Pre-Functional Checklists.pdf
PDF 435 KB Posted
- Attached to
- Y1PC--Dallas National Cemetery Solicitation
- Solicitation number
- 36C10F20R0056
About this file
This solicitation is for the Phase 4 expansion of the Dallas Fort Worth National Cemetery, including the construction of additional gravesites, buildings, and cemetery improvements. The scope of work includes developing approximately 56 acres of land with approximately 12,430 pre-placed crypt full casket gravesites, 615 oversize pre-placed crypt casket gravesites, approximately 600 traditional gravesites, approximately 3,000 in-ground cremains, approximately 300-gravesite Hybrid Natural (Green) Burial Section, along with earthwork, drainage, fencing, roads, parking, utilities, signage and site furnishings. A new irrigation system will also be installed. The work must be completed within 900 calendar days of the notice to proceed. The estimated cost of construction is between $20-50 million. This opportunity is set aside solely for Service-Disabled Veteran Owned Small Businesses. Questions regarding the solicitation are due by July 22, 2020 and proposals are due August 8, 2020. The soliciting agency is the Department of Veterans Affairs Office of Construction and Facilities Management.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Dallas PPI - 2.pdf | ||
| Dallas PPI - 1.pdf | ||
| DNC Pre-Bid Sign-In Sheet 15 July 2020.jpeg | JPEG file | |
| CS-Sheets 1 of 3.pdf | ||
| Final Dallas 36C10F20R0056_3 (7-9-2020).pdf | ||
| Dallas-Fort Worth National Cemetery Cx Plan - V1 - 3-27-2020.pdf | ||
| 000 Base Bid Submittal Register.pdf | ||
| BID DOCUMENTS SWPPP DFW VA CEM PH4.pdf | ||
| V-Sheets.pdf | ||
| X-Sheets.pdf | ||
| CG-Sheets 1 of 2.pdf | ||
| CP-Sheets.pdf | ||
| LP-Sheets.pdf | ||
| G-Sheets.pdf | ||
| T-Sheets.pdf | ||
| A-Sheets.pdf | ||
| DALLAS WAGE RATES.pdf | ||
| F-Sheets.pdf | ||
| I-Sheets.pdf | ||
| E-Sheets.pdf | ||
| CS-Sheets 2 of 3.pdf | ||
| S-Sheets.pdf | ||
| ATTACHMENT 2_PAST PERF QUEST.docx | DOCX document | |
| Final Dallas 36C10F20R0056_3 (7-9-2020).pdf | ||
| M-Sheets.pdf | ||
| Base Bid Specification Package.pdf | ||
| CG-Sheets 2 of 2.pdf | ||
| B-Sheets.pdf | ||
| P-Sheets.pdf | ||
| CS-Sheets 3 of 3.pdf | ||
| CD-Sheets.pdf | ||
| LI-Sheets.pdf | ||
| CU-Sheets.pdf | ||
| ATTACHMENT 3 - Dallas Pre-Proposal Inquiry (PPI) Form.docx | DOCX document |
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Checklists 110 Checklists sorted by name
Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
CHECKLIST
#13 A-ACCU-1/A-WFCU-1
Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Type Pre-Functional Asset A-ACCU-1/A-WFCU-1
NOT STARTED
Sections 1
First Section NOT STARTED Mechanical Contractor Status set by Alvin George on 3/26/2020.
MODEL VERIFICATION
1 Record Manufacturer of Outdoor Unit:
2 Record Manufacturer of Indoor Unit:
3 Record Model Number of Outdoor Unit:
4 Record Model Number of Indoor Unit:
5 Record Serial Number of Outdoor Unit:
6 Record Serial Number of Indoor Unit:
7 Record V/Ph/Hz:
INSTALLATION
8 Indoor and outdoor units are free from physical damage.
9 Indoor and outdoor units are clean.
10 Indoor and outdoor units are installed per contract documents and manufacturer requirements.
11 Adequate clearance around indoor and outdoor units for service per manufacturer’s requirements.
12 All unit components are in good condition.
13 All components are accessible for maintenance.
14 Equipment tag and nameplate are permanently affixed.
15 Thermostat is installed and operational.
REFRIGERANT/CONDENSATE PIPING
16 Refrigerant piping is installed, supported, and insulated per contract documents.
17 Refrigerant piping is verified to be complete between the indoor and outdoor units.
18 Unit is charged with appropriate type and quantity of refrigerant.
19 Condensate drain piping is installed, supported, and insulated per contract documents.
20 Condensate drain piping is routed to nearby drain.
21 No leakage is detected.
START UP
Checklists | Printed on 03/27/2020 | Page 2 of 149
22 Unit has started up per manufacturer recommendations and contract documents.
23 Start up reports are attached to this checklist.
#13 A-ACCU-1/A-WFCU-1 | Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Checklists | Printed on 03/27/2020 | Page 3 of 149
#15 A-ACCU-1/A-WFCU-1 -
Electrical Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Type Pre-Functional Asset Air Cooled Condensing
Unit & Indoor AC Unit Split System
NOT STARTED
Sections 1
First Section NOT STARTED Electrical Contractor Status set by Alvin George on 3/26/2020.
A-ACCU-1
1 Unit is energized.
2 All electrical connections are tight and torqued to manufacturer requirements and standards.
3 All electrical connections are clean.
4 All electrical components are grounded.
5 Electrical disconnects are labeled and accessible per code.
6 All required electrical work is performed.
A-WFCU-1
7 Unit is energized.
8 All electrical connections are tight and torqued to manufacturer requirements and standards.
9 All electrical connections are clean.
10 All electrical components are grounded.
11 Electrical disconnects are labeled and accessible per code.
12 All required electrical work is performed.
Checklists | Printed on 03/27/2020 | Page 4 of 149
#62 A-CRC-1
Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Type Pre-Functional Asset A-CRC-1
NOT STARTED
Sections 1
First Section NOT STARTED Mechanical Contractor Status set by Derek Hudak on 3/26/2020.
MODEL VERIFICATION
1 Record Manufacturer:
2 Record Model Number:
3 Record Serial Number:
4 Record V/Ph/Hz:
INSTALLATION
5 Unit is free from physical damage.
6 Unit is clean.
7 Unit is installed per contract documents and manufacturer requirements.
8 Adequate clearance around unit for service per manufacturer’s requirements.
9 All unit components are in good condition.
10 All components are accessible for maintenance.
11 Equipment tag and nameplate are permanently affixed.
12 Corresponding control manifold is installed per contract documents and manufacturer requirements.
13 Thermostat is installed and operational.
REFRIGERANT/CONDENSATE PIPING
14 Refrigerant piping is installed, supported, and insulated per contract documents.
15 Refrigerant piping is verified to be complete between the indoor unit and corresponding control manifold.
16 Unit is charged with appropriate type and quantity of refrigerant.
17 Condensate drain piping is installed, supported, and insulated per contract documents.
18 Condensate drain piping is routed to mop sinnk.
19 No leakage is detected.
START UP
20 Unit has started up per manufacturer recommendations and contract documents.
21 Start up reports are attached to this checklist.
Checklists | Printed on 03/27/2020 | Page 5 of 149
#63 A-CRC-2
Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Type Pre-Functional Asset A-CRC-2
NOT STARTED
Sections 1
First Section NOT STARTED Mechanical Contractor Status set by Derek Hudak on 3/26/2020.
MODEL VERIFICATION
1 Record Manufacturer:
2 Record Model Number:
3 Record Serial Number:
4 Record V/Ph/Hz:
INSTALLATION
5 Unit is free from physical damage.
6 Unit is clean.
7 Unit is installed per contract documents and manufacturer requirements.
8 Adequate clearance around unit for service per manufacturer’s requirements.
9 All unit components are in good condition.
10 All components are accessible for maintenance.
11 Equipment tag and nameplate are permanently affixed.
12 Corresponding control manifold is installed per contract documents and manufacturer requirements.
13 Thermostat is installed and operational.
REFRIGERANT/CONDENSATE PIPING
14 Refrigerant piping is installed, supported, and insulated per contract documents.
15 Refrigerant piping is verified to be complete between the indoor unit and corresponding control manifold.
16 Unit is charged with appropriate type and quantity of refrigerant.
17 Condensate drain piping is installed, supported, and insulated per contract documents.
18 Condensate drain piping is routed to mop sinnk.
19 No leakage is detected.
START UP
20 Unit has started up per manufacturer recommendations and contract documents.
Checklists | Printed on 03/27/2020 | Page 6 of 149
#64 A-CRC-3
Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Type Pre-Functional Asset A-CRC-3
NOT STARTED
Sections 1
First Section NOT STARTED Mechanical Contractor Status set by Derek Hudak on 3/26/2020.
MODEL VERIFICATION
1 Record Manufacturer:
2 Record Model Number:
3 Record Serial Number:
4 Record V/Ph/Hz:
INSTALLATION
5 Unit is free from physical damage.
6 Unit is clean.
7 Unit is installed per contract documents and manufacturer requirements.
8 Adequate clearance around unit for service per manufacturer’s requirements.
9 All unit components are in good condition.
10 All components are accessible for maintenance.
11 Equipment tag and nameplate are permanently affixed.
12 Corresponding control manifold is installed per contract documents and manufacturer requirements.
13 Thermostat is installed and operational.
REFRIGERANT/CONDENSATE PIPING
14 Refrigerant piping is installed, supported, and insulated per contract documents.
15 Refrigerant piping is verified to be complete between the indoor unit and corresponding control manifold.
16 Unit is charged with appropriate type and quantity of refrigerant.
17 Condensate drain piping is installed, supported, and insulated per contract documents.
18 Condensate drain piping is routed to mop sinnk.
19 No leakage is detected.
START UP
20 Unit has started up per manufacturer recommendations and contract documents.
Checklists | Printed on 03/27/2020 | Page 7 of 149
#65 A-CRC-4
Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Type Pre-Functional Asset A-CRC-4
NOT STARTED
Sections 1
First Section NOT STARTED Mechanical Contractor Status set by Derek Hudak on 3/26/2020.
MODEL VERIFICATION
1 Record Manufacturer:
2 Record Model Number:
3 Record Serial Number:
4 Record V/Ph/Hz:
INSTALLATION
5 Unit is free from physical damage.
6 Unit is clean.
7 Unit is installed per contract documents and manufacturer requirements.
8 Adequate clearance around unit for service per manufacturer’s requirements.
9 All unit components are in good condition.
10 All components are accessible for maintenance.
11 Equipment tag and nameplate are permanently affixed.
12 Corresponding control manifold is installed per contract documents and manufacturer requirements.
13 Thermostat is installed and operational.
REFRIGERANT/CONDENSATE PIPING
14 Refrigerant piping is installed, supported, and insulated per contract documents.
15 Refrigerant piping is verified to be complete between the indoor unit and corresponding control manifold.
16 Unit is charged with appropriate type and quantity of refrigerant.
17 Condensate drain piping is installed, supported, and insulated per contract documents.
18 Condensate drain piping is routed to mop sinnk.
19 No leakage is detected.
START UP
20 Unit has started up per manufacturer recommendations and contract documents.
Checklists | Printed on 03/27/2020 | Page 8 of 149
#66 A-CRC-5
Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Type Pre-Functional Asset A-CRC-5
NOT STARTED
Sections 1
First Section NOT STARTED Mechanical Contractor Status set by Derek Hudak on 3/26/2020.
MODEL VERIFICATION
1 Record Manufacturer:
2 Record Model Number:
3 Record Serial Number:
4 Record V/Ph/Hz:
INSTALLATION
5 Unit is free from physical damage.
6 Unit is clean.
7 Unit is installed per contract documents and manufacturer requirements.
8 Adequate clearance around unit for service per manufacturer’s requirements.
9 All unit components are in good condition.
10 All components are accessible for maintenance.
11 Equipment tag and nameplate are permanently affixed.
12 Corresponding control manifold is installed per contract documents and manufacturer requirements.
13 Thermostat is installed and operational.
REFRIGERANT/CONDENSATE PIPING
14 Refrigerant piping is installed, supported, and insulated per contract documents.
15 Refrigerant piping is verified to be complete between the indoor unit and corresponding control manifold.
16 Unit is charged with appropriate type and quantity of refrigerant.
17 Condensate drain piping is installed, supported, and insulated per contract documents.
18 Condensate drain piping is routed to mop sinnk.
19 No leakage is detected.
START UP
20 Unit has started up per manufacturer recommendations and contract documents.
Checklists | Printed on 03/27/2020 | Page 9 of 149
#67 A-CRC-6
Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Type Pre-Functional Asset A-CRC-6
NOT STARTED
Sections 1
First Section NOT STARTED Mechanical Contractor Status set by Derek Hudak on 3/26/2020.
MODEL VERIFICATION
1 Record Manufacturer:
2 Record Model Number:
3 Record Serial Number:
4 Record V/Ph/Hz:
INSTALLATION
5 Unit is free from physical damage.
6 Unit is clean.
7 Unit is installed per contract documents and manufacturer requirements.
8 Adequate clearance around unit for service per manufacturer’s requirements.
9 All unit components are in good condition.
10 All components are accessible for maintenance.
11 Equipment tag and nameplate are permanently affixed.
12 Corresponding control manifold is installed per contract documents and manufacturer requirements.
13 Thermostat is installed and operational.
REFRIGERANT/CONDENSATE PIPING
14 Refrigerant piping is installed, supported, and insulated per contract documents.
15 Refrigerant piping is verified to be complete between the indoor unit and corresponding control manifold.
16 Unit is charged with appropriate type and quantity of refrigerant.
17 Condensate drain piping is installed, supported, and insulated per contract documents.
18 Condensate drain piping is routed to mop sinnk.
19 No leakage is detected.
START UP
20 Unit has started up per manufacturer recommendations and contract documents.
Checklists | Printed on 03/27/2020 | Page 10 of 149
#68 A-CRC-7
Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Type Pre-Functional Asset A-CRC-7
NOT STARTED
Sections 1
First Section NOT STARTED Mechanical Contractor Status set by Derek Hudak on 3/26/2020.
MODEL VERIFICATION
1 Record Manufacturer:
2 Record Model Number:
3 Record Serial Number:
4 Record V/Ph/Hz:
INSTALLATION
5 Unit is free from physical damage.
6 Unit is clean.
7 Unit is installed per contract documents and manufacturer requirements.
8 Adequate clearance around unit for service per manufacturer’s requirements.
9 All unit components are in good condition.
10 All components are accessible for maintenance.
11 Equipment tag and nameplate are permanently affixed.
12 Corresponding control manifold is installed per contract documents and manufacturer requirements.
13 Thermostat is installed and operational.
REFRIGERANT/CONDENSATE PIPING
14 Refrigerant piping is installed, supported, and insulated per contract documents.
15 Refrigerant piping is verified to be complete between the indoor unit and corresponding control manifold.
16 Unit is charged with appropriate type and quantity of refrigerant.
17 Condensate drain piping is installed, supported, and insulated per contract documents.
18 Condensate drain piping is routed to mop sinnk.
19 No leakage is detected.
START UP
20 Unit has started up per manufacturer recommendations and contract documents.
Checklists | Printed on 03/27/2020 | Page 11 of 149
#69 A-CRC-8
Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Type Pre-Functional Asset A-CRC-8
NOT STARTED
Sections 1
First Section NOT STARTED Mechanical Contractor Status set by Derek Hudak on 3/26/2020.
MODEL VERIFICATION
1 Record Manufacturer:
2 Record Model Number:
3 Record Serial Number:
4 Record V/Ph/Hz:
INSTALLATION
5 Unit is free from physical damage.
6 Unit is clean.
7 Unit is installed per contract documents and manufacturer requirements.
8 Adequate clearance around unit for service per manufacturer’s requirements.
9 All unit components are in good condition.
10 All components are accessible for maintenance.
11 Equipment tag and nameplate are permanently affixed.
12 Corresponding control manifold is installed per contract documents and manufacturer requirements.
13 Thermostat is installed and operational.
REFRIGERANT/CONDENSATE PIPING
14 Refrigerant piping is installed, supported, and insulated per contract documents.
15 Refrigerant piping is verified to be complete between the indoor unit and corresponding control manifold.
16 Unit is charged with appropriate type and quantity of refrigerant.
17 Condensate drain piping is installed, supported, and insulated per contract documents.
18 Condensate drain piping is routed to mop sinnk.
19 No leakage is detected.
START UP
20 Unit has started up per manufacturer recommendations and contract documents.
Checklists | Printed on 03/27/2020 | Page 12 of 149
#70 A-CRC-9
Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Type Pre-Functional Asset A-CRC-9
NOT STARTED
Sections 1
First Section NOT STARTED Mechanical Contractor Status set by Derek Hudak on 3/26/2020.
MODEL VERIFICATION
1 Record Manufacturer:
2 Record Model Number:
3 Record Serial Number:
4 Record V/Ph/Hz:
INSTALLATION
5 Unit is free from physical damage.
6 Unit is clean.
7 Unit is installed per contract documents and manufacturer requirements.
8 Adequate clearance around unit for service per manufacturer’s requirements.
9 All unit components are in good condition.
10 All components are accessible for maintenance.
11 Equipment tag and nameplate are permanently affixed.
12 Corresponding control manifold is installed per contract documents and manufacturer requirements.
13 Thermostat is installed and operational.
REFRIGERANT/CONDENSATE PIPING
14 Refrigerant piping is installed, supported, and insulated per contract documents.
15 Refrigerant piping is verified to be complete between the indoor unit and corresponding control manifold.
16 Unit is charged with appropriate type and quantity of refrigerant.
17 Condensate drain piping is installed, supported, and insulated per contract documents.
18 Condensate drain piping is routed to mop sinnk.
19 No leakage is detected.
START UP
20 Unit has started up per manufacturer recommendations and contract documents.
Checklists | Printed on 03/27/2020 | Page 13 of 149
#57 A-CU-01
Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Type Pre-Functional Asset A-CU-01
NOT STARTED
Sections 1
First Section NOT STARTED Mechanical Contractor Status set by Derek Hudak on 3/26/2020.
MODEL VERIFICATION
1 Record Manufacturer:
2 Record Model Number:
3 Record Serial Number:
4 Record V/Ph/Hz:
INSTALLATION
5 Unit is free from physical damage.
6 Unit is clean.
7 Unit is installed per contract documents and manufacturer requirements.
8 Adequate clearance around indoor and outdoor units for service per manufacturer’s requirements.
9 All unit components are in good condition.
10 All components are accessible for maintenance.
11 Equipment tag and nameplate are permanently affixed.
REFRIGERANT PIPING
12 Refrigerant piping is installed, supported, and insulated per contract documents.
13 Refrigerant piping is verified to be complete between the outdoor unit and control manifold.
14 Unit is charged with appropriate type and quantity of refrigerant.
START UP
15 Unit has started up per manufacturer recommendations and contract documents.
16 Start up reports are attached to this checklist.
Checklists | Printed on 03/27/2020 | Page 14 of 149
#99 A-DOAS-1
Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Type Pre-Functional Asset A-DOAS-1
NOT STARTED
Sections 1
First Section NOT STARTED Mechanical Contractor Status set by Derek Hudak on 3/26/2020.
MODEL VERIFICATION
1 Record Manufacturer:
2 Record Model Number:
3 Record Serial Number:
4 Record Supply Fan Motor Horsepower (HP):
5 Record Exhaust Fan Motor Horsepower (HP):
6 Record V/Ph/Hz:
INSTALLATION
7 Unit installed per project specifications and manufacturer recommendations.
8 Adequate clearance around unit for service.
9 All components accessible for maintenance.
10 Equipment tag and nameplate permanently affixed.
11 Unit is clean.
12 All unit components (dampers, heat wheel, etc) are in good condition.
13 Access doors can be closed tightly.
14 Filters installed properly (no bypass air) and are clean.
15 Fans and motors lubricated and aligned.
16 Ductwork is installed, supported, and insulated per contract documents.
17 Balancing dampers are installed to allow proper balancing of the system.
18 Speed controller installed.
19 No leakage is detected.
START UP
20 Unit has started up per manufacturer recommendations and contract documents.
21 Unit's operation is without any unusual noise or vibration.
22 Start up reports are attached to this checklist.
Checklists | Printed on 03/27/2020 | Page 15 of 149
#100 A-DOAS-1 - Controls Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Type Pre-Functional Asset Direct Digital Control
System
NOT STARTED
Sections 1
First Section NOT STARTED Mechanical Contractor Status set by Derek Hudak on 3/26/2020.
1 All required control devices (controllers, sensors, actuators, thermostats, etc) are installed and operational.
2 Specified sequence of operations is programmed.
Checklists | Printed on 03/27/2020 | Page 16 of 149
#101 A-DOAS-1 - Electrical Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Type Pre-Functional Asset Power Distribution System
NOT STARTED
Sections 1
First Section NOT STARTED Electrical Contractor Status set by Derek Hudak on 3/26/2020.
1 Unit is energized.
2 All electrical connections are tight and torqued to manufacturer requirements and standards.
3 All electrical connections are clean.
4 All electrical components are grounded.
5 Electrical disconnect is labeled and accessible per code.
6 All required electrical work is performed.
Checklists | Printed on 03/27/2020 | Page 17 of 149
#102 A-DOAS-1 - TAB
Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Type Pre-Functional Asset TAB
NOT STARTED
Sections 1
First Section NOT STARTED TAB Contractor Status set by Derek Hudak on 3/26/2020.
1 Air balancing is complete.
2 Preliminary TAB report is submitted.
3 Balanced values are within 0% to +10% of design for total supply air, exhaust air, and outside air.
4 Balanced values are within 0% to +5% of design for diffusers, registers, and grilles with a design airflow rate 100 CFM or less.
Checklists | Printed on 03/27/2020 | Page 18 of 149
#90 A-FCU-1
Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Type Pre-Functional Asset A-FCU-1
NOT STARTED
Sections 1
First Section NOT STARTED Mechanical Contractor Status set by Derek Hudak on 3/26/2020.
MODEL VERIFICATION
1 Record Manufacturer:
2 Record Model Number:
3 Record Serial Number:
4 Record V/Ph/Hz:
INSTALLATION
5 Unit is free from physical damage.
6 Unit is clean.
7 Unit is installed per contract documents and manufacturer requirements.
8 Adequate clearance around unit for service per manufacturer’s requirements.
9 All unit components are in good condition.
10 All components are accessible for maintenance.
11 Equipment tag and nameplate are permanently affixed.
12 Ductwork is installed, supported, and insulated per contract documents.
13 Volume dampers are provided for each supply diffuser and return register.
14 Corresponding control manifold is installed per contract documents and manufacturer requirements.
15 Thermostat is installed and operational.
REFRIGERANT/CONDENSATE PIPING
16 Refrigerant piping is installed, supported, and insulated per contract documents.
17 Refrigerant piping is verified to be complete between the indoor unit and corresponding control manifold.
18 Unit is charged with appropriate type and quantity of refrigerant.
19 Condensate drain piping is installed and supported per contract documents.
20 Condensate drain piping is routed to mop sinnk.
21 No leakage is detected.
Checklists | Printed on 03/27/2020 | Page 19 of 149
#90 A-FCU-1 | Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Checklists | Printed on 03/27/2020 | Page 20 of 149
#91 A-FCU-2
Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Type Pre-Functional Asset A-FCU-2
NOT STARTED
Sections 1
First Section NOT STARTED Mechanical Contractor Status set by Derek Hudak on 3/26/2020.
MODEL VERIFICATION
1 Record Manufacturer:
2 Record Model Number:
3 Record Serial Number:
4 Record V/Ph/Hz:
INSTALLATION
5 Unit is free from physical damage.
6 Unit is clean.
7 Unit is installed per contract documents and manufacturer requirements.
8 Adequate clearance around unit for service per manufacturer’s requirements.
9 All unit components are in good condition.
10 All components are accessible for maintenance.
11 Equipment tag and nameplate are permanently affixed.
12 Ductwork is installed, supported, and insulated per contract documents.
13 Volume dampers are provided for each supply diffuser and return register.
14 Corresponding control manifold is installed per contract documents and manufacturer requirements.
15 Thermostat is installed and operational.
REFRIGERANT/CONDENSATE PIPING
16 Refrigerant piping is installed, supported, and insulated per contract documents.
17 Refrigerant piping is verified to be complete between the indoor unit and corresponding control manifold.
18 Unit is charged with appropriate type and quantity of refrigerant.
19 Condensate drain piping is installed and supported per contract documents.
20 Condensate drain piping is routed to mop sinnk.
21 No leakage is detected.
Checklists | Printed on 03/27/2020 | Page 21 of 149
#91 A-FCU-2 | Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Checklists | Printed on 03/27/2020 | Page 22 of 149
#92 A-FCU-3
Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Type Pre-Functional Asset A-FCU-3
NOT STARTED
Sections 1
First Section NOT STARTED Mechanical Contractor Status set by Derek Hudak on 3/26/2020.
MODEL VERIFICATION
1 Record Manufacturer:
2 Record Model Number:
3 Record Serial Number:
4 Record V/Ph/Hz:
INSTALLATION
5 Unit is free from physical damage.
6 Unit is clean.
7 Unit is installed per contract documents and manufacturer requirements.
8 Adequate clearance around unit for service per manufacturer’s requirements.
9 All unit components are in good condition.
10 All components are accessible for maintenance.
11 Equipment tag and nameplate are permanently affixed.
12 Ductwork is installed, supported, and insulated per contract documents.
13 Volume dampers are provided for each supply diffuser and return register.
14 Corresponding control manifold is installed per contract documents and manufacturer requirements.
15 Thermostat is installed and operational.
REFRIGERANT/CONDENSATE PIPING
16 Refrigerant piping is installed, supported, and insulated per contract documents.
17 Refrigerant piping is verified to be complete between the indoor unit and corresponding control manifold.
18 Unit is charged with appropriate type and quantity of refrigerant.
19 Condensate drain piping is installed and supported per contract documents.
20 Condensate drain piping is routed to mop sinnk.
21 No leakage is detected.
Checklists | Printed on 03/27/2020 | Page 23 of 149
#92 A-FCU-3 | Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Checklists | Printed on 03/27/2020 | Page 24 of 149
#60 A-WFCU-2
Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Type Pre-Functional Asset A-WFCU-2
NOT STARTED
Sections 1
First Section NOT STARTED Mechanical Contractor Status set by Derek Hudak on 3/26/2020.
MODEL VERIFICATION
1 Record Manufacturer:
2 Record Model Number:
3 Record Serial Number:
4 Record V/Ph/Hz:
INSTALLATION
5 Unit is free from physical damage.
6 Unit is clean.
7 Unit is installed per contract documents and manufacturer requirements.
8 Adequate clearance around unit for service per manufacturer’s requirements.
9 All unit components are in good condition.
10 All components are accessible for maintenance.
11 Equipment tag and nameplate are permanently affixed.
12 Corresponding control manifold is installed per contract documents and manufacturer requirements.
13 Thermostat is installed and operational.
REFRIGERANT/CONDENSATE PIPING
14 Refrigerant piping is installed, supported, and insulated per contract documents.
15 Refrigerant piping is verified to be complete between the indoor unit and corresponding control manifold.
16 Unit is charged with appropriate type and quantity of refrigerant.
17 Condensate drain piping is installed, supported, and insulated per contract documents.
18 Condensate drain piping is routed to mop sinnk.
19 Condensate pump is installed.
20 No leakage is detected.
START UP
21 Unit has started up per manufacturer recommendations and contract documents.
Checklists | Printed on 03/27/2020 | Page 25 of 149
#60 A-WFCU-2 | Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Checklists | Printed on 03/27/2020 | Page 26 of 149
#115 Access Control Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Type Pre-Functional Asset Access Control
NOT STARTED
Sections 1
First Section NOT STARTED Status set by Derek Hudak on 3/27/2020.
VERIFY THE FOLLOWING COMPONENTS HAVE BEEN INSTALLED FOR THE
ACCESS CONTROL SYSTEM:
1 Interface cabinet for hard wired existing system extension
2 Head end cabinet for standalone system
3 Control and communications panels
4 Electronic security management system fully compatible with existing Host VAMC Security Management System
5 Card readers at restricted access entry points as indicated in the drawings
6 Credential cards
7 Picture ID and badging station
8 Door position indicators
9 Portal control devices
10 Entry Control Device
11 Electronic door hardware
12 Power supplies
13 Power and control wiring, raceways, and grounding
VERIFY THE ACCESS CONTROL SYSTEM HAS BEEN INSTALLED IN THE
FOLLOWING LOCATIONS:
14 Administration Building: employee entrances, secure records storage, electrical rooms, telephone, MCR, and telecom rooms
15 Maintenance Building: main building entry
16 Other Facilities as indicated on the contract documents.
VERIFY THE FOLLOWING ABOUT THE ACCESS CONTROL SYSTEM:
17 The installer is BICSI RCDD certified and a licensed security contractor or manufacturer authorized representative
18 Intrusion detection and video surveillance have been integrated into the physical access and control system (PACS)
19 Personal identity verification (PIV) cards are programmable and addressable for card readers
Checklists | Printed on 03/27/2020 | Page 27 of 149
20 PACS has been installed and programmed for ease of operation, programming, servicing, maintaining, testing, and upgrading
21 A field survey has been completed to test and inspect existing door equipment and signal lines
22 Existing door equipment and wiring usable without modification is being reused with the contracting officer's representative's approval
VERIFY THE FOLLOWING ABOUT THE ACCESS CONTROL SYSTEM HEAD
END EQUIPMENT:
23 The access control system has been coordinated to transmit an alarm to a remote workstation
24 Electronic security management system is expandable, capable of network connectivity, and has reporting capability.
VERIFY THE FOLLOWING ABOUT THE ACCESS CONTROL SYSTEM IN THE
FIELD:
25 Computer access is password protected
26 Electric fans, non-disposable air filters, and enclosure openings are provided to dissipate heat from panel modules
27 Cables at each termination, pull box, and break in conductor run have permanent labels identifying each cable according to system submittal drawings
28 Equipment has permanently affixed labels
VERIFY THE FOLLOWING ABOUT THE ACCESS CONTROL SYSTEM
REPORTING CAPABILITIES:
29 Individual reports provide the employee's name, office location, phone number, normal hours of operation, and a detailed listing of the employee's daily access controlled events
30 System reports provide information on a daily, weekly and monthly basis including events, alarms, and other activity associated with system users
31 The report format is tabular and chronologic by date and time
#115 Access Control | Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Checklists | Printed on 03/27/2020 | Page 28 of 149
#107 ATS-A
Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Type Pre-Functional Asset ATS-A
NOT STARTED
Sections 1
First Section NOT STARTED Electrical Contractor Status set by Derek Hudak on 3/26/2020.
MODEL VERIFICATION
1 Record Manufacturer:
2 Record Model Number:
3 Record Serial Number:
4 Record Number of Poles:
5 Open or Closed Transition?
INSTALLATION
6 Adequate clearance around unit for service per manufacturer’s requirements.
7 Dedicated electrical space (extending 6’ above equipment footprint) is free of piping, ductwork, leak protection, or other equipment foreign to the electrical installation per NEC 110.26.
8 All components/accessories present.
9 All components are accessible for maintenance.
START UP
10 Phase-to-phase, phase-to-ground, and neutral-to-ground, and insulation tests have been conducted, acceptable and report attached.
11 Operation of test switch verified and acceptable.
12 Return to normal switch operation verified and acceptable.
13 Operation of unit and associated generator verified and acceptable.
Checklists | Printed on 03/27/2020 | Page 29 of 149
#108 Crypt Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Type Pre-Functional Asset Crypts
NOT STARTED
Sections 1
First Section NOT STARTED Status set by Derek Hudak on 3/27/2020.
RECORD LOCATION INFORMATION
1 Crypt Number:
2 Crypt Burial Section:
3 Type of Crypt (Perimeter or Interior):
DOUBLE DEPTH CRYPTS VERIFICATION
4 The crypt is a one-piece box with a separate outer lid.
5 A removable one-piece inside shelf is provided.
6 Four casket risers or two casket support bars are provided.
7 If casket risers are being used, two 4 inch drain holes are provided in the floor of the structure at opposite ends.
8 If two support bars are being used, three 4 inch drain holes are provided in the structure - two holes at opposite ends and one in the middle.
9 Exterior maximum height dimension is 60 inches, including the lid.
10 Crypt and lid are all installed at heights indicated on the plans.
11 If the crypt is a perimeter crypt, stiffening ribs have been added per the drawing details.
12 Plot size is 3 ft by 8 ft.
13 3/8" stones have been installed between the head and foot of the neighboring crypts.
INSIDE SHELVES VERIFICATION
14 The shelf is a one piece of rigid construction.
15 The shelf is capable of holding 400 lbs.
16 The shelf is rigid, non-brittle, and non-deteriorating.
17 The shelf has one lifting hole in the middle about 2 inches away from the edge with a maximum diameter of 3/4 inches.
Checklists | Printed on 03/27/2020 | Page 30 of 149
#109 Crypts - Combined Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Type Pre-Functional Asset Crypts
NOT STARTED
Sections 1
First Section NOT STARTED Status set by Derek Hudak on 3/27/2020.
BATCHING AND CONSTRUCTION VERIFICATION
1 All crypts are confirmed to have 75% of the compressive strength attained prior to being shipped to the site.
2 Crypts are structurally designed for overhead and lateral soil pressures with a 28 day compressive strength of 35 Mpa.
3 As required, crypts meet sustainability requirements outlined in the contract specifications.
4 A guarantee has been provided for all crypts.
5 A proposed shelf removal tool has been provided.
6 The shelf removal tool is constructed so one person can easily retrieve and install the shelf from ground level without entering the crypt.
7 Three OSHA approved and tag certified wire rope lifting devices for removing the lid have been provided.
8 Two perimeter crypts have been provided.
9 One interior crypt has been provided.
DELIVERY, STORAGE, AND HANDLING VERIFICATION
10 Crypts having surface holes, air bubbles, chips, or spalling are all under 0.1 square meter per specifications.
11 Temporary bracing protection devices have been provided to prevent damage to the units during handling, transportation and storage.
12 Units are stored on blocking, gravel or other approved methods to prevent damage or plugging of the bottom drainage holes.
13 There are no markings, including logos, trademarks and proprietary information on the surface of the crypts.
14 The date of manufacture (month, day, and year) are written on the box and lid in permanent ink.
INSTALLATION
15 Written documentation that verifies the installer has been regularly engaged, for at least three years, in installation of precast concrete similar to this project has been submitted.
16 Crypt lid painting is completed within 10 seconds of cleaning being completed.
17 Crypt under drain cleanouts have been installed as indicated on the plans and coordinated the grading, storm water, and drainage plans.
Checklists | Printed on 03/27/2020 | Page 31 of 149
18 Drainage piping and aggregate are installed 12" below crypt as indicated on the drawings below the crypt.
19 Crypt plots are pitched and sloped 3% on drainage and leveling aggregate as indicated on the drawings.
20 Irrigation line and aisle are installed per the plans.
21 Associated crypt gravesite grid monument is installed as indicated on the drawings.
22 Associated crypt headstones are installed as indicated on the drawings.
23 Numbering of the crypts matches the layout on the plans.
24 Crypt quantity matches the plans.
25 Crypts are installed as configured on the drawings and centered on the grid lines.
#109 Crypts - Combined | Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Checklists | Printed on 03/27/2020 | Page 32 of 149
#16 DHP-1
Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Type Pre-Functional Asset DHP-1
NOT STARTED
Sections 1
First Section NOT STARTED Plumbing Contractor Status set by Alvin George on 3/26/2020.
MODEL VERIFICATION
1 Record Pump Manufacturer:
2 Record Pump Model Number:
3 Record Pump Serial Number:
4 Record Motor horsepower:
5 Record V/Ph/Hz:
INSTALLATION
6 Unit is free from physical damage.
7 Unit is clean.
8 Unit installed and secured per contract documents and manufacturer recommendations.
9 Adequate clearance around the unit for service.
10 Equipment tag and nameplate permanently affixed.
11 Pipe insulation is complete.
12 All piping is clean, complete, and free from leaks.
13 Strainer is in place and clean.
START UP
14 Pump is started up per manufacturer recommendations and contract documents.
15 Pump operation is without any unusual noise or vibration.
16 Start up documentation is attached to this checklist.
Checklists | Printed on 03/27/2020 | Page 33 of 149
#17 DHP-1 - Electrical Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Type Pre-Functional Asset Domestic Hot Water
Circulation Pump
NOT STARTED
Sections 1
First Section NOT STARTED Electrical Contractor Status set by Alvin George on 3/26/2020.
1 Unit has power.
2 All electrical connections are tight and properly installed.
3 All electrical connections are clean.
4 Disconnect switch is installed, labeled and accessible.
5 All required electrical work is performed.
Checklists | Printed on 03/27/2020 | Page 34 of 149
#40 DWH-1
Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Type Pre-Functional Asset DWH-1
NOT STARTED
Sections 1
First Section NOT STARTED Plumbing Contractor Status set by Alvin George on 3/26/2020.
MODEL VERIFICATION
1 Record Manufacturer:
2 Record Model Number:
3 Record Serial Number:
4 Heating Capacity:
5 Storage Capacity:
6 Record V/Ph/Hz:
INSTALLATION
7 Unit is free from physical damage.
8 Unit is clean.
9 Unit is installed per contract documents and manufacturer requirements.
10 Adequate clearance around unit for service.
11 All unit components are in good condition.
12 All components are accessible for maintenance.
13 Equipment tag and nameplate are permanently affixed.
14 Combustion air and vent are installed per contract documents and manufacturer requirements.
15 Combustion air and vent separation distance follows water heater manufacturer recommendation.
16 All piping and fittings are installed and supported per contract documents.
17 Are required hydronic and gas valves are installed and in right direction.
18 Expansion tank is installed.
19 Thermometer is installed on hot water supply pipe.
20 No leakage is detected.
START UP
21 Unit has started up per manufacturer recommendations and contract documents.
Checklists | Printed on 03/27/2020 | Page 35 of 149
#41 DWH-1 - Electrical Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Type Pre-Functional Asset Gas Fired Water Heater
NOT STARTED
Sections 1
First Section NOT STARTED Electrical Contractor Status set by Alvin George on 3/26/2020.
DWH-1
1 Unit has power.
2 All electrical connections are tight and clean.
3 All electrical components are grounded.
4 Electrical disconnect is installed, labeled and accessible per code.
5 All required electrical work is performed.
Checklists | Printed on 03/27/2020 | Page 36 of 149
#52 DWH-2 (Toilet 103) Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Type Pre-Functional Asset DWH-2 (Toilet 103)
NOT STARTED
Sections 1
First Section NOT STARTED Plumbing Contractor Status set by Derek Hudak on 3/26/2020.
MODEL VERIFICATION
1 Record Manufacturer:
2 Record Model Number:
3 Record Serial Number:
4 Heating Capacity:
INSTALLATION
5 Unit is free from physical damage.
6 Unit is clean.
7 Unit is installed per contract documents and manufacturer requirements.
8 Adequate clearance around unit for service.
9 Equipment tag and nameplate are permanently affixed.
10 All piping and fittings are installed and supported per contract documents.
11 No leakage is detected.
START UP
12 Unit has started up per manufacturer recommendations and contract documents.
13 Start up reports are attached to this checklist.
Checklists | Printed on 03/27/2020 | Page 37 of 149
#53 DWH-2 (Toilet 109) Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Type Pre-Functional Asset DWH-2 (Toilet 109)
NOT STARTED
Sections 1
First Section NOT STARTED Plumbing Contractor Status set by Derek Hudak on 3/26/2020.
MODEL VERIFICATION
1 Record Manufacturer:
2 Record Model Number:
3 Record Serial Number:
4 Heating Capacity:
INSTALLATION
5 Unit is free from physical damage.
6 Unit is clean.
7 Unit is installed per contract documents and manufacturer requirements.
8 Adequate clearance around unit for service.
9 Equipment tag and nameplate are permanently affixed.
10 All piping and fittings are installed and supported per contract documents.
11 No leakage is detected.
START UP
12 Unit has started up per manufacturer recommendations and contract documents.
Checklists | Printed on 03/27/2020 | Page 38 of 149
#54 DWH-3
Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Type Pre-Functional Asset DWH-3
NOT STARTED
Sections 1
First Section NOT STARTED Plumbing Contractor Status set by Derek Hudak on 3/26/2020.
MODEL VERIFICATION
1 Record Manufacturer:
2 Record Model Number:
3 Record Serial Number:
4 Heating Capacity:
INSTALLATION
5 Unit is free from physical damage.
6 Unit is clean.
7 Unit is installed per contract documents and manufacturer requirements.
8 Adequate clearance around unit for service.
9 Equipment tag and nameplate are permanently affixed.
10 All piping and fittings are installed and supported per contract documents.
11 No leakage is detected.
START UP
12 Unit has started up per manufacturer recommendations and contract documents.
Checklists | Printed on 03/27/2020 | Page 39 of 149
#55 DWH-4
Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Type Pre-Functional Asset DWH-4
NOT STARTED
Sections 1
First Section NOT STARTED Plumbing Contractor Status set by Derek Hudak on 3/26/2020.
MODEL VERIFICATION
1 Record Manufacturer:
2 Record Model Number:
3 Record Serial Number:
4 Heating Capacity:
INSTALLATION
5 Unit is free from physical damage.
6 Unit is clean.
7 Unit is installed per contract documents and manufacturer requirements.
8 Adequate clearance around unit for service.
9 Equipment tag and nameplate are permanently affixed.
10 All piping and fittings are installed and supported per contract documents.
11 No leakage is detected.
START UP
12 Unit has started up per manufacturer recommendations and contract documents.
Checklists | Printed on 03/27/2020 | Page 40 of 149
#37 EF-1
Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Type Pre-Functional Asset EF-1
NOT STARTED
Sections 1
First Section NOT STARTED Mechanical Contractor Status set by Alvin George on 3/26/2020.
MODEL VERIFICATION
1 Record Manufacturer
2 Record Model Number
3 Record Serial Number
4 Motor HP
5 Record V/Ph/Hz
INSTALLATION
6 Is equipment tag and nameplate permanently affixed?
7 Equipment mounted per contract documents?
8 Electrical disconnect labeled and accessible per code?
9 Motor rotation is in proper direction?
10 Thermostat is installed and operational.
11 Intake louver is installed and associated damper to be interlocked to fan is installed and operational.
START UP
12 Unit has started up per manufacturer recommendations and contract documents.
Checklists | Printed on 03/27/2020 | Page 41 of 149
#38 EF-1 - Electrical Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Type Pre-Functional Asset Exhaust Fan
NOT STARTED
Sections 1
First Section NOT STARTED Electrical Contractor Status set by Alvin George on 3/26/2020.
1 Unit is energized.
2 Control damper is installed and interlocked to fan.
3 All electrical connections are tight and torqued to manufacturer requirements and standards.
4 All electrical connections are clean.
5 All electrical components are grounded.
Checklists | Printed on 03/27/2020 | Page 42 of 149
#25 Electric Water Heaters - Combined Electrical Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Type Pre-Functional Asset Electric Water Heater
NOT STARTED
Sections 1
First Section NOT STARTED Electrical Contractor Status set by Alvin George on 3/26/2020.
DWH-2 (TOILET 103)
1 Unit has power.
2 All electrical connections are tight and clean.
3 Electrical disconnect is installed, labeled and accessible per code.
4 Water heater is being supplied with proper voltage.
5 All required electrical work is performed.
DHW-2 (TOILET 109)
6 Unit has power.
7 All electrical connections are tight and clean.
8 Electrical disconnect is installed, labeled and accessible per code.
9 Water heater is being supplied with proper voltage.
10 All required electrical work is performed.
DWH-3
11 Unit has power.
12 All electrical connections are tight and clean.
13 Electrical disconnect is installed, labeled and accessible per code.
14 Water heater is being supplied with proper voltage.
15 All required electrical work is performed.
DWH-4
16 Unit has power.
17 All electrical connections are tight and clean.
18 Electrical disconnect is installed, labeled and accessible per code.
19 Water heater is being supplied with proper voltage.
20 All required electrical work is performed.
Checklists | Printed on 03/27/2020 | Page 43 of 149
#111 Generator Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Type Pre-Functional Asset Generator
NOT STARTED
Sections 1
First Section NOT STARTED Electrical Contractor Status set by Derek Hudak on 3/27/2020.
1 Record and install Manufacturer.
2 Record and install Model #.
3 Record and install Serial #.
PHYSICAL CHECKS
4 Unit is clean and free of physical damage.
5 All components/accessories present.
6 Manufacturer's ratings readable/accurate.
7 All exhaust and supply ventilation openings are sealed with durable plastic or other weatherproof means.
INSTALLATION
8 Concrete housekeeping pad of appropriate dimension and height provided.
9 Unit secured and supported as required by manufacturer and specifications.
10 Adequate access for maintenance per manufacturer requirements.
11 All components accessible for maintenance.
12 Battery powered emergency lighting located near generator.
13 There is sufficient clearance around unit for special accessibility requirements (i.e. truck access to site).
14 Feeder, power, service outlet(s) and control conduit feeds are aligned with openings and accommodate seismic motion.
15 Unit location coordinated with piping, ductwork, conduit and other trades to allow sufficient clearances.
16 Unit secured as required by manufacturer and contract documents, including external vibration isolation as specified.
17 Unit is level.
18 All piping components have been installed (in the correct order) as required by contract documents or manufacturer.
ELECTRICAL
19 All electrical connections tight.
20 Crankcase and water jacket heaters wired and operational.
21 Starter battery installed and wired properly.
22 Battery charger wired and operational.
Checklists | Printed on 03/27/2020 | Page 44 of 149
23 Remote annunciator installed and operational.
24 Remote manual emergency stop station installed and operational.
25 All local alarms and safeties wiring installed and operational.
26 Unit interior is clean of dirt and debris.
27 Fuel tank filled.
28 Cooling system is filled with specified water/antifreeze mixture.
29 Jacket water heater has operated for a period of 24 hours prior to startup.
30 All switches and circuit breakers have been manually tested (report submitted).
31 Phase-to-phase, phase-to-ground, and neutral-to-ground, and insulation tests have been conducted and are acceptable (report submitted).
32 Battery is fully charged.
TESTING
33 Indicating lamps function properly.
34 Time delays for transfer and generator shut down set per contract documents.
35 Operation of power transfer from normal to emergency source and back functions properly.
36 Unit load tested for specified duration and results acceptable (report submitted).
37 Battery, capacity, charge and integrity tests completed and results acceptable (report submitted).
38 Voltage and frequency transient stability test completed and results acceptable (report submitted).
39 Main breaker causes trouble alarm in the tripped or off position at remove annunciator.
#111 Generator | Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Checklists | Printed on 03/27/2020 | Page 45 of 149
#110 Global Navigation Satellite System Reference System Farnsworth Group | Dallas-Fort Worth National Cemetery Phase 4 Cx
Type Pre-Functional Asset Global Navigation Satellite
NOT STARTED
Sections 1
First Section NOT STARTED Status set by Derek Hudak on 3/27/2020.
COMPONENTS VERIFICATION
1 One GPS handheld receiver and data logger (Rover Unit) is provided for every six interments.
2 A minimum of three Rover Units are provided.
3 A back-up Rover Unit is provided.
4 A ruggedized carry case is provided for each Rover Unit.
5 A 6.6 foot carbon fiber snap-lock rover pole is provided for each Rover Unit.
6 A pole storage bag is provided for each Rover Unit.
7 Alternate rubber foot pads or spike caps for all pole legs are provided for each Rover Unit.
8 A data logger mount is provided for each Rover Unit.
9 Each GPS handheld receiver has a rechargeable and removable battery to provide a full day use on a full charge.
10 Each GPS handheld receiver has extra batteries that are capable of providing a full day use.
11 A competent superintendent satisfactory to the RE/COR is present on the project site during all installation activities.
12 All equipment and accessories are brand new, unused, and not reconditioned, remanufactured, nor recertified.
13 All GPS equipment is 100% sealed from sand, dust, and moisture.
14 All antennas are 100% stainless steel.
15 Antennas are roof-based mounted when possible.
16 Antennas that are not roof-based mounted have reinforced concrete pier foundation installed at the location in the drawings.
HEAD END EQUIPMENT VERIFICATION
17 Radio Antenna Facilities (RAF) are provided as necessary to provide a functioning system.
Checklists | Printed on 03/27/2020 | Page 46 of 149
18 GPS receivers are capable of code and phase measurements, internal raw data logging, raw data streaming and internal data storage.
19 The Base Station consists of a GPS reference antenna, GPS receiver, UHF radio transmitter, transmitting antenna, voltage converter, and cables and conduits necessary to link the system equipment.
20 The Base Station is installed per GPS sales and service contractor and NGS Guidelines.
21 The Base Station and Rover Unit radio frequencies are coordinated.
22 The Base Station and Rover Units are capable of broadcasting corrections through UHF radio signals at 5 and 35 watt power.
23 The Base Station receiver and radio system are installed in an enclosure with a UPS that is capable of providing 30 minutes of power to the GPS receiver and radio.
FIELD VERIFICATION
24 The field data collected by the Rover Units meet the 0.4 inch accuracy standard set in the contract specifications.
25 One RAF location is within a 200 ft cable run from the Base Station.
26 Signal boosters are provided as required for longer cable runs to RAFs, as recommended by the equipment .
27 Transferring information to and from the TerraFlex servers has been coordinated.
28 Five survey monuments have been installed with a minimum diameter of 3.5…
This is the start of the file's text. The full file is on GovTribe.