About this file

This is an NCO-1 Checklist Supplement for a Design-Bid-Build construction project to replace campus fire hydrants at the VA Medical Center in Augusta, ME. The project (#402-25-001) has an IGCE of $198,984.20 with a total budget of $200,000 using NRM funding, and a target award date of 3/15/2025.

The project has moderate technical, cost, and schedule risks due to potential excavation challenges including untraceable utilities, utility conflicts potentially containing asbestos, and contaminated soils. Key requirements include completing work on one hydrant before moving to another, with excavation work restricted until mid-March/April due to frozen ground conditions. The procurement method preference is RFP Trade-Offs based on past experience, with evaluation factors including past performance, safety, and compliance with ILSM and traffic control requirements. The contractor will be responsible for commissioning and testing/inspections, with the Togus Fire Department identified as a key stakeholder. No liquidated damages are specified, and no government-furnished equipment will be provided. The project has a 142-day period of performance and will be overseen by COR Seth Bickford with Ben Baker as backup POC.

View the file

Other files for this federal contract opportunity

Other files attached to Y1PZ--402-25-001 Replace Campus Fire Hydrants, newest first.
File Type Posted
36C24125Q0164 0002.pdf PDF
36C24125Q0164 0001.pdf PDF
402-25-001 Hydrant Locations.pdf PDF
SOW Replace Campus Fire Hydrants 0001.docx DOCX document
402-25-001 Replace Hydrants pre-bid site walkthrough.pdf PDF
Attachment 1 Single Source Justification MPT to SAT.pdf PDF
SOW Replace Campus Fire Hydrants 1.21.25 revised.docx DOCX document
36C24125Q0164.docx DOCX document
852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING.docx DOCX document
Wage_Determination_Heavy - ME20250022.pdf PDF
Attachment 3 Hydrant pictures.pptx PPTX presentation
Attachment 2 Campus Hydant Flow Testing.pdf PDF
Attachment 1 Campus water distribution network.jpg JPG image
Attachment 4 Specifications.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NCO-1 Checklist Supplement - Construction Minor/NRM [Design-Bid-Build}

Project Name Replace Campus Fire Hydrants Construction POP 142

Project Number 402-25-001 Assigned COR Seth Bickford

VAMC Location 1 VA Center, Augusta, ME 04330 Back - UP POC Ben Baker

IGCE - Construction 198,984.20 Capital Asset Manager Roger Pruzinsky

Total Budget 200000 Contingency (If Minor Construction) N/a

Type of Funding Used and Expiration Date NRM Target Award Date 3/15/2025

Other Information

Design History

Proprietary or Brand Name Items

Hazardous Materials/ Asbestos

Unique Requirements/ Challenges

None

Please provide the following:

A-E Name/Contract #: N/A Address:

POC:

Email:

Phone #:

Please fill out each block accordingly below.

This checklist supplement contains the required information that is needed in order for NCO 1 to build the procurement package for Construction Projects (Excluding Design Build). Please complete this checklist and then attach all of the requested items as noted in the list.

Upon receipt of this checklist and the required documents, the assigned CO/CS will contact the COR via email to confirm receipt and to provide review comments. If necessary, a teleconference will be scheduled to discuss the procurement timeline. Please fill out all blocks listed below completely, verbage that is currently in the answer blocks does not need to stay upon completion of the information. If any of the answers are unknown or subject to change, please note this in the comments.

Design Contract Award Date: N/A Performance Period Duration:

Design Completion Date:

Design Award Amount (Inlcude cost of mods):

*Please provide a copy of the Design Contact* (Ask NCO for a copy, if necessary)

None known

Contractor shall finish all work assoicated with 1 hydrant before moving onto another. Unforseen conditions are possible since this project requires excavation. Common issues encountered here during excavation include: Untracable utilities, Utilities in conflict with work to be performed which may or may not contain asbestos, contaminted or unsuitable soils.

Risk (Technical, Cost, Schedule)

NTP

Security/ Badging Process

Government Furnished Equipment

Life Cycle Cost Analysis

Technical Evaluation Board Members (TEB)

Will there be any Government Furnished Equipment provided as part of this project? No If so, please identify what items and where the items can be found in the specs and/or drawings.

Was there a Life Cycle Cost Analysis done for this project? No If so, please provide a copy to PCAC.

Procurement Preference Is there a preference as to the Procurement Method used for this project? (i.e. IFB, RFP-Trade-Offs, RFP-LPTA) What is the justification for preferred method? Prior experience with Trade-Offs has shown we end up getting a better quality product and service without costing above the IGCE. These contractors will be visable to all on campus and are a easy target for scrutanty from a safety and traffic control prespective so we need someone who will work well with the campus and adhere to set schedules, OSHA standards, and professionalism.

Will the NTP be able to be issued after award of the Construction project or are there potential issues that will impact the start of the project?

Excavation in Augusta, ME isnt feasible until mid march - april due to frozen ground and snowbanks.

Will the site be able to handle the security/badging process or should PCAC work through the VSC for security/badging? Yes Are there any unique security/badging requirements mandated by the site? No

Technical (Select One - Low, Moderate, High) See section on unique requirements. Prior experience with contracts requiring excavation on this campus have found many unforseen challenges.

Cost (Select One - Low, Moderate, High) Change orders will likely be needed if unforseen conditions arise during excavation requiring change orders.

Schedule (Select One - Low, Moderate, High) Change orders will likely be needed if unforseen conditions arise during excavation requiring change orders.

Evaluation Factors If an RFP, what evaluation factors would be important? (Past Performance, Schedule, Understanding of Project Requirements, Key Personnel, Project Challenges, etc.) Past Performance, Safety, Compliance with ILSM and Traffic Control requirements.

Commissioning

Liquidated Damages (LD) Does the site want liquidated damages for this project? If so, why? (PCAC typcailly does not include LD as most of the time the VA is a large part of the delays.) No

Please identify the Technical Evaluation Board Members (TEB) for this project if issued as an RFP. A minimum of 3 members is required and a max of 5. Seth Bickford, Abigail Campbell, Mickey OBrion.

Will Commissioning be part of this project and if so who will do it? The A-E? Contractor? 3rd Party hired by VA? Yes, Contractor

Testing and Inspections

As-Builts or Shop Drawings Are there any preferences as to having the contractor provide As-Builts or Shop Drawings at the completion of construction? The answer you provide will determine one of the clauses we add to the solicitation/contract. No

Who is responsible for the Testing and Inspections for this project? Contractor

Project Stakeholders Identify the project stakeholders and individuals that need to be on the project distribution list. For example, project status, issues, etc.

Togus Fire Department