ERV Schedule_TAFB B9001_O-212477.xlsx

XLSX spreadsheet 8 KB Posted

Attached to
WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
Solicitation number
FA813726R0026
Issued by

About this file

This is an Energy Recovery Ventilator (ERV) Schedule specification document for Building 9001 at Tyndall Air Force Base. The document provides detailed technical specifications for a RenewAire HE05 indoor unit ERV system (designated ERV-1) located at elevation 1,299 feet. The unit is designed to supply 300 CFM of fresh air and exhaust 200 CFM of return air, each with 0.5 inches of static pressure and 0.5 HP motors operating without variable frequency drives. The system achieves a sensible effectiveness rating of 87.5% during summer cooling and 69.5% during winter heating, with total effectiveness of 86.1% for winter operations. Electrical specifications include 120V single-phase 60 Hz power supply with 6.1 MCA and 15 MOPD rating.

The ERV system utilizes pleated 2-inch MERV 10 filters for both supply and exhaust air streams. Performance data indicates cooling conditions with outdoor air at 99.5°F dry bulb and 73.9°F wet bulb, fresh air entering at 85.2°F dry bulb and 68.9°F wet bulb, and return air at 75°F dry bulb and 62.3°F wet bulb, with corresponding winter heating conditions detailed in the schedule. This specification document supports the REACT VII Facility installation project (Solicitation FA813726R0026) at Tyndall Air Force Base, which is set-aside exclusively for SBA Certified Women Owned Small Businesses (WOSB) with a mandatory initial site visit scheduled for July 20, 2026.

View the file

Other files

File Type Posted
Solicitation Amendment FA813726R00260001 - CANCELLATION.pdf PDF
Solicitation Amendment FA813726R00260001 SF 30.pdf PDF
250063_ATT 10_Submittal Register.pdf PDF
250063_ATT 9_SOW.pdf PDF
250063_ATT 11_Drawings.pdf PDF
WWYK250063-04March2026.pdf PDF
2020 TAFB Facility Standard.pdf PDF
2026 TAFB Electrical Standard - Signed.pdf PDF
SOW Att 02a_Controlled Area Training.pptx PPTX presentation
SOW Att 02c_Controlled Area Training - Certificate.pdf PDF
22 00 00.pdf PDF
28 31 76.pdf PDF
23 09 23.02.pdf PDF
07 14 00.pdf PDF
08 51 23.pdf PDF
10 44 16.pdf PDF
07 21 16.pdf PDF
00 72 00.pdf PDF
00 71 00.pdf PDF
01 78 00.pdf PDF
01 33 00.pdf PDF
000_TABLE OF CONTENTS.pdf PDF
01 78 23.pdf PDF
esvperf_singledual_2023_V2.pdf PDF
lrad331965pd_spec.pdf PDF
REACT VII SA-01.pdf PDF
TAFB B9001 VAV Schedule.pdf PDF
ARCH-COMBINED.pdf PDF
4500-MUG.pdf PDF
overall plan 04.15.2021.pdf PDF
250063_ATT 10_Submittal Register.xlsx XLSX spreadsheet
26 05 73 POWER STUDIES.pdf PDF
26 20 00.pdf PDF
09 90 00.pdf PDF
23 09 13.pdf PDF
23 36 00.00 40.pdf PDF
08 71 00.pdf PDF
05 40 00.pdf PDF
10 14 00.10.pdf PDF
08 33 23.pdf PDF
08 11 13.pdf PDF
07 92 00.pdf PDF
01 33 16.00 10.pdf PDF
01 32 16.00 20.pdf PDF
image.png PNG image
250063 React VII_Hardware schedule 25MAR26 JL.xlsx XLSX spreadsheet
JOIST SPECIAL INSPECTIONS.xlsx XLSX spreadsheet
ELECTRICAL PANEL SCHEDULE U18L.xlsx XLSX spreadsheet
esvEH_singledual_2023_V2.pdf PDF
lk406gn05t4_spec.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

html table

Model InformationFan DataEnergy Recovery DataUnit Information
UnitBasis of DesignModelLocationTag#Elevation (ft)Supply Air AirflowExhaust Air AirflowSummer/CoolingWinter/HeatingPerformance EffectivenessElectricalFiltersNotes
Outdoor AirFresh AirReturn AirOutdoor AirFresh AirReturn AirOutdoor AirReturn Air
Fresh Air CFMESPMotor HPVFDFLAExhaust Air CFMESPMotor HPVFDFLADry BulbWet BulbGrains/lbDry BulbWet BulbGrains/lbDry BulbWet BulbGrains/lbDry BulbWet BulbGrains/lbDry BulbWet BulbGrains/lbDry BulbWet BulbGrains/lbSensible (%)Summer Total (%)Winter Total (%)Voltage/Phase/HZMCAMOPDTypeDepthRatingTypeDepthRating
1RenewAireHE05Indoor UnitERV-112993000.51NO2.72000.51NO2.799.573.990.885.268.984.87562.367.812.5106.246.136.518.27051.128.487.569.586.1120V / 1 Phase / 60 HZ6.115Pleated2"MERV 10Pleated2"MERV 10

File details come from the government source that posted it. Updated .