CS-Sheets 1 of 3.pdf
PDF 20 MB Posted
- Attached to
- Y1PC--Dallas National Cemetery Solicitation
- Solicitation number
- 36C10F20R0056
About this file
This solicitation is for the Phase 4 expansion of the Dallas Fort Worth National Cemetery. The Department of Veterans Affairs seeks to construct additional gravesites, buildings, and cemetery improvements on approximately 56 acres of land. The scope of work includes over 12,000 pre-placed crypt gravesites, 600 traditional gravesites, 3,000 in-ground cremains sites, and a 300-site Hybrid Natural Burial Section. Additional requirements are earthwork, drainage, fencing, roads, parking, utilities, signage, site furnishings, and a new irrigation system. The construction cost is estimated between $20-50 million. The applicable NAICS code is 237990 and the small business size standard is $39.5 million. The solicitation is set aside 100% for Service-Disabled Veteran Owned Small Businesses. Questions are due by July 22nd and proposals by August 8th, to be submitted to the Department of Veterans Affairs Office of Construction and Facilities Management. Offerors must be listed on Vendor Information Pages as a SDVOSB at proposal submission.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Dallas PPI - 2.pdf | ||
| Dallas PPI - 1.pdf | ||
| DNC Pre-Bid Sign-In Sheet 15 July 2020.jpeg | JPEG file | |
| Final Dallas 36C10F20R0056_3 (7-9-2020).pdf | ||
| Dallas-Fort Worth National Cemetery Cx Plan - V1 - 3-27-2020.pdf | ||
| 000 Base Bid Submittal Register.pdf | ||
| Pre-Functional Checklists.pdf | ||
| BID DOCUMENTS SWPPP DFW VA CEM PH4.pdf | ||
| V-Sheets.pdf | ||
| X-Sheets.pdf | ||
| CG-Sheets 1 of 2.pdf | ||
| CP-Sheets.pdf | ||
| LP-Sheets.pdf | ||
| G-Sheets.pdf | ||
| T-Sheets.pdf | ||
| A-Sheets.pdf | ||
| DALLAS WAGE RATES.pdf | ||
| F-Sheets.pdf | ||
| I-Sheets.pdf | ||
| E-Sheets.pdf | ||
| CS-Sheets 2 of 3.pdf | ||
| S-Sheets.pdf | ||
| ATTACHMENT 2_PAST PERF QUEST.docx | DOCX document | |
| Final Dallas 36C10F20R0056_3 (7-9-2020).pdf | ||
| M-Sheets.pdf | ||
| Base Bid Specification Package.pdf | ||
| CG-Sheets 2 of 2.pdf | ||
| B-Sheets.pdf | ||
| P-Sheets.pdf | ||
| CS-Sheets 3 of 3.pdf | ||
| CD-Sheets.pdf | ||
| LI-Sheets.pdf | ||
| CU-Sheets.pdf | ||
| ATTACHMENT 3 - Dallas Pre-Proposal Inquiry (PPI) Form.docx | DOCX document |
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WM
CO
CO
CO
CO
CO
CO
I
I
I
GM
GM
WM
WM
GM
GM
GM
CO
CO
CO
CO
CO
I
I
WM
SS
SS
SS
J P
R O
J E
C T
S C
A L I B
R E
D
F W
N
A T
I O
N A
L
C
E M
E T
E R
Y
P
H
C
A D
S
H T
S
C
I V
I L S
I T
E D
D D
W G
MOUNTAIN CREEK PARKWAY
ROAD 1
R
O
D
FENCED AREA FOR
MAINTENANCE
CONTRACTOR
NEW ADMINISTRATION
BUILDING
R
O
R
O
O
A D
R
O
O
EXISTING
FLOODPLAIN
NORTH
15A
15B
15C
15A
15B
15C
15D
15F
15E
10' FLAG POLE
ACCESS ROAD
INITIAL
CONSTRUCTION
ACCESS
TEMPORARY
TOPSOIL STOCKPILE
40,000 S.F.
CONSTRUCTION
CONTRACTOR
STAGING AREA AND
RE TRAILER
R
O
O
ROAD 3
NORTHWEST
PARKING
SOUTH
PARKING
OVERALL SITE PLAN
JWC KK
CS100
TEMP
LOCKER ROOM
MAINTENANCE
DRIVE
NEW GENERATOR
SOIL STORAGE
BUILDING
INSTALL TEMPORARY
TEST WELL
N=6947797.83
E=2451106.84
TEMP
RESTROOM
NORTHEAST
PARKING
WEST PARKING
NORTH
VICINITY MAP
SCALE 1"=1000'
R
I
O
G
A
N
D
D
R
MOUNTAIN CREEK PKWY
L
O
E
S
T
C
R
R
O
O
ROAD 1
R
O
O
O
O
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of
Construction and Facilities
Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DALLAS, TEXAS
916CM2012
DALLAS - FORT WORTH
NATIONAL CEMETERY
Calibre
9090 South Ridgeline Boulevard, Suite 105
Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com
Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
MKEC Engineering, Inc.
Ken Kallenbach
(316) 684-9600
Architect:
TK-Architecture, LLC
Tom Kapels
(719) 325-9303
Irrigation:
Aqua Engineering
Bob Beccard
(970) 372-6104
RCDD:
APOGEE Consulting
Jim Ezekiel
(919) 535-3878
MEP:
Miller Remick
Tom Chapman
(856) 429-4000
Cost Estimating:
MOCA Cost Engineering
Todd Waddle
(850) 389-8131
Surveying, Water Wells & Treatment:
Fabre Engineering & Surveying
Frank Fabre
(850) 433-6438
Geotechnical Engineering:
Terracon Consultants
Jennifer Peters
(210) 907-7648
PHASE 4 DEVELOPMENT
03-31-2020
OF 246
BID DOCUMENTS
SECTION 60
(PPC)
SECTION 69
(PPC)
SECTION 61
(PPC)
SECTION 62
(PPC)
SECTION 63
(PPC)
SECTION 70
(TRADITIONAL)
GREEN
BURIALS
SECTION 71
(OVERSIZED PPC)
SECTION 64
(PPC)
SEC 72
(IGC)
SEC 73
(IGC)
SEC 74
(IGC)
SEC 75
(IGC)
MAINTENANCE
FACILITY #1301
CO
CO
CO
CO
GM
WM
WM
SS
GM
GM
GM
CO
CO
CO
CO
CO
SITE STATISTICS
MAINTENANCE
FACILITY
5,346
SF
EX. BLDG #2
3,264
SF
EX. BLDG #3
4,312
SF
NEW ADMIN
BUILDING
4,472
SF
NE PARKING
LOT
18 SPACES
NW PARKING
LOT
16 SPACES
WEST PARKING
LOT
10 SPACES
SOUTH
PARKING LOT
8 + 2 ADA SPACES
R
O
O
O
RIO GRANDE DRIVE
CP #52
T.B.M 259/52-C
CP #50
T.B.M 259/52-A
T.B.M 259/52-B
CP #51
T.B.M 259/52-A
CP #50
M
A
I
N
T
E
N
A
N
C
E
F
A
C
I
L
I
T
Y
E
X
I
S
T
I
N
G
P
A
R
K
I
N
G
E
X
I
S
T
I
N
G
B
L
E
X
I
S
T
I
N
G
B
L
E
X
I
S
T
I
N
G
P
A
R
K
I
N
G
N
M
I
N
B
L
S
O
U
T
H
P
A
R
K
I
N
G
W
E
S
T
P
A
R
K
I
N
G
N
O
R
T
H
E
A
S
T
P
A
R
K
I
N
G
N
O
R
T
H
W
E
S
T
P
A
R
K
I
N
G
T
E
M
P
L
C
K
E
R
R
O
O
M
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of
Construction and Facilities
Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DALLAS, TEXAS
916CM2012
DALLAS - FORT WORTH
NATIONAL CEMETERY
Cemetery Expertise:
MKEC Engineering, Inc.
Ken Kallenbach
(316) 684-9600
Architect:
TK-Architecture, LLC
Tom Kapels
(719) 325-9303
Irrigation:
Aqua Engineering
Bob Beccard
(970) 372-6104
RCDD:
APOGEE Consulting
Jim Ezekiel
(919) 535-3878
MEP:
Miller Remick
Tom Chapman
(856) 429-4000
Cost Estimating:
MOCA Cost Engineering
Todd Waddle
(850) 389-8131
Surveying, Water Wells & Treatment:
Fabre Engineering & Surveying
Frank Fabre
(850) 433-6438
Geotechnical Engineering:
Terracon Consultants
Jennifer Peters
(210) 907-7648
PHASE 4 DEVELOPMENT
03-31-2020
OF 246
BID DOCUMENTS
S
T
A
OF
X
A
S
P
R
O
F
E
S
S
I
O
A L
G
I
N
E
E
R
JOHN DAVID STRANDBERG
103176
L
I
C
EN
S
E
D
SITE PLAN
ADMINISTRATION BUILDING
CFS JDS
CS101
1-800-344-8377
LEGEND
ENGINEER NOTES:
BENCHMARK:
T.B.M. 259/52-A
CONTROL POINT #50
T.B.M. 259/52-B
CONTROL POINT #51
T.B.M. 259/52-C
CONTROL POINT #52
NORTH
VICINITY MAP
SCALE 1"=1000'
R
A
N
D
D
R
MOUNTAIN CREEK PKWY
L
O
R
R
O
O
O
R
O
O
O
NORTH
LINE TABLE
CURVE TABLE
SS
RIO GRANDE DRIVE
R
O
HEADSTONE
CUTTER AREA
(100'X100')
BLANK
HEADSTONES
AREA
(60'X60')
CONCRETE
STORAGE
BINS BY
V.A
(28'X100')
MOW TRIM
CONTRACTOR
YARD
(80X120)
SOIL STORAGE
BUILDING (4,000
SF)
GRAVE BOXES
AREA
(40'X100') BY
V.A
NORTHEAST
PARKING
CP #52CP #52
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of
Construction and Facilities
Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DALLAS, TEXAS
916CM2012
DALLAS - FORT WORTH
NATIONAL CEMETERY
Calibre
9090 South Ridgeline Boulevard, Suite 105
Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com
Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
MKEC Engineering, Inc.
Ken Kallenbach
(316) 684-9600
Architect:
TK-Architecture, LLC
Tom Kapels
(719) 325-9303
Irrigation:
Aqua Engineering
Bob Beccard
(970) 372-6104
RCDD:
APOGEE Consulting
Jim Ezekiel
(919) 535-3878
MEP:
Miller Remick
Tom Chapman
(856) 429-4000
Cost Estimating:
MOCA Cost Engineering
Todd Waddle
(850) 389-8131
Surveying, Water Wells & Treatment:
Fabre Engineering & Surveying
Frank Fabre
(850) 433-6438
Geotechnical Engineering:
Terracon Consultants
Jennifer Peters
(210) 907-7648
PHASE 4 DEVELOPMENT
03-31-2020
OF 246
BID DOCUMENTS
S
T
A
OF
X
A
S
P
R
O
F
E
S
S
I
O
A L
G
I
N
E
E
R
JOHN DAVID STRANDBERG
103176
L
I
C
EN
S
E
D
SITE PLAN SOILS STORAGE
BUILDING AREA
CFS JDS
CS102
1-800-344-8377
LEGEND
ENGINEER NOTES:
BENCHMARK:
T.B.M. 259/52-A
CONTROL POINT #50
T.B.M. 259/52-B
CONTROL POINT #51
T.B.M. 259/52-C
CONTROL POINT #52
NORTH
VICINITY MAP
SCALE 1"=1000'
R
A
N
D
D
R
MOUNTAIN CREEK PKWY
L
O
R
R
O
O
O
R
O
O
O
I
I
G M
I
I
J P
R O
J E
C T
S C
A L I B
R E
D
T
I O
N A
L
C
E M
E T
E R
Y
P
H
C
A D
S
H T
S
C
I V
I L S
I T
E D
D D
W G
N O
R T
H
R O
O
U N
T A
E
K
P
R
K W
A Y
SECTION 60
(PPC)
SHT CS104
R
O
O
O
O
SECTION 69
(PPC)
SHT CS109
SECTION 61
(PPC)
SHT CS105
SECTION 62
(PPC)
SHT CS106
SECTION 63
(PPC)
SHT CS107
SECTION 70
(TRADITIONAL)
SHT CS110
GREEN BURIALS
SHT CS111
SECTION 71
(OVERSIZED PPC)
SHT CS110
R
O
SECTION 64
(PPC)
SHT CS108
M A
IN
T
E N
A N
C E
D R
IV
E
OVERALL BURIAL PLAN
RWB KK
CS103
SECTIONS 72
(IGC)
SHT CS112
SECTIONS 73
(IGC)
SHT CS112
SECTIONS 74
(IGC)
SHT CS112
SECTIONS 75
(IGC)
SHT CS112
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of
Construction and Facilities
Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DALLAS, TEXAS
916CM2012
DALLAS - FORT WORTH
NATIONAL CEMETERY
Calibre
9090 South Ridgeline Boulevard, Suite 105
Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com
Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
MKEC Engineering, Inc.
Ken Kallenbach
(316) 684-9600
Architect:
TK-Architecture, LLC
Tom Kapels
(719) 325-9303
Irrigation:
Aqua Engineering
Bob Beccard
(970) 372-6104
RCDD:
APOGEE Consulting
Jim Ezekiel
(919) 535-3878
MEP:
Miller Remick
Tom Chapman
(856) 429-4000
Cost Estimating:
MOCA Cost Engineering
Todd Waddle
(850) 389-8131
Surveying, Water Wells & Treatment:
Fabre Engineering & Surveying
Frank Fabre
(850) 433-6438
Geotechnical Engineering:
Terracon Consultants
Jennifer Peters
(210) 907-7648
PHASE 4 DEVELOPMENT
03-31-2020
OF 246
BID DOCUMENTS
NORTH
VICINITY MAP
SCALE 1"=1000'
R
A
N
D
D
R
MOUNTAIN CREEK PKWY
L
O
R
R
O
O
R
O
O
O
O
J P
R O
J E
C T
S C
A L I B
R E
D
T
I O
N A
L
C
E M
E T
E R
Y
P
H
C
A D
S
H T
S
C
I V
I L S
I T
E D
D D
W G
N O
R
H
60.K
60.L
60.U
60.T60.M60.J
60.C
60.S60.N60.I
60.D
60.R60.O60.H
60.E
60.Q
60.P60.G
60.F
60.B
60.3
60.1
60.A
3 1/4"
PLAN
G r a v e s i t e
Grid
M o n u m e n t
1 A
SECTION 60
(CRYPTS)
3'X8'
60.2
CAST-IN-PLACE GRAVESITE
CONTROL MONUMENTS
SECTION 61
S E
C T
I O
N
M A
I N
T E
N A
N C
E
D
R I V
E
LEGEND
BURIAL SECTION 60
SECTION & CONTROL MARKERS
RWB KK
CS104
SECTION MARKER DETAIL
NORTH
VICINITY MAP
SCALE 1"=1000'
R
A
N
D
D
R
MOUNTAIN CREEK PKWY
L
O
R
R
O
O
R
O
O
O
O
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of
Construction and Facilities
Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DALLAS, TEXAS
916CM2012
DALLAS - FORT WORTH
NATIONAL CEMETERY
Calibre
9090 South Ridgeline Boulevard, Suite 105
Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com
Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
MKEC Engineering, Inc.
Ken Kallenbach
(316) 684-9600
Architect:
TK-Architecture, LLC
Tom Kapels
(719) 325-9303
Irrigation:
Aqua Engineering
Bob Beccard
(970) 372-6104
RCDD:
APOGEE Consulting
Jim Ezekiel
(919) 535-3878
MEP:
Miller Remick
Tom Chapman
(856) 429-4000
Cost Estimating:
MOCA Cost Engineering
Todd Waddle
(850) 389-8131
Surveying, Water Wells & Treatment:
Fabre Engineering & Surveying
Frank Fabre
(850) 433-6438
Geotechnical Engineering:
Terracon Consultants
Jennifer Peters
(210) 907-7648
PHASE 4 DEVELOPMENT
03-31-2020
OF 246
BID DOCUMENTS
P
R O
J E
C T
S C
A L I B
R E
D
T
I O
N A
L
C
E M
E T
E R
Y
P
H
C
A D
S
H T
S
C
I V
I L S
I T
E D
D D
W G
N O
R
H
LEGEND
61.C 61.L 61.M 61.V
61.D
61.K 61.N 61.U
61.E 61.J
61.O 61.T
61.F 61.I 61.P
61.S
61.G 61.H 61.Q 61.R
61.1
SECTION 61
61.2
61.B
SECTION 62
SECTION 60
M A
I N
T E
N A
N C
E
D
R I V
E
BURIAL SECTION 61
SECTION & CONTROL MARKERS
RWB KK
CS105
NORTH
VICINITY MAP
SCALE 1"=1000'
R
A
N
D
D
R
MOUNTAIN CREEK PKWY
L
O
R
R
O
O
R
O
O
O
O
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of
Construction and Facilities
Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DALLAS, TEXAS
916CM2012
DALLAS - FORT WORTH
NATIONAL CEMETERY
Calibre
9090 South Ridgeline Boulevard, Suite 105
Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com
Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
MKEC Engineering, Inc.
Ken Kallenbach
(316) 684-9600
Architect:
TK-Architecture, LLC
Tom Kapels
(719) 325-9303
Irrigation:
Aqua Engineering
Bob Beccard
(970) 372-6104
RCDD:
APOGEE Consulting
Jim Ezekiel
(919) 535-3878
MEP:
Miller Remick
Tom Chapman
(856) 429-4000
Cost Estimating:
MOCA Cost Engineering
Todd Waddle
(850) 389-8131
Surveying, Water Wells & Treatment:
Fabre Engineering & Surveying
Frank Fabre
(850) 433-6438
Geotechnical Engineering:
Terracon Consultants
Jennifer Peters
(210) 907-7648
PHASE 4 DEVELOPMENT
03-31-2020
P
R O
J E
C T
S C
A L I B
R E
D
T
I O
N A
L
C
E M
E T
E R
Y
P
H
C
A D
S
H T
S
C
I V
I L S
I T
E D
D D
W G
N O
R T
H
62.E 62.F 62.O 62.P
62.D
62.G
62.N 62.Q
62.C 62.H
62.M
62.R
62.B 62.I 62.L
62.S
62.A 62.J
62.K 62.T
62.2
62.2
SECTION 62
62.1
SECTION 63
62.1
61.1
SECTION 61
M A
I N
T E
N A
N C
E
D
R I V
BURIAL SECTION 62
SECTION & CONTROL MARKERS
RWB KK
CS106
NORTH
VICINITY MAP
SCALE 1"=1000'
R
A
N
D
D
R
MOUNTAIN CREEK PKWY
L
O
R
R
O
O
R
O
O
O
O
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of
Construction and Facilities
Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DALLAS, TEXAS
916CM2012
DALLAS - FORT WORTH
NATIONAL CEMETERY
Calibre
9090 South Ridgeline Boulevard, Suite 105
Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com
Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
MKEC Engineering, Inc.
Ken Kallenbach
(316) 684-9600
Architect:
TK-Architecture, LLC
Tom Kapels
(719) 325-9303
Irrigation:
Aqua Engineering
Bob Beccard
(970) 372-6104
RCDD:
APOGEE Consulting
Jim Ezekiel
(919) 535-3878
MEP:
Miller Remick
Tom Chapman
(856) 429-4000
Cost Estimating:
MOCA Cost Engineering
Todd Waddle
(850) 389-8131
Surveying, Water Wells & Treatment:
Fabre Engineering & Surveying
Frank Fabre
(850) 433-6438
Geotechnical Engineering:
Terracon Consultants
Jennifer Peters
(210) 907-7648
PHASE 4 DEVELOPMENT
03-31-2020
L O
R A
L
G R
O U
N D
S
P
O L
I C
Y
J P
R O
J E
C T
S C
A L I B
R E
D
T
I O
N A
L
C
E M
E T
E R
Y
P
H
C
A D
S
H T
S
C
I V
I L S
I T
E D
D D
W G
N O
R T
H
63.K
63.J
63.I
63.G
63.H
63.F
63.E
63.B
63.C
63.A
63.D
63.1
63.1
SECTION 63
63.L
63.M
63.O
63.N
63.P
63.Q
63.R 63.S
63.T
SECTION 64
SECTION 62
63.2
63.2
M
A
I
N
T
E
N
A
N
I
V
E
BURIAL SECTION 63
SECTION & CONTROL MARKERS
RWB KK
CS107
VICINITY MAP
SCALE 1"=1000'
R
A
N
D
D
R
MOUNTAIN CREEK PKWY
L
O
R
R
O
O
R
O
O
O
O
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of
Construction and Facilities
Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DALLAS, TEXAS
916CM2012
DALLAS - FORT WORTH
NATIONAL CEMETERY
Calibre
9090 South Ridgeline Boulevard, Suite 105
Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com
Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
MKEC Engineering, Inc.
Ken Kallenbach
(316) 684-9600
Architect:
TK-Architecture, LLC
Tom Kapels
(719) 325-9303
Irrigation:
Aqua Engineering
Bob Beccard
(970) 372-6104
RCDD:
APOGEE Consulting
Jim Ezekiel
(919) 535-3878
MEP:
Miller Remick
Tom Chapman
(856) 429-4000
Cost Estimating:
MOCA Cost Engineering
Todd Waddle
(850) 389-8131
Surveying, Water Wells & Treatment:
Fabre Engineering & Surveying
Frank Fabre
(850) 433-6438
Geotechnical Engineering:
Terracon Consultants
Jennifer Peters
(210) 907-7648
PHASE 4 DEVELOPMENT
03-31-2020
P
R O
J E
C T
S C
A L I B
R E
D
T
I O
N A
L
C
E M
E T
E R
Y
P
H
C
A D
S
H T
S
C
I V
I L S
I T
E D
D D
W G
N O
R T
H
64.K
64J
64.I
64.G
64.H
64.F
64.E
64.B
64.C
64.A
64.D
64.2
SECTION 64
64.L
SECTION 63
64.1
64.M
63.1
M
A
I
N
T
E
N
A
N
I
V
E
BURIAL SECTION 64
SECTION & CONTROL MARKERS
RWB KK
CS108
VICINITY MAP
SCALE 1"=1000'
R
A
N
D
D
R
MOUNTAIN CREEK PKWY
L
O
R
R
O
O
R
O
O
O
O
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of
Construction and Facilities
Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DALLAS, TEXAS
916CM2012
DALLAS - FORT WORTH
NATIONAL CEMETERY
Calibre
9090 South Ridgeline Boulevard, Suite 105
Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com
Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
MKEC Engineering, Inc.
Ken Kallenbach
(316) 684-9600
Architect:
TK-Architecture, LLC
Tom Kapels
(719) 325-9303
Irrigation:
Aqua Engineering
Bob Beccard
(970) 372-6104
RCDD:
APOGEE Consulting
Jim Ezekiel
(919) 535-3878
MEP:
Miller Remick
Tom Chapman
(856) 429-4000
Cost Estimating:
MOCA Cost Engineering
Todd Waddle
(850) 389-8131
Surveying, Water Wells & Treatment:
Fabre Engineering & Surveying
Frank Fabre
(850) 433-6438
Geotechnical Engineering:
Terracon Consultants
Jennifer Peters
(210) 907-7648
PHASE 4 DEVELOPMENT
03-31-2020
File details come from the government source that posted it. Updated .