This is Amendment 0002 to solicitation 36C24125Q0164, issued by the Department of Veterans Affairs Network Contracting Office 1 at VAMC Togus in Augusta, ME, effective February 19, 2025. The amendment provides answers to contractor questions regarding a fire hydrant replacement project.

The Q&A clarifies several key technical requirements: utility drawings are available but accuracy isn't guaranteed; 7-foot temporary construction fencing is required (6-foot not acceptable); work must be performed on one hydrant at a time; hydrants must be painted yellow rather than NFPA standard red with blue cap; specifications only apply to items directly referenced in the scope of work; and flow testing/hydrant outages must be coordinated through the COR who will handle arrangements with fire departments and campus personnel.

View the file

Other files for this federal contract opportunity

Other files attached to Y1PZ--402-25-001 Replace Campus Fire Hydrants, newest first.
File Type Posted
36C24125Q0164 0001.pdf PDF
402-25-001 Hydrant Locations.pdf PDF
SOW Replace Campus Fire Hydrants 0001.docx DOCX document
402-25-001 Replace Hydrants pre-bid site walkthrough.pdf PDF
Attachment 1 Single Source Justification MPT to SAT.pdf PDF
SOW Replace Campus Fire Hydrants 1.21.25 revised.docx DOCX document
36C24125Q0164.docx DOCX document
PCRA Construction Only.pdf PDF
Attachment 1 Campus water distribution network.jpg JPG image
852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING.docx DOCX document
Wage_Determination_Heavy - ME20250022.pdf PDF
Attachment 3 Hydrant pictures.pptx PPTX presentation
Attachment 2 Campus Hydant Flow Testing.pdf PDF
Attachment 4 Specifications.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

0002 02-19-2025

402-25-001

Department of Veterans Affairs

Network Contracting Office 1

VAMC Togus

1 VA Center

Augusta ME 04330

To all Offerors/Bidders

36C24125Q0164

01-23-2025

X

X X

1. The purpose of the amendment is:

a. To answer all RFI questions submitted. See attached for responses.

Amendment 0002 RFI Questions and Answers

Q1. Are existing utility Drawings available for the areas around the hydrants?

A1. Yes, however the accuracy cannot be guaranteed (posted with previous amendment).

Concerning plumbing, the most up to date drawing is what was posted in the solicitation.

Q2. Can we use 6' temp construction Fence?

A2. No, solicitation calls for 7’.

Q3. Can we have multiple crews working simultaneously on separate hydrants or are we solely going to be able to work one hydrant at a time?

A3. One site at a time.

Q4. What color are the hydrants going to be painted? The NFPA guidelines specify a red body with a light blue cap but the specifications sheet says that they will be painted yellow.

A4. Hydrants will need to be yellow.

Q5. The scope says that we will be replacing the hydrants and associated piping but the specifications lists all valves and piping associated with the plumbing of the hydrants almost as if we would be replacing everything and starting fresh.

A5. Specifications call out reference standards, material requirements, and some limitations on means and methods for items referenced in the scope of work. Contractor will not be responsible for executing anything listed in the specifications that doesn’t have a direct correlation to anything in the scope of work.

Q6. Would the Campus Fire Department be assisting with the flow testing or is this something that we would have to coordinate with the Augusta Fire Department to accomplish?

A6. Coordinate timing for flow testing and hydrant outages with the projects COR (Contracting Officer Representative). The COR will make any necessary arrangements and notifications with the fire departments and with the Togus campus.