Bid_Schedule_SEKI_184084_ _158783.pdf

PDF 207 KB Posted

Attached to
Rehabilitate & Replace Water System
Solicitation number
P15PS01011
Issued by

About this file

Bid Schedule 158783 184084

View the file

Other files

File Type Posted
SF30_Amendment_002.pdf PDF
Sol_P15PS01011_Amd_000002.pdf PDF
SEKI_15070_-_E3_-_GGCCWWTP_UST-AST.pdf PDF
P15PS01011-_SITE_VISIT_-_SIGN_IN_ _Q A.PDF PDF
Sol_P15PS01011_Amd_000001.pdf PDF
SF30_Amenment_001.pdf PDF
SEKI_184084_ _158783-_DRAWINGS.pdf PDF
DIRECTION_FRESNO_-_GRANT_GROVE_WWTP.pdf PDF
SEKI_184084_ _158783_-_SOW_SPECS.pdf PDF
Submittal_Instructions.pdf PDF
1442.pdf PDF
PAST_PERFORMANCE_QUESTIONNAIRE.pdf PDF
Bid_Schedule_157070.pdf PDF
SUBCONTRACTOR_REF_FORM.pdf PDF
Bid_Bond_SF_24.pdf PDF
General_References_Form.pdf PDF
SOLICITATION_FINAL.pdf PDF
SEKI_157070_-_DRAWINGS.pdf PDF
Sol_P15PS01011.pdf PDF
Wages_DB_Fresno.pdf PDF
Wages_DB_Tulare.pdf PDF
SEKI_157070_-_SOW_SPECS.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT

LINE ITEM

NUMBER

(CLIN)

CONTRACT LINE ITEM (CLI) TITLE QUANTITY

UNIT OF

MEASURE

UNIT PRICE TOTAL PRICE

1 Mobilization and Demobilization 1 Lump Sum $0

Clover Creek - Headworks Upgrades

1 Lump Sum $0

Clover Creek - Equalization Ladder and

Pump Rehabilitation 1 Lump Sum $0

Clover Creek - Effluent Pump

Rehabilitation and Surge Tank

Replacement

1 Lump Sum $0

Clover Creek - Chlorine Room and

Contact Chamber Modifications 1 Lump Sum $0

Clover Creek - RAS/WAS Valve

Rehabilitation

8 EA $0

Clover Creek - Aeration Basin Ladder

Modifications

2 EA $0

Clover Creek - Process Electrical

Survey and Modifications 1 Lump Sum $0

Clover Creek - Combustible Gas

Detector System 1 Lump Sum $0

Grant Grove - Replace Influent Grinder and Controls

1 EA $0

Grant Grove - Flow Equalization

System Upgrades

2 EA $0

CONTRACT PRICE SCHEDULE

SOLICITATION NUMBER: P15PS01011

158783 & 184084

DEVELOPED AREA: Sequoia and Kings Canyon National Parks

PROJECT TITLE: Clover Creek and Grant Grove WWTP Rehabilitation

Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items.

Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 180 calendar days from the date of award. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government.

In addition to the offer that conforms to the solicitation documents, offerors are encouraged to submit alternate proposals that will result in cost savings to the Government. Such proposals shall clearly identify why the acceptance of the alternate proposal would be advantageous to the Government, see FAR Clause 52.215-1, Instructions to Offerors - Competitive

Acquisition-Alternate II and DSC-36 Clause (Instructions for Submission of Offers and Other Information) in Section L of the

Solicitation.

SEKI - 150113 150281

CPS - 1

NUMBER

(CLIN)

CONTRACT LINE ITEM (CLI) TITLE QUANTITY

UNIT OF

MEASURE

UNIT PRICE TOTAL PRICE

CONTRACT PRICE SCHEDULE

SOLICITATION NUMBER: P15PS01011

158783 & 184084

DEVELOPED AREA: Sequoia and Kings Canyon National Parks

PROJECT TITLE: Clover Creek and Grant Grove WWTP Rehabilitation

Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items.

Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 180 calendar days from the date of award. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government.

In addition to the offer that conforms to the solicitation documents, offerors are encouraged to submit alternate proposals that will result in cost savings to the Government. Such proposals shall clearly identify why the acceptance of the alternate proposal would be advantageous to the Government, see FAR Clause 52.215-1, Instructions to Offerors - Competitive

Acquisition-Alternate II and DSC-36 Clause (Instructions for Submission of Offers and Other Information) in Section L of the

Solicitation.

Grant Grove - Aeration Blower Motors and VFD's

2 EA $0

Grant Grove - Replace Clarifier

Mechanisms

2 EA $0

Grant Grove - Replace Air

Compressors and Add Air Dryers

2 EA $0

Grant Grove - Blower 4, 5 & 6 Pipe

Loop Upgrade 1 Lump Sum $0

Grant Grove - Replace and Upgrade

Exhaust Fans in Process Area

2 EA $0

Grant Grove - Replace Supernatent

Telescoping Valves

2 EA $0

Grant Grove - Install Combustible Gas

Detectors 1 Lump Sum $0

Grant Grove - Install New Chlorination

System 1 Lump Sum $0

Grant Grove - Install DO Analyzers in

Aeration Basins

2 EA $0

Grant Grove - Install New SCADA

System 1 Lump Sum $0

Grant Grove - Replace Motor Control

Center 1 Lump Sum $0

CPS - 2

NUMBER

(CLIN)

CONTRACT LINE ITEM (CLI) TITLE QUANTITY

UNIT OF

MEASURE

UNIT PRICE TOTAL PRICE

CONTRACT PRICE SCHEDULE

SOLICITATION NUMBER: P15PS01011

158783 & 184084

DEVELOPED AREA: Sequoia and Kings Canyon National Parks

PROJECT TITLE: Clover Creek and Grant Grove WWTP Rehabilitation

Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items.

Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 180 calendar days from the date of award. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government.

In addition to the offer that conforms to the solicitation documents, offerors are encouraged to submit alternate proposals that will result in cost savings to the Government. Such proposals shall clearly identify why the acceptance of the alternate proposal would be advantageous to the Government, see FAR Clause 52.215-1, Instructions to Offerors - Competitive

Acquisition-Alternate II and DSC-36 Clause (Instructions for Submission of Offers and Other Information) in Section L of the

Solicitation.

Grant Grove - Conduct System Ground

Survey 1 Lump Sum $0

Grant Grove - Add Software Dialer and

USB Modem 1 Lump Sum $0

Grant Grove - Replace Sludge Bldg.

Doors

2 EA $0

$0

Bid Option 1 - Replace RAS/WAS AOD

Pumps at Grant Grove

2 EA $0

Bid Option 2 - Replace Supernatent

AOD Pumps at Grant Grove

2 EA $0

Bid Option 3 - Install Stairway and

Platform at Effluent Storage Building at Grant Grove

1 Lump Sum $0

Bid Option 4 - Replace Process Area

Ladders at Grant Grove

8 EA $0

Bid Option 5 - Soda Ash System Scissor

Lift at Grant Grove 1 Lump Sum $0

Bid Option 6 - Clarifier Rehabilitation at Clover Creek 1 Lump Sum $0

$0

$0 All measurement and payment information is included in the project specifications, Section 01 27 00.

TOTAL BASE PRICE (Contract Line Item Number 1 through 25) ------------------------------------

TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Numbers 26 through 31) ------------------------------------

TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Numbers 1 through 31) -----------

CPS - 3

File details come from the government source that posted it. Updated .