P-Sheets.pdf

PDF 4 MB Posted

Attached to
Y1PC--Dallas National Cemetery Solicitation
Solicitation number
36C10F20R0056
Issued by

About this file

This solicitation package includes construction drawings and specifications for plumbing systems for a project to expand Dallas Fort Worth National Cemetery. The project will construct additional gravesites, a new administration building, maintenance building renovations, and cemetery improvements across approximately 56 acres. Work includes over 12,000 pre-placed crypt gravesites, 600 traditional gravesites, 3,000 in-ground cremains sites, a 300-grave Hybrid Natural Burial Section, earthwork, utilities, roads, parking, and a new irrigation system. The solicitation is a 100% Service-Disabled Veteran Owned Small Business set-aside with a magnitude of construction cost between $20-50 million. Questions are due by July 22nd and proposals are due August 8th. The Department of Veterans Affairs Office of Construction and Facilities Management is the issuing agency.

View the file

Other files

File Type Posted
Dallas PPI - 2.pdf PDF
Dallas PPI - 1.pdf PDF
DNC Pre-Bid Sign-In Sheet 15 July 2020.jpeg JPEG file
CS-Sheets 1 of 3.pdf PDF
Final Dallas 36C10F20R0056_3 (7-9-2020).pdf PDF
Dallas-Fort Worth National Cemetery Cx Plan - V1 - 3-27-2020.pdf PDF
000 Base Bid Submittal Register.pdf PDF
Pre-Functional Checklists.pdf PDF
BID DOCUMENTS SWPPP DFW VA CEM PH4.pdf PDF
V-Sheets.pdf PDF
X-Sheets.pdf PDF
CG-Sheets 1 of 2.pdf PDF
CP-Sheets.pdf PDF
LP-Sheets.pdf PDF
G-Sheets.pdf PDF
T-Sheets.pdf PDF
A-Sheets.pdf PDF
DALLAS WAGE RATES.pdf PDF
F-Sheets.pdf PDF
I-Sheets.pdf PDF
E-Sheets.pdf PDF
CS-Sheets 2 of 3.pdf PDF
S-Sheets.pdf PDF
ATTACHMENT 2_PAST PERF QUEST.docx DOCX document
Final Dallas 36C10F20R0056_3 (7-9-2020).pdf PDF
M-Sheets.pdf PDF
Base Bid Specification Package.pdf PDF
CG-Sheets 2 of 2.pdf PDF
B-Sheets.pdf PDF
CS-Sheets 3 of 3.pdf PDF
CD-Sheets.pdf PDF
LI-Sheets.pdf PDF
CU-Sheets.pdf PDF
ATTACHMENT 3 - Dallas Pre-Proposal Inquiry (PPI) Form.docx DOCX document
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of

Construction and Facilities

Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DALLAS, TEXAS

916CM2012

DALLAS - FORT WORTH

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105

Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com

Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

MKEC Engineering, Inc.

Ken Kallenbach

(316) 684-9600

Architect:

TK-Architecture, LLC

Tom Kapels

(719) 325-9303

Irrigation:

Aqua Engineering

Bob Beccard

(970) 372-6104

RCDD:

APOGEE Consulting

Jim Ezekiel

(919) 535-3878

MEP:

Miller Remick

Tom Chapman

(856) 429-4000

Cost Estimating:

MOCA Cost Engineering

Todd Waddle

(850) 389-8131

Surveying, Water Wells & Treatment:

Fabre Engineering & Surveying

Frank Fabre

(850) 433-6438

Geotechnical Engineering:

Terracon Consultants

Jennifer Peters

(210) 907-7648

PHASE 4 DEVELOPMENT

03-31-2020

OF 246

BID DOCUMENTS

PLUMBING

ABBREVIATIONS, NOTES &

SYMBOLS

P-001

AHTM BH

L

K

J

H

G

F.5

F

E

D

C

B.1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

B

MA

STOR

11.1 13.1

K.9

BREEZE-

WAY

UNIFORM

ELEC

WOMEN

LOCKER

MEN

LOCKER

GENERAL

FOREMAN

GROUNDS

FOREMAN

MAINT

OFFICE

PLANS

BREAK

ROOM

ADMIN

OFFICE

ASST

DIRECTOR

BUDGET

OFFICE

DIRECTOR

OFFICE

WORK

LEADER

INTERM

FOREMAN

CORRIDOR

STOR

OPERATIONS

CENTER

GENERAL

OFFICE

ENTRY

JAN

TOILET

TOILET

NORTH

VICINITY MAP

SCALE 1"=1000'

R I O

G R

A

ND DR

MOUNTAIN CREEK PKWY

L O

N E S

T A R

C

IR

R O A D

R O A D

2 ROAD 1

ROAD 1

R O

A D

ROAD 3

R O A D

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of

Construction and Facilities

Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DALLAS, TEXAS

916CM2012

DALLAS - FORT WORTH

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105

Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com

Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

MKEC Engineering, Inc.

Ken Kallenbach

(316) 684-9600

Architect:

TK-Architecture, LLC

Tom Kapels

(719) 325-9303

Irrigation:

Aqua Engineering

Bob Beccard

(970) 372-6104

RCDD:

APOGEE Consulting

Jim Ezekiel

(919) 535-3878

MEP:

Miller Remick

Tom Chapman

(856) 429-4000

Cost Estimating:

MOCA Cost Engineering

Todd Waddle

(850) 389-8131

Surveying, Water Wells & Treatment:

Fabre Engineering & Surveying

Frank Fabre

(850) 433-6438

Geotechnical Engineering:

Terracon Consultants

Jennifer Peters

(210) 907-7648

PHASE 4 DEVELOPMENT

03-31-2020

OF 246

BID DOCUMENTS

PLUMBING

MAINT FACILITY

DEMOLITION PLAN

PD110

AHTM WH

L

K

J

H

G

F.5

F

E

D

C

B.1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

B

11.1 13.1

K.9

BREEZE-

WAY

UNIFORM

ELEC

ENTRY

TRAINING

ROOM

MULTI-USE

TRAINING

COMPUTER

TRAINING

GROUNDS

FOREMAN

INTERMENT

FOREMAN

GENERAL

FOREMAN

HALL

TELECOM

TOILET

TOILET

WORK

LEADERS

HONOR

GUARD

STOR

BREAK

CORRIDOR

M. LOCKER

W. LOCKER

CUST

STOR

6 7

K

J

H

ELEC

GENERAL

FOREMAN

HALL

NORTH

VICINITY MAP

SCALE 1"=1000'

R

AND DR

MOUNTAIN CREEK PKWY

L O

N E S

T A R

C

IR

R O A D

R O A D

2 ROAD 1

ROAD 1

R O

A D

ROAD 3

R O A D

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of

Construction and Facilities

Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DALLAS, TEXAS

916CM2012

DALLAS - FORT WORTH

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105

Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com

Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

MKEC Engineering, Inc.

Ken Kallenbach

(316) 684-9600

Architect:

TK-Architecture, LLC

Tom Kapels

(719) 325-9303

Irrigation:

Aqua Engineering

Bob Beccard

(970) 372-6104

RCDD:

APOGEE Consulting

Jim Ezekiel

(919) 535-3878

MEP:

Miller Remick

Tom Chapman

(856) 429-4000

Cost Estimating:

MOCA Cost Engineering

Todd Waddle

(850) 389-8131

Surveying, Water Wells & Treatment:

Fabre Engineering & Surveying

Frank Fabre

(850) 433-6438

Geotechnical Engineering:

Terracon Consultants

Jennifer Peters

(210) 907-7648

PHASE 4 DEVELOPMENT

03-31-2020

OF 246

BID DOCUMENTS

PLUMBING

MAINTENANCE FACILTY

OVERALL PLAN

PP110

ENTRY

OPERATIONS

CENTER

TOILET

TOILET

LOBBY

RECEPTION

CONF

TOILET

TOILET

CORRIDOR

BREAK

MECH

STOR

OPEN

OFFICE

BUDGET

OFFICE

ADMIN

OFFICE

ASST

DIRECT

CEMETERY

DIRECT

ASST

DIRECT

TELECOM

H G F E D C B A

1FBR

F

B R

1FBR

F

B R

NORTH

VICINITY MAP

SCALE 1"=1000'

R

A

ND DR

MOUNTAIN CREEK PKWY

L O

N E S

T A R

C

IR

R O A D

R O A D

2 ROAD 1

ROAD 1

R O

A D

ROAD 3

R O A D

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of

Construction and Facilities

Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DALLAS, TEXAS

916CM2012

DALLAS - FORT WORTH

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105

Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com

Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

MKEC Engineering, Inc.

Ken Kallenbach

(316) 684-9600

Architect:

TK-Architecture, LLC

Tom Kapels

(719) 325-9303

Irrigation:

Aqua Engineering

Bob Beccard

(970) 372-6104

RCDD:

APOGEE Consulting

Jim Ezekiel

(919) 535-3878

MEP:

Miller Remick

Tom Chapman

(856) 429-4000

Cost Estimating:

MOCA Cost Engineering

Todd Waddle

(850) 389-8131

Surveying, Water Wells & Treatment:

Fabre Engineering & Surveying

Frank Fabre

(850) 433-6438

Geotechnical Engineering:

Terracon Consultants

Jennifer Peters

(210) 907-7648

PHASE 4 DEVELOPMENT

03-31-2020

OF 246

BID DOCUMENTS

PLUMBING

ADMINISTRATION

SANITARTY AND VENT PLAN

PP121

ENTRY

OPERATIONS

CENTER

TOILET

TOILET

LOBBY

RECEPTION

CONF

TOILET

TOILET

CORRIDOR

BREAK

MECH

STOR

OPEN

OFFICE

BUDGET

OFFICE

ADMIN

OFFICE

ASST

DIRECT

CEMETERY

DIRECT

ASST

DIRECT

TELECOM

H G F E D C B A

1FBR

F

B R

1FBR

F

B R

NORTH

VICINITY MAP

SCALE 1"=1000'

R

A

ND DR

MOUNTAIN CREEK PKWY

L O

N E S

T A R

C

IR

R O A D

R O A D

2 ROAD 1

ROAD 1

R O

A D

ROAD 3

R O A D

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of

Construction and Facilities

Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DALLAS, TEXAS

916CM2012

DALLAS - FORT WORTH

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105

Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com

Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

MKEC Engineering, Inc.

Ken Kallenbach

(316) 684-9600

Architect:

TK-Architecture, LLC

Tom Kapels

(719) 325-9303

Irrigation:

Aqua Engineering

Bob Beccard

(970) 372-6104

RCDD:

APOGEE Consulting

Jim Ezekiel

(919) 535-3878

MEP:

Miller Remick

Tom Chapman

(856) 429-4000

Cost Estimating:

MOCA Cost Engineering

Todd Waddle

(850) 389-8131

Surveying, Water Wells & Treatment:

Fabre Engineering & Surveying

Frank Fabre

(850) 433-6438

Geotechnical Engineering:

Terracon Consultants

Jennifer Peters

(210) 907-7648

PHASE 4 DEVELOPMENT

03-31-2020

OF 246

BID DOCUMENTS

PLUMBING

ADMINISTRATION

DOMESTIC WATER PLAN

PP122

UNIFORM

CORRIDOR

M. LOCKER

W. LOCKER

CUST

10 11 12 13 14 1511.1 13.1

G

F.5

F

E

D

G

F.5

F

E

D

10 11 12 13 14 1511.1 13.1

UNIFORM

CORRIDOR

M. LOCKER

W. LOCKER

CUST

BREEZ

WAY

HALL

TELECOM

TOILET

TOILET

WORK

LEADERS

HONOR

GUARD

STOR

STOR

5 6 7 8

G

F.5

F

E

D

G

F.5

F

E

D

5 6 7 8

BREEZ

WAY

HALL

TELECOM

TOILET

TOILET

WORK

LEADERS

HONOR

GUARD

STOR

STOR

NORTH

VICINITY MAP

SCALE 1"=1000'

R

A

ND DR

MOUNTAIN CREEK PKWY

L O

N E S

T A R

C

IR

R O A D

R O A D

2 ROAD 1

ROAD 1

R O

A D

ROAD 3

R O A D

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of

Construction and Facilities

Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DALLAS, TEXAS

916CM2012

DALLAS - FORT WORTH

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105

Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com

Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

MKEC Engineering, Inc.

Ken Kallenbach

(316) 684-9600

Architect:

TK-Architecture, LLC

Tom Kapels

(719) 325-9303

Irrigation:

Aqua Engineering

Bob Beccard

(970) 372-6104

RCDD:

APOGEE Consulting

Jim Ezekiel

(919) 535-3878

MEP:

Miller Remick

Tom Chapman

(856) 429-4000

Cost Estimating:

MOCA Cost Engineering

Todd Waddle

(850) 389-8131

Surveying, Water Wells & Treatment:

Fabre Engineering & Surveying

Frank Fabre

(850) 433-6438

Geotechnical Engineering:

Terracon Consultants

Jennifer Peters

(210) 907-7648

PHASE 4 DEVELOPMENT

03-31-2020

OF 246

BID DOCUMENTS

PLUMBING

MAINTENANCE FACILTY

ENLARGED PLANS

PP401

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of

Construction and Facilities

Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DALLAS, TEXAS

916CM2012

DALLAS - FORT WORTH

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105

Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com

Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

MKEC Engineering, Inc.

Ken Kallenbach

(316) 684-9600

Architect:

TK-Architecture, LLC

Tom Kapels

(719) 325-9303

Irrigation:

Aqua Engineering

Bob Beccard

(970) 372-6104

RCDD:

APOGEE Consulting

Jim Ezekiel

(919) 535-3878

MEP:

Miller Remick

Tom Chapman

(856) 429-4000

Cost Estimating:

MOCA Cost Engineering

Todd Waddle

(850) 389-8131

Surveying, Water Wells & Treatment:

Fabre Engineering & Surveying

Frank Fabre

(850) 433-6438

Geotechnical Engineering:

Terracon Consultants

Jennifer Peters

(210) 907-7648

PHASE 4 DEVELOPMENT

03-31-2020

OF 246

BID DOCUMENTS

PLUMBING

MAINTENANCE FACILITY

RISER AND FLOW DIAGRAMS

P-601

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of

Construction and Facilities

Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DALLAS, TEXAS

916CM2012

DALLAS - FORT WORTH

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105

Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com

Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

MKEC Engineering, Inc.

Ken Kallenbach

(316) 684-9600

Architect:

TK-Architecture, LLC

Tom Kapels

(719) 325-9303

Irrigation:

Aqua Engineering

Bob Beccard

(970) 372-6104

RCDD:

APOGEE Consulting

Jim Ezekiel

(919) 535-3878

MEP:

Miller Remick

Tom Chapman

(856) 429-4000

Cost Estimating:

MOCA Cost Engineering

Todd Waddle

(850) 389-8131

Surveying, Water Wells & Treatment:

Fabre Engineering & Surveying

Frank Fabre

(850) 433-6438

Geotechnical Engineering:

Terracon Consultants

Jennifer Peters

(210) 907-7648

PHASE 4 DEVELOPMENT

03-31-2020

OF 246

BID DOCUMENTS

PLUMBING

ADMINISTRATION

RISER AND FLOW DIAGRAMS

P-602

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of

Construction and Facilities

Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DALLAS, TEXAS

916CM2012

DALLAS - FORT WORTH

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105

Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com

Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

MKEC Engineering, Inc.

Ken Kallenbach

(316) 684-9600

Architect:

TK-Architecture, LLC

Tom Kapels

(719) 325-9303

Irrigation:

Aqua Engineering

Bob Beccard

(970) 372-6104

RCDD:

APOGEE Consulting

Jim Ezekiel

(919) 535-3878

MEP:

Miller Remick

Tom Chapman

(856) 429-4000

Cost Estimating:

MOCA Cost Engineering

Todd Waddle

(850) 389-8131

Surveying, Water Wells & Treatment:

Fabre Engineering & Surveying

Frank Fabre

(850) 433-6438

Geotechnical Engineering:

Terracon Consultants

Jennifer Peters

(210) 907-7648

PHASE 4 DEVELOPMENT

03-31-2020

OF 246

BID DOCUMENTS

PLUMBING

DETAILS & SCHEDULES P-701

File details come from the government source that posted it. Updated .