000 Base Bid Submittal Register.pdf

PDF 248 KB Posted

Attached to
Y1PC--Dallas National Cemetery Solicitation
Solicitation number
36C10F20R0056
Issued by

About this file

This solicitation seeks proposals for the Phase 4 expansion of Dallas Fort Worth National Cemetery. The project will construct additional gravesites, cemetery improvements including a new administration building and renovated maintenance building, and develop approximately 56 acres of land. Work includes approximately 12,430 pre-placed crypt full casket gravesites, 615 oversize pre-placed crypt casket gravesites, approximately 600 traditional gravesites, approximately 3,000 in-ground cremains, approximately 300-gravesite Hybrid Natural (Green) Burial Section, earthwork, drainage, fencing, roads, parking, access, utilities, site improvements, signage and site furnishings, and a new irrigation system. The work must be completed within 900 calendar days of receipt of the notice to proceed. The construction cost is estimated between $20-50 million. The solicitation is a 100% SDVOSB set aside issued by the Department of Veterans Affairs Office of Construction and Facilities Management. Proposals are due August 8, 2020 by 12:00 PM Eastern Time. Offerors must be registered as a verified SDVOSB in the Vendor Information Pages database upon submission. Questions regarding the solicitation should be submitted in writing by July 22, 2020. Offerors are responsible for monitoring amendments on betaSAM.gov.

View the file

Other files

File Type Posted
Dallas PPI - 2.pdf PDF
Dallas PPI - 1.pdf PDF
DNC Pre-Bid Sign-In Sheet 15 July 2020.jpeg JPEG file
CS-Sheets 1 of 3.pdf PDF
Final Dallas 36C10F20R0056_3 (7-9-2020).pdf PDF
Dallas-Fort Worth National Cemetery Cx Plan - V1 - 3-27-2020.pdf PDF
Pre-Functional Checklists.pdf PDF
BID DOCUMENTS SWPPP DFW VA CEM PH4.pdf PDF
V-Sheets.pdf PDF
X-Sheets.pdf PDF
CG-Sheets 1 of 2.pdf PDF
CP-Sheets.pdf PDF
LP-Sheets.pdf PDF
G-Sheets.pdf PDF
T-Sheets.pdf PDF
A-Sheets.pdf PDF
DALLAS WAGE RATES.pdf PDF
F-Sheets.pdf PDF
I-Sheets.pdf PDF
E-Sheets.pdf PDF
CS-Sheets 2 of 3.pdf PDF
S-Sheets.pdf PDF
ATTACHMENT 2_PAST PERF QUEST.docx DOCX document
Final Dallas 36C10F20R0056_3 (7-9-2020).pdf PDF
M-Sheets.pdf PDF
Base Bid Specification Package.pdf PDF
CG-Sheets 2 of 2.pdf PDF
B-Sheets.pdf PDF
P-Sheets.pdf PDF
CS-Sheets 3 of 3.pdf PDF
CD-Sheets.pdf PDF
LI-Sheets.pdf PDF
CU-Sheets.pdf PDF
ATTACHMENT 3 - Dallas Pre-Proposal Inquiry (PPI) Form.docx DOCX document
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(c) (d) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q)

01 00 01 General Requirements (Major NCA Projects)

General Intention 1.1

Statement of Bid Item(s) 1.2

Specifications and Drawings for Contractor 1.3

Construction Security Requirements 1.4

Fire Safety 1.5

Operation and Storage Areas 1.6

Alterations 1.7

Environmental Controls 1.8

Disposal and Retention 1.9

Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements 1.10

Restoration 1.11

Physical Data 1.12

Professional Surverying Services 1.13

Layout of Work 1.14

As-Built Drawings 1.15

Use of Roadways 1.16

RE's Field Office 1.17

Temporary Use of Mechanical and Electrical Equipment 1.18

Temporary Toilets 1.19

Availability and Use of Utility Services 1.20

Tests 1.21

Instructions 1.22

Government-Furnished Property 1.23

Relocated Equipment and Items 1.24

Construction Sign 1.25

Safety Sign 1.26

Construction Digital Images 1.27

Final Elevation Digital Images 1.28

Historic Preservation 1.29

Project Health and Safety Plan 1.30

Project Sustainability Goals 1.31

SUBMITTAL REGISTER

CONTRACTOR

A

C

T

I

V

I

T

Y

N

O

S P E C

S E C T

CONTRACTOR

APPROVING AUTHORITY

SCHEDULE DATES

SUBMIT

A C T I O N

C O D E A C T I O N C O

D E

(e) (f)

Barrancas National Cemetery Phase 2B Expansion, Pensacola, FL

CONTRACTOR

ACTION

CONTRACT NO.

828CM2036

C&C Contractors

C L

A S

S

IF

IC

A

T

IO

N

APPROVAL

NEEDED BY

MATERIAL

NEEDED BY

DATE OF ACTION

DATE FWD TO

APPR AUTH /

DATE RCD

FROM CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

DATE OF

ACTION

MAILED TO

CONTR / DATE

RCD FROM

APPR AUTH

DESCRIPTION ITEM

SUBMITTED

TITLE AND LOCATION

P A

R A

G R

A P

H

01 32 16 Network Analysis Schedule

Description 1.1

Contractor's Representative 1.2

Contractor's Consultant 1.3

Computer Produced Schedules 1.4

The Complete Project Network Diagram

Submittal 1.5

Work Activity/Event Cost Data 1.6

Network Diagram Requirements 1.7

Payment to the Contractor 1.8

Payment and Progress Reporting 1.9

Responsibility for Completion 1.10

Changes to Network Diagram and Schedule 1.11

Adjustment of Contract Completion 1.12

01 33 23 Shop Drawings, Product Data, and Samples

01 35 26 Safety Requirements

Applicable Publications 1.1

Definitions 1.2

Regulatory Requirements 1.3

Accident Prevention Plan

Activity Hazard Analysis

Preconstruction Conference 1.6

"Site Safety and Health Officer" (SSHO) and

"Competent Person" (CP) 1.7

Training

Inspections 1.9

Accidents, OSHA 300 Logs, and Man-Hours 1.10

Personal Protective Equipment (PPE) 1.11

Fire Safety

Electrical 1.13

Fall Protection 1.14

Scaffolds and Other Work Platforms 1.15

Excavation and Trenches 1.16

Cranes 1.17

Control of Hazardous Energy (Lockout/Tagout) 1.18

Confined Space Entry 1.19

Welding and Cutting 1.20

Ladders 1.21

Floor and Wall Openings 1.22

01 45 00.00 Quality Control

References 1.1

Submittals

Information for the Senior Resident Engineer (SRE/CO)

QC Program Requirements 1.4

Acceptance of the Construction Quality Control (QC)

Plan 1.4.2

1.4

1.5

1.8

1.12

1.3

1.2

Preliminary Construction Work Authorized Prior to

Acceptance 1.4.3

Notification of Changes 1.4.4

Compliance with Architectural Barriers Act Accessibility

Standards 1.4.5

QC Organization 1.5

QC Manager 1.5.1

Contractor's LEED Cordinator (CLC) 1.5.3

LEED Administrator 1.5.4

Commissioning Authority 1.5.5

LEED Commissioning Authority 1.5.6

Construction Quality Management Training 1.5.7

Alternate QC Manager Duties and Qualifications 1.5.8

Quality Control (QC) Plan 1.6

Construction Quality Control (QC) Plan 1.6.1

QC Plan Meetings 1.7

Coordination and Mutual Understanding Meeting 1.8

Purpose 1.8.1

Coordination of Activities 1.8.2

Attendees 1.8.3

QC Meetings 1.9

Design Review and Documentation 1.10

Basis of Design and Design Intent 1.10.1

Design Review 1.10.2

Contract Document Review 1.10.3

Three Phases of Control 1.11

Prepatory Phase 1.11.1

Initial Phase 1.11.2

Follow-Up Phase 1.11.3

Additional Prepatory and Initial Phases 1.11.4

Notification of Three Phases of Control for Off-Site Work 1.11.5

Submittal and Review and Approval 1.12

Testing 1.13

Accreditation Requirements 1.13.1

Laboratory Accreditation Authorities 1.13.2

Capability Check 1.13.3

Test Results 1.13.4

Test Reports and Monthly Summary Report of Tests 1.13.5

QC Certifications 1.14

CQC Report Cerification 1.14.1

Invoice Certification 1.14.2

Completion Certification 1.14.3

Completion Inspections 1.15

Punch-Out Inspections 1.15.1

Pre-Final Inspection 1.15.2

Final Acceptance Inspection 1.15.3

Documentation 1.16

Construction Documentation 1.16.1

Quality Control Validation 1.16.2

Testing Plan and Log 1.16.3

Rework Items List 1.16.4

As-Built Drawings 1.16.5

Notification of Non-Compliance 1.17

Construction Indoor Air Quality (IAQ) Management Plan 1.18

Requirements During Construction 1.18.1

Requirements After Construction 1.18.2

Preparation 3.10

01 45 19 Reference Standards

Description 1.1

AVAILABILITY OF SPECIFICATIONS LISTED IN THE

GSA INDEX OF FEDERAL SPECIFICATIONS,

STANDARDS AND COMMERCIAL ITEM

DESCRIPTIONS FPMR PART 101-29 (FAR 52.211-1)

(AUG 1998)

1.2

Availability for Examination of Specifications Not Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions (FAR 52.211-4) (Jun

1.3

Availability of Specifications Not Listed in the GSA Index of Federal Specifications, Standards and Commercial

Item Descriptions (FAR 52.211-3) (Jun 1988)

1.4

01 45 29 Testing Laboratory Services

Description 1.1

Related Documents 1.2

Applicable Publications 1.3

Requirements 1.4

Earthwork 3.1

Foundation Piles 3.2

Landscaping 3.3

Asphalt Concrete Paving 3.4

Site Work Concrete 3.5

Concrete 3.6

Reinforcement 3.7

Prestressed Concrete 3.8

Architectural Cast Stone 3.9

Masonry 3.10

Structural Steel 3.11

Steel Decking 3.12

Shear Connector Studs 3.13

Type of Test 3.15

01 57 19 Temporary Environmental Controls

Description 1.1

Definitions of Pollutants 1.2

Quality Control 1.3

References 1.4

Sustainability Requirements 1.5

Submittals 1.6

Protection of Environmental Resources 1.7

01 74 19 Construction and Demolition Waste

Management

Description 1.1

Related Work 1.2

Quality Assurance

Terminology

Submittals 1.5

Applicable Publications 1.6

Records 1.7

Materials 2.1

Collection 3.1

Disposal 3.2

Report 3.3

01 78 23 Operations and Maintenance Data

Submission of Operation and Maintenance Data 1.1

1.3

1.4

Types of Information Required in O&M Data Packages 1.2

Schedule of Operation and Maintenance Data Packages 1.4

Types of Information Required in Controls O&M Data

Packages 2.2

(c) (d) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q)

01 81 13 Sustainable Construction Requirements

Description 1.1

Related Work 1.2

Definitions 1.3

Reference Standards 1.4

Submittals 1.5

Quality Assurance 1.6

Applicable Publications 1.7

Performance Criteria 2.1

Field Quality Control 3.1

01 91 13 General Commissioning Requirements

Related Documents 1.1

Summary 1.2

Description 1.3

Definitions 1.4

Submittals 1.5

Quality Assurance 1.6

Scheduling 1.7

Commissioning Team 1.8

Owner's Responsibilities 1.9

Test Equipment 2.1

Examination 3.1

Field Quality Control 3.2

Demonstration 3.3

02 41 10 Demolition and Site Clearing

Description 1.1

Related Work 1.2

Protection 1.3

Utility Services 1.4

Site Clearing 3.1

SUBMITTAL REGISTER

CONTRACTOR

A

C

T

I

V

I

T

Y

N

O

S P E C

S E C T

CONTRACTOR

APPROVING AUTHORITY

SCHEDULE DATES

SUBMIT

A C T I O N

C O D E

A C T I O N

C O D E

TITLE AND LOCATION

Barrancas National Cemetery Phase 2B Expansion, Pensacola, FL

DESCRIPTION ITEM

SUBMITTED

P A

R A

G R

A P

H

C L

A S

S

IF

IC

A

T

IO

N

CONTRACTOR

APPROVAL

NEEDED BY

DATE OF ACTION

DATE FWD TO

APPR AUTH /

DATE RCD

FROM CONTR

MAILED TO

CONTR / DATE

RCD FROM

APPR AUTH

(e) (f)

MATERIAL

NEEDED BY

ACTION

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

DATE OF

ACTION

C&C Contractors

828CM2036

CONTRACT NO.

Demolition 3.2

Clean-up 3.2

(c) (d) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q)

03 30 00 Cast-In-Place Concrete

Description 1.1

Related Work 1.2

Testing Agency for Concrete Mix Design 1.3

Tolerances 1.4

Regulatory Requirements 1.5

Submittals 1.6

Delivery, Storage, and Handling 1.7

Pre-Concrete Conference 1.8

Mock-Up 1.9

Applicable Publications 1.10

Forms 2.1

Materials 2.2

Concrete Mixes 2.3

Batching and Mixing 2.4

Formwork 3.1

Placing Reinforcement 3.2

Construction Joints 3.5

Expansion Joints and Contraction Joints 3.6

Placing Concrete 3.7

Hot Weather 3.8

Cold Weather 3.9

Protection and Curing 3.10

Removal of Forms 3.11

Concrete Surface Preparation 3.12

Concrete Finishes 3.13

Retaining and Site Walls 3.17

Precast Concrete Items 3.18

03 48 21 Precast Concrete Burial Crypts

Description 1.1

Design Overview 1.2

Related Work 1.3

Sustainability Requirements 1.4

Regulatory Requirements for Recycled Content 1.5

Quality Assurance 1.6

Design Criteria 1.7

Allowable Tolerances 1.8

Submittals 1.9

Product Delivery, Storage, and Handling 1.10

Coordination 1.11

(e) (f)

SUBMITTAL REGISTER

CONTRACTOR

A

C

T

I

V

I

T

Y

N

O

S P E C

S E C T

CONTRACTOR

APPROVING AUTHORITY

SCHEDULE DATES

SUBMIT

A C T I O N

C O D E

A C T I O N

C O D E

828CM2036

Barrancas National Cemetery Phase 2B Expansion, Pensacola, FL

DESCRIPTION ITEM

SUBMITTED

C L

A S

S

IF

IC

A

T

IO

N

APPROVAL

NEEDED BY

MATERIAL

NEEDED BY

CONTRACTOR

DATE OF ACTION

ACTION

DATE FWD TO

APPR AUTH /

DATE RCD

FROM CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

CONTRACT NO.

DATE OF

ACTION

MAILED TO

CONTR / DATE

RCD FROM

APPR AUTH

TITLE AND LOCATION

P A

R A

G R

A P

H

C&C Contractors

Guarantee 1.12

Applicable Publications 1.13

Materials 2.1

Fabrication 2.2

Testing and Inspection 2.3

Crypt Field Quality Assurance 3.1

General Layout Control 3.2

Preparation 3.3

Handling, Installation and Painting 3.4

Protection of Work 3.5

Replacement and Repair 3.6

Backfilling and Crypt Field Protection 3.7

Inspection and Acceptance 3.8

04 05 13 Masonry Mortaring

Description 1.1

Related Work 1.2

Testing Laboratory-Contractor Retained 1.3

Tests 1.4

Submittals 1.5

Product Delivery, Storage, and Handling 1.6

Applicable Publications 1.7

Hydrated Lime 2.1

Aggregate for Masonry Mortar 2.2

Blended Hydraulic Cement 2.3

Masonry Cement 2.4

Mortar Cement 2.5

Portland Cement 2.6

Liquid Acrylic Resin 2.7

Water 2.8

Pointing Mortar 2.9

Masonry Mortar 2.10

Color Admixture 2.11

Mixing 3.1

04 05 16 Masonry Grouting

Description 1.1

Related Work 1.2

Tests 1.3

Submittals 1.4

Product Delivery, Storage, and Handling 1.5

Applicable Publications 1.6

Hydrated Lime 2.1

Aggregate for Masonry Grout 2.2

Blended Hydraulic Cement 2.3

Masonry Cement 2.4

Portland Cement 2.5

Liquid Acrylic Resin 2.6

Water 2.7

Grout 2.8

Color Admixture 2.9

Mixing 3.1

Grout Use Locations 3.2

04 20 00 Concrete Unit Masonry

Related Work 1.2

Sustainability Requirements 1.3

Submittals 1.4

Warranty 1.6

Applicable Publications 1.7

Concrete Masonry Units 2.2

Reinforcement 2.3

Anchors, Ties, and Reinforcement 2.4

Preformed Compressible Joint Filler 2.5

Accessories 2.6

Job Conditions 3.1

Construction Tolerances 3.2

Installation General 3.3

Anchorage 3.4

Reinforcement 3.5

Brick Expansion and CMU Control Joints 3.6

Concrete Masonry Units 3.9

Grouting 3.10

Placing Reinforcement 3.11

Cleaning and Repair 3.12

04 72 00 Cast Stone Masonry

Description 1.1

Related Work 1.2

Submittals 1.4

Product Delivery, Storage, and Handling 1.5

Warranty 1.6

Applicable Publications 1.7

Quality Assurance 1.8

Manufacturing Tolerances 1.9

Project Conditions 1.11

Architectural Cast Stone 2.1

Raw Materials 2.2

Color and Finish 2.3

Reinforcing 2.4

Embedded Anchors and Other Inserts 2.5

Curing 2.6

Examination 3.1

Setting Tolerances 3.2

Jointing 3.3

Setting 3.4

Joint Protection 3.5

Repair and Cleaning 3.6

Inspection and Acceptance 3.7

05 12 00 Structural Steel Framing

Description 1.1

Related Work 1.2

Quality Assurance 1.3

Tolerances 1.4

Design 1.5

Regulatory Requirements 1.6

Sustainability Requirements 1.7

Submittals 1.8

Applicable Publications 1.9

Materials 2.1

Connections (Shop and Field) 3.1

Fabrication 3.2

Shop Painting 3.3

Erection 3.4

Field Painting 3.5

Survey 3.6

05 31 00 Steel Decking

Description 1.1

Related Work 1.2

Design Requirements 1.3

Sustainability Requirements 1.4

Submittals 1.5

Quality Assurance 1.6

Applicable Publications 1.7

Materials 2.1

Requirements 2.2

Erection 3.1

Welding 3.2

Field Repair 3.3

05 40 00 Cold-Formed Metal Framing

Description 1.1

Related Work 1.2

Design Requirements 1.3

Sustainability Requirements 1.4

Submittals 1.5

Pre-Installation Conference 1.6

Applicable Publications 1.7

Materials 2.1

Wall Framing 2.2

Framing Accessories 2.3

Connections 2.4

Plastic Grommets 2.5

Anchors, Clips, and Fasteners 2.6

Fabrication 3.1

Installation 3.2

Tolerances 3.3

Field Quality Control 3.4

Field Repair 3.5

05 50 00 Metal Fabrication

Description 1.1

Related Work 1.2

Submittals 1.4

Quality Assurance 1.5

Applicable Publications 1.6

Materials 2.1

Hardware 2.2

Fabrication 2.3

Supports 2.4

Loose Lintels 2.5

Shelf Angles 2.6

Handrails 2.7

Installation, General 3.1

Installation of Supports 3.2

Steel Lintels 3.3

Shelf Angles 3.4

Steel Components for Millwork Items 3.5

Clean and Adjusting 3.6

06 10 00 Rough Carpentry

Description 1.1

Performance Requirements 1.3

Submittals 1.5

Product Delivery, Storage, and Handling 1.6

Applicable Publications 1.7

Lumber 2.1

Plywood 2.2

Rough Hardware 2.3

Blocking 2.4

Installation of Framing and Miscellaneous Wood

Members 3.1

Protection 3.2

07 21 13 Thermal Insulation

Description 1.1

Related Work 1.2

Sustainability Requirements 1.3

Submittals 1.5

Storage and Handling 1.7

Applicable Publications 1.8

Insulation - General 2.1

Polyisocyanurate Board Insulation 2.2

Polystyrene Board 2.3

Glass Fiber Insulation 2.4

Fasteners 2.5

Adhesive 2.6

Tape 2.7

Blocking Around Heat Producing Devices 2.8

Installation - General 3.1

Polyiso Board 3.2

Polystyrene Board 3.3

Glass Fiber Bait 3.4

Acoustical Insulation 3.5

07 22 00 Roof and Deck Insulation

Description 1.1

Related Work 1.2

Quality Control 1.3

Submittals 1.4

Delivery, Storage, and Marking 1.5

Applicable Publications 1.6

Quality Assurance 1.7

Insulation 2.2

Fasteners 2.3

Recovered Materials 2.4

General 3.1

Surface Preparation 3.2

Vapor Retarder 3.3

Insulation Thickness 3.4

Installation of Insulation 3.5

07 40 00 Roofing Panels

Description 1.1

Related Work 1.2

Design Requirements 1.3

Manufacturer's Qualifications 1.4

Installer Qualifications 1.5

Sustainability Requirements 1.6

Submittals 1.8

Pre-Installation Conference 1.9

Applicable Publications 1.10

Sheet Steel 2.1

Aluminum Plate and Sheet 2.2

Fasteners 2.3

Fabrication 2.4

Finish 2.5

Installation 3.1

Isolation of Aluminum 3.2

Protection and Cleaning 3.3

07 60 00 Flashing and Sheet Metal

Description 1.1

Related Work 1.2

Applicable Publications 1.3

Performance Requirements 1.4

Submittals 1.6

Flashing and Sheet Metal Materials 2.1

Flashing Accessories 2.2

Sheet Metal Thickness 2.3

Fabrication, General 2.4

Finishes 2.5

Through-Wall Flashings 2.6

Counterflashing (CAP Flashing or Hoods) 2.7

Hanging Gutters 2.8

Conductors (Downspouts) 2.9

Installation 3.1

Through-Wall Flashings 3.2

Counterflashing (CAP Flashing or Hoods) 3.4

Hanging Gutters 3.6

07 84 00 Firestopping

Description 1.1

Related Work 1.2

Submittals 1.4

Delivery and Storage 1.5

Warranty 1.6

Quality Assurance 1.7

Applicable Publications 1.8

Firestop Systems 2.1

Smoke Stopping in Smoke Partitions 2.2

Examination 3.1

Preparation 3.2

Installation 3.3

Inspections 3.4

Clean-Up and Acceptance of Work 3.5

07 92 00 Joint Sealants

Description 1.1

Related Work 1.2

Quality Control 1.3

Submittals 1.5

Project Conditions 1.7

Delivery, Storage, and Handling 1.8

Definitions 1.9

Warranty 1.10

Applicable Publications 1.11

Sealants 2.1

Caulking Compound 2.2

Color 2.3

Joint Sealant Backing 2.4

Filler 2.5

Primer 2.6

Cleaners-Non Porous Surfaces 2.7

Inspection 3.1

Preparations 3.2

Backing Installation 3.3

Sealant Depths and Geometry 3.4

Installation 3.5

Cleaning 3.6

Protection 3.7

Locations 3.8

08 11 13 Hollow Metal Doors and Frames

Description 1.1

Related Work 1.2

Testing 1.3

Submittals 1.5

Shipment 1.6

Storage and Handling 1.7

Applicable Publications 1.8

Materials 2.1

Fabrication General 2.2

Classification and Performance 2.3

Metal Frames 2.4

Louvers 2.6

Hardware Preparation 2.7

Shop Painting 2.8

Installation 3.1

Installation of Hardware 3.2

08 14 00 Interior Wood Doors

Sustainability Requirements 1.3

Submittals 1.4

Warranty 1.5

Delivery and Storage 1.6

Applicable Publications 1.7

Flush Doors 2.1

Prefitting 2.2

Factory Finishing 2.3

Identification Mark 2.4

Door Preparation 3.1

Installation 3.2

Door Protection 3.3

08 36 13 Sectional Doors

Description 1.1

Related Work 1.2

Manufacturer's and Installer's Qualifications 1.3

Sustainability Requirements 1.4

Submittals 1.5

Applicable Publications 1.6

Materials 2.1

Design Requirements 2.2

Fabrication 2.3

Finishes 2.5

Installation 3.1

Repair 3.2

08 41 13 Aluminum-Framed Entrances and Storefronts

Description 1.1

Related Work 1.2

Performance Requirements 1.3

Sustainability Requirements 1.4

Submittals 1.5

Quality Assurance 1.6

Delivery, Storage, and Handling 1.7

Applicable Publications 1.8

Materials General 2.1

Doors 2.2

Protection of Aluminum 2.3

Frames 2.4

Fabrication 2.5

Reinforcement for Builders Hardware 2.6

Finish 2.7

Installation 3.1

Adjusting 3.2

Protection, Cleaning, and Repairing 3.3

08 51 13 Aluminum Windows

Description 1.1

Definitions 1.2

Related Work 1.3

Delivery, Storage and Handling 1.4

Quality Assurance 1.5

Sustainability Requirements 1.6

Submittals 1.7

Warranty 1.8

Applicable Publications 1.9

Materials 2.1

Fabrication 2.2

Fixed Windows 2.4

Finish 2.6

Protection (Dissimilar Materials) 3.1

Installation, General 3.2

Mullions Closures, Trim, and Panning 3.3

Adjust and Clean 3.4

08 71 00 Door Hardware

Description 1.1

Related Work 1.2

General 1.3

Sustainability Requirements 1.4

Submittals 1.5

Delivery and Marking 1.6

Instructions 1.7

Applicable Publications 1.8

Butt Hinges 2.1

Continuous Hinges 2.2

Door Closing Devices 2.3

Overhead Closers 2.4

Door Stops 2.5

Floor Door Holders 2.6

Locks and Latches 2.7

Electric Strikes 2.9

Keys 2.10

Kick-Mop Plates 2.11

Exit Devices 2.12

Flush Bolts (Lever Extension) 2.13

Door Pulls with Plates 2.14

Push Plates 2.15

Combination Push and Pull Plates 2.16

Thresholds 2.17

Weatherstrips (For Exterior Doors) 2.18

Finishes 2.20

Base Metals 2.21

Hardware Heights 3.1

Installation 3.2

Final Inspection 3.3

Hardware Sets 3.4

08 80 00 Glazing

Description 1.1

Related Work 1.2

Labels 1.3

Performance Requirements 1.4

Submittals 1.6

Delivery, Storage, and Handling 1.7

Project Conditions 1.8

Warranty 1.9

Applicable Publications 1.10

Glass Products 2.1

Laminated Glass 2.4

Insulating Glass Units 2.5

Glazing Accessories 2.6

Examination 3.1

Preparation 3.2

Installation - General 3.3

Installation - Dry Method (Tape and Gasket Spline

Glazing) 3.4

Installation - Wet/Dry Method (Preformed Tape and

Sealant) 3.5

Installation - Wet Method (Sealant and Sealant) 3.6

Installation - Interior Wet/Dry Method (Tape and

Sealant)

3.7

Installation - Interior Wet Method (Compound and

Compound) 3.8

Replacement and Cleaning 3.10

Protection 3.11

Monolithic Glass Schedule 3.12

Insulating Glass Schedule 3.14

08 90 00 Louvers and Vents

Description 1.1

Related Work 1.2

Sustainability Requirements 1.3

Submittals 1.4

Applicable Publications 1.5

Materials 2.1

Exterior Wall Louvers 2.2

Closure Angles and Closure Plates 2.3

Wire Guards 2.4

Wall Vents 2.7

Air Intake Vents 2.8

Finish 2.10

Protection 2.11

Installation 3.1

Cleaning and Adjusting 3.2

09 06 00 Schedule for Finishes

Description 1.1

Manufacturers 1.2

Submittals 1.3

Applicable Publications 1.4

Color Board 2.1

Division 03 - Concrete 2.2

Division 04 - Masonry 2.3

Division 06 - Wood, Plastics, and Composties 2.5

Division 07 - Thermal and Moisture Protection 2.6

Division 08 - Openings 2.7

Division 09 - Finishes 2.8

Division 10 - Specialties 2.9

Division 12 - Furnishings 2.10

Division 13 - Special Construction 2.11

Division 22 - Plumbing 2.12

Division 26 - Electrical 2.13

Division 32 - Exterior Improvements 2.1

09 22 16 Non-Structural Metal Framing

Description 1.1

Related Work 1.2

Terminology 1.3

Submittals 1.5

Delivery, Identification, Handling, and Storage 1.6

Applicable Publications 1.7

Steel Studs and Runners (Track) 2.1

Furring Channels 2.2

Fasteners, Clips, and Other Metal Accessories 2.3

Suspended Ceiling System for Gypsum Board 2.4

Component Finish 2.5

Installation Criteria 3.1

Installing Studs 3.2

Installing Furred and Suspended Ceilings or Soffits 3.3

Tolerances 3.4

09 29 00 Gypsum Board

Description 1.1

Related Work 1.2

Terminology 1.3

Submittals 1.5

Delivery, Identification, Handling, and Storage 1.6

Environmental Conditions 1.7

Applicable Publications 1.8

Gypsum Board 2.1

Gypsum Sheathing Board 2.2

Accessories 2.3

Fasteners 2.4

Finishing Materials and Laminating Adhesive 2.5

Gypsum Board Heights 3.1

Installing Gypsum Board 3.2

Installing Gypsum Sheathing 3.3

Finishing of Gypsum Board 3.4

Repairs 3.5

09 30 13 Tiling

Description 1.1

Related Work 1.2

Performance Requirements 1.3

Sustainability Requirements 1.4

Submittals 1.5

Delivery and Storage 1.6

Applicable Publications 1.7

Tile 2.1

Cementitious Backer Units 2.2

Fasteners 2.3

Glass Mat Water Resistant Gypsum Backer Board 2.4

Setting Materials or Bond Coats 2.5

Grouting Materiald 2.6

Patching and Leveling Compound 2.7

Metal Divider Strips 2.9

Water 2.10

Cleaning Compounds 2.11

Polyethylene Sheet 2.14

Environmental Requirements 3.1

Allowable Tolerance 3.2

Surface Preparation 3.3

Cementitious Backer Units 3.4

Glass Mat Water Resistant Gypsum Backer Board 3.5

Metal Divider Strips 3.7

Ceramic Tile - General 3.8

Grouting 3.9

Movement Joints 3.10

Cleaning 3.11

Protection 3.12

Testing Finish Floor 3.13

Interior Ceramic Tile Installation Schedule 3.14

09 51 00 Acoustical Ceilings

Related Work 1.2

Performance Requirements 1.3

Sustainability Requirements 1.4

Submittals 1.5

Definitions 1.6

Applicable Publications 1.7

Delivery, Storage, and Handling 1.8

Environmental Requirements 1.9

Scheduling 1.10

Metal Suspension System 2.1

Wire 2.2

Acoustical Units 2.3

Ceiling Treatment 3.1

Ceiling Suspension System Installation 3.2

Acoustical Unit Installation 3.3

Clean-Up and Completion 3.4

09 65 13 Resilient Base and Accessories

Description 1.1

Related Work 1.2

Sustainability Requirements 1.3

Submittals 1.4

Delivery 1.5

Storage 1.6

Applicable Publications 1.7

General 2.1

Resilient Base and Accessories 2.2

Primer (For Concrete Floors) 2.5

Leveling Compound (For Concrete Floors) 2.6

Adhesives 2.7

Project Conditions 3.1

Installation Requirements 3.2

Base Installation 3.3

Cleaning and Protection 3.4

09 65 19 Resilient Tile Flooring

Description 1.1

Related Work 1.2

Performance Requirements 1.3

Sustainability Requirements 1.4

Submittals 1.5

Delivery 1.6

Storage 1.7

Applicable Publications 1.8

General 2.1

Vinyl Composition Tile 2.2

Adhesives 2.5

Primer (For Concrete Subfloors) 2.6

Leveling Compound (For Concrete Floors) 2.7

Polish and Cleaners 2.8

Edge Strips 2.9

Project Conditions 3.1

Subfloor Preparation 3.2

Installation 3.3

Cleaning and Protection 3.4

Location 3.5

09 67 23 Resinous Flooring

Description 1.1

Related Work 1.2

Sustainability Requirements 1.3

Submittals 1.4

Quality Assurance 1.5

Material Packaging Delivery and Storage 1.6

Warranty 1.7

Applicable Publications 1.8

System Description 2.1

Epoxy Flooring System 2.2

Base Cap Strip 2.3

Project Conditions 3.1

Installation Requirements 3.2

Preparation 3.3

Application 3.4

Curing, Protection, and Cleaning 3.5

Tolerance 3.6

09 68 00 Carpeting

Description 1.1

Related Work 1.2

Performance Requirements 1.3

Quality Assurance 1.4

Sustainability Requirements 1.5

Submittals 1.6

Delivery and Storage 1.7

Environmental Requirements 1.8

Warranty 1.9

Applicable Publications 1.10

Carpet 2.1

Adhesive and Concrete Primer 2.2

Seaming Tape 2.3

Leveling Compound (For Concrete Floors) 2.4

Surface Preparation 3.1

Modular Tile Installation 3.4

Entrance Carpet Installation 3.5

Edge Strips Installation 3.6

Protection and Cleaning 3.7

09 91 00 Painting

Description 1.1

Related Work 1.2

Sustainability Requirements 1.3

Submittals 1.4

Delivery and Storage 1.5

Applicable Publications 1.6

Materials 2.1

Paint Properties 2.2

Regulatory Requirements 2.3

Job Conditions 3.1

Surface Preparation 3.2

Paint Preparation 3.3

Application 3.4

Prime Painting 3.5

Exterior Finishes 3.6

Interior Finishes 3.7

Refinishing Existing Painted Surfaces 3.8

Paint Color 3.9

Protection Clean Up and Touch-Up 3.10

10 14 00 Exterior Signage

Description 1.1

Related Work 1.2

Manufacturer's Qualifications 1.3

Sustainability Requirements 1.4

Submittals 1.5

Delivery and Storage 1.6

Warranty 1.7

Applicable Publications 1.8

Materials 2.1

Signage General 2.2

Sign Standards 2.3

Signs Types 2.4

Text and Graphics 2.5

Fabrication 2.6

Protection of Aluminum 2.7

Double-Post-Panel Signs 2.8

Single-Post Traffic Regulatory Signs 2.9

Pylon Street Signs 2.13

Pylon Section Markers 2.14

Granite Section Markers 2.15

Faucet Post with Sign 2.16

Concrete Mow Collars or Strips 2.18

Traffic Regulatory - Tall 2.21

Flag Type Street Sign 2.22

Pylon Handicapped Sign 2.23

Installation 3.1

Plaque Installation 3.2

Cleaning 3.3

Protection 3.4

10 14 05 Interior Signage

Description 1.1

Related Work 1.2

Manufacturer's Qualifications 1.3

Submittals 1.4

Delivery and Storage 1.5

Applicable Publications 1.6

Minumum Sign Requirements 1.7

Colors and Finishes 1.8

General 2.1

Products 2.2

Interior Signage Types for Rooms 2.3

Fabrication 2.4

Installation 3.1

10 21 13 Toilet Compartments

Description 1.1

Related Work 1.2

Sustainability Requirements 1.3

Submittals 1.5

Applicable Publications 1.6

Fabrication 2.1

Anchoring Devices and Fasteners 2.2

Installation 3.1

10 21 16 Shower and Dressing Compartments

Summary 1.1

Related Requirements 1.2

Applicable Publications 1.3

Submittals 1.4

Quality Assurance 1.5

Delivery 1.6

Storage and Handling 1.7

Field Conditions 1.8

Warranty 1.9

Materials 2.1

Products - General 2.2

Shower Cabinets 2.3

Finishes 2.4

Accessories 2.5

Installation - General 3.1

Cleaning 3.2

Protection 3.3

10 26 00 Wall and Door Protection

Description 1.1

Related Work 1.2

Quality Assurance 1.3

Submittals 1.4

Delivery and Storage 1.5

Warranty 1.6

Applicable Publications 1.7

Materials 2.1

Corner Guards 2.2

Fasteners and Anchors 2.6

Finish 2.7

Resilient Corner Guards 3.1

Stainless Steel Corner Guards 3.2

10 28 00 Toilet and Bath Accessories

Description 1.1

Related Work 1.2

Submittals 1.3

Quality Assurance 1.4

Packaging and Delivery 1.5

Storage 1.6

Applicable Publications 1.7

Materials 2.1

Fasteners 2.2

Finish 2.3

Fabrication - General 2.4

Combination Paper Towel Dispenser and Disposal Units 2.6

Toilet Tissue Dispensers 2.8

Grab Bars 2.9

Metal Framed Mirrors 2.13

Sanitary Napkin Disposal 2.15

Mop Racks 2.19

Stainless Steel Shelves 2.20

Preparation 3.1

Installation 3.2

Cleaning 3.3

10 44 13 Fire Extinguisher Cabinets

Description 1.1

Related Work 1.2

Submittals 1.3

Applicable Publications 1.4

Fire Extinguisher Cabinets 2.1

Fabrication 2.2

Finish 2.3

10 51 13 Metal Lockers

Description 1.1

Related Work 1.2

Submittals 1.3

Quality Assurance 1.4

Delivery, Storage, and Handling 1.5

Project Conditions 1.6

Coordination 1.7

Warranty 1.8

Applicable Publications 1.9

Materials 2.1

Metal Lockers 2.2

Fabrication 2.3

Steel Sheet Finishes 2.4

Examination 3.1

Installation 3.2

Adjusting, Cleaning, and Protection 3.3

11 83 00 Global Navigation Satellite System (GNSS)

Summary 1.1

Related Work 1.2

References 1.3

Submittals 1.4

Quality Control 1.5

Site Conditions 1.6

Guarantee 1.7

Acceptance 1.8

GNSS Reference System Equipment 2.1

System Control Box 2.2

Cable and Conduit Connections 2.3

Reference Monuments 2.4

Site Calibration and Quality Control 3.1

11 83 02 GNSS & GIS Mapping and Geodata

Description 1.1

General 2.1

Description of Data Collection by Element Type 2.2

Aerial Photography 2.3

General 3.1

Demonstration 3.2

Training 3.3

12 24 00 Window Shades

Description 1.1

Related Work 1.2

Quality Control 1.3

Sustainability Requirements 1.4

Submittals 1.5

Applicable Publications 1.6

Materials 2.1

Fastenings 2.4

Fabrication 2.5

Installation 3.1

12 32 00 Manufactured Wood Casework

Description 1.1

Related Work 1.2

Performance Requirements 1.3

Manufacturer's Qualifications 1.4

Sustainability Requirements 1.5

Submittals 1.6

Applicable Publications 1.7

Plastic Laminate 2.2

Plywood, Softwood 2.3

Particleboard 2.4

Fire-Retardant Treatment 2.6

Hardware 2.7

Adhesives 2.8

Fabrication 2.9

Installation 3.1

Fastenings 3.2

Tolerances 3.3

Repair, Adjusting, and Cleaning 3.4

12 36 00 Countertops

Description 1.1

Related Work 1.2

Submittals 1.3

Applicable Publications 1.4

Materials 2.1

Sinks 2.2

Traps and Fittings 2.3

Water Faucets 2.4

Fixture Identification 2.6

Countertops 2.10

Installation 3.1

Protection and Cleaning 3.2

13 34 19 Metal Building Systems

Description 1.1

Related Work 1.2

Manufacturer's Qualifications 1.3

Design Criteria 1.4

Sustainability Requirements 1.5

Submittals 1.6

Pre-Installation Conference 1.7

Storage and Protection 1.8

Warranty 1.9

Applicable Publications 1.10

Framing Materials 2.1

Wall Panels 2.2

Roof Panels 2.3

Accessories 2.4

Fabrication 2.5

Factory Finish and Painting 2.6

Miscellaneous Materials 2.7

Erection 3.1

Special Inspection and Testing for Seismis-Resisting

Systems 3.2

22 05 11 Common Work Results for Plumbing

Description 1.1

Related Work 1.2

Applicable Publications 1.3

Submittals 1.4

Quality Assurance 1.5

Delivery, Storage and Handling 1.6

As-Built Documentation 1.7

Materials for Various Services 2.1

Factory-Assembled Products 2.2

Compatibility of Related Equipment 2.3

Safety Guards 2.4

Electric Motors, Motor Control, Control Wiring 2.5

Variable Speed Motor Controllers 2.6

Equipment and Materials Identification 2.7

Firestopping 2.8

Galvanized Repair Compound 2.9

Pipe and Equipment Supports and Restraints 2.10

Pipe Penetrations 2.11

Wall, Floor and Ceiling Plates 2.12

Asbestos 2.13

Tools and Lubricants 2.14

Arrangement and Installation of Equipment and Piping 3.1

Temporary Piping and Equipment 3.2

Pipe and Equipment Supports 3.3

Plumbing Systems Demolition 3.4

Cleaning and Painting 3.5

Identification Signs 3.6

Startup and Temporary Operation 3.7

Operating and Performance Tests 3.8

Operation and Maintenance Manuals 3.9

Commissioning 3.10

Demonstration and Training 3.11

22 05 12 General Motor Requirements for Plumbing

Equipment

Description 1.1

Related Work 1.2

Applicable Publications 1.3

Submittals 1.4

Quality Assurance 1.5

Motors 2.1

Installation 3.1

Field Tests 3.2

22 05 23 General-Duty Valves for Plumbing Piping

Description 1.1

Related Work 1.2

Applicable Publications 1.3

Submittals 1.4

Delivery, Storage and Handling 1.5

Valves, General 2.1

Shut-Off Valves 2.2

Balancing Valves 2.3

Check Valves 2.4

Backflow Preventers 2.5

Thermostatic Mixing Valves 2.6

Examination 3.1

Installation 3.2

Labeling and Identifying 3.3

Adjusting 3.4

Commissioning 3.5

22 05 33 Heat Tracing For Plumbing Piping

Description 1.1

Related Work 1.2

Applicable Publications 1.3

Submittals 1.4

Quality Assurance 1.5

As-Built Documentation 1.6

Self-Regulating Parallel Resistance Heating Cables 2.1

Controls 2.2

Accessories 2.3

General 3.1

Installation 3.2

Tests 3.3

22 07 11 Plumbing Insulation

Description 1.1

Related Work 1.2

Applicable Publications 1.3

Submittals 1.4

Quality Assurance 1.5

As-Built Documentation 1.6

Storage and Handling of Material 1.7

Mineral Fiber or Fiber Glass 2.1

Mineral Wool or Refractory Fiber 2.2

Cellular Glass Closed-Cell 2.3

Insulation Facings and Jackets 2.4

Pipe Covering Protection Saddles 2.5

Adhesive, Mastic, Cement 2.6

Mechanical Fasteners 2.7

Reinforcement and Finishes 2.8

Firestopping Material 2.9

Flame and Smoke 2.10

General Requirements 3.1

Insulation Installation 3.2

Pipe Insulation Schedule 3.3

22 08 00 Commissioning of Plumbing Services

Description 1.1

Related Work 1.2

Summary 1.3

Definitions 1.4

Commissioned Systems 1.5

Submittals 1.6

Construction Inspections 3.1

Pre-Functional Checklists 3.2

Contractors Tests 3.3

Systems Functional Performance Testing 3.4

Training of VA Personnel 3.5

22 11 00 Facility Water Distribution

Description 1.1

Related Work 1.2

Applicable Publications 1.3

Submittals 1.4

Quality Assurance 1.5

Spare Parts 1.6

As-Built Documentation 1.7

Materials 2.1

Above Ground (Interior) Water Piping 2.2

Exposed Water Piping 2.3

Trap Primer Water Piping 2.4

Waterproofing 2.5

Strainers 2.6

Dielectric Fittings 2.7

Sterilization Chemicals 2.8

Water Hammer Arrester 2.9

Installation 3.1

Tests 3.2

Sterilization 3.3

Commissioning 3.4

22 11 23 Domestic Water Pumps

Description 1.1

Related Work 1.2

Applicable Publications 1.3

Submittals 1.4

Quality Assurance 1.5

As-Built Documentation 1.6

Materials 2.1

Hot Water Recirculating Pump 2.2

Startup and Testing 3.1

Commissioning 3.2

Demonstration and Training 3.3

22 13 00 Facility Sanitary and Vent Piping

Description 1.1

Related Work 1.2

Applicable Publications 1.3

Submittals 1.4

Quality Assurance 1.5

As-Built Documentation 1.6

Sanitary Waste, Drain, and Vent Piping 2.1

Exposed Waste Piping 2.2

Specialty Pipe Fittings 2.3

Cleanouts 2.4

Floor Drains 2.5

Traps 2.6

Primer Valves and Trap Seal Primer Systems 2.7

Penetration Sleeves 2.8

Pipe Installation 3.1

Joint Construction 3.2

Specialty Pipe Fittings 3.3

Pipe Hangers, Supports Accessories 3.4

Tests 3.5

Commissioning 3.6

22 33 00 Electric Domestic Water Heaters

Description 1.1

Related Work 1.2

Applicable Publications 1.3

Submittals 1.4

Quality Assurance 1.5

As-Built Documentation 1.6

Electric, Tankless, Domestic Water Heater 2.1

Supports 2.2

Installation 3.1

Leakage Test 3.2

Performance Test 3.3

Startup and Testing 3.4

Commissioning 3.5

Demonstration and Training 3.6

22 34 00 Fuel-Fired Domestic Water Heaters

Description 1.1

Related Work 1.2

Applicable Publications 1.3

Submittals 1.4

Quality Assurance 1.5

As-Built Documentation 1.6

Power Vent, Gas Fired, Storage Domestic Water

Heaters 2.1

Condensing, Gas Fired, Storage Domestic Water

Heaters 2.2

Domestic Hot Water Expansion Tanks 2.3

Heat Traps 2.4

Combination Temperature and Pressure Relief Valves 2.5

Gas Shutoff Valves 2.6

Gas Pressure Regulators 2.7

Automatic Gas Valves 2.8

Thermometers 2.9

Supports 2.10

Installation 3.1

Leakage Test 3.2

Performance Test 3.3

Startup and Testing 3.4

Commissioning 3.5

Demonstration and Training 3.6

22 40 00 Plumbing Fixtures

Description 1.1

Related Work 1.2

Applicable Publications 1.3

Submittals 1.4

Quality Assurance 1.5

As-Built Documentation 1.6

Materials 2.1

Stainless Steel 2.2

Stops 2.3

Escutcheons 2.4

Laminar Flow Control Device 2.5

Carriers 2.6

Water Closets 2.7

Urinals 2.8

Lavatories 2.9

Sinks 2.10

Dispenser, Drinking Water 2.11

Shower Bath Fixture 2.12

Hydrant, Hose Bibb and Miscellaneous Devices 2.13

Installation 3.1

Cleaning 3.2

Commissioning 3.3

Demonstration and Training 3.4

23 05 11 Common Work Results for HVAC

Description 1.1

Related Work 1.2

Applicable Publications 1.3

Submittals 1.4

Quality Assurance 1.5

Delivery, Storage and Handling 1.6

Factory-Assembled Products 2.1

Compatibility of Related Equipment 2.2

Drive Guards 2.3

Lifting Attachments 2.4

Electric Motors 2.5

Equipment and Materials Identification 2.6

Firestopping 2.7

Galvanized Repair Compound 2.8

HVAC Pipe and Equipment Supports and Restraints 2.9

Pipe Penetrations 2.10

Special Tools and Lubricants 2.11

Wall, Floor and Ceiling Plates 2.12

Asbestos 2.13

Installation 3.1

Arrangement and Installation of Equipment and Piping 3.2

Temporary Piping and Equipment 3.3

Rigging 3.4

Pipe and Equipment Supports 3.5

Mechanical Demolition 3.6

Cleaning and Painting 3.7

Identification Signs 3.8

Motor and Drive Alignment 3.9

Lubrication 3.10

Startup and Temporary Operation 3.11

Operating and Performance Tests 3.12

23 05 12 General Motor Requirements for HVAC Equipment

Description 1.1

Related Work 1.2

Applicable Publications 1.3

Submittals 1.4

As-Built Documentation 1.5

Motors 2.1

Installation 3.1

Startup and Testing 3.2

Commissioning 3.3

Demonstration and Training 3.4

23 05 41 Noise and Vibration Control for HVAC Piping and

Equipment

Description 1.1

Related Work 1.2

Applicable Publications 1.3

Submittals 1.4

Quality Assurance 1.5

As-Built Documentation 1.6

General Requirements 2.1

Vibration Isolaters 2.2

Bases 2.3

Sound Attenuating Units 2.4

Installation 3.1

Adjusting 3.2

Startup and Testing 3.3

Commissioning 3.4

Demonstration and Training 3.5

23 05 93 Testing, Adjusting, and Balancing for HVAC

Related Work 1.2

Applicable Publications 1.3

Submittals 1.4

Quality Assurance 1.5

Project Conditions 1.6

Coordination 1.7

Plugs 2.1

Insulation Repair Material 2.2

General 3.1

Contract Documents Review Report 3.2

Examination 3.3

Systems Inspection Report 3.4

Preparation 3.5

Duct Air Leakage Test Report 3.6

Preliminary Tab Reports 3.7

Final Tab Report 3.8

Tab Procedures 3.9

Verification and Alternate Season Tests 3.10

Vibration Testing 3.11

Sound Testing 3.12

Marking of Settings 3.13

Identification of Test Ports 3.14

Commissioning 3.15

23 07 11 HVAC Insulation

Description 1.1

Related Work 1.2

Applicable Publications 1.3

Submittals 1.4

Quality Assurance 1.5

Storage and Handling of Material 1.6

Insulation Materials 2.1

Mineral Fiber Board or Block, Blanket, and Preformed

Pipe Insulation 2.2

Mineral Wool or Refractory Fiber for Insulation 2.3

Flexible Elastomeric Cellular Thermal Preformed Pipe and Equipment Insulation 2.4

Insulation Facings and Jackets 2.5

Pipe Covering Protection Saddles 2.6

Adhesive, Mastic, Cement 2.7

Mastics 2.8

Sealants 2.9

Factory-Applied Jackets 2.10

Field-Applied Jackets 2.11

Tapes 2.12

Mechanical Fasteners 2.13

Reinforcement and Finishes 2.14

Firestopping Material 2.15

Flame and Smoke 2.16

General Requirements 3.1

Insulation Installation 3.2

Insulaton Application - Ductwork 3.3

Insulation Application - Piping 3.4

Commissioning 3.5

23 08 00 Commissioning of HVAC Systems

Description 1.1

Related Work 1.2

Summary 1.3

Definitions 1.4

Commissioned Systems 1.5

Submittals 1.6

Construction Inspections 3.1

Pre-Functional Checklists 3.2

Contractors Tests 3.3

Systems Functional Performance Testing 3.4

Training of VA Personnel 3.5

23 09 23 Direct-Digital Control System for HVAC

Description 1.1

Definitions 1.2

Related Work 1.3

Applicable Publications 1.4

Submittals 1.5

Direct Digital Controllers 2.1

Direct Digital Control Software 2.2

Sensors (Air and Water) 2.3

Control Cables 2.4

Thermostats 2.5

Installation 3.1

Startup and Testing 3.2

Commissioning 3.3

23 11 23 Facility Natural-Gas Piping

Description 1.1

Related Work 1.2

Applicable Publications 1.3

Submittals 1.4

As-Built Documentation 1.5

System Pressure 1.6

Fuel Gas Service Connections to Building 2.1

Fuel Gas Piping Above Ground 2.2

Exposed Fuel Gas Piping 2.3

Valves 2.4

Waterproofing 2.5

Strainers 2.6

Dielectric Fittings 2.7

Gas Equipment Connectors 2.8

Cleaning of System After Installation 3.2

Tests 3.3

Startup and Testing 3.4

Commissioning 3.5

Demonstration and Training 3.6

23 23 00 Refrigerant Piping

Description 1.1

Related Work 1.2

Applicable Publications 1.3

Submittals 1.4

Quality Assurance 1.5

As-Built Documentation 1.6

Piping and Fittings 2.1

Gages 2.2

Pipe Supports 2.3

Refrigerants and Oil 2.4

Pipe/Conduit Roof Penetration Cover 2.5

Pipe Insulation for DX HVAC Systems 2.6

Installation 3.1

Pipe and Tubing Insulation 3.2

Signs and Identification 3.3

Field Quality Control 3.4

Field Tests 3.5

System Test and Charging 3.6

Startup and Testing 3.7

Commissioning 3.8

Demonstration and Training 3.9

23 31 00 HVAC Ducts and Casings

Description 1.1

Related Work 1.2

Applicable Publications 1.3

Submittals 1.4

Quality Assurance 1.5

As-Built Documentation 1.6

Duct Materials and Sealants 2.1

Duct Construction and Installation 2.2

Manual Volume Dampers 2.3

Flexible Air Duct 2.4

Flexible Connections 2.5

Turning Vanes 2.6

Prefabricated Roof Curbs 2.7

Roof Hoods and Goosenecks 2.8

Installation 3.1

Duct Leakage Tests and Repair 3.2

Testing, Adjusting, and Balancing (TAB) 3.3

Startup and Testing 3.4

Commissioning 3.5

Demonstration and Training 3.6

23 34 00 HVAC Fans

Related Work 1.2

Applicable Publications 1.3

Submittals 1.4

Quality Assurance 1.5

As-Built Documentation 1.6

Prefabricated Roof Curbs 2.1

Propellor Fans 2.2

Installation 3.1

Pre-Operation Maintenance 3.2

Startup and Testing 3.3

Commissioning 3.4

Demonstration and Training 3.5

23 37 00 Air Outlets and Inlets

Description 1.1

Related Work 1.2

Applicable Publications 1.3

Submittals 1.4

Quality Assurance 1.5

As-Built Documentation 1.6

Gravity Type Air Intake/Exhaust Hoods 2.1

Prefabricated Roof Curbs 2.2

Equipment Supports 2.3

Air Outlets and Inlets 2.4

Wire Mesh Grille 2.5

Installation 3.1

Testing, Adjusting, and Balancing (TAB) 3.2

Startup and Testing 3.3

Commissioning 3.4

Demonstration and Training 3.5

23 81 00 Decentralized Unitary HVAC Equipment

Description 1.1

Related Work 1.2

Quality Assurance 1.3

Submittals 1.4

Applicable Publications 1.5

Unitary Air Conditioners - General 2.1

Conventional Single Zone Split System Air Conditioners 2.2

Variable Flow Refrigerant System (VFR) 2.3

Outdoor Ventilation Unit (DOAS) 2.4

Heat Exchange Ventilation Unit 2.5

Installation 3.1

Connections 3.2

Field Quality Control 3.3

Instructions 3.4

Startup and Testing 3.5

Commissioning 3.6

Demonstration and Training 3.7

23 82 39 Unit Heaters

Description 1.1

Related Work 1.2

Applicable Publications 1.3

Submittals 1.4

Quality Assurance 1.5

As-Built Documentation 1.6

Propellor Unit Heaters 2.1

Examination 3.1

Installation 3.2

Connections 3.3

Startup and Testing 3.4

Commissioning 3.5

Demonstration and Training 3.6

26 05 11 Requirements for Electrical Installations

Description 1.1

Minimum Requirements 1.2

Test Standards 1.3

Qualifications (Manufacturers, Products and Services) 1.4

Applicable Publications 1.5

Manufactured Products 1.6

Variations From Contract Requirements 1.7

Materials and Equipment Protection 1.8

Work Performance 1.9

Equipment Installation and Requirements 1.10

Equipment Identification 1.11

Submittals 1.12

Singular Number 1.13

Warranty 1.15

Training 1.16

26 05 13 Medium Voltage Cables

Description 1.1

Related Work 1.2

Quality Assurance 1.3

Factory Tests 1.4

Submittals 1.5

Applicable Publications 1.6

Shipment and Storage 1.7

Cable 2.1

Splices and Terminations 2.2

Fireproofing Tape 2.3

General 3.1

Protection During Splicing Operations 3.2

Pulling Cables in Ducts and Manholes 3.3

Splices and Terminations 3.4

Fireproofing 3.5

Circuit Identification of Feeders 3.6

Acceptance Checks and Tests 3.7

26 05 19 Low-Voltage Electrical Power Conductors and

Cables

Description 1.1

Related Work 1.2

Quality Assurance 1.3

Submittals 1.4

Applicable Publications 1.5

Conductors 2.1

Splices 2.2

Control Wiring 2.3

Wire Lubricating Compound 2.4

Connectors and Terminations 2.5

Installation, General 3.1

Installation in Manholes 3.2

Splice Installation 3.3

Control and Signal Wiring Installation 3.4

Control and Signal System Identification 3.5

Feeder Identification 3.6

Existing Conductors and Cables 3.7

Acceptance Checks and Tests 3.8

26 05 26 Grounding and Bonding for Electrical Systems

Description 1.1

Related Work 1.2

Quality Assurance 1.3

Submittals 1.4

Applicable Publications 1.5

Grounding and Bonding Conductors 2.1

Ground Rods 2.2

Ground Connections 2.4

Equipment Rack and Cabinet Ground Bars 2.5

Ground Terminal Blocks 2.6

Grounding Bus Bar 2.7

General 3.1

Inaccessible Grounding Conditions 3.2

Secondary Equipment and Circuits 3.3

Corrosion Inhibitors 3.4

Conductive Piping 3.5

Lightning Protection System 3.6

Electrical Room Grounding 3.7

Wireway Grounding 3.8

Ground Resistance 3.9

Ground Rod Installation 3.10

Acceptance Checks and Tests 3.11

26 05 33 Raceway and Boxes for Electrical Systems

Description 1.1

Related Work 1.2

Quality Assurance 1.3

Submittals 1.4

Applicable Publications 1.5

Material 2.1

Conduit Penetrations 3.2

Conduit Installation - Concealed 3.3

Conduit Installation - Exposed 3.4

Conduit Installation - Direct Burial 3.5

Conduit Installation - Wet or Damp Locations 3.7

Conduit Installation - Motors and Vibrating Equipment 3.8

Conduit Installation - Expansion Joints 3.9

Conduit Supports 3.10

Box Installation 3.11

26 05 41 Underground Electrical Construction

Description 1.1

Related Work 1.2

Quality Assurance 1.3

Submittals 1.4

Applicable Publications 1.5

Pre-Cast Concrete Manholes and Hardware 2.1

Pullboxes 2.2

Ducts 2.3

Grounding 2.4

Warning Tape 2.5

Pull Rope for Spare Ducts 2.6

Manhole And Pullbox Installation 3.1

Trenching 3.2

Duct Installation 3.3

Acceptance Checks and Tests 3.4

26 05 73 Overcurrent Protective Device Coordination Study

Description 1.1

Related Work 1.2

Quality Assurance 1.3

Submittals 1.4

Applicable Publications 1.5

Study Requirements 1.6

Analysis 1.7

Adjustments, Settings, and Modifications 1.8

26 08 00 Commissioning of Electrical Systems

Description 1.1

Related Work 1.2

Summary 1.3

Definitions 1.4

Commissioned Systems 1.5

Submittals 1.6

Construction Inspections 3.1

Pre-Functional Checklists 3.2

Contractors Tests 3.3

Systems Functional Performance Testing 3.4

Training of VA Personnel 3.5

26 09 23 Lighting Controls

Related Work 1.2

Quality Assurance 1.3

Submittals 1.4

Applicable Publications 1.5

Electronic Time Switches 2.1

Electromechanical-Dial Time Switches 2.2

Outdoor Photoelectric Switches 2.3

Timer Switches 2.4

Ceiling-Mounted Photoelectric Switches 2.5

Skylight Photoelectric Switches 2.6

Indoor Occupancy Sensors 2.7

Indoor Vacancy Sensor Switch 2.8

Outdoor Motion Sensor (PIR) 2.9

Lighting Control System - Digital Addressable Lighting

Interface (DALI) 2.10

Installation 3.1

Acceptance Checks and Tests 3.2

Follow-Up Verification 3.3

Instruction 3.4

26 22 00 Low-Voltage Transformers

Description 1.1

Related Work 1.2

Quality Assurance 1.3

Submittals 1.4

Applicable Publications 1.5

Transformers 2.1

Installation 3.1

Acceptance Checks and Tests 3.2

26 24 16 Panelboards

Description 1.1

Related Work 1.2

Quality Assurance 1.3

Submittals 1.4

Applicable Publications 1.5

General Requirements 2.1

Enclosures and Trims 2.2

Molded Case Circuit Breakers 2.3

Installation 3.1

Acceptance Checks and Tests 3.2

26 27 26 Wiring Devices

Description 1.1

Related Work 1.2

Quality Assurance 1.3

Submittals 1.4

Applicable Publications 1.5

Receptacles 2.1

Toggle Switches 2.2

Manual Dimming Control 2.3

Wall Plates 2.4

Installation 3.1

Acceptance Checks and Tests 3.2

26 29 11 Motor Controllers

Description 1.1

Related Work 1.2

Quality Assurance 1.3

Submittals 1.4

Applicable Publications 1.5

Motor Controllers 2.1

Manual Motor Controllers 2.2

Magnetic Motor Controllers 2.3

Low-Voltage Variable Speed Motor Controllers (VSMC) 2.5

Installation 3.1

Acceptance Checks and Tests 3.2

Spare Parts 3.3

Instruction 3.4

26 29 21 Enclosed Switches and Circuit Breakers

Description 1.1

Related Work 1.2

Quality Assurance 1.3

Submittals 1.4

Applicable Publications 1.5

Fused Switches Rated 600 Amperes and Less 2.1

Unfused Switches Rated 600 Amperes and Less 2.2

Fused Switches Rated Over 600 Amperes to 1200

Amperes 2.3

Motor Rated Toggle Switches 2.4

Separately-Enclosed Circuit Breakers 2.5

Installation 3.1

Acceptance Checks and Tests 3.2

Spare Parts 3.3

26 32 13 Engine Generators

Description 1.1

Related Work 1.2

Quality Assurance 1.3

Factory Tests 1.4

Submittals 1.5

Storage and Handling 1.6

Job Conditions 1.7

Applicable Publications 1.8

General Requirements 2.1

Engine 2.2

Governor 2.3

Lubrication Oil System 2.4

Fuel System - Natural Gas 2.5

Cooling System 2.6

Air Intake and Exhaust Systems 2.7

Engine Starting System 2.8

Lubricating Oil Heater 2.9

Jacket Coolant Heater 2.10

Generator 2.11

Generator Overcurrent and Fault Protection 2.12

Controls 2.13

Remote Manual Stop Station 2.14

Remote Annunciator Panel 2.15

Sound-Attenuated Enclosure 2.16

Spare Parts 2.17

Installation 3.1

Acceptance Checks and Tests 3.2

Instructions and Final Inspections 3.3

26 36 23 Automatic Transfer Switches

Description 1.1

Related Work 1.2

Quality Assurance 1.3

Submittals 1.4

Applicable Publications 1.5

General Requirements 2.1

Sequence of Operation 2.2

Remote Annunciator System 2.4

Installation 3.1

Acceptance Checks and Tests 3.2

Field Settings Verification 3.3

Instruction 3.4

26 41 00 Facility Lightning Protection

Description 1.1

Related Work 1.2

Quality Assurance 1.3

Submittals 1.4

Applicable Publications 1.5

General Requirements 2.1

Installation 3.1

Acceptance Checks and Tests

(c) (d) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q)

26 51 00 Interior Lighting

Description 1.1

Related Work 1.2

Quality Assurance 1.3

Submittals 1.4

Applicable Publications 1.5

Lighting Fixtures 2.1

Ballasts 2.2

ACTION

DATE FWD TO

APPR AUTH /

DATE RCD

FROM CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

C&C Contractors

CONTRACTOR

APPROVAL

NEEDED BY

MATERIAL

NEEDED BY

DATE OF ACTION

(e) (f)

CONTRACTOR

APPROVING AUTHORITY

SCHEDULE DATES

SUBMIT

A C T I O N

C O D E

A C T I O N

C O D E

P A

R A

G R

A P

H

C L

A S

S

IF

IC

A

T

IO

N

DATE OF

ACTION

MAILED TO

CONTR / DATE

RCD FROM

APPR AUTH

3.2

SUBMITTAL REGISTER

CONTRACTOR

A

C

T

I

V

I

T

Y

N

O

S P E C

S E C T

CONTRACT NO.

828CM2036

TITLE AND LOCATION

Barrancas National Cemetery Phase 2B Expansion, Pensacola, FL

DESCRIPTION ITEM

SUBMITTED

Fluorescent Emergency Ballast 2.3

Emergency Lighting Unit 2.4

Lamps 2.5

LED Exit Light Fixtures 2.6

LED Light Fixtures 2.7

Installation 3.1

Acceptance Checks and Tests 3.2

26 56 00 Exterior Lighting

Description 1.1

Related Work 1.2

Quality Assurance 1.3

Submittals 1.4

Applicable Publications 1.5

Delivery, Storage and Handling 1.6

General 2.1

Poles 2.2

Foundations for Poles 2.3

Luminaires 2.4

Lamps 2.5

LED Drivers 2.9

Lighting Contractors 2.10

Controls 2.11

Existing Lighting Systems 2.12

Installation 3.1

Grounding 3.2

Acceptance Checks and Tests 3.3

27 05 11 Requirements for Communications Installations

Description 1.1

References 1.2

Applicable Publications 1.3

Singular Number 1.4

Related Work 1.5

Administrative Requirements 1.6

Submittals 1.7

Closeout Submittals 1..8

Maintenance Material Submittals 1.9

Quality Assurance 1.10

Delivery, Storage and Handling 1.11

Field Conditions 1.12

Warranty 1.13

Performance and Design Criteria 2.1

Equipment Identification 2.2

Underground Warning Tape 2.3

Wire Lubricating Compound 2.4

Fireproofing Tape 2.5

Underground Cables 2.6

Preparation 3.1

Installation - General 3.2

Equipment Installation 3.3

Equipment Identification 3.4

Cutting and Patching 3.5

Field Quality Control 3.6

Cleaning 3.7

Training 3.8

Protection 3.9

Color Chart 3.10

27 05 26 Grounding and Bonding For Communications

Systems

Description 1.1

Related Work 1.2

Submittals 1.3

Components 2.1

Equipment Installation and Requirements 3.1

Labeling 3.2

Field Quality Control 3.3

27 05 33 Raceways and Boxes for Communications Systems

Description 1.1

Related Work 1.2

Submittals 1.3

Material 2.1

Communications Handholes and Boxes for Exterior

Underground Communications Wiring 2.2

Pre-Cast Concrete Communications Manholes and

Hardware 2.3

Warning Tape 2.4

Equipment Installation and Requirements 3.1

Exisitng Conduits 3.2

Testing 3.3

27 08 00 Commissiong of Communications Systems

Description 1.1

Related Work 1.2

Coordination 1.3

Closeout Submittals 1.4

Field Quality Control 3.1

Training 3.2

27 10 00 Control, Communication and Signal Wiring

Description 1.1

Related Work 1.2

Submittals 1.3

Control Wiring 2.1

Communication and Signal Wiring 2.2

Installation Kit 2.3

Existing Wiring 2.4

Installation 3.1

Equipment Identification 3.2

Testing 3.3

27 11 00 Telecommunications Room Fittings

Description 1.1

Submittals 1.3

Equipment and Materials 2.1

Preparation 3.1

Installation 3.2

27 15 00 Communications Structured Cabling

Description 1.1

Related Work 1.2

Submittals 1.3

Warranty 1.4

Performance and Design Criteria 2.1

Equipment and Materials 2.2

Distribution Equipment and Systems 2.3

Patch Cords 2.4

Installation 3.1

Field Quality Control 3.2

Maintenance 3.3

27 41 31 Master Antenna Television Equipment and Systems

Description 1.1

Related Work 1.2

Coordination 1.3

Submittals 1.4

Warranty 1.5

Performance and Design Criteria 2.1

Head End Equipment and Room 2.2

Distribution Equipment 2.3

Topology "Tree" 2.4

Examination 3.1

Installation 3.2

Field Quality Control 3.3

Training 3.4

Maintenance 3.5

28 05 00 Common Work Results for Electronic Safety and

Security

Description 1.1

Related Work 1.2

Definitions 1.3

Quality Assurance 1.4

General Arrangement of Contract Documents 1.5

Submittals 1.6

Applicable Publications 1.7

Coordination 1.8

Maintenance and Service 1.9

Minimum Requirements 1.10

Delivery, Storage and Handling 1.11

Project Conditions 1.12

Equipment and Materials 1.13

Electrical Power 1.14

Transient Voltage Suppression, Power Surge

Supplesion, and Grounding 1.15

Component…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .