Bid_Schedule_157070.pdf

PDF 82 KB Posted

Attached to
Rehabilitate & Replace Water System
Solicitation number
P15PS01011
Issued by

About this file

Bid Schedule 157070

View the file

Other files

File Type Posted
SF30_Amendment_002.pdf PDF
Sol_P15PS01011_Amd_000002.pdf PDF
SEKI_15070_-_E3_-_GGCCWWTP_UST-AST.pdf PDF
P15PS01011-_SITE_VISIT_-_SIGN_IN_ _Q A.PDF PDF
Sol_P15PS01011_Amd_000001.pdf PDF
SF30_Amenment_001.pdf PDF
SEKI_184084_ _158783-_DRAWINGS.pdf PDF
DIRECTION_FRESNO_-_GRANT_GROVE_WWTP.pdf PDF
SEKI_184084_ _158783_-_SOW_SPECS.pdf PDF
Submittal_Instructions.pdf PDF
1442.pdf PDF
PAST_PERFORMANCE_QUESTIONNAIRE.pdf PDF
SUBCONTRACTOR_REF_FORM.pdf PDF
Bid_Bond_SF_24.pdf PDF
General_References_Form.pdf PDF
SOLICITATION_FINAL.pdf PDF
SEKI_157070_-_DRAWINGS.pdf PDF
Bid_Schedule_SEKI_184084_ _158783.pdf PDF
Sol_P15PS01011.pdf PDF
Wages_DB_Fresno.pdf PDF
Wages_DB_Tulare.pdf PDF
SEKI_157070_-_SOW_SPECS.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT

LINE ITEM

NUMBER

(CLIN)

CONTRACT LINE ITEM (CLI) TITLE QUANTITY

UNIT OF

MEASURE

UNIT PRICE TOTAL PRICE

1 Mobilization / Demobilization 1 Lump Sum

Demolition / Removal of Diesel

Underground Storage Tank 1 Lump Sum

Propane Above‐ground Storage

Tank 1 Lump Sum

4 Vaporizer and Propane Piping 1 Lump Sum

5 HVAC Improvements 1 Lump Sum

6 Electrical Improvements 1 Lump Sum

Emergency Generator

Replacement 1 Lump Sum

8 OPTION A, Asphalt Paving 625 SY

OPTION B, Treatment Building

Lighting Replacement 1 Lump Sum

PROJECT TITLE: Grant Grove WWTF UST/AST & HVAC Replacement

CONTRACT PRICE SCHEDULE

SOLICITATION NUMBER: P15PS01011

PARK ‐ PMIS: 157070

DEVELOPED AREA: Kings Canyon National Park, Grant Grove

TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Numbers 8 through 9) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐

TOTAL PROPOSED PRICE ‐ BASE PLUS ALL OPTIONS (Contract Line Item Numbers 1 through 9) ‐‐‐‐‐‐‐‐‐‐‐

All measurement and payment information is included in the project specifications, Section 012700.

Notice: Refer to FAR Clause 52.217‐5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump‐sum line items, provide the total price only. For all unit‐priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 180 calendar days from the date of award. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government.

TOTAL BASE PRICE (Contract Line Item Number 1 through 7) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐

In addition to the offer that conforms to the solicitation documents, offerors are encouraged to submit alternate proposals that will result in cost savings to the Government. Such proposals shall clearly identify why the acceptance of the alternate proposal would be advantageous to the Government, see FAR Clause 52.215‐1, Instructions to Offerors ‐ Competitive Acquisition‐Alternate II and DSC‐36 Clause (Instructions for Submission of Offers and Other Information) in Section L of the Solicitation.

SEKI ‐ 157070

CPS ‐ 1

File details come from the government source that posted it. Updated .