AMD 0001 21R1315.pdf
PDF 751 KB Posted
- Attached to
- FY21 MCON Project P-803, Individual Combat Skills Training, Marine Corps Base Guam, Finegayan, Guam
- Solicitation number
- N62742-21-R-1315
About this file
This is an amendment to a solicitation for construction services. The solicitation is for an FY21 MCON project to construct individual combat skills training facilities at Marine Corps Base Guam in Finegayan, Guam. The amendment revises evaluation criteria and technical specifications. It updates the evaluation factors for award document to clarify experience requirements and safety rating criteria. It also makes changes to specification sections for cast-in-place concrete, rough carpentry, playground surfacing, and notes on structural drawings. The solicitation number is N62742-21-R-1315 and was issued by the Department of the Navy Naval Facilities Engineering Command for a project valued over $5 million. The response due date is not provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMD 03 21R1315.pdf | ||
| 21R1315 Note6-final.pdf | ||
| 21R1315 Note 5.pdf | ||
| 21R1315 Note 4.pdf | ||
| 21R1315 Note 3.pdf | ||
| AMD 02 21R1315.pdf | ||
| 21R1315 Note 2-Final.pdf | ||
| 21R1315 Note 1.pdf | ||
| P-803 Final Phase II Specifications.pdf | ||
| P-803 Final Phase II Drawings.pdf | ||
| N62742-21-R-1315 Front End.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N62742-21-R-1315, FY21 P-803, Individual Combat Skills Training, Marine Corps Base Guam, Finegayan, Guam, Amdnement 0001
See Next Page
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-May-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6274221R1315
X 9B. DATED (SEE ITEM 11)
08-Apr-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-May-2021
CODE
HAND DELIVER
NAVFAC PACIFIC
CONSTRUCTION CONTRACTS BR (ACQ33)
4256 RADFORD DR, BLDG 62
HONOLULU HI 96818-3296
N62742 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6274221R1315
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
This amendment is issued to revise the following:
1. Document 00202, Evaluation Factors for Award is deleted in its entirety and replace with the attached Document 00202, Evaluation Factors for Award, REV-1.
2. SECTION 03 30 00 CAST-IN-PLACE CONCRETE is revised as follows:
a. Paragraph 2.6 REINFORCEMENT: Delete subparagraph b. in its entirety and replace it with “b. Not Used.”
b. Paragraph 2.6.2 Mechanical Reinforcing Bar Connectors: Delete subparagraphs b. and c. in their entirety and replace it with “b. Not Used.” and “c. Not Used.”
3. SECTION 06 10 00 ROUGH CARPENTRY is revised as follows:
a. Paragraph 2.2.2.4 Round Wood Poles is deleted in its entirety and replaced with the following:
“Round Wood Poles shall be Pacific Coast Douglas Fir Larch, Lean-peeled and compliant with ASTM D3200; with at least 80 percent of inner bark removed and with knots and limbs cut flush with the surface.”
4. SECTION 32 18 16.13 PLAYGROUND PROTECTIVE SURFACING is revised as follows:
a. Paragraph 1.2.2 Head Injury Criteria (HIC) is deleted in its entirety and replaced with the following:
“1.2.2 NOT USED.”
5. SECTION 00 01 15 LIST OF DRAWINGS
1.2 CONTRACT DRAWINGS
Changes as directed below shall be made narratively to the respective drawings. Drawings incorporating the directed changes are not issued with this amendment.
NAVFAC DWG
NO.
DWG
SHEET NO.
CHANGE
NO.
TITLE/DIRECTED CHANGES
17263803 S-001 0001 GENERAL STRUCTURAL NOTES
Under “CONCRETE NOTES”, Note A, replace “03 31 30 MARINE CONCRETE” with “03 30 00 CAST-IN-
PLACE CONCRETE”.
17263843 A-105 0001 RAPPELLING TOWER GROUND FLOOR PLAN
Replace note, "PRECAST CONCRETE STAIR AND
LANDING W/ S.S. GUARDRAIL AND HANDRAIL,
SEE ALSO STRUCT, TYP” with "PRECAST
CONCRETE STAIR AND CONCRETE LANDING
W/ S.S. GUARDRAIL AND HANDRAIL, SEE ALSO
STRUCT, TYP”.
17263844 A-106 0001 RAPPELLING TOWER 30’-0” H & 60’-0” H
PLATFORM FLOOR PLANS
Replace 2 instances of note, "PRECAST CONCRETE
STAIR AND LANDING (WR-1) W/ S.S.
GUARDRAIL AND HANDRAIL, SEE ALSO
NAVFAC DWG
NO.
DWG
SHEET NO.
CHANGE
NO.
TITLE/DIRECTED CHANGES
STRUCT, TYP” with "PRECAST CONCRETE
STAIR AND CONCRETE LANDING (WR-1) W/
S.S. GUARDRAIL AND HANDRAIL, SEE ALSO
STRUCT, TYP”.
17263845 A-107 0001 RAPPELLING TOWER REFLECTED CEILING
PLANS
Replace note, "UNDERSIDE OF PRECAST
CONCRETE STAIR AND LANDING, PAINT (PE-1),
SEE ALSO STRUCT, TYP” with "UNDERSIDE OF
PRECAST CONCRETE STAIR AND CONCRETE
LANDING, PAINT (PE-1), SEE ALSO STRUCT,
TYP”.
17263851 A-203 0001 EXTERIOR ELEVATIONS – RAPPELLING
TOWER
Replace note, "PRECAST CONCRETE STAIR AND
LANDING W/ S.S. GUARDRAIL AND HANDRAIL
BEYOND, SEE ALSO STRUCT, TYP” with
"PRECAST CONCRETE STAIR AND CONCRETE
LANDING W/ S.S. GUARDRAIL AND HANDRAIL
BEYOND, SEE ALSO STRUCT, TYP”.
17263852 A-204 0001 EXTERIOR ELEVATIONS – RAPPELLING
TOWER
Replace 2 instances of note, "PRECAST CONCRETE
STAIR AND LANDING W/ S.S. GUARDRAIL AND
HANDRAIL, SEE ALSO STRUCT, TYP” with
"PRECAST CONCRETE STAIR AND CONCRETE
LANDING W/ S.S. GUARDRAIL AND HANDRAIL,
SEE ALSO STRUCT, TYP”.
17263855 A-301 0001 BUILDING SECTIONS – RAPPELLING TOWER
Replace note, "PRECAST CONCRETE STAIR AND
LANDING W/ S.S. GUARDRAIL AND HANDRAIL,
SEE ALSO STRUCT, TYP” with "PRECAST
CONCRETE STAIR AND CONCRETE LANDING
W/ S.S. GUARDRAIL AND HANDRAIL, SEE ALSO
STRUCT, TYP”.
17263861 A-404 0001 RAPPELLING TOWER STAIR PLANS AND
SECTION
Replace 4 instances of note, "PRECAST CONCRETE
STAIR AND LANDING, SEE ALSO STRUCT, TYP”
with "PRECAST CONCRETE STAIR AND
CONCRETE LANDING, SEE ALSO STRUCT,
TYP”.
The following Sketch dated 05/25/21, is added to the list of drawings:
SKETCH NO. TITLE
SKS-001 SHEET S-105, DETAIL A1 – RAPPELLING TOWER 30’-0” FRAMING PLAN
SKETCH NO. TITLE
Add five (5) Tie-Down Anchors to the 30’-0” framing plan level to match architectural drawings.
6. All other terms and conditions remain unchanged.
-- End of Amendment --
FY21 MCON PROJECT P-803, INDIVIDUAL WON 1619791
COMBAT SKILLS TRAINING, MARINE CORPS
BASE GUAM, FINEGAYAN, GUAM
N62742-21-R-1315
DOCUMENT 00202-REV 1
DOCUMENT 00202
EVALUATION FACTORS FOR AWARD-REV 1
TABLE OF CONTENTS
PART I. GENERAL
1.1. INTENT TO AWARD WITHOUT DISCUSSIONS
1.2 COMPETITIVE RANGE
1.3 ENFORCEABILITY OF PROPOSAL
PART II. EVALUATION FACTORS / RATING SCHEME
2.1 EVALUATION CRITERIA AND BASIS OF AWARD
2.2 PRICE EVALUATION
2.3 TECHNICAL EVALUATION
2.4 RATING SCHEME
ATTACHMENTS
(A) Construction Experience Data Sheet
(B) NAVFAC/USACE Past Performance Questionnaire (Form PPQ-0)
DOCUMENT 00202
EVALUATION FACTORS FOR AWARD
PART I. GENERAL
1.1 INTENT TO AWARD WITHOUT DISCUSSIONS
The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the initial proposal shall conform to the solicitation requirements and should contain the best offer from a technical and price standpoint.
Only the three (3) lowest-priced proposals will be evaluated for fair and reasonable pricing and technical acceptability. If none of the three (3) lowest-priced proposals are found to be technically acceptable, then the next three (3) lowest-priced proposals will be evaluated for technical acceptability. If none of the six (6) lowest priced proposals are found to be technically acceptable, then all remaining proposals will be evaluated for technical acceptability.
The Government intends to select the lowest reasonably priced technically acceptable offer and award a contract (within the funds available) without conducting discussions.
1.2 COMPETITIVE RANGE
The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines discussions are necessary, the Contracting Officer may conduct discussions with offerors determined to be in the competitive range. The Government may limit the number of proposals in the competitive range to the most highly rated. If the Contracting Officer determines the number of proposals in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
1.3 ENFORCEABILITY OF PROPOSAL
The proposal must set forth full, accurate and complete information as required by this solicitation. The Government will rely on such information in the award of a contract. The awardee’s proposal will be incorporated into the contract and all items proposed will become binding requirements of the contract. By submission of the offer, the offeror agrees that all items proposed (e.g. subcontractors with teaming agreements, etc.) will be utilized for the duration of the contract and any substitutions must be equal or better and will require prior approval by the Contracting Officer.
PART II. EVALUATION FACTORS / RATING SCHEME
2.1 EVALUATION CRITERIA AND BASIS OF AWARD
The contract resulting from this solicitation will be awarded to that responsible Offeror whose offer, conforming to the solicitation, is determined to be the lowest evaluated price of proposals (within the funds available) meeting or exceeding the acceptability standards for the technical evaluation factors. An overall technical factor rating must be at least “ACCEPTABLE” in order to be considered for award. An “UNACCEPTABLE” rating in any factor will result in the overall technical proposal being rated “UNACCEPTABLE” unless corrected through discussions. An overall technical rating of “UNACCEPTABLE” will make a proposal ineligible for award.
2.2 PRICE EVALUATION
(a) One or more of the following techniques may be used to evaluate the total evaluated price to ensure that it is fair and reasonable:
Comparison of proposed prices received in response to the solicitation Comparison of proposed prices with the Independent Government Estimate
(b) The price proposals will be listed from lowest to highest.
(c) The price proposal will initially be evaluated separately from the technical proposal.
2.3 TECHNICAL EVALUATION FACTORS
The following evaluation factors shall be used to evaluate the technical proposals.
FACTOR 1: EXPERIENCE
FACTOR 2: PAST PERFORMANCE
FACTOR 3: SAFETY
Factor 1 – Experience
(a) Solicitation Submittal Requirements:
The Offeror shall complete the attached Construction Experience Project Data Sheet (Attachment A) for each project submitted and complete all individual blocks. Attachment A and all information therein is MANDATORY and SHALL be used to evaluate experience. The Government will evaluate only the information provided in Attachment A and all other information provided on other than Attachment A will not be considered.
The Offeror may expand individual blocks on the Attachment A; however, Attachment A for each project submitted shall not exceed a total of four (4) single-sided pages or, two (2) double-sided pages, 8.5” x 11”, 1” margin left/right/top/bottom, and 10-point font or larger. For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP.
Submit a maximum of two (2) construction projects that best demonstrates the Offeror’s construction experience that are similar in size, scope, and complexity as provided in the RELEVANT CONSTRUCTION PROJECT definition below. If the Offeror submits more than two (2) projects for evaluation, the Government will evaluate the first two (2) projects submitted and will disregard any other project information after the first two (2).
RELEVANT CONSTRUCTION PROJECT: For purposes of this evaluation, a recent relevant construction project is defined as follows:
New construction of cast-in-place reinforced concrete structures/buildings that resist seismic (Seismic Design
Category D) AND wind loads (basic wind speeds of 170 mph or more). Projects must be approximately $5M or more in construction dollar value.
Each project submitted for evaluation must have been completed or substantially completed within the past fifteen (15) years from the date of issuance of this solicitation. Alteration, renovation, or repair will not be considered a relevant project. “Substantially completed” is defined as at least 90% physical completion by the date of solicitation issue.
NOTES:
1. A relevant construction project is further defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather Offerors shall submit the work performed under a task order as a project.
2. There is a clear distinction between “experience” and “past performance.” Experience is related to the types and amounts of projects previously accomplished. Past performance relates to how well a contractor has performed.
3. The “Offeror” is defined as the exact name in Block 14 of the Solicitation, Offer and Award (SF1442). If the Offeror is utilizing experience and past performance information of any entity other than (1) the Offeror; (2) if the Offeror is a joint venture, its joint venture partners jointly and severally liable for the contract; or (3) a firm that has been acquired by the Offeror and is now part of the Offeror (separate legal entities are not considered part of the Offeror), the Offeror shall provide in its proposal a fully-executed teaming agreement or other contractual agreement. The teaming agreement or other contractual agreement shall, at a minimum, (1) be signed by the Offeror and the other entity, (2) specifically reference this solicitation/contract, and (3) specify the work to be performed by the other entity such that it is clear that the other entity will be meaningfully involved in this contract. For item (3), clearly state the specific commitments of resources of the other entity in terms of the work it will specifically perform or manage in the performance of the contract at the worksite. Note that generalized statements concerning commitment of resources are not sufficient to demonstrate that an entity will be meaningfully involved in the performance of the contract. Examples of “generalized statements” include a commitment of resources merely based on an entity’s “access” to resources and other generalized statements such as an entity will “provide support and expertise on the project.” The Government will only consider information provided in the teaming agreement for the purpose of determining whether the Offeror has clearly demonstrated that any entity (other than the Offeror and, if the Offeror is a joint venture, its joint venture partners jointly and severally liable for the contract) will have meaningful involvement in the performance of the contract. For experience and past performance information of a firm that has been acquired by the Offeror and is no longer a separate legal entity, the Offeror shall provide an explanation of the acquisition sufficient to demonstrate that the predecessor firm is now part of the Offeror in Block 1 of Attachment A.
(b) Basis of Evaluation:
The basis of evaluation will include the Offeror’s demonstrated experience in executing at least one (1) recent relevant construction project as defined in the solicitation submittal requirements and paragraph 2.4 below.
Factor 2 – Past Performance
(a) Solicitation Submittal Requirements:
If a completed Contractor Performance Assessment Reporting System (CPARS) or Construction Contractor Appraisal Support System (CCASS) evaluation is available, it shall be submitted with the proposal for each project included in Factor 1 – Experience. If a completed CPARS or CCASS evaluation is not available, then submit Past Performance Questionnaires (PPQ – Attachment B) for each project included in Factor 1 – Experience. PPQs shall be completed and signed by the contracting agent and/or their representative responsible for construction contract administration. A PPQ shall not be from a prime contractor for work performed by a subcontractor. The Offeror shall provide completed PPQs in the proposal. Offerors may submit PPQs previously submitted for other solicitations as long as complete, required information is included.
Offerors may provide any information on problems encountered and the corrective actions taken on projects submitted under Factor 1 – Experience. Offerors may also address any adverse past performance issues.
Explanations shall not exceed two (2) double-sided pages (or four (4) single-sided pages) in total.
The Government reserves the right to contact references for verification or additional information. The Government’s inability to contact any of the Offeror’s references or the references unwillingness to provide the information requested may affect the Government’s evaluation of this factor.
Performance awards, letters of appreciation, certificates, or additional information submitted will not be considered.
(b) Basis of Evaluation
The Offeror’s past performance will be evaluated on how well the Offeror performed on the relevant projects submitted under Factor 1 – Experience. In addition, the Government reserves the right to obtain information for use in the evaluation of past performance on recent relevant projects from any and all sources including sources outside of the Government. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS) using all CAGE/DUNS numbers of Contractors who are part of a partnership or joint venture identified in the Offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror.
This evaluation is separate and distinct from the Contracting Officer’s responsibility determination.
Offerors lacking relevant past performance history will not be evaluated favorably or unfavorably in past performance and will receive a Neutral rating. In the context of acceptability/unacceptability, unknown past performance shall be considered “Acceptable.”
There is a clear distinction between “experience” and “past performance.” Experience is related to the types and amounts of projects previously accomplished. Past performance relates to how well a contractor has performed.
The basis of evaluation will consider the Offeror’s performance record that demonstrates the Offeror’s ability to successfully perform the required effort or the Offeror’s performance record is unknown. See also paragraph 2.4 below.
Factor 3 – Safety
(a) Solicitation Submittal Requirements:
The Offeror shall submit the following information: For a partnership, joint venture, or LLC etc., separate TRC and DART Rate submittal requirements are required for each partner/member; however, only one safety narrative is required. If any Offeror/partner/LLC member has TRC and/or DART rates, then TRC and DART Rates shall not be submitted for any subcontractors or affiliates of that Offeror/partner/LLC member. If any Offeror/partner/LLC member does not have TRC and/or DART rates, provide an explanation as to why they are unable to provide them and submit TRC and DART information specified in paragraphs (1) and (2) below for the firm(s) that will be providing the on-site construction labor resources for that Offeror/partner/LLC member.
(1) OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate and Total Recordable Case (TRC) Rate: Submit the OSHA DART and TRC rates and supporting OSHA 300 log and OSHA Form 300A summary for the three previous complete calendar years (2020, 2019, and 2018). If an Offeror does not have the OSHA DART and/or TRC rates, affirmatively state so, explain why, and submit equivalent DART and TRC rates based upon the OSHA formula shown below. The following provides the OSHA formula for DART and TRC:
DART Rate:
The DART rate is calculated by adding up the number of incidents involving work related deaths, one or more Lost Days, one or more Restricted Days, or the transfer of an employee to a different job within the same company, multiplying that number by 200,000, and then dividing that number by the number of employee labor hours worked.
Total Number of DART incidents x 200,000
DART Rate = Number of employee labor hours worked
TRC Rate:
The TRC rate is calculated by multiplying the number of recordable cases by 200,000, and then dividing that number by the number of labor hours.
Total Number of Recordable Cases x 200,000
TRC Rate = Number of employee labor hours worked
“Recordable cases” include each work related death and each work related injury or occupational illness involving days away from work, restricted work, transfer to another job, medical treatment beyond first aid, or loss of consciousness.
(2) Technical Approach for Safety: Describe the plan for safety that will be implemented to evaluate safety performance of potential subcontractors as part of the selection process for all levels of subcontractors. Submit a narrative that fully describes the safety management system that they will use to oversee the safety compliance and performance of self-performed and subcontractor performed work. Describe any innovative methods that will be employed to ensure and monitor safe work practices at self-performed and/or all subcontractor levels. Additionally, describe the methodology to execute an effective program that utilizes sound mishap prevention techniques and processes, employee reporting of unsafe conditions, unsafe activities, and near-miss mishaps.
There is no page limitation to address paragraph (1) above. The narrative to address paragraph (2) above shall not exceed two (2) pages, single-sided, 8.5” x 11”, 1” margin left/right/top/bottom, and 10-point font or larger. For a partnership, joint venture, or LLC etc., the mishap rates (DART, TRC) are required for each partner/member;
however, only one safety narrative is required. DART and TRC Rates shall not be submitted for subcontractors.
(b) Basis of Evaluation:
The basis of evaluation and acceptability are DART rates of 2.99 or less for each of the three previous complete calendar years, TRC rates of 4.49 or less for each of the three previous complete calendar years AND an acceptable technical approach for safety as defined in the solicitation submittal requirements for Factor 3 and Paragraph 2.4 below.
2.4 RATING SCHEME
The following information is pertinent to the rating of the technical proposals:
(a) Deficiency: A material failure of the proposal to meet a Government requirement.
(b) If the proposal contains an “UNACCEPTABLE” rating for any of the Factors, the overall rating of the technical proposal will be “UNACCEPTABLE.” An overall technical rating of “UNACCEPTABLE makes a proposal ineligible for award.
FACTOR 1 Experience and Factor 3 Safety:
ACCEPTABLE Proposal meets the minimum requirements of the solicitation.
UNACCEPTABLE Proposal does not meet the minimum requirements of the solicitation.
The deficiencies, as defined below, of each proposal for each technical evaluation factor which influenced the assigned adjectival rating shall be identified.
Definitions
Deficiency
A material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level.
FACTOR 2 Past Performance:
ACCEPTABLE
Based on the Offeror’s performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort, or the Offeror’s performance record is unknown.
Note: In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the Offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305(a)(2)(iv)). Therefore, the Offeror shall be determined to have unknown or neutral past performance. In the context of acceptability/unacceptability neutral shall be considered “acceptable.”
UNACCEPTABLE
Based on the Offeror’s performance record, the Government does not have a reasonable expectation that the Offeror will be able to successfully perform the required effort.
DOCUMENT 00202 – ATTACHMENT A
ATTACHMENT A
CONSTRUCTION EXPERIENCE PROJECT DATA SHEET
Project No. (check one): CON #1 CON #2
1. Name of Entity that Performed Project*: _________________________________________________ Address: ________________________________________ Phone Number: __________________________________ Entity Identifier (DUNS #): __________________________ Point of Contact: _________________________________ Contact Phone Number: _____________________________
a. If the firm that performed the project has been acquired by the Offeror and is no longer a separate legal entity, the Offeror shall provide an explanation of the acquisition sufficient to demonstrate that the predecessor firm is now part of the Offeror.
b. Name of Entity that Performed Work that Experience is Claimed for* (i.e.; if the project was performed by a J/V and Offeror is claiming experience of one of the J/V members that performed work on the project, state the exact legal name of the JV member the Offeror claims experience for): __________________________________________________________ Address: ________________________________________ Phone Number: ___________________________________ Entity Identifier (DUNS #): __________________________ Point of Contact: __________________________________ Contact Phone Number: _____________________________
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain)
Percent of project work performed:
If subcontractor, who was prime (Name/Phone #):
3. Contract Number: Delivery/Task Order Number:
Project Title:
Project Location:
4. Construction Award Date (mm/dd/yy): Construction Completion Date (mm/dd/yy):
5. Type of Work: New Construction Renovation Repair Alteration Other (explain):
6. Type of Contract/Task Order: (Check ALL that apply)
Firm-Fixed Price Cost/Time and Material Other (explain):
DOCUMENT 00202 – ATTACHMENT A
Complete Block 7 for Construction Projects.
7. Construction Project:
Construction Award Amount: $__________________________ Final Construction Price: $________________________
Type of Contract/Task Order: (Check ALL that apply)
Design-Build Design-Bid-Build Delivery/Task Order (IDIQ) Other (explain):
If Design-Build, identify the Lead Design Firm: ____________________________________________________________
8. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: relevant features, square footage, construction methods), including any sustainable features or USGBC LEED certifications. If design-build, include a description of the design-effort.
New construction _____ Yes _____ No
Cast in place reinforced concrete structure/building ____ Yes _____ No
Seismic Design Category D _____ Yes ____ No
Basic wind speeds of 170 mph or more ____ Yes ____ No
Dollar Value $________
Completed ____
PROVIDE DETAILED DESCRIPTION THAT DOCUMENTS THE ABOVE CRITERIA FOR RELEVANCY:
DOCUMENT 00202 – ATTACHMENT B
ATTACHMENT B
NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0)
CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
1. Contractor Information Firm Name: CAGE Code:
Address: Entity Identifier Number:
Phone Number:
Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information Contract Number:
Delivery/Task Order Number (if applicable):
Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):
Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy):
Explain Differences:
Original Contract Price (Award Amount):
Final Contract Price (to include all modifications, if applicable):
Explain Differences:
4. Project Description:
Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
CLIENT INFORMATION (Client to complete Blocks 5-8)
5. Client Information Name:
Title:
Phone Number:
Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
NOTE: NAVFAC REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO NAVFAC WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON NAVFAC SOLICITATIONS. CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO NAVFAC. PLEASE CONTACT THE OFFEROR FOR NAVFAC POC INFORMATION. THE GOVERNMENT
RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.
ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE
RATING DEFINITION NOTE
(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating.
Also, there should have been NO significant weaknesses identified.
(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract.
There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable
No information or did not apply to your contract
Rating will be neither positive nor negative.
Contractor Information (Firm Name):
Client Information (Name):
TO BE COMPLETED BY CLIENT
PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE
1. QUALITY:
a) Quality of technical data/report preparation efforts E VG S M U N
b) Ability to meet quality standards specified for technical performance E VG S M U N
c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance
E VG S M U N
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
E VG S M U N
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
E VG S M U N
b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract
E VG S M U N
3. CUSTOMER SATISFACTION:
a) To what extent were the end users satisfied with the project? E VG S M U N
b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes;
responsiveness to administrative reports, businesslike and communication)
E VG S M U N
c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?
E VG S M U N
d) Overall customer satisfaction E VG S M U N
4. MANAGEMENT/ PERSONNEL/LABOR
a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?
E VG S M U N
b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N
c) Government Property Control E VG S M U N
d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N
e) Utilization of Small Business concerns E VG S M U N
f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N
g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes
E VG S M U N
h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)
E VG S M U N
Contractor Information (Firm Name):
Client Information (Name):
5. COST/FINANCIAL MANAGEMENT
a) Ability to meet the terms and conditions within the contractually agreed price(s)?
E VG S M U N
b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client
E VG S M U N
c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)
E VG S M U N
d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.
Yes No
e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.
Yes No
f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.
Yes No
6. SAFETY/SECURITY
a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?
(Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)
E VG S M U N
b) Contractor complied with all security requirements for the project and personnel security requirements.
E VG S M U N
7. GENERAL
a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).
E VG S M U N
b) Compliance with contractual terms/provisions (explain if specific issues) E VG S M U N
c) Would you hire or work with this firm again? (If no, please explain below) Yes No
d) In summary, provide an overall rating for the work performed by this contractor.
E VG S M U N
Please provide responses to the questions above (if applicable) and/or additional remarks.
Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):
DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING COMMAND PACIFIC
258 MAKALAPA DRIVE, STE 100, PEARL HARBOR, HI 96860
FY21 MCON PROJECT P-803 INDIVIDUAL COMBAT SKILLS TRAINING
PREPARED
APPROVED BY:
DATE:
SCALE SHEET NO.
AMENDMENT SHEET NO.
WON
CTH
1/8" = 1'-0"
AI
05/25/21
SKS-001
S-105
1619790
DET A1 - RAPPELLING TOWER 30'-0" FRAMING PLAN
A1
S-301
R-3R-1 R-2
R-A
R-B
R-C
A4
S-301
A2
S-302
A1
S-302
A2
S-301
3B-11 3B-12
3B-9 3B-10
3B-7 3B-8
B
-4
B
-3
B
-2 B
-1
B
-5 B
-6
8" THK. CONCRETE
SLAB WITH #4 TOP
AND BOTTOM REINF.
AT 6" E.W., TYP.
8" THK. CONC.
WALL
PRECAST
CONCRETE
STAIR, TYP.
13' - 2" 19' - 10"
33' - 0"
1/8" = 1'-0"A1
RAPPELLING TOWER 30'-0" FRAMING PLAN
'-0
'-0
TIE DOWN ANCHOR,
SEE S-508, TYP.
File details come from the government source that posted it. Updated .