000_TABLE OF CONTENTS.pdf

PDF 70 KB Posted

Attached to
WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
Solicitation number
FA813726R0026
Issued by

About this file

This is a table of contents document for Tinker Air Force Base General Requirements established in January 2022, outlining the organizational structure of procurement and contracting specifications for construction projects at the military installation.

The document is organized into two primary divisions. Division 00 addresses Procurement and Contracting Requirements, encompassing five sections: General Requirements for Construction on Tinker AFB (00 70 00), General Safety Requirements for Construction on Tinker AFB (00 71 00), General Environmental Requirements for Construction on Tinker AFB (00 72 00), and Special Provisions for Working on Tinker AFB (00 80 00 and 00 80 05), with the latter specifically addressing work on or near the airfield. Division 01 contains General Requirements with nine subsections covering small project construction progress schedules, submittal procedures, design data for design-after-award projects, sources for reference publications, quality control, contractor facilities, and closeout submittals including operation and maintenance data. This table of contents serves as a reference guide for contractors and procurement personnel to locate specific requirements applicable to construction activities at Tinker Air Force Base.

View the file

Other files

File Type Posted
Solicitation Amendment FA813726R00260001 - CANCELLATION.pdf PDF
Solicitation Amendment FA813726R00260001 SF 30.pdf PDF
250063_ATT 10_Submittal Register.pdf PDF
250063_ATT 9_SOW.pdf PDF
250063_ATT 11_Drawings.pdf PDF
WWYK250063-04March2026.pdf PDF
2020 TAFB Facility Standard.pdf PDF
2026 TAFB Electrical Standard - Signed.pdf PDF
SOW Att 02a_Controlled Area Training.pptx PPTX presentation
SOW Att 02c_Controlled Area Training - Certificate.pdf PDF
22 00 00.pdf PDF
28 31 76.pdf PDF
23 09 23.02.pdf PDF
07 14 00.pdf PDF
08 51 23.pdf PDF
10 44 16.pdf PDF
07 21 16.pdf PDF
00 72 00.pdf PDF
00 71 00.pdf PDF
01 78 00.pdf PDF
01 33 00.pdf PDF
01 78 23.pdf PDF
esvperf_singledual_2023_V2.pdf PDF
lrad331965pd_spec.pdf PDF
REACT VII SA-01.pdf PDF
TAFB B9001 VAV Schedule.pdf PDF
ARCH-COMBINED.pdf PDF
4500-MUG.pdf PDF
overall plan 04.15.2021.pdf PDF
250063_ATT 4_ODS.pdf PDF
WWYK250063-04March2026 1.docx DOCX document
250063_ATT 3_RMDF.pdf PDF
23 00 00.pdf PDF
23 07 00.pdf PDF
23 31 13.00 40.pdf PDF
23 08 00.pdf PDF
03 01 00.pdf PDF
23 64 26.pdf PDF
10 14 00.20.pdf PDF
23 05 48.00 40.pdf PDF
07 84 00.pdf PDF
23 03 00.pdf PDF
01 50 00.pdf PDF
00 80 00.pdf PDF
01 42 00.pdf PDF
UMRL.pdf PDF
PILE SCHEDULE.xlsx XLSX spreadsheet
HELICAL PILES NOTES.docx DOCX document
z400i.pdf_safe.pdf PDF
ELECTRICAL COMBINED.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tinker AFB Tinker General Requirements

January 2022 Page 1 TABLE OF CONTENTS

TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 70 00

00 71 00

00 72 00

00 80 00 00 80 05

GENERAL REQUIREMENTS FOR CONSTRUCTION ON TINKER AIR FORCE

BASE

GENERAL SAFETY REQUIREMENTS FOR CONSTRUCTION ON TINKER AIR

FORCE BASE

GENERAL ENVIRONMENTAL REQUIREMENTS FOR CONSTRUCTION ON

TINKER AIR FORCE BASE

SPECIAL PROVISIONS FOR WORKING ON TINKER AFB

SPECIAL PROVISIONS FOR WORKING ON OR NEAR THE AIRFIELD ON

TINKER AFB

DIVISION 01 - GENERAL REQUIREMENTS

01 32 16.00 20 SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES

01 33 00 SUBMITTAL PROCEDURES

01 33 16.00 10 DESIGN DATA (DESGIN AFTER AWARD)

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 50 00 CONTRACTOR FACILITIES

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

-- End of Table of Contents –-

File details come from the government source that posted it. Updated .