
08 11 13.pdf PDF
07 92 00.pdf PDF
01 33 16.00 10.pdf PDF
01 32 16.00 20.pdf PDF
image.png PNG image
250063 React VII_Hardware schedule 25MAR26 JL.xlsx XLSX spreadsheet
JOIST SPECIAL INSPECTIONS.xlsx XLSX spreadsheet
ELECTRICAL PANEL SCHEDULE U18L.xlsx XLSX spreadsheet
esvEH_singledual_2023_V2.pdf PDF
lk406gn05t4_spec.pdf PDF
2_-_HE05-JINV-S11EE---GNT---L_001.pdf PDF
ERV Schedule_TAFB B9001_O-212477.xlsx XLSX spreadsheet
4500-CIVIL.pdf PDF
250063_ATT 10_Submittal Register.pdf PDF
250063_ATT 9_SOW.pdf PDF
250063_ATT 11_Drawings.pdf PDF
WWYK250063-04March2026.pdf PDF
2020 TAFB Facility Standard.pdf PDF
2026 TAFB Electrical Standard - Signed.pdf PDF
SOW Att 02a_Controlled Area Training.pptx PPTX presentation
SOW Att 02c_Controlled Area Training - Certificate.pdf PDF
22 00 00.pdf PDF
28 31 76.pdf PDF
23 09 23.02.pdf PDF
07 14 00.pdf PDF
08 51 23.pdf PDF
10 44 16.pdf PDF
07 21 16.pdf PDF
00 72 00.pdf PDF
00 71 00.pdf PDF
01 78 00.pdf PDF
01 33 00.pdf PDF
000_TABLE OF CONTENTS.pdf PDF
01 78 23.pdf PDF
esvperf_singledual_2023_V2.pdf PDF
lrad331965pd_spec.pdf PDF
REACT VII SA-01.pdf PDF
TAFB B9001 VAV Schedule.pdf PDF
ARCH-COMBINED.pdf PDF
4500-MUG.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

PILE SCHEDULE
PILE CAPHELICAL PIER LOADS
LOADASDLRFD
P124"X24"X2'-0" REINF W/ (8)-#4 VERTS AND (6)-#4 TIESP33K45K
V0.1K0.2K
M0.4K-FT0.9K-FT
P224"X24"X2'-0" REINF W/ (8)-#4 VERTS AND (6)-#4 TIESP21K29K
V0.1K0.2K
M15K-FT21K-FT

File details come from the government source that posted it. Updated .