This solicitation is for Phase 4 expansion of the Dallas Fort Worth National Cemetery. The solicitation requires construction of additional gravesites, buildings including a new administration building and soil storage building, and cemetery improvements across approximately 56 acres of land. The scope of work includes approximately 12,430 pre-placed crypt full casket gravesites, 615 oversize pre-placed crypt casket gravesites, approximately 600 traditional gravesites, approximately 3,000 in-ground cremains gravesites, a 300-grave Hybrid Natural Burial Section, associated earthwork, drainage, fencing, roads, parking, utilities, signage and site furnishings. The project also requires a new irrigation system. All work must be completed within 900 calendar days of the Notice to Proceed. The estimated cost of construction is between $20-50 million. The solicitation is set aside for Service-Disabled Veteran Owned Small Businesses and proposals are due by August 8, 2020 to the Department of Veterans Affairs Office of Construction and Facilities Management.

View the file

Other files

File Type Posted
Dallas PPI - 2.pdf PDF
Dallas PPI - 1.pdf PDF
DNC Pre-Bid Sign-In Sheet 15 July 2020.jpeg JPEG file
CS-Sheets 1 of 3.pdf PDF
Final Dallas 36C10F20R0056_3 (7-9-2020).pdf PDF
Dallas-Fort Worth National Cemetery Cx Plan - V1 - 3-27-2020.pdf PDF
000 Base Bid Submittal Register.pdf PDF
Pre-Functional Checklists.pdf PDF
BID DOCUMENTS SWPPP DFW VA CEM PH4.pdf PDF
V-Sheets.pdf PDF
X-Sheets.pdf PDF
CG-Sheets 1 of 2.pdf PDF
CP-Sheets.pdf PDF
LP-Sheets.pdf PDF
G-Sheets.pdf PDF
T-Sheets.pdf PDF
A-Sheets.pdf PDF
DALLAS WAGE RATES.pdf PDF
F-Sheets.pdf PDF
I-Sheets.pdf PDF
E-Sheets.pdf PDF
CS-Sheets 2 of 3.pdf PDF
S-Sheets.pdf PDF
ATTACHMENT 2_PAST PERF QUEST.docx DOCX document
Final Dallas 36C10F20R0056_3 (7-9-2020).pdf PDF
M-Sheets.pdf PDF
Base Bid Specification Package.pdf PDF
CG-Sheets 2 of 2.pdf PDF
B-Sheets.pdf PDF
P-Sheets.pdf PDF
CS-Sheets 3 of 3.pdf PDF
CD-Sheets.pdf PDF
CU-Sheets.pdf PDF
ATTACHMENT 3 - Dallas Pre-Proposal Inquiry (PPI) Form.docx DOCX document
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DALLAS, TEXAS

916CM2012

DALLAS - FORT WORTH

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

MKEC Engineering, Inc.

Ken Kallenbach

(316) 684-9600

Architect:

TK-Architecture, LLC Tom Kapels

(719) 325-9303

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

RCDD:

APOGEE Consulting Jim Ezekiel

(919) 535-3878

MEP:

Miller Remick Tom Chapman

(856) 429-4000

Cost Estimating:

MOCA Cost Engineering Todd Waddle

(850) 389-8131

Surveying, Water Wells & Treatment:

Fabre Engineering & Surveying Frank Fabre

(850) 433-6438

Geotechnical Engineering:

Terracon Consultants Jennifer Peters

(210) 907-7648

PHASE 4 DEVELOPMENT

03-31-2020

OF 246

BID DOCUMENTS

LI100

JDL/RWBCCT

ROBERT W. BECCARD

84064P R O F E S S I O N A L E N G I N E E R

S T A T E O F T E X A S

L I C E N S E D

IRRIGATION NOTES AND

LEGEND

IRRIGATION SYSTEM GENERAL DESCRIPTION LEGEND

Q

A-1

2"

A

24 24

B

2 2

.5

GENERAL NOTES

FLAG NOTES

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

TT

ET

CO

CO

CO

CO

CO

CO

I

I

I

W

W

BT

BT

BT

BT

BT

BT

BT

BT

BT

BT

BT

BT

BT

BT

BT

BT

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

BE

BE

BE

BE

BE

BE

OH

E

BT

BT

BE

BT

BT

BT

BT

BT

BT

BT

BT

BT

BT

BT

BT

BT

BT

BT

BT

BT

BT

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OHE

OHE

OHE

OHE

OHE

OHE

OPERATE EXISTING REMOTE CONTROL VALVE FROM

CONTROLLER TO VERIFY OPERATION OF CONTROL

WIRE. REMOVE EXISTING REMOTE CONTROL VALVE

AND REPLACE. RECONNECT EXISTING CONTROL WIRE.

OPERATE EXISTING REMOTE CONTROL VALVE FROM

CONTROLLER TO VERIFY OPERATION OF CONTROL

WIRE. REMOVE EXISTING REMOTE CONTROL VALVE

AND REPLACE. RECONNECT EXISTING CONTROL WIRE.

OPERATE EXISTING REMOTE CONTROL VALVE FROM

CONTROLLER TO VERIFY OPERATION OF CONTROL

WIRE. REMOVE EXISTING REMOTE CONTROL VALVE

AND REPLACE. RECONNECT EXISTING CONTROL WIRE.

ABANDON EXISTING MAINLINE AND

REMOTE CONTROL VALVES IN PLACE.

BRING CONTROL WIRE TO NEW

REMOTE CONTROL VALVES NEXT TO

ADMIN BUILDING.

12"

12"

12"

12"

12"

10" 10"

10"

4"

10"

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DALLAS, TEXAS

916CM2012

DALLAS - FORT WORTH

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

MKEC Engineering, Inc.

Ken Kallenbach

(316) 684-9600

Architect:

TK-Architecture, LLC Tom Kapels

(719) 325-9303

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

RCDD:

APOGEE Consulting Jim Ezekiel

(919) 535-3878

MEP:

Miller Remick Tom Chapman

(856) 429-4000

Cost Estimating:

MOCA Cost Engineering Todd Waddle

(850) 389-8131

Surveying, Water Wells & Treatment:

Fabre Engineering & Surveying Frank Fabre

(850) 433-6438

Geotechnical Engineering:

Terracon Consultants Jennifer Peters

(210) 907-7648

PHASE 4 DEVELOPMENT

03-31-2020

OF 246

BID DOCUMENTS

LI101

JDL/RWBCCT

ROBERT W. BECCARD

84064P R O F E S S I O N A L E N G I N E E R

S T A T E O F T E X A S

L I C E N S E D

IRRIGATION DEMOLITION

1" =

40' 0' 20' 40' 80'

40'

X X X X X X X X X X X X X X X X X X

X

X

NORTH

VICINITY MAP

SCALE 1"=1000'

MOUNTAIN CREEK PKWY

LO

N

E STAR CIR

R I O

G

RAND DR

ROAD 5

ROAD 4

ROAD 2 ROAD 1

ROAD 1

RO

AD 1

ROAD 3

LI101

TT

O O O O O O OO O O

O

O

FLO

R

AL /

G

R O

U N

D

S PO

LIC

Y

FLO

R

AL /

G

R O

U N

D

S PO

LIC

Y

FL

O

RA

L

GR

OU

ND

S

PO

LI

CY

FL

O

R

AL

G

R O

U N

D S

PO

LI

C Y

8"

8"

8"

8"

8"

8"

8"

8"

8"

8"

8"

10"

10"

8"

8"

8"

4"7

2.5"

2"

1.5"

3"

4"

3" 3" 2.5" 2" 1.5"

4"

3" 3" 2.5" 2" 1.5"

4"

3" 3" 2.5" 2" 1.5"

4"

3"

3" 2.5"

2" 1.5"

3"

2.5"

2"

2"

1.25"

1.25"

3"

3" 2.5" 2" 1.5"

3"

3" 2.5" 2" 1.5"

3"

3" 2.5" 2" 1.5"

3"

3" 2.5" 2" 1.5"

3"

3" 2.5" 2" 1.5"

3"

3" 2.5" 2" 1.25"

3"

3" 2.5" 2" 1.5"

3"

2"

1.25"

2.5"

2"

1.25"

3"

3" 2.5" 2" 1.5"

3"

3" 2.5" 2" 1.5"

3" 2.5" 2" 1.25"

2.5"

1.25"

2"

1.25"

1.25"

2.5"

2.5" 2" 1.5"

3"

3"

2.5"

2" 1.25"

2.5" 2" 1.5"

2.5"

2"

1.5"

4"

3"3"2.5"2"1.5"

3"

3"2.5"2"1.5"

4"

3"3"2.5"2"1.5"

4"

3"3" 2.5"2"1.5"

3"

3"2.5"2"1.5"

3"

3"2.5"2"1.5"

3"

2.5"

2"

2"

1.25"

1.25"

3"

3"2.5"2"1.5"

3"

3"2.5"2"1.5"

3"

3"2.5"2"1.25"

3"

3"2.5"2"1.5"

3"

3"2.5"2"1.5"

3"

2.5"2"1.25"

3"

2.5"2"1.5"

3"

3"2.5"2"1.5"

3"

2"

1.25"

2.5"

2"

1.25"

3"

2"1.25" 2.5"

2"

2"

1.25"

4"

4"2.5"

2.5"

2.5"2"

2"1.25"

1.5"

3"

2.5"2"1.5"

4"

4"

4"

4"

4"

4"

3"

3"

3"

3"

8"

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

24 24

Q

A-1

3"

A-2

3"

A-3

3"

A-4

3"

A-6

2"

A-7

2"

A-8

2"

A-9

2"

A-10

2"

A-11

2"

A-12

2"

A-13

2"

A-15

2"

A-16

2"

A-17

2"

A-18

2"

A-19

2"

A-20

2"

A-21

2"

B-9

A-42

3"

A-41

2"

A-40

3"

A-39

3"

A-37

2"

A-36

2"

A-35

2"

A-34

2"

A-33

2"

A-32

2"

A-31

2"

A-30

2"

A-29

2"

A-28

2"

A-27

2"

A-26

2"

A-24

2"

A-23

3"

A-22

2"

.5

.5

.5 .5

.5

.5 .5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

A-38

1"

A-25

1"

A-14

1"

A-5

1"

.5

.5

.5

.5

1.25"

1.25"

.5

.5

1.25"

1.25"

.5

.5

.5

.5

.5

.5

.5

.5

1.25"

1.25"

.5

.5

.5

.5

.5

1.25"

1.25"

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DALLAS, TEXAS

916CM2012

DALLAS - FORT WORTH

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

MKEC Engineering, Inc.

Ken Kallenbach

(316) 684-9600

Architect:

TK-Architecture, LLC Tom Kapels

(719) 325-9303

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

RCDD:

APOGEE Consulting Jim Ezekiel

(919) 535-3878

MEP:

Miller Remick Tom Chapman

(856) 429-4000

Cost Estimating:

MOCA Cost Engineering Todd Waddle

(850) 389-8131

Surveying, Water Wells & Treatment:

Fabre Engineering & Surveying Frank Fabre

(850) 433-6438

Geotechnical Engineering:

Terracon Consultants Jennifer Peters

(210) 907-7648

PHASE 4 DEVELOPMENT

03-31-2020

OF 246

BID DOCUMENTS

LI201

JDL/RWBCCT

ROBERT W. BECCARD

84064P R O F E S S I O N A L E N G I N E E R

S T A T E O F T E X A S

L I C E N S E D

IRRIGATION PLAN

1" =

40' 0' 20' 40' 80'

40'

MATCHLINE SEE SHEET LI202

M

AT

C H

LI

N

E

SE

E

SH

EE

T

LI

X X X X X X X X X X X X X X X X X X

X

X

NORTH

VICINITY MAP

SCALE 1"=1000'

MOUNTAIN CREEK PKWY

LO

N

E STAR CIR

R I O

G

RAND DR

ROAD 5

ROAD 4

ROAD 2 ROAD 1

ROAD 1

RO

AD 1

ROAD 3

LI203

LI202

LI201

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

FLORAL /

GROUNDS POLICY

FLORAL /

GROUNDS POLICY

FLORAL /

GROUNDS POLICY

8"

8"

8"

8"

8"

8"

8"

8"

8"

4"

4"

3"

3"

3"

8"

8"

8"

8"

8"

8"

3"

3"

3"

3" 2.5" 2" 1.5"

3"

3" 2.5" 2" 1.5"

3"

2"

1.25"

2.5" 2"

1.25"

3"

1.25" 3"

2.5"

2"

1.25"

3"

2"

2"

2"

1.25"1.25"

3"

2.5"

2"

1.5"

3"

2.5"

2"

1.25"

3"

2.5"

2"

1.5"

3"

3"

2.5"

2"

3"

2"

2"

2"

1.25"

1.25"

3"

2.5"

2"

1.5"

2.5"

2"

1.5"

2"

1.25"

8"

3" 2.5"

2"

2"1.25"

1.25"

3"

2.5"2"1.5"

3"

3"2.5"2"1.5"

3"

3"

2.5"

3"3"2.5"

3"

4"

2.5"

3"

8"

8"

8"

8"

8"

8"

8"

8"

8"

8"

8"

8"

8"

8"

8"

8"

8"

8"

8"

1.25"

2"

4"

4"

3"

3"

2.5"

2"

1.5"

3"

3"

2.5"

2"

1.5"

2.5"

2"

2"

1.25"

2.5"

2"

1.25"

3"

3"

2.5"

2"

1.5"

3"

3"

2.5"

2"

1.5"

Q

Q

Q

Q

Q

A B

Q

Q

B-1

2"

B-2

2"

B-3

2"

B-4

2"

B-14

2"

B-15

2"

B-12

2"

- B-13

2"

B-11

2"

B-9

2"

B-5

2"

B-6

2"

B-7

2"

B-8

2"

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5.5 .5

.5 .5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5 .5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5.5

.5.5

Q

Q

Q

Q

Q

Q

Q

Q

Q

.5

.5

.5

.5

B-17

1.5"

.5

.5

B-16

1"

B-10

2"

Q

Q

Q

.5 .5

.5 .5

.5 .5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5 .5

.5

.5 .5

.5 .5

.5

.5 .5

.5

.5

.5

.5

.5 .5

.5

B-20

3"

B-19

2"

B-18

2"

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

1.25"

1.25"

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

2"

2" 1.5"

1.5"

1.25"

1.25"

.5

.5

.5

.5

.5

.5

.5

1.25"

2" 1.5"

1.5" 1.25"

1.5"

1.5"

1.25"

8"

8"

8" 8" 8"

8"

8"

.5

.5

.5

.5

.5

.5

.5

.5

.5

Q

Q

Q

.5.5

.5

1.25"

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DALLAS, TEXAS

916CM2012

DALLAS - FORT WORTH

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

MKEC Engineering, Inc.

Ken Kallenbach

(316) 684-9600

Architect:

TK-Architecture, LLC Tom Kapels

(719) 325-9303

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

RCDD:

APOGEE Consulting Jim Ezekiel

(919) 535-3878

MEP:

Miller Remick Tom Chapman

(856) 429-4000

Cost Estimating:

MOCA Cost Engineering Todd Waddle

(850) 389-8131

Surveying, Water Wells & Treatment:

Fabre Engineering & Surveying Frank Fabre

(850) 433-6438

Geotechnical Engineering:

Terracon Consultants Jennifer Peters

(210) 907-7648

PHASE 4 DEVELOPMENT

03-31-2020

OF 246

BID DOCUMENTS

LI202

JDL/RWBCCT

ROBERT W. BECCARD

84064P R O F E S S I O N A L E N G I N E E R

S T A T E O F T E X A S

L I C E N S E D

IRRIGATION PLAN

1" =

40' 0' 20' 40' 80'

40'

MATCHLINE SEE SHEET LI201

X X X X X X X X X X X X X X X X X X

X

X

NORTH

VICINITY MAP

SCALE 1"=1000'

MOUNTAIN CREEK PKWY

LO

N

E STAR CIR

R I O

G

RAND DR

ROAD 5

ROAD 4

ROAD 2 ROAD 1

ROAD 1

RO

AD 1

ROAD 3

LI203

LI202

LI201

M

AT

C

H

LI

N E

SE

E

SH

EE

T

LI

MATCHLINE THIS SHEET

MATCHLINE THIS SHEET

I

I

I

I

I

I

I

I

I

I

I

I

I

I

TT

ET

CO

CO

CO

CO

CO

CO

I

I

I

W

W

BT

BT

BT

BT

BT

BT

BT

BT

BT

BT

BT

BT

BT

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OHE

OHE

OHE

OHE

OHE

OHE

BE

BE

BE

BE

BE

OH

E

BT

BT

BE

BT

BT

BT

BT

BT

BT

BT

BT

BT

BT

BT

BT

BT

BT

BT

BT

BT

BT

BT

BT

BT

BT

BT

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OHE

OHE

OHE

OHE

OHE

FLO

RAL /

G R

O U

N D

S PO

LIC

Y

POTHOLE AND LOCATE EXISTING POTABLE WATER MAIN

PRIOR TO INSTALLATION OF IRRIGATION MAINLINE.

DEPTH OF POTABLE WATER MAIN IS NOT KNOWN. INSTALL

IRRIGATION MAINLINE BELOW POTABLE WATER MAIN.

12"

12"

12"

12"

12"

12"

10" 10"

8" 8"

8"

8"

8"

8"

10"

4"

10"

4"

4"

8"

8"

8"

3"

2.5"

2"

1.5"

4"

4"

4" 4"

1.25"

1.25"

3"

3"

2.5"

3"

2.5"

2"

1.5"

2"

1.25"3"

2"

1.25"

2"

1.25"

2"

2"

1.5"

1.25"

1.5"

8"

3"

2.5"

2"

2"

1.5"

1.25"

2.5"

2"

1.25"

3" 2.5"

2"

3"

Q

A B

Q

A-1

3"

A-2

3"

A-3

3"

A-4

3"

A-6

2"

A-7

2"

A-8

2"

A-9

2"

B-24

2"

B-25

2"

B-26

2"

.5

.5

.5

D-30

1.5"

D-21

1.5"

D-22

2"

D-24

2"

D-25

1.5"

D-26

1.5"

D-27

2"

D-28

1"

Q

Q

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

A-5

1"

B-28

1"

B-27

1.5"

Q

Q

.5 .5

.5 .5

.5 .5

.5

.5

B-23

2"

B-22

2"

B-21

2"

.5

.5

.5

Q

2 2

2 2

2"

2"

1.25" 1.25"

1.25"

1.25"

1.5"

1.5"

1.25"

1.25" 1.25"

2.5" 1.25"

1.25"

2.5" 1.25"2"

1.25"

2" 1.5"

1.25" 1.25"

1.5"

1.25"

1.25"

.5

.5

.5

.5

1.25"

.5

.5

2"

.5 .5

.5 .5

.5 .5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5 .5

.5

.5

.5

.5

.5

.5

1.25"

1.25"

D-29

1"

.5 .5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5.5 .5 .5

.5

.5

.5 .5

.5

.5

.5

.5

.5

.5

.5 .5

.5

.5

.5

2"

1.5"

1.25"

D-23

1"

.5 .5

1.25"

.5

.5

1.5"

1.25" 1.25"

3"

3"

2"

2.5"

2"

1.25"

2"

2"

1.25"

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DALLAS, TEXAS

916CM2012

DALLAS - FORT WORTH

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

MKEC Engineering, Inc.

Ken Kallenbach

(316) 684-9600

Architect:

TK-Architecture, LLC Tom Kapels

(719) 325-9303

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

RCDD:

APOGEE Consulting Jim Ezekiel

(919) 535-3878

MEP:

Miller Remick Tom Chapman

(856) 429-4000

Cost Estimating:

MOCA Cost Engineering Todd Waddle

(850) 389-8131

Surveying, Water Wells & Treatment:

Fabre Engineering & Surveying Frank Fabre

(850) 433-6438

Geotechnical Engineering:

Terracon Consultants Jennifer Peters

(210) 907-7648

PHASE 4 DEVELOPMENT

03-31-2020

OF 246

BID DOCUMENTS

LI203

JDL/RWBCCT

ROBERT W. BECCARD

84064P R O F E S S I O N A L E N G I N E E R

S T A T E O F T E X A S

L I C E N S E D

IRRIGATION PLAN

1" =

40' 0' 20' 40' 80'

40'

M

AT

C H

LI

N

E

SE

E

SH

EE

T

LI

M

AT

C

H

LI

N E

SE

E

SH

EE

T

LI

LI203

LI202

LI201

X X X X X X X X X X X X X X X X X X

X

X

NORTH

VICINITY MAP

SCALE 1"=1000'

MOUNTAIN CREEK PKWY

LO

N

E STAR CIR

R I O

G

RAND DR

ROAD 5

ROAD 4

ROAD 2 ROAD 1

ROAD 1

RO

AD 1

ROAD 3

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DALLAS, TEXAS

916CM2012

DALLAS - FORT WORTH

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

MKEC Engineering, Inc.

Ken Kallenbach

(316) 684-9600

Architect:

TK-Architecture, LLC Tom Kapels

(719) 325-9303

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

RCDD:

APOGEE Consulting Jim Ezekiel

(919) 535-3878

MEP:

Miller Remick Tom Chapman

(856) 429-4000

Cost Estimating:

MOCA Cost Engineering Todd Waddle

(850) 389-8131

Surveying, Water Wells & Treatment:

Fabre Engineering & Surveying Frank Fabre

(850) 433-6438

Geotechnical Engineering:

Terracon Consultants Jennifer Peters

(210) 907-7648

PHASE 4 DEVELOPMENT

03-31-2020

OF 246

BID DOCUMENTS

LI501

JDL/RWBCCT

ROBERT W. BECCARD

84064P R O F E S S I O N A L E N G I N E E R

S T A T E O F T E X A S

L I C E N S E D

IRRIGATION DETAILS

1 AIR/VACUUM RELIEF VALVE

ASSEMBLY N.T.S. 2 ISOLATION GATE VALVE

ASSEMBLY N.T.S. 3 QUICK COUPLER VALVE

ASSEMBLY N.T.S.

Q

4 POP-UP ROTOR SPRINKLER

ASSEMBLY N.T.S. 5 POP-UP SPRAY SPRINKLER

ASSEMBLY N.T.S. 6 REMOTE CONTROL VALVE 3"

ASSEMBLY N.T.S.

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DALLAS, TEXAS

916CM2012

DALLAS - FORT WORTH

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

MKEC Engineering, Inc.

Ken Kallenbach

(316) 684-9600

Architect:

TK-Architecture, LLC Tom Kapels

(719) 325-9303

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

RCDD:

APOGEE Consulting Jim Ezekiel

(919) 535-3878

MEP:

Miller Remick Tom Chapman

(856) 429-4000

Cost Estimating:

MOCA Cost Engineering Todd Waddle

(850) 389-8131

Surveying, Water Wells & Treatment:

Fabre Engineering & Surveying Frank Fabre

(850) 433-6438

Geotechnical Engineering:

Terracon Consultants Jennifer Peters

(210) 907-7648

PHASE 4 DEVELOPMENT

03-31-2020

OF 246

BID DOCUMENTS

LI502

JDL/RWBCCT

ROBERT W. BECCARD

84064P R O F E S S I O N A L E N G I N E E R

S T A T E O F T E X A S

L I C E N S E D

IRRIGATION DETAILS

1 REMOTE CONTROL VALVE

ASSEMBLY N.T.S.

MAINLINE PIPE

REMOTE CONTROL VALVE

ASSEMBLY

SOLVENT

WELD TEE

ISOLATION ANGLE VALVE

ON SERVICE TEE

2 SPRINKLER PLACEMENT

DETAIL N.T.S.

52" MIN.

55.5"

IRRIGATION

AISLE BOUNDARY

8"

4'

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DALLAS, TEXAS

916CM2012

DALLAS - FORT WORTH

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

MKEC Engineering, Inc.

Ken Kallenbach

(316) 684-9600

Architect:

TK-Architecture, LLC Tom Kapels

(719) 325-9303

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

RCDD:

APOGEE Consulting Jim Ezekiel

(919) 535-3878

MEP:

Miller Remick Tom Chapman

(856) 429-4000

Cost Estimating:

MOCA Cost Engineering Todd Waddle

(850) 389-8131

Surveying, Water Wells & Treatment:

Fabre Engineering & Surveying Frank Fabre

(850) 433-6438

Geotechnical Engineering:

Terracon Consultants Jennifer Peters

(210) 907-7648

PHASE 4 DEVELOPMENT

03-31-2020

OF 246

BID DOCUMENTS

LI503

JDL/RWBCCT

ROBERT W. BECCARD

84064P R O F E S S I O N A L E N G I N E E R

S T A T E O F T E X A S

L I C E N S E D

IRRIGATION DETAILS

1 FLOWER WATER STATION

ASSEMBLY N.T.S. 2 TRENCH

DETAIL N.T.S. 3 JOINT RESTRAINT FITTINGS

ASSEMBLY N.T.S.

Pipe Fitting with Joint Restraint

11.25° BEND (IPS)

(PJ x PJ)

TEE w/ REDUCER IN

BRANCH & RUN (IPS)

(PJ x PJ x PJ)

45° BEND (IPS)

(PJ x PJ)

22.5° BEND (IPS)

(PJ x PJ)

TEE (IPS)

(PJ x PJ x PJ)

90° BEND (IPS)

(PJ x PJ)

REDUCER (IPS)

(PJ x PJ)

PIPE BELL

PLAN VIEW

A. IRRIGATION CONTROLLER ASSEMBLY

B. UL LISTED 5/8" X 10' COPPER-CLAD GROUNDING

ROD

C. UL LISTED 4" X 8' COPPER GROUNDING PLATE

D. 9" ROUND POLYMER CONCRETE VALVE BOX

AND LID

E. CADWELD CONNECTION: PAIGE ELECTRIC

F. 3" MINIMUM DEPTH OF 3/4" WASHED GRAVEL

G. BRICK (1 OF 4)

H. #6 AWG INSULATED SOLID COPPER WIRE. NO

SHARP BENDS.

I. SPHERE OF INFLUENCE

J. EARTH CONTACT MATERIAL, POWERSET© OR

POWERFILL© DEPENDING ON SOIL CONDITIONS

K. FINISH GRADE

A

C

B

8'

10'

11'

I

I

30" MINIMUM

12"

SECTION VIEW

H

H

H

B

C J

D

G

F

E

NOTES:

1. CONNECT ALL #6 AWG WIRES INSIDE THE

CONTROLLER. CONNECT ONE WIRE TO

THE CONTROLLER GROUND LUG AND

USE A #4 SPLIT BOLT TO CONNECT ALL

WIRES TOGETHER.

2. EARTH CONTACT MATERIAL MUST

COMPLETELY COVER THE WELD JOINT

ON THE GROUND PLATE.

K

4 THRUST BLOCK

DETAIL N.T.S.

5 GROUNDING

DETAIL N.T.S. 6 POP-UP BUBBLER

ASSEMBLY N.T.S.7 IRRIGATION CONTROLLER

ASSEMBLY N.T.S.

UNDISTURBED SOIL

THRUST BLOCK

WIRE

X Y

7 BUBBLER PLACEMENT

DETAIL N.T.S.

File details come from the government source that posted it. Updated .