P-803 Final Phase II Specifications.pdf
PDF 8 MB Posted
- Attached to
- FY21 MCON Project P-803, Individual Combat Skills Training, Marine Corps Base Guam, Finegayan, Guam
- Solicitation number
- N62742-21-R-1315
About this file
This is a request for proposal for a military construction project at Marine Corps Base Guam. The solicitation is for construction of individual combat skills training facilities including a covered training area, 60 foot rappelling tower, field training area, bleachers, hand to hand combat pit, and obstacle course. The work includes site preparation, foundations, structures, utilities, finishes and other site improvements. The period of performance is expected to be approximately 18 months. Proposals are due by 2:00 PM local time on May 7, 2021 and the contract is to be awarded by July 30, 2021. The work will be conducted on the installation and is managed by the Naval Facilities Engineering Command Pacific.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMD 03 21R1315.pdf | ||
| 21R1315 Note6-final.pdf | ||
| 21R1315 Note 5.pdf | ||
| 21R1315 Note 4.pdf | ||
| 21R1315 Note 3.pdf | ||
| AMD 02 21R1315.pdf | ||
| 21R1315 Note 2-Final.pdf | ||
| AMD 0001 21R1315.pdf | ||
| 21R1315 Note 1.pdf | ||
| P-803 Final Phase II Drawings.pdf | ||
| N62742-21-R-1315 Front End.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WORK ORDER NO: 1619790
SPECIFICATIONS
Final Design Submittal (Phase II)
For
FY21 MCON PROJECT P-803
INDIVIDUAL COMBAT SKILLS TRAINING
At the
NAVAL SUPPORT ACTIVITY, MARINE CORPS BASE, GUAM
PREPARED BY:
Architectural: RMAA-API JV, RMA Architects, Inc.
Civil: RMAA-API JV, SSFM International, Inc.
Landscape: RMAA-API JV, Ki Concepts, LLC Structural: RMAA-API JV, SSFM International, Inc.
Mechanical: RMAA-API JV, Miyashiro & Associates, Inc.
Fire Protection: RMAA-API JV, Coffman Engineers, Inc.
Electrical: RMAA-API JV, Nakamura Oyama and Associates, Inc.
Geotechnical: RMAA-API JV, Geolabs, Inc.
Environmental: RMAA-API JV, Myounghee Noh and Associates, LLC Sustainability: RMAA-API JV, AMEL Technologies, Inc.
Submitted By: _______________________________ Date: ____________ Bryan Ginoza, AIA
APPROVED BY:
Specification: _________________________________________________ Mr. Clint Hashiba, P.E.
For Commander, NAVFAC Pacific: ________________________________________________
Mr. Evan A. Mizue, P.E.
Date: _______________________ yannnnnnnnnn GGGGGGGGGinoza, AAAAAAAAIAIAIAIAIAAIAAAIAIA
March 30, 2021
04/07/21
HASHIBA.CLINT.T.1
232054359
Digitally signed by
HASHIBA.CLINT.T.1232054359
Date: 2021.04.07 15:35:01 -10'00'
This Page Intentionally Left Blank
FY21 MCON PROJECT P-803 INDIVIDUAL COMBAT SKILLS TRAINING 1619790
MARINE CORPS BASE GUAM, FINEGAYAN, GUAM
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 01 15 02/11 LIST OF DRAWINGS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 08/15 SUMMARY OF WORK
01 14 00 11/11 WORK RESTRICTIONS
01 20 00.00 20 11/11 PRICE AND PAYMENT PROCEDURES
01 30 00 08/15 ADMINISTRATIVE REQUIREMENTS
01 31 23.13 20 05/17 ELECTRONIC CONSTRUCTION AND FACILITY
SUPPORT CONTRACT MANAGEMENT SYSTEM
01 32 17.00 20 05/18 COST-LOADED NETWORK ANALYSIS SCHEDULES
(NAS)
01 33 00 08/18 SUBMITTAL PROCEDURES
01 33 29 02/17 (Change 3 - 08/ SUSTAINABILITY REPORTING
01 35 13.02 PAC 02/21 INDUSTRIAL CONTROL SYSTEMS PROCUREMENT
01 35 26 11/15 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 20 11/11 QUALITY CONTROL
01 45 35 02/20 SPECIAL INSPECTIONS
01 50 00 05/18 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19 11/15 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19.01 20 11/15 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL
CONTROLS
01 57 19.01 30 11/15 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL
CONTROLS (JRM ESS)
01 57 19.04 11/15 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL
CONTROLS (DPRI)
01 58 00 08/19 PROJECT IDENTIFICATION
01 74 19 02/19 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 00 05/19 CLOSEOUT SUBMITTALS
01 78 23 08/15 OPERATION AND MAINTENANCE DATA
01 78 24.00 20 02/15 FACILITY ELECTRONIC OPERATION AND
MAINTENANCE SUPPORT INFORMATION (eOMSI)
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 05/10 DEMOLITION
DI VI SI ON 03 - CONCRETE
03 30 00 02/19 CAST-IN-PLACE CONCRETE
03 45 33 05/16 PRECAST PRESTRESSED STRUCTURAL CONCRETE
DI VI SI ON 05 - METALS
05 50 13 05/17 MISCELLANEOUS METAL FABRICATIONS
05 52 00 02/18 METAL RAILINGS
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
06 10 00 08/16 ROUGH CARPENTRY
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
PROJECT TABLE OF CONTENTS Page 1
07 18 00 TRAFFIC COATINGS
07 19 00 05/11 WATER REPELLENTS
07 56 00 A/E FLUID-APPLIED ROOF COATING SYSTEM
07 60 00 05/17 FLASHING AND SHEET METAL
07 84 00 05/10 FIRESTOPPING
07 92 00 08/16 JOINT SEALANTS
DI VI SI ON 08 - OPENI NGS
08 11 13 08/20 STEEL DOORS AND FRAMES
08 11 16 05/17 ALUMINUM DOORS AND FRAMES
08 31 00 05/17 ACCESS DOORS AND PANELS
08 71 00 02/16 DOOR HARDWARE
08 91 00 05/11 METAL WALL LOUVERS
DI VI SI ON 09 - FI NI SHES
09 90 00 05/11 PAINTS AND COATINGS
DI VI SI ON 10 - SPECI ALTI ES
10 14 00.10 08/17 EXTERIOR SIGNAGE
10 21 13 08/17 TOILET COMPARTMENTS
10 28 13 08/17 TOILET ACCESSORIES
10 44 16 11/19 FIRE EXTINGUISHERS
DI VI SI ON 12 - FURNI SHI NGS
12 93 00 08/17 SITE FURNISHINGS
DI VI SI ON 22 - PLUMBI NG
22 00 00 11/15 PLUMBING, GENERAL PURPOSE
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 03 00.00 20 08/10 BASIC MECHANICAL MATERIALS AND METHODS
23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
23 30 00 05/20 HVAC AIR DISTRIBUTION
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 05 11 NAVFAC PAC 09/18 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS
25 08 11.00 20 04/20 Risk Management Framework for Facility-Related Control Systems
DI VI SI ON 26 - ELECTRI CAL
26 08 00 08/08 APPARATUS INSPECTION AND TESTING
26 12 21 05/17 SINGLE-PHASE PAD-MOUNTED TRANSFORMERS
26 20 00 08/19 INTERIOR DISTRIBUTION SYSTEM
26 41 00 11/13 LIGHTNING PROTECTION SYSTEM
26 51 00 05/20 INTERIOR LIGHTING
DI VI SI ON 27 - COMMUNI CATI ONS
PROJECT TABLE OF CONTENTS Page 2
27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
DI VI SI ON 31 - EARTHWORK
31 23 00.00 20 02/11 EXCAVATION AND FILL
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 05 33 08/17 LANDSCAPE ESTABLISHMENT
32 11 23 08/17 AGGREGATE BASE COURSES
32 11 23.23 08/17 BASE COURSE DRAINAGE LAYERS
32 13 13.06 05/20 PORTLAND CEMENT CONCRETE PAVEMENT FOR
ROADS AND SITE FACILITIES
32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 08/16 PAVEMENT MARKINGS
32 18 16.13 08/17 PLAYGROUND PROTECTIVE SURFACING
32 31 13 11/16 CHAIN LINK FENCES AND GATES
32 92 19 08/17 SEEDING
32 93 00 08/17 EXTERIOR PLANTS
DI VI SI ON 33 - UTI LI TI ES
33 11 00 02/18 WATER UTILITY DISTRIBUTION PIPING
33 30 00 05/18 SANITARY SEWERAGE
33 40 00 02/10 STORM DRAINAGE UTILITIES
33 71 02 02/15 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 3
This Page Intentionally Left Blank
DOCUMENT 00 01 15
LIST OF DRAWINGS
02/11
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
SHT
NO.
NAVFAC
DWG NO.
DWG NO. SHEET NAME
1 17263735 G-001 TITLE SHEET, PROJECT DESIGN TEAM, LOCATION MAP, VICINITY MAP
2 17263736 G-002 INDEX TO DRAWINGS
3 17263737 G-003 GENERAL NOTES, SCOPE OF WORK, SYMBOLS AND REFERENCES
4 17263738 G-004 TYPICAL MOUNTING HEIGHTS
5 17263739 G-101 MARINE CORPS BASE GUAM BASE MAP
6 17263740 G-901 SITE PERSPECTIVE
17263741 NOT USED
17263742 NOT USED
17263743 NOT USED
7 17263744 GI100 BUILDING CODE SUMMARY SHEET
8 17263745 GI101 CODE COMPLIANCE SITE PLAN
9 17263746 GI102 COVERED TRAINING AREA - LIFE SAFETY PLAN
10 17263747 GI103 RAPPELLING TOWER 30'-0" H & 60'-0" H PLATFORM - LIFE SAFETY
PLAN
11 17263748 GI104 BLEACHERS - LIFE SAFETY PLAN
17263749 NOT USED
17263750 NOT USED
17263751 NOT USED
DOCUMENT 00 01 15 Page 1
12 17263752 B-001 GEOTECHNICAL GENERAL NOTES
13 17263753 B-002 BORING LOG LEGEND
14 17263754 B-003 BORING LOG LEGEND
15 17263755 B-101 BORING LOCATION PLAN
16 17263756 B-701 BORING LOGS - 1
17 17263757 B-702 BORING LOGS - 2
18 17263758 B-703 BORING LOGS - 3
19 17263759 B-704 BORING LOGS - 4
20 17263760 B-705 BORING LOGS - 5
17263761 NOT USED
17263762 NOT USED
17263763 NOT USED
21 17263764 C-001 NOTES, LEGENDS, SYMBOLS AND ABBREVIATIONS
22 17263765 C-002 GENERAL NOTE - 1
23 17263766 C-003 GENERAL NOTE - 2
24 17263767 C-100 OVERALL EXISTING CONDITION PLAN
25 17263768 C-101 HORIZONTAL CONTROL PLAN
26 17263769 CD100 OVERALL DEMOLITION PLAN
27 17263770 CD101 OVERALL EROSION AND SEDIMENT CONTROL PLAN
28 17263771 CD501 EROSION AND SEDIMENT CONTROL DETAIL
29 17263772 CS100 OVERALL SITE PLAN
30 17263773 CS101 DETAILED SITE PLAN
31 17263774 CS501 CIVIL DETAIL
32 17263775 CP101 SERVICE ROAD PLAN AND PROFILE - 1
33 17263776 CP102 SERVICE ROAD PLAN AND PROFILE - 2
34 17263777 CP103 SIGNING AND STRIPING PLAN
35 17263778 CP301 SERVICE ROAD TYPICAL SECTIONS
DOCUMENT 00 01 15 Page 2
36 17263779 CP501 PCC JOINT DETAILS
37 17263780 CP502 SIGNING AND STRIPING DETAILS
38 17263781 CG100 OVERALL GRADING PLAN
39 17263782 CG101 GRADING PLAN - 1
40 17263783 CG102 DETAILED GRADING PLAN - 1
41 17263784 CG103 DETAILED GRADING PLAN - 2
42 17263785 CU101 UTILITY PLAN
43 17263786 CU102 WATERLINE PLAN AND PROFILE
44 17263787 CU103 SEWERLINE PLAN AND PROFILE
45 17263788 CU104 DRAIN CULVERT PLAN AND PROFILE
46 17263789 CU501 DRAINAGE DETAILS
47 17263790 CU502 SEWER DETAILS
48 17263791 CU503 WATER DETAILS - 1
49 17263792 CU504 WATER DETAILS - 2
50 17263793 CU505 WATER DETAILS - 3
17263794 NOT USED
17263795 NOT USED
17263796 NOT USED
17263797 NOT USED
51 17263798 LP-101 LANDSCAPE PLAN
52 17263799 L-501 LANDSCAPE DETAILS AND NOTES
17263800 NOT USED
17263801 NOT USED
17263802 NOT USED
53 17263803 S-001 GENERAL STRUCTURAL NOTES
54 17263804 S-002 GENERAL STRUCTURAL NOTES, DESIGN LOADS & ABBREVIATIONS
55 17263805 S-003 COVERED TRAINING AREA WIND PRESSURE PLAN
DOCUMENT 00 01 15 Page 3
56 17263806 S-004 BLEACHERS WIND PRESSURE PLAN
57 17263807 S-005 RAPPELLING TOWER WIND PRESSURE PLAN
58 17263808 S-101 COVERED TRAINING AREA FOUNDATION PLAN AND ROOF FRAMING PLAN
59 17263809 S-102 BLEACHERS FOUNDATION AND FRAMING PLAN
60 17263810 S-103 BLEACHERS ROOF FRAMING PLAN
61 17263811 S-104 RAPPELLING TOWER GROUND FOUNDATION & 15'-0" H FRAMING PLAN
62 17263812 S-105 RAPPELLING TOWER 30'-0" H, 45'-0" H & 60'-0" H PLATFORM
FRAMING PLANS
63 17263813 S-201 EXTERIOR ELEVATIONS, BUILDING SECTIONS - COVERED TRAINING
AREA
64 17263814 S-202 EXTERIOR ELEVATIONS, BUILDING SECTIONS - BLEACHERS
65 17263815 S-204 EXTERIOR ELEVATIONS - RAPPELLING TOWER
66 17263816 S-205 EXTERIOR ELEVATIONS - RAPPELLING TOWER
67 17263817 S-301 BUILDING SECTIONS - RAPPELLING TOWER
68 17263818 S-302 BUILDING SECTIONS - RAPPELLING TOWER
69 17263819 S-401 SECTIONS AND DETAILS - COVERED TRAINING AREA
70 17263820 S-402 SECTIONS AND DETAILS - COVERED TRAINING AREA
71 17263821 S-403 SECTIONS AND DETAILS - BLEACHERS
72 17263822 S-404 SECTIONS AND DETAILS - BLEACHERS
73 17263823 S-405 SECTIONS AND DETAILS - RAPPELLING TOWER
74 17263824 S-406 SECTIONS AND DETAILS - RAPPELLING TOWER
75 17263825 S-407 STAIR SECTIONS - RAPPELLING TOWER
76 17263826 S-501 TYPICAL SLAB-ON-GRADE DETAILS
77 17263827 S-502 CONCRETE FOOTING SCHEDULE AND DETAILS
78 17263828 S-503 CONCRETE COLUMN SCHEDULE AND DETAILS
79 17263829 S-504 CONCRETE BEAM SCHEDULE AND DETAILS
80 17263830 S-505 TYPICAL REBAR SPLICE DETAILS
81 17263831 S-506 TYPICAL CONCRETE WALL DETAILS
82 17263832 S-507 TYPICAL SUSPENDED SLAB DETAILS
DOCUMENT 00 01 15 Page 4
83 17263833 S-508 HELL HOLE AND A FRAME RIGGING DETAILS
17263834 NOT USED
17263835 NOT USED
17263836 NOT USED
17263837 NOT USED
84 17263838 A-001 ARCHITECTURAL REFERENCE SYMBOLS, ABBREVIATIONS, WALL TYPES,
COLOR AND MATERIAL SELECTIONS
85 17263839 A-101 SITE PLAN
86 17263840 A-102 COVERED TRAINING AREA FLOOR PLAN AND REFLECTED CEILING PLAN
87 17263841 A-103 COVERED TRAINING AREA ROOF PLAN
88 17263842 A-104 BLEACHERS FLOOR PLANS, REFLECTED CEILING PLAN, ROOF PLAN
89 17263843 A-105 RAPPELLING TOWER GROUND FLOOR PLAN
90 17263844 A-106 RAPPELLING TOWER 30'-0" H & 60'-0" H PLATFORM FLOOR PLANS
91 17263845 A-107 RAPPELLING TOWER REFLECTED CEILING PLANS
92 17263846 A-108 RAPPELLING TOWER REFLECTED CEILING PLAN, ROOF PLAN
93 17263847 A-109 MARTIAL ARTS PIT FLOOR PLAN
94 17263848 A-110 OBSTACLE COURSE PLAN AND ELEVATION
95 17263849 A-201 EXTERIOR ELEVATIONS, BUILDING SECTIONS - COVERED TRAINING
AREA
96 17263850 A-202 EXTERIOR ELEVATIONS, BUILDING SECTIONS - BLEACHERS
97 17263851 A-203 EXTERIOR ELEVATIONS - RAPPELLING TOWER
98 17263852 A-204 EXTERIOR ELEVATIONS - RAPPELLING TOWER
99 17263853 A-205 EXTERIOR ELEVATIONS - OBSTACLES
100 17263854 A-206 EXTERIOR ELEVATIONS - OBSTACLES
101 17263855 A-301 BUILDING SECTIONS - RAPPELLING TOWER
102 17263856 A-311 WALL SECTIONS - COVERED TRAINING AREA
103 17263857 A-312 WALL SECTIONS - BLEACHERS
104 17263858 A-401 COVERED TRAINING AREA ENLARGED FLOOR PLAN, STAIR SECTION
105 17263859 A-402 COVERED TRAINING AREA INTERIOR ELEVATIONS
DOCUMENT 00 01 15 Page 5
106 17263860 A-403 BLEACHERS STAIR PLAN AND SECTION
107 17263861 A-404 RAPPELLING TOWER STAIR PLANS AND SECTION
108 17263862 A-405 RAPPELLING TOWER ENLARGED FLOOR PLANS
109 17263863 A-406 TRANSFORMER AND TRASH ENCLOSURE ENLARGED PLANS, ELEVATIONS,
AND SECTIONS
110 17263864 A-501 DETAILS - ROOF
111 17263865 A-502 DETAILS - RAPPELLING TOWER, TRAFFIC COATING, OBSTACLES
112 17263866 A-503 DETAILS - STAIRS, RAILING
113 17263867 A-504 DETAILS - STAIRS, RAILING
114 17263868 A-505 DETAILS - FIRESTOPPING, MISCELLANEOUS
115 17263869 A-601 DOOR SCHEDULE, DOOR TYPES, DOOR DETAILS, LOUVER SCHEDULE,
LOUVER TYPES, LOUVER DETAILS
116 17263870 A-611 SIGN SCHEDULE AND DETAILS
17263871 NOT USED
17263872 NOT USED
17263873 NOT USED
17263874 NOT USED
17263875 NOT USED
117 17263876 M-001 LEGEND, ABBREVIATION AND NOTES
118 17263877 M-101 MECHANICAL SITE PLAN
119 17263878 M-102 COVERED TRAINING AREA PLUMBING PLAN AND PIPING DIAGRAMS
120 17263879 M-103 BLEACHERS MECHANICAL PLAN AND SECTION
121 17263880 M-104 RAPPELLING TOWER - PLUMBING PLANS
122 17263881 M-501 DETAIL
123 17263882 M-601 EQUIPMENT SCHEDULES, PLUMBING FIXTURE SCHEDULE AND CONTROLS
17263883 NOT USED
17263884 NOT USED
17263885 NOT USED
124 17263886 E-001 ELECTRICAL SYMBOLS, ABBREVIATIONS, GENERAL NOTES
DOCUMENT 00 01 15 Page 6
125 17263887 ES101 SITE ELECTRICAL PLAN
126 17263888 E-101 COVERED TRAINING AREA - LIGHTING AND POWER PLANS
127 17263889 E-102 BLEACHERS - LIGHTING AND POWER PLANS
128 17263890 E-103 RAPPELLING TOWER GROUND FLOOR - LIGHTING AND POWER PLANS
129 17263891 E-104 RAPPELLING TOWER 30'-0" H & 60'-0" H PLATFORM LIGHTING AND
POWER PLANS
130 17263892 E-105 RAPPELLING TOWER 60'-0" H PLATFORM LIGHTNING PROTECTION AND
GROUNDING PLANS
131 17263893 E-501 ELECTRICAL MANHOLE DETAIL
132 17263894 E-502 TYPICAL DUCT SECTION, HANDHOLE, PAD MOUNTED TRANSFORMER
ENCLOSURE DETAILS
133 17263895 E-503 LIGHTNING AND GROUNDING DETAILS
134 17263896 E-601 ONE LINE DIAGRAM, PANEL SCHEDULE
17263897 NOT USED
17263898 NOT USED
17263899 NOT USED
135 17263900 T-001 TELECOMM LEGEND, NOTES
136 17263901 TS101 SITE COMMUNICATIONS PLAN
137 17263902 T-101 COVERED TRAINING AREA - TELECOMMUNICATION PLAN
138 17263903 T-501 TELECOMMUNICATION MANHOLE DETAILS
139 17263904 T-502 TELECOMMUNICATION DETAILS
140 17263905 T-601 FACILITIES TELECOM DIAGRAM
17263906 NOT USED
17263907 NOT USED
17263908 NOT USED
-- End of Document --
DOCUMENT 00 01 15 Page 7
SECTION 01 11 00
SUMMARY OF WORK
08/15
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Project Description
The work includes construction of Individual Combat Skills Training Facilities consisting of a single story Covered Training Area, 60 ft high Rappelling Tower, Field Training Area, Bleachers, Hand to Hand Combat Pit, and Obstacle Course. Construction includes but is not limited to shallow reinforced concrete foundations, slabs, walls, floors, roof, fluid applied roofing, railings, exterior and interior finishes, plumbing, ventilation, electrical power, lighting, and telecommunications. Sitework includes but is not limited to grading, landscaping, government vehicle parking and access road, trash enclosure, sewer, water, electrical and telecommunication utilities, and environmental mitigation consisting of cultural and natural resources, and munitions, explosives or concern.
1.1.2 Location
The work is located at the Marine Corps Base, Finegayan, Guam, approximately as indicated. The exact location will be shown by the Contracting Officer.
1.2 EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
1.3 LOCATION OF UNDERGROUND UTILITIES
Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.
Contact Contracting Officer prior to excavating, to mark utilities and to verify existing utility locations indicated on contract drawings, within area of work.
Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities are discovered. Verify the elevations of existing piping, utilities, and any type of underground or encased obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations
SECTION 01 11 00 Page 1 to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
1.3.1 Notification Prior to Excavation
Notify the Contracting Officer at least 30 calendar days prior to starting excavation work.
1.4 COMPUTER/TELECOMMUNICATION/ACCESS CONTROL/IDS COORDINATION REQUIREMENTS
1.4.1 Computer/Telecommunication/Access Control/IDS Contractor Access
Allow the Computer/Telecommunication/Access Control/IDS Contractor access to the facility towards the end of construction (finishes 90 percent complete, rough-in 100 percent complete, Inside Plant (ISP)/Outside Plant (OSP) infrastructure in place) to provide equipment in the telecommunications rooms and make final connections. Coordinate efforts with the Computer/Telecommunication/Access Control/IDS Contractor to facilitate joint use of building spaces during the final phases of construction. After the Contracting Officer has facilitated coordination meetings between the two contractors, within one week, incorporate the effort of additional coordination with the Computer/Telecommunication/Access Control/IDS Contractor into the construction schedule to demonstrate a plan for maintaining the contract duration.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00 Page 2
SECTION 01 14 00
WORK RESTRICTIONS
11/11
PART 1 GENERAL
1.1 DEFINITIONS
1.1.1 State
"State" when used in reference to states of the United States also includes the Territory of Guam.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
List of Contact Personnel
Personnel List
1.3 SPECIAL SCHEDULING REQUIREMENTS
a. Have materials, equipment, and personnel required to perform the work at the site prior to the commencement of the work.
b. Permission to interrupt any Activity roads or utility service must be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.
c. The work under this contract requires special attention to the scheduling and conduct of the work in connection with existing operations. Identify on the construction schedule each factor which constitutes a potential interruption to operations.
c. The work under this contract requires special attention to the scheduling and conduct of the work in connection with existing operations. Identify on the construction schedule each factor which constitutes a potential interruption to operations.
1.4 CONTRACTOR ACCESS AND USE OF PREMISES
1.4.1 Activity Regulations
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. To minimize traffic congestion, delivery of materials must be outside of peak traffic hours (6:30 to 8:00 a.m. and 3:30 to 5:00 p.m.) unless otherwise approved by the Contracting Officer. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor
SECTION 01 14 00 Page 1 equipment for identification.
1.4.1.1 Subcontractors and Personnel Contacts
Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.4.1.2 Installation Access
Obtain access to Navy installations through participation in the Defense Biometrics Identification System (DBIDS). Requirements for Contractor employee registration, and transition for employees currently under Navy Commercial Access Control System (NCACS), are available at https://www.cnic.navy.mil/om/dbids.html. No fees are associated with obtaining a DBIDS credential.
Participation in the DBIDS is not mandatory, and Contractor personnel may apply for One-Day Passes at the Base Visitor Control Office to access an installation.
1.4.1.2.1 Registration for DBIDS
Registration for DBIDS is available at https://www.cnic.navy.mil/om/dbids.html. Procedure includes:
a. Present a letter or official award document (i.e. DD Form 1155 or SF 1442) from the Contracting Officer, that provides the purpose for access, to the base Visitor Control Center representative.
b. Present valid identification, such as a passport or Real ID Act-compliant state driver's license.
c. Provide completed SECNAV FORM 5512/1 to the base Visitor Control Center representative to obtain a background check. This form is available for download at https://www.cnic.navy.mil/om/dbids.html.
d. Upon successful completion of the background check, the Government will complete the DBIDS enrollment process, which includes Contractor employee photo, finger prints, base restriction and several other assessments.
e. Upon successful completion of the enrollment process, the Contractor employee will be issued a DBIDS credential, and will be allowed to proceed to worksite.
1.4.1.2.2 DBIDS Eligibility Requirements
Throughout the length of contract, the Contractor employee must continue to meet background screen standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.
An adjudication process may be initiated when a background screen failure results in disqualification from participation in the DBIDS, and Contractor employee does not agree with the reason for disqualification. The
SECTION 01 14 00 Page 2
Government is the final authority.
1.4.1.2.3 DBIDS Notification Requirements
a. Immediately report instances of lost or stolen badges to the Contracting Officer.
b. Immediately collect DBIDS credentials and notify the Contracting Officer in writing under the following circumstances:
(1) An employee has departed the company without having properly returned or surrendered their DBIDS credentials.
(2) There is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the Installation or anyone therein.
1.4.1.2.4 One-Day Passes
Personnel applying for One-Day passes at the Base Visitor Control Office are subject to daily mandatory vehicle inspection, and will have limited access to the installation. One-day passes will take at least 5 working days to process background checks. The Government is not responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS.
1.4.1.3 No Smoking Policy
Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.
1.4.2 Working Hours
Regular working hours must consist of an 8 1/2 hour period between 7:30 a.m. and 4:30 p.m., Monday through Friday, excluding Government holidays.
1.4.3 Work Outside Regular Hours
Work outside regular working hours requires Contracting Officer approval.
Notify Contracting Officer 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours.
During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer.
1.4.4 Utility Cutovers and Interruptions
a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required paragraph WORK OUTSIDE REGULAR HOURS.
b. Ensure that new utility lines are complete, except for the connection, SECTION 01 14 00 Page 3 before interrupting existing service.
c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, fire alarm, and compressed air are considered utility cutovers pursuant to the paragraph WORK OUTSIDE REGULAR HOURS. Such interruptions are further limited to four hours.
This time limit includes time for deactivation and reactivation.
d. Operation of Station Utilities: The Contractor must not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor must notify the Contracting Officer giving reasonable advance notice when such operation is required.
e. Connection to Existing Sanitary Sewer Line: Provide positive verification that the existing line conveys sanitary sewer; verify line is not incorrectly connected to a storm drain. If required, obtain Installation's Sanitary Sewer Connection Permit 2 weeks prior to connection and in accordance with Section 33 30 00 SANITARY SEWERS.
e. Connection to Existing Sanitary Sewer Line: Provide positive verification that the existing line conveys sanitary sewer; verify line is not incorrectly connected to a storm drain. If required, o btain Installation's Sanitary Sewer Connection Permit 2 weeks prior to connection and in accordance with Section 33 30 00 SANITARY SEWERS.
1.5 SECURITY REQUIREMENTS
1.5.1 Personnel List
Submit for approval, at least 21 calendar days prior to the desired date of entry, an original alphabetical list of personnel who require entry into Government property to perform work on the project. Furnish for each person:
a. Name
b. Date and place of birth
c. Citizenship
d. Home address
e. Social security number
f. Current pass expiration date
g. Naturalization or Alien Registration or Temporary Non-Immigrant ID card number
h. Passport number, place of issue, and expiration date
i. Guam Police clearance report for last six months
The request for personnel passes must be accompanied with the following certification:
SECTION 01 14 00 Page 4
"I hereby certify that all personnel on this list are either born U.S.
citizens, naturalized U.S. citizens with the naturalization number shown, or legal aliens with the alien registration number indicated or Temporary Non-Immigrant with the Temporary Non-Immigrant ID card number shown."
Signature/Firm Name
1.5.1.1 Citizenship Requirements
Aliens will not be admitted to the work site without approval. Clearance for aliens may require approximately 21 work days for approval.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
SECTION 01 14 00 Page 5
SECTION 01 20 00.00 20
PRICE AND PAYMENT PROCEDURES
11/11
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Earned Value Report; G
1.2 EARNED VALUE REPORT
1.2.1 Data Required
This contract requires the use of a cost-loaded Network Analysis Schedule (NAS). Schedule of Prices must not be used with cost-loaded Network Analysis Schedule (NAS). Use Earned Value Report derived from cost-loaded NAS. Provide a detailed breakdown of the contract price, giving quantities for each of the various kinds of work, unit prices and extended prices. Within 30 calendar days of contract award, prepare and deliver to the Contracting Officer an Earned Value Report (construction contract) as directed by the Contracting Officer. Earned Value Report must have cost summarized and totals provided for each construction category.
1.2.2 Schedule Instructions
Payments will not be made until the Earned Value Report from the cost-loaded NAS has been submitted to and accepted by the Contracting Officer. Earned Value Report must identify the cost for site work, and include incidental work to the 5 ft line. Identify costs for the building(s), and include work out to the 5 ft line. Work out to the 5 ft line shall include construction encompassed within a theoretical line 5 ft from the face of exterior walls and shall include attendant construction, such as pad mounted HVAC cooling equipment, cooling towers, and transformers placed beyond the 5 ft line.
1.2.3 Real Property Assets
The Government will provide the Draft DD Form 1354, Transfer and Acceptance of Military Real Property filled in with the appropriate Real Property Unique Identifiers (RPUID) and related construction Category Codes to summarize the designed real property assets that apply to this contract. The Contractor must meet with the Contracting Officer and the Real Property Accounting Officer (RPAO) during the Pre Construction Meeting and the Project Closeout Meetings to modify and include any necessary changes to the Draft DD Form 1354.
The Contractor must provide the Interim DD Form 1354 that uses the appropriate division of the RPUIDs/ Category Codes to represent the final constructed facility and include all associated cost. Coordinate the
SECTION 01 20 00.00 20 Page 1
Contractor's Price and Payment structure with the structure of the RPUIDs/ Category Codes.
Divide detailed asset breakdown into the RPUIDs and related construction Category Codes and populate associated costs which represent all aspects of the work. Where assets diverge into multiple RPUID/ Category Codes, divide the asset and provide the proportion of the assets in each RPUID/ Category Code. Assets and related RPUID/ Category Codes may be modified by the Contracting Officer as necessary during course of the work.
Coordinate identification and proportion of these assets with the Government Real Property Accounting Officer (RPAO).
Cost data accumulated under this section are required in the preparation of DD Form 1354.
1.2.4 Schedule Requirements for HVAC TAB
The field work Section 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC shall be broken down in the Earned Value Report from the cost-loaded NAS by separate line items which reflect measurable deliverables. Specific payment percentages for each line item shall be determined on a case by case basis for each contract. The line items shall be as follows:
a. Approval of Design Review Report: The TABS Agency is required to conduct a review of the project plans and specifications to identify any feature, or the lack thereof, that would preclude successful testing and balancing of the project HVAC systems. The resulting findings shall be submitted to the Government to allow correction of the design. The progress payment shall be issued after review and approval of the report.
b. Approval of the pre-field engineering report: The TABS Agency submits a report which outlines the scope of field work. The report shall contain details of what systems will be tested, procedures to be used, sample report forms for reporting test results and a quality control checklist of work items that must be completed before TABS field work commences.
c. Intial field work: Incremental payments are issued as the TABS field work progresses. The TABS Agency mobilizes to the project site and executes the field work as outlined in the pre-field engineering report. The HVAC water and air systems are balanced and operational data shall be collected for one seasonal condition (either summer or winter depending on project timing).
d. Approval of Initial report: On completion of the Initial field work, the data is compiled into a report and submitted to the Government.
The report is reviewed, and approved, after ensuring compliance with the pre-field engineering report scope of work.
e. Completion of Initial field QA check: Contract QC and Government representatives meet the TABS Agency at the jobsite to retest portions of the systems reported in the Intial report. The purpose of these tests are to validate the accuracy and completeness of the previously submitted Inital report.
f. Approval of Final report: The TABS Agency completes all Final field work, which is normally comprised mainly of taking heat transfer temperature readings, in the season opposite of that under which
SECTION 01 20 00.00 20 Page 2
Initial performance data was compiled. This data shall be compiled into a report and submitted to the Government. On completion of submittal review to ensure compliance with the pre-field engineering report scope, progress payment is issued. Progress payment is less than that issued for the Initial report since most of the water and air balancing work effort is completed under Initial.
1.3 CONTRACT MODIFICATIONS
In conjunction with the Contract Clause "DFARS 252.236-7000, Modification Proposals-Price Breakdown," and where actual ownership and operating costs of construction equipment cannot be determined from Contractor accounting records, equipment use rates shall be based upon the applicable provisions of the Guam Cost Guidebooks, Equipment Watch Blue Book or acceptable guidance specific to Guam to establish a set cost for equipment and equipment operations cost.
1.4 CONTRACTOR'S INVOICE AND CONTRACT PERFORMANCE STATEMENT
1.4.1 Content of Invoice
Requests for payment will be processed in accordance with the Contract Clause FAR 52.232-27, Prompt Payment Construction Contracts and FAR 52.232-5, Payments Under Fixed-Price Construction Contracts. .The requests for payment shall include the documents listed below.
a. The Contractor's invoice, on NAVFAC Form 7300/30 furnished by the Government, showing in summary form, the basis for arriving at the amount of the invoice. Form 7300/30 shall include certification by Contractor and Quality Control (QC) Manager.
b. The Earned Value Report from the cost-loaded NAS, showing in detail:
the estimated cost, percentage of completion, and value of completed performance for each of the construction categories stated in this contract.
c. Updated Project Schedule and reports required by the contract.
d. Contractor Safety Self Evaluation Checklist.
e. Other supporting documents as requested.
f. Updated copy of submittal register.
g. Invoices not completed in accordance with contract requirements will be returned to the Contractor for correction of the deficiencies.
h. Monthly Work-hour report.
i. Solid Waste Disposal Report.
j Certified payrolls.
k. Updated testing logs.
l. Updated housing list.
SECTION 01 20 00.00 20 Page 3
1.4.2 Submission of Invoices
If DFARS Clause 5252.232-7006 is included in the contract, provide the documents listed in paragraph CONTENT OF INVOICE in their entirety as attachments in Wide Area Work Flow (WAWF) for each invoice submitted. The maximum size of each WAWF attachment is two megabytes, but there are no limits on the number of attachments. If a document cannot be attached in WAWF due to system or size restriction, provide it as instructed by the Contracting Officer.
1.4.3 Final Invoice
a. A final invoice shall be accompanied by the certification required by DFARS 252.247.7023 TRANSPORTATION OF SUPPLIES BY SEA, and the Contractor's Final Release. If the Contractor is incorporated, the Final Release shall contain the corporate seal. An officer of the corporation shall sign and the corporate secretary shall certify the Final Release.
b. For final invoices being submitted via WAWF, the original Contractor's Final Release Form and required certification of Transportation of Supplies by Sea must be provided directly to the respective Contracting Officer prior to submission of the final invoice. Once receipt of the original Final Release Form and required certification of Transportation of Supplies by Sea has been confirmed by the Contracting Officer, the Contractor shall then submit final invoice and attach a copy of the Final Release Form and required certification of Transportation of Supplies by Sea in WAWF.
c. Final invoices not accompanied by the Contractor's Final Release and required certification of Transportation of Supplies by Sea will be considered incomplete and will be returned to the Contractor.
1.5 PAYMENTS TO THE CONTRACTOR
Payments will be made on submission of itemized requests by the Contractor which comply with the requirements of this section, and will be subject to reduction for overpayments or increase for underpayments made on previous payments to the Contractor.
1.5.1 Obligation of Government Payments
The obligation of the Government to make payments required under the provisions of this contract will, at the discretion of the Contracting Officer, be subject to reductions and suspensions permitted under the FAR and agency regulations including the following in accordance with FAR 32.503-6:
a. Reasonable deductions due to defects in material or workmanship;
b. Claims which the Government may have against the Contractor under or in connection with this contract;
c. Unless otherwise adjusted, repayment to the Government upon demand for overpayments made to the Contractor; and
d. Failure to provide up to date record drawings.
SECTION 01 20 00.00 20 Page 4
1.5.2 Payment for Onsite and Offsite Materials
Progress payments may be made to the contractor for materials delivered on the site, for materials stored off construction sites, or materials that are in transit to the construction sites under the following conditions:
a. FAR 52.232-5(b) Payments Under Fixed Price Construction Contracts.
b. Materials delivered on the site but not installed, including completed preparatory work, and off-site materials to be considered for progress payment shall be major high cost, long lead, special order, or specialty items, not susceptible to deterioration or physical damage in storage or in transit to the construction site. Examples of materials acceptable for payment consideration include, but are not limited to, structural steel, non-magnetic steel, non-magnetic aggregate, equipment, machinery, large pipe and fittings,precast/prestressed concrete products, plastic lumber (e.g., fender piles/curbs), and high-voltage electrical cable. Materials not acceptable for payment include consumable materials such as nails, fasteners, conduits, gypsum board, glass, insulation, and wall coverings.
c. Materials to be considered for progress payment prior to installation shall be specifically and separately identified in the Contractor's estimates of work submitted for the Contracting Officer's approval in accordancewith Earned Value Report requirement of this contract.
Requests for progress payment consideration for such items shall be supported by documents establishing their value and that the title requirements of the clause at FAR 52.232-5 have been met.
d. Materials are adequately insured and protected from theft and exposure.
e. Provide a written consent from the surety company with each payment request for offsite materials.
f. Materials to be considered for progress payments prior to installation shall be stored in Guam. Other locations are subject to written approval by the Contracting Officer.
g. Identify items to be considered for payment under this section and submit along with initial Earned Value Report for Contracting Officer Approval.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
SECTION 01 20 00.00 20 Page 5
SECTION 01 30 00
ADMINISTRATIVE REQUIREMENTS
08/15
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
15 CFR 772 Definition of Terms
29 CFR §1910, et seq. Occupational Health & Safety Standards
29 CFR 1910.142 Temporary Labor Camps
29 CFR 1926 § Safety & Health Regulations for Construction
GUAM PUBLIC LAW
31-72 Policy For Workforce Housing Facilities For Temporary Workers
GUAM CODE ANNOTATED (G.C.A.)
10 G.C.A. §§ 20-54 Environmental Health
10 G.C.A. §§ 55-79 Public Safety
10 G.C.A. §§ 84-96 Guam Public Health Act
10 G.C.A. §§ 21 Sanitary Permit
10 G.C.A. §§ 23, P.L 25-15 Eating and Drinking Establishments
10 G.C.A. §§ 24 Food Establishments
10 G.C.A. §§ 40 Guam Food, Drug and Cosmetic Act
16 G.C.A. §§ 1101, et seq. Vehicles
22 G.C.A. § 7 Guam Employment Service Law
GUAM ADMINISTRATIVE RULES AND REGULATIONS (G.A.R.)
25 G.A.R. § 6 Guam Board of Nurse Examiners
25 G.A.R. § 11 Guam Board of Medical Examiners
26 G.A.R. §§ 4401, et seq. Health Certificate Regulations
26 G.A.R. §§ 6200, et seq. Ambulance and Emergency Medical Technician
SECTION 01 30 00 Page 1
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
15 CFR 772 Definition of Terms
15 CFR 773 Special Licensing Procedures
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Insurance
Permits
Licenses
Pre-deployment medical screening
Medical Contractual Agreement
Medical Certification
Housing List
Housing Certification
Background check
Safety & security Certification
View Location Map
Progress and Completion Pictures
1.3 CONTRACTOR WORKFORCE HOUSING LOGISTICS AND MATERIAL MANAGEMENT
REQUIREMENTS
a. For the purposes of this specification, the term, "temporary resident worker" means all workers except the following:
1. Permanent residents of Guam
2. Managers and supervisors (U.S. citizens or resident aliens)
b. For the purpose of this specification, the term, "worksites" means locations at Finegayan, Naval Base, and Andersen Air Force Base.
c. For the purpose of this specification, the term, "peak hours" for traffic means 6:30 a.m. to 8:30 a.m. and 3:30 p.m. to 6:00 p.m.
SECTION 01 30 00 Page 2
d. Workforce Housing Logistics and Material Management (WHL&MM) Plan:
The WHL&MM Plan shall address the requirements for Medical, Housing, Food, Material Management, Safety & Security, and Transportation set forth in this specification section. The Contractor shall submit the WHL&MM Plan to the Contracting Officer within 60 days from contract award. Maintain the WHL&MM Plan and submit any changes for Contracting Officer review within 30 calendar days of proposed implementation.
1.3.1 Medical
Assure that staffing, personnel assignment and other human resources practices result in development and maintenance of a healthy Contractor and Subcontractor workforce employed in the performance of this contract in accordance with all statutes and regulations of the U.S Federal Government or the GovGuam in effect on the date of award of this contract or thereafter promulgated by the aforementioned governmental authorities.
Perform health care activities in accordance with 10 G.C.A. §§ 84 - 96 - Guam Public Health Act, 25 G.A.R. § 6 - Guam Board of Nurse Examiners, 25 G.A.R. § 11 - Guam Board of Medical Examiners, 26 G.A.R. §§ 4401, et seq. , Health Certificate Regulations, and 26 G.A.R. §§ 6200, et seq. , Ambulance and Emergency Medical Technician.
1.3.1.1 Medical Quality Control Manager (MQCM)
Medical QC Manager qualifications:
A licensed physician from a state or territory in the U.S. with either an Internal Medicine or Family Practice background or credentials.
Also have occupational health or public health experience. Submit a copy of the medical license to the Contracting Officer for approval.
Medical QC Manager responsibilities:
a. Prepare a medical plan to include medical care surveillance, worksite and workforce housing monitoring, appropriate occupational health screening of employees per federal OSHA regulations and identifies the process and medical professional or responsible party that verifies each worker's pre-island TB and immunization/titer screening and the post-arrival TB screening.
b. Ensure validity and document all medical testing, screening and immunizations completed.
c. Monitor the workers at the construction site and workforce housing facilities for medical problems and symptoms.
d. Prepare weekly Medical Reports that represents the general medical condition of the workers from medical care surveillance rates, occupational injuries sustained and worksite monitoring.
e. Maintain medical records.
1.3.1.2 Clinical Examinations
Perform worker pre-deployment medical screening of physical condition and general health for all deployed workers prior to their departure for Guam. Screening shall include, within 3 months of departure for Guam, a
SECTION 01 30 00 Page 3 chest x-ray (CXR), syphilis screening by RPR, HIV testing, documented tetanus vaccination within past 10 years, MMR vaccination (or documentation of positive titers for measles, mumps and rubella), influenza vaccination, varicella vaccination (or documentation of positive titers for varicella), blood pressure check, and a comprehensive dental exam, which is comprised of (1) a brief medical history to rule out any medical problems that may affect conventional dental treatment; (2) a visual intra-oral exam, including evaluation of caries, defective restorations (fillings) and appliances (both fixed and removable), oral cancer check (visual), and percussion of suspect teeth and Periodontal Screening and Recording (PSR) (No need for forensic exam - recording which teeth are missing or existing restorations); and (3) a radiographic evaluation including bitewing and pan-oral view. Ensure that each worker's health status prior to deployment to Guam for work on this Government contract is adequate for performance of the activities to which the worker will be assigned giving consideration to the climatic and other physical elements to be experienced on Guam. Any applicants that are found to have conditions inconsistent with the prospective future employment term on Guam will be promptly referred for medical advice and treatment and their employment status will be determined by the employer in accordance with their firm's hiring policies. Report applicants suspected of having tuberculosis on the basis of a CXR suggestive of tuberculosis or who have signs and symptoms suggestive of tuberculosis to their respective country's tuberculosis program office. Within two weeks of arrival on Guam, and prior to commencing work, workers shall receive a baseline CXR and clinical examination for signs and symptoms of tuberculosis. Report workers with findings suggestive of tuberculosis to the Guam Department of Health and Social Services for evaluation. These requirements shall not apply to managerial, specialized technical and administrative Contractor and Subcontractor workers and consultants visiting Guam for business purposes for periods of 14 calendar days or less. If these personnel plan on visiting Guam between 15-45 calendar days, they shall report to the Contractor's Medical Quality Control Manager (MQCM) for a check-up. Those that show symptoms of TB may be required to take a baseline CXR and/or clinical examination.
1.3.1.3 Monitoring
a. Monitor the workers at the construction site and workforce housing facilities for incidences of fever, bloody sputum, pneumonia, influenza-like illness, rash illness, diarrhea, and other indicators that would raise the index of suspicion of an infectious disease etiology. Report the numbers of workers with these conditions to Guam Department of Public Health and Social Services every week.
Additionally, report any conditions on the Official Guam Notifiable Disease List (Chapter 3, Title X, Guam Code Annotated) to Guam Department of Public Health and Social Services within the timeframe required by Guam Code.
b. Perform annual screening of workers in Guam to include, but not limited to, an annual tuberculosis screening exam with option for chest X-ray if screening is positive. Refer workers with positive screening and CXR results to the Guam Department of Public Health and Social Services for evaluation.
1.3.1.4 Health and Medical Care
Each Contractor worker deployed to work on Guam for a period in excess of 14 calendar days shall be covered by either commercially purchased health
SECTION 01 30 00 Page 4 and medical care insurance or a Contractor self-furnished health and medical facilities for the entire duration of the worker's or consultant's deployed assignment. For workers or consultants that are not deployed to the work site, the medical coverage shall commence within 45 calendar of arrival on Guam. The Contractor shall effect appropriate contractual agreements with its workers and/or workers' representatives that require such workers to accept the Contractor's insurance plan coverage and/or use of the Contractor furnished medical facilities. The minimum insurance plan coverage and/or medical facilities furnished by the Contractor shall be as follows:
a. Emergency Medical Care - initial emergency response treatment, stabilization, and transport of a sudden and unexpected medical condition (e.g. either severe injury or severe illness symptoms/signs). If immediate medical attention is not obtained, the symptoms could result in serious and/or permanent adverse medical outcomes.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .