SEKI_157070_-_DRAWINGS.pdf
PDF 8 MB Posted
- Attached to
- Rehabilitate & Replace Water System
- Solicitation number
- P15PS01011
About this file
Drawings PMIS 1587070
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Install pressure relief valve
Install pressure relief valve
CURRENT GENERATOR MUST REMAIN IN SERVICE BETWEEN DECEMBER
1st AND MAY 1st OR NEWLY INSTALLED GENERATOR MUST BE IN SERVICE PRIOR TO DECEMBER 1st.
Provide removed generator to NPS.
T
T
11 7
IRH-2
IRH-3
Emergency shutdown - Provide 10A fuse at generator battery. Provide ¾” conduit with 3#12 from battery to LPT-1 at building. Provide ¾” conduit with 3#12 from LPT-1 at building to LPT-1 at tank. Provide ¾” conduit with 3#12 from LPT-1 at tank to solenoid near PRV-2 at tank (For location of LPT-1 and generator refer to sheet M3. For location of PRV-2 refer to detail 1 on sheet M8). Each LPT-1 emergency stop button shall be rated NEMA 4 and shall have a normally closed contact. Emergency stop buttons shall be wired in series with PRV-2 solenoid to open solenoid on loss of power.
File details come from the government source that posted it. Updated .