Dallas PPI - 2.pdf

PDF 119 KB Posted

Attached to
Y1PC--Dallas National Cemetery Solicitation
Solicitation number
36C10F20R0056
Issued by

About this file

This document contains a solicitation and related pre-proposal questions and answers for the Phase 4 expansion of the Dallas Fort Worth National Cemetery. The Department of Veterans Affairs seeks to construct additional gravesites, buildings, and cemetery improvements on approximately 56 acres of land. The scope of work includes over 12,000 pre-placed crypt and traditional gravesites, 3,000 in-ground cremains sites, a 300-site natural burial section, roads, utilities and a new irrigation system. The construction cost is estimated between $20-50 million. The solicitation is set aside 100% for Service-Disabled Veteran Owned Small Businesses. Proposals are due August 7, 2020. Past performance information must be provided for the prime contractor and major subcontractors. Key personnel must be employed by the prime contractor but substitution requests will be considered.

View the file

Other files

File Type Posted
Dallas PPI - 1.pdf PDF
DNC Pre-Bid Sign-In Sheet 15 July 2020.jpeg JPEG file
CS-Sheets 1 of 3.pdf PDF
Final Dallas 36C10F20R0056_3 (7-9-2020).pdf PDF
Dallas-Fort Worth National Cemetery Cx Plan - V1 - 3-27-2020.pdf PDF
000 Base Bid Submittal Register.pdf PDF
Pre-Functional Checklists.pdf PDF
BID DOCUMENTS SWPPP DFW VA CEM PH4.pdf PDF
V-Sheets.pdf PDF
X-Sheets.pdf PDF
CG-Sheets 1 of 2.pdf PDF
CP-Sheets.pdf PDF
LP-Sheets.pdf PDF
G-Sheets.pdf PDF
T-Sheets.pdf PDF
A-Sheets.pdf PDF
DALLAS WAGE RATES.pdf PDF
F-Sheets.pdf PDF
I-Sheets.pdf PDF
E-Sheets.pdf PDF
CS-Sheets 2 of 3.pdf PDF
S-Sheets.pdf PDF
ATTACHMENT 2_PAST PERF QUEST.docx DOCX document
Final Dallas 36C10F20R0056_3 (7-9-2020).pdf PDF
M-Sheets.pdf PDF
Base Bid Specification Package.pdf PDF
CG-Sheets 2 of 2.pdf PDF
B-Sheets.pdf PDF
P-Sheets.pdf PDF
CS-Sheets 3 of 3.pdf PDF
CD-Sheets.pdf PDF
LI-Sheets.pdf PDF
CU-Sheets.pdf PDF
ATTACHMENT 3 - Dallas Pre-Proposal Inquiry (PPI) Form.docx DOCX document
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI SUBMISSSION LOG

SOLICITATION NUMBER 36C10F200056

PRE- PROPOSAL INQUIRY (PPI) FORM

DALLAS FORT WORTH NATIONAL CEMETERY PHASE 4 EXPANSION

Question No.

Reference (Sect/Para/Page)

QUESTION GOVERNMENT RESPONSE

Can Covenant Construction Services, LLC be added to the plan holder’s list for this project.

Contact: Trevor Cassel – trevorc@ccsvet.com

Any SDVOSB that meets the qualifications in the solicitation may bid this project if interested.

Block 10

SF1442

Block 10 of the SF1442 states August 8, 2020 for the bid date. Block 13 states that bids are due by 12:00 on August 7, 2020. Please confirm that Aug 7, 2020 at 12:00 noon Eastern time is the correct bid due date.

A correction date posted on beta.SAM.gov. Proposals are due August 7, 2020 by 1200

EST.

Paragraph 4.1 /

In Factor 1 – Past Performance offerors are asked to provide information on past performance projects. Specifically, we are asked to identify our firm’s role in the provided projects. If we submit an offer on this project with a teaming agreement in place with a major subcontractor, will projects performed by said subcontractor be accepted for evaluating past performance even if the offering contractor did not perform a role on that project?

Past performance information must submit for a minimum of three and a maximum of five recent and relevant projects performed by the Prime Contractor and major Subcontractors. Teaming partner major Subcontractor past performance will evaluate.

Paragraph 4.2 Sub Factor 2.2

In Sub-Factor 2.2 we are to provide resumes of key personnel. Do these personnel need to be employed by the SDVOSB concern who is submitting the offer? Can they be employees of a key subcontractor?

Key personnel must be employed by the entity that has the direct contract with the Government.

Paragraph 4.2 Sub Factor 2.2

In the even that the team members that are submitted in this proposal are not available at the time of actual award, what will be the criteria for substituting team members?

Contractor must submit a request for approval to substitute key personnel with the Contracting Officer and Senior Resident Engineer (ACO). Substitution must be as qualified or better than the proposed key personnel.