P15PS01011-_SITE_VISIT_-_SIGN_IN_ _Q A.PDF

PDF 133 KB Posted

Attached to
Rehabilitate & Replace Water System
Solicitation number
P15PS01011
Issued by

About this file

Sign in Sheet and Q A

View the file

Other files

File Type Posted
SF30_Amendment_002.pdf PDF
Sol_P15PS01011_Amd_000002.pdf PDF
SEKI_15070_-_E3_-_GGCCWWTP_UST-AST.pdf PDF
Sol_P15PS01011_Amd_000001.pdf PDF
SF30_Amenment_001.pdf PDF
SEKI_184084_ _158783-_DRAWINGS.pdf PDF
DIRECTION_FRESNO_-_GRANT_GROVE_WWTP.pdf PDF
SEKI_184084_ _158783_-_SOW_SPECS.pdf PDF
Submittal_Instructions.pdf PDF
1442.pdf PDF
PAST_PERFORMANCE_QUESTIONNAIRE.pdf PDF
Bid_Schedule_157070.pdf PDF
SUBCONTRACTOR_REF_FORM.pdf PDF
Bid_Bond_SF_24.pdf PDF
General_References_Form.pdf PDF
SOLICITATION_FINAL.pdf PDF
SEKI_157070_-_DRAWINGS.pdf PDF
Bid_Schedule_SEKI_184084_ _158783.pdf PDF
Sol_P15PS01011.pdf PDF
Wages_DB_Fresno.pdf PDF
Wages_DB_Tulare.pdf PDF
SEKI_157070_-_SOW_SPECS.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

NATIONAL PARK SERVICE

Sequoia and Kings Canyon National Parks

47050 Generals Highway Three Rivers, California 93271-9651

(559) 565-3341

IN REPLY REFER TO:

June 2, 2015

Memorandum

To: Contractor(s)

From: Project Manager, Sequoia and Kings Canyon National Parks

Subject: Rehabilitate Grant Grove and Clover Creek Wastewater Treatment Plants & Replace 4,000

Gallon Fuel Oil UST with Propane Fuel System, Grant Grove Wastewater

Solicitation Number P15PS01011 Site Visit Question & Answer

Q1 – Bid bonds emailed or sent?

A1 – Refer to section L E3 in solicitation.

Q2 – Explain set-aside?

A2 – This is a Hub-Zone set-aside, prime must be certified Hub-zone, refer to solicitation.

Q3 – Is there liquidated damages on this procurement?

A3 – No.

Q4 – Any plans of existing utilities under pavement?

A4 – SEKI 157070 on C2, contractor to field verify and locate prior to trenching.

Q5 – SEKI 157070 specs call out a Kohler Generator, can alternate manufacturer be used?

A5 – Price proposals need to be based off make(s)/model(s) indicated in drawings and specifications.

Q6 – SEKI 184084 – Are only electrical panels with bold line weight being replaced?

A6 – No, full electric panel replacement part of scope.

Q7 – Automatic Transfer Switch being replaced at Grant Grove?

A7– Yes – see Contract Line Item No. 22 Grant Grove, Replace Motor Control Center definition. SEKI

157070 Sheet E3 has been amended to clarify the ATS scope of work.

Q8 – Can we put in Allen Bradley or pre-approved equal into specs?

A8 – No, too late to change. Equals for approval will be considered.

Q9 – Re-use existing surface mounted conduit in Clover Creek head works?

A9 – No, replacement. Refer to pictures on E12. Conduits that are concealed in concrete slabs or in walls may be re-used unless otherwise noted in the contract documents.

P15PS01011 - SITE VISIT - O&A.pdf
June 2, 2015
From: Project Manager, Sequoia and Kings Canyon National Parks