Dallas PPI - 2.pdf
PDF 119 KB Posted
- Attached to
- Y1PC--Dallas National Cemetery Solicitation
- Solicitation number
- 36C10F20R0056
About this file
This document contains a solicitation and related pre-proposal questions and answers for the Phase 4 expansion of the Dallas Fort Worth National Cemetery. The Department of Veterans Affairs seeks to construct additional gravesites, buildings, and cemetery improvements on approximately 56 acres of land. The scope of work includes over 12,000 pre-placed crypt and traditional gravesites, 3,000 in-ground cremains sites, a 300-site natural burial section, roads, utilities and a new irrigation system. The construction cost is estimated between $20-50 million. The solicitation is set aside 100% for Service-Disabled Veteran Owned Small Businesses. Proposals are due August 7, 2020. Past performance information must be provided for the prime contractor and major subcontractors. Key personnel must be employed by the prime contractor but substitution requests will be considered.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Dallas PPI - 1.pdf | ||
| DNC Pre-Bid Sign-In Sheet 15 July 2020.jpeg | JPEG file | |
| CS-Sheets 1 of 3.pdf | ||
| Final Dallas 36C10F20R0056_3 (7-9-2020).pdf | ||
| Dallas-Fort Worth National Cemetery Cx Plan - V1 - 3-27-2020.pdf | ||
| 000 Base Bid Submittal Register.pdf | ||
| Pre-Functional Checklists.pdf | ||
| BID DOCUMENTS SWPPP DFW VA CEM PH4.pdf | ||
| V-Sheets.pdf | ||
| X-Sheets.pdf | ||
| CG-Sheets 1 of 2.pdf | ||
| CP-Sheets.pdf | ||
| LP-Sheets.pdf | ||
| G-Sheets.pdf | ||
| T-Sheets.pdf | ||
| A-Sheets.pdf | ||
| DALLAS WAGE RATES.pdf | ||
| F-Sheets.pdf | ||
| I-Sheets.pdf | ||
| E-Sheets.pdf | ||
| CS-Sheets 2 of 3.pdf | ||
| S-Sheets.pdf | ||
| ATTACHMENT 2_PAST PERF QUEST.docx | DOCX document | |
| Final Dallas 36C10F20R0056_3 (7-9-2020).pdf | ||
| M-Sheets.pdf | ||
| Base Bid Specification Package.pdf | ||
| CG-Sheets 2 of 2.pdf | ||
| B-Sheets.pdf | ||
| P-Sheets.pdf | ||
| CS-Sheets 3 of 3.pdf | ||
| CD-Sheets.pdf | ||
| LI-Sheets.pdf | ||
| CU-Sheets.pdf | ||
| ATTACHMENT 3 - Dallas Pre-Proposal Inquiry (PPI) Form.docx | DOCX document |
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI SUBMISSSION LOG
SOLICITATION NUMBER 36C10F200056
PRE- PROPOSAL INQUIRY (PPI) FORM
DALLAS FORT WORTH NATIONAL CEMETERY PHASE 4 EXPANSION
Question No.
Reference (Sect/Para/Page)
QUESTION GOVERNMENT RESPONSE
Can Covenant Construction Services, LLC be added to the plan holder’s list for this project.
Contact: Trevor Cassel – trevorc@ccsvet.com
Any SDVOSB that meets the qualifications in the solicitation may bid this project if interested.
Block 10
SF1442
Block 10 of the SF1442 states August 8, 2020 for the bid date. Block 13 states that bids are due by 12:00 on August 7, 2020. Please confirm that Aug 7, 2020 at 12:00 noon Eastern time is the correct bid due date.
A correction date posted on beta.SAM.gov. Proposals are due August 7, 2020 by 1200
EST.
Paragraph 4.1 /
In Factor 1 – Past Performance offerors are asked to provide information on past performance projects. Specifically, we are asked to identify our firm’s role in the provided projects. If we submit an offer on this project with a teaming agreement in place with a major subcontractor, will projects performed by said subcontractor be accepted for evaluating past performance even if the offering contractor did not perform a role on that project?
Past performance information must submit for a minimum of three and a maximum of five recent and relevant projects performed by the Prime Contractor and major Subcontractors. Teaming partner major Subcontractor past performance will evaluate.
Paragraph 4.2 Sub Factor 2.2
In Sub-Factor 2.2 we are to provide resumes of key personnel. Do these personnel need to be employed by the SDVOSB concern who is submitting the offer? Can they be employees of a key subcontractor?
Key personnel must be employed by the entity that has the direct contract with the Government.
Paragraph 4.2 Sub Factor 2.2
In the even that the team members that are submitted in this proposal are not available at the time of actual award, what will be the criteria for substituting team members?
Contractor must submit a request for approval to substitute key personnel with the Contracting Officer and Senior Resident Engineer (ACO). Substitution must be as qualified or better than the proposed key personnel.
mailto:trevorc@ccsvet.com