Past Performance Questionnaire_Blank.docx

DOCX document 62 KB Posted

Attached to
Z2DA--554-26-101 Reslope Shower Floors in Bldg H&K Patient Rooms (VA-26-00013277)
Solicitation number
36C25926R0038
Issued by

About this file

This is a Past Performance Questionnaire template designed to evaluate contractor performance on federal contracts. The form is completed jointly by the contractor and the contracting client, with the contractor providing firm information (name, CAGE code, DUNS number, contact details) and contract details (contract number, type, award date, completion date, original and final prices), while the client completes evaluation sections and signs off on the assessment. The questionnaire requires contractors to identify their role (prime, subcontractor, joint venture) and explain the relevance of the past project to the current solicitation.

The evaluation framework assesses performance across seven categories using a six-point scale (Exceptional, Very Good, Satisfactory, Marginal, Unsatisfactory, Not Available): Quality (technical data preparation, quality standards, problem resolution, quality assurance); Schedule/Timeliness (delivery compliance, resource utilization); Customer Satisfaction (end-user satisfaction, staff cooperation, customer interest); Management/Personnel/Labor (on-site management, workforce qualification, government property control, personnel expertise, small business utilization, multi-project management, change management, overall leadership); Cost/Financial Management (price compliance, cost reduction innovations, invoice timeliness for cost-type contracts, accounting system adequacy, terminations for default, financial stability); Safety/Security (safety environment maintenance, security compliance); and General (emergency response, contractual compliance, willingness to work with firm again, overall performance rating). Narrative explanations are required for any unsatisfactory or marginal ratings, with sections for identifying strengths, weaknesses, deficiencies, and additional comments to inform performance risk evaluation.

View the file

Other files

File Type Posted
Attachment D - Floor Detail RFI.pdf PDF
36C25926R0038 0002.docx DOCX document
Answers to RFRs 3.06.2026.pdf PDF
S04 - Site Visit Attendance rd2.pdf PDF
36C25926R0038 0001.docx DOCX document
SOW Attachment C Phasing 554-26-101 Reslope Shower Floors.pdf PDF
SOW 554-26-101 Reslope Shower Floors in Bldg H_K Final.docx DOCX document
S04 - Site Visit Meeting Doc.docx DOCX document
Prime and Sub Contractor Construction Breakdown.xlsx XLSX spreadsheet
22 13 00_JSI041 - Facility Sanitary and Vent Piping.pdf PDF
Specifications 554-26-101 Reslope Shower Floors in Bldg H_K.pdf PDF
ICRA 554-26-101 Reslope Shower Floors in Bldg H_K.docx DOCX document
Self-Performed and Subcontracted Worksheet.docx DOCX document
Drawings 554-26-101 Reslope Shower Floors in Bldg H_K.pdf PDF
09 67 23 20 Decorative Mosaic Flake submittal.pdf PDF
Tile Enchant_Literature.pdf PDF
852.219-75 LOS Certification.docx DOCX document
Bathroom Photos.pdf PDF
22 13 00-31 - Trench Drain 3 Submittal.pdf PDF
SOW Attachment B procedure 554-26-101 Reslope Shower Floors.docx DOCX document
52.222-54 Employment Eligibility Verification Deviation NOV 2025.docx DOCX document
36C25926R0038.docx DOCX document
Answers to RFR.pdf PDF
SOW Attachment A rooms 554-26-101 Reslope Shower Floors.pdf PDF
Tile Enchant_HDP_Technical_Sheet_Oct_2022.pdf PDF
52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026 Deviation NOV 2025.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAST PERFORMANCE QUESTIONNAIRE

Solicitation Number:
Project Title:

CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information
Firm Name:CAGE Code:
Address:DUNs Number:
Phone Number:Email Address:
Point of Contact:Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information
Contract Number:Delivery/Task Order Number (if applicable): Contract Type:Firm Fixed PriceCost ReimbursementOther (Please specify): Contract Title:Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable): Explain Differences:

4. Project Description:
Complexity of WorkHighMedRoutine

How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information
Name:Title:
Phone Number:Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

Section D: Performance Information: Choose the letter on the scale that most accurately describes the contractor’s performance or situation. PLEASE PROVIDE A NARRATIVE EXPLANATION FOR ANY UNSATISFACTORY OR MARGINAL RATINGS.

E
VG
S
M
U
N

Exceptional (Outstanding) Very Good (Above Average)

Satisfactory
Marginal
Unsatisfactory
Not Available
Performance meets
Performance meets
Performance meets
Performance does
Performance does
No record of past
contractual
contractual
contractual
not meet some
not meet most
performance or the
requirements and
requirements and
requirements. The
contractual
contractual
record is
exceeds many to
exceeds some to
contractual
requirements. The
requirements and
inconclusive.
the Government’s
the Government’s
performance of the
contractual
recovery is not
benefit. The
benefit. The
element or sub-
performance of the
likely in a timely
contractual
contractual
element contains
element or sub-
manner. The
performance of the
performance of the
some minor
element being
contractual
element or sub-
element or sub-
problems for which
evaluated reflects a
performance of the
element being
element being
corrective actions
serious problem for
element or sub-
evaluated was
evaluated was
taken by the
which the
element contains a
accomplished with
accomplished with
Contractor appear,
Contractor has not
serious problem(s)
few minor problems
some minor
or were,
yet identified
for which the
for which corrective
problems for which
satisfactory.
corrective actions.
Contractor’s
actions taken by the
corrective actions
The Contractor’s
corrective actions
Contractor were
taken by the
proposed actions
appear or were
highly effective
Contractor were effective
appear only marginally effective,
ineffective

or were not fully implemented

1. QUALITY:

a) Quality of technical data/report preparation efforts

E
VG
S
M
U
N

a.1. Comments:

b) Ability to meet quality standards specified for technical performance

E

VG

S

M

U

N b.1. Comments:

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance

S

M

U

N c.1. Comments:

d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)

VG

S

M

U

N d.1. Comments:

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)

VG

S

M

U

N

2.a.1 Comments:

b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract

E

VG

S

M

U

N

2.b.1. Comments:

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project?
E
VG
S
M
U
N

3. a.1. Comments:

b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)

S

M

U

3.b.1. Comments:

c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?

E

VG

S

M

U

N

3.c.1. Comments:

d) Overall customer satisfaction
E
VG
S
M
U
N

3.d.1 Comments:

4. MANAGEMENT/ PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?

VG

S

M

U

N

4.a.1. Comments:

b) Ability to hire, apply, and retain a qualified workforce to this effort
E
VG
S
M
U
N

4.b.1 Comments:

c) Government Property Control
E
VG
S
M
U
N

4.c.1. Comments:

d) Knowledge/expertise demonstrated by contractor personnel
E
VG
S
M
U
N

4.d.1. Comments:

e) Utilization of Small Business concerns
E
VG
S
M
U
N

4.e.1. Comments:

f) Ability to simultaneously manage multiple projects with multiple disciplines

E

VG

S

M

U

N

4.f.1. Comments:

g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes

E

VG

S

M

U

N

4.g.1. Comments:

h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)

E

VG

S

M

U

N

4.h.1. Comments:

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agreed price(s)?

VG

S

M

5.a.1. Comments:

b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client

E

VG

S

M

U

N

5.b.1. Comments:

c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

S

M

5.c.1. Comments:

d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.

Yes

No

5.d.1. Comments:

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

5.e.1. Comments:

f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.

5.f.1 Comments:

6. SAFETY/SECURITY

a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and

E

VG

S

M requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)

6.a.1 Comments:

b) Contractor complied with all security requirements for the project and personnel security requirements.

E
VG
S
M
U
N

6.b.1. Comments:

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).

VG

S

M

U

N

7.a.1. Comments:

b) Compliance with contractual terms/provisions (explain if specific issues)

E

VG

S

M

U

N

7.b.1. Comments:

c) Would you hire or work with this firm again? (If no, please explain below)

7.c.1. Comments:

d) In summary, provide an overall rating for the work performed by this contractor.

E

VG

S

M

U

7.d.1. Comments:

Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):

STRENGTHS:

WEAKNESSES:

DEFICIENCIES:

COMMENTS:

Past Performance Information provided by:

(Printed Name)

Signature: Date: Organization: Phone: