This document contains an amendment to a solicitation and related specifications for a federal construction project. The Navy is seeking bids to construct an Individual Combat Skills Training facility at Marine Corps Base Guam, and issued Amendment 0003 to revise project details including removing certain design drawings, revising technical specifications, and adjusting notes on boring logs and site preparation. Bids are due by the date specified in the original solicitation N62742-21-R-1315. The project involves applying a fluid-applied roof membrane system over concrete substrates, consisting of multiple layers of silicone coatings reinforced with fabric, along with associated sealants, primers and granular finishes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 21R1315 Note6-final.pdf | ||
| 21R1315 Note 5.pdf | ||
| 21R1315 Note 4.pdf | ||
| 21R1315 Note 3.pdf | ||
| AMD 02 21R1315.pdf | ||
| 21R1315 Note 2-Final.pdf | ||
| AMD 0001 21R1315.pdf | ||
| 21R1315 Note 1.pdf | ||
| P-803 Final Phase II Specifications.pdf | ||
| P-803 Final Phase II Drawings.pdf | ||
| N62742-21-R-1315 Front End.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N62742-21-R-1312, FY21 P-803 Individual Combat Skills Training, Marine Corps Base Guam, Finegayan, Guam
See Next Page
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-Jun-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6274221R1315
X 9B. DATED (SEE ITEM 11)
08-Apr-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Jun-2021
CODE
HAND DELIVER
NAVFAC PACIFIC
CONSTRUCTION CONTRACTS BR (ACQ33)
4256 RADFORD DR, BLDG 62
HONOLULU HI 96818-3296
N62742 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6274221R1315
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
This amendment is issued to revise the following:
1. SF1442, Price Proposal Schedule, Notes, Note 5, FAR 52.217-7, Option for Increased Quantity-Separately Priced line Item (MAR 1989) is delete in its entirety and replaced with the following:
FAR 52.217-7, OPTION FOR INCREASED QUANTITY-SEPARATELY PRICED LINE ITEM (MAR 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the options at the time of award or by written notice to the Contractor within 60 calendar days from the date of contract award. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
2. Document 00700, Clause 1.108 FAR 52.236-4, Physical Data (APR 1984), paragraph (a) is deleted in its entirety and replaced with the following:
(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations conducted under the J-001B project. Base bids on the drawings and specifications provided.
3. Project Table of Contents is revised to delete Section 07 56 00, Fluid-Applied Roof Coating System and to replace it with Section 07 56 00, Fluid-Applied Roof Membrane System.
4. Section 07 56 00, Fluid-Applied Roof Membrane System, attached, is added to the specification sections.
5. Section 32 16 19 Concrete Curbs, Gutters and Sidewalks is revised as follows:
a. Paragraph 2.7 Detectable Warning System is deleted in its entirety and replaced with:
2.7 NOT USED.
b. Paragraph 3.10 Detectable Warning System is deleted in its entirety and replaced with:
3.10 NOT USED.
6. DWG B-001 is revised narratively as follows:
a. Boring Log Notes is revised as follows:
1) Delete Notes 1 through 4 in their entirety.
2) Add Note 1: The design documents for P-803 are based on information from the final design submittal of Project J-001B. Base bids on the P-803 project documents provided.
b. Foundation Probing and Grouting Notes, Note 14 is deleted in its entirety and replaced with the following:
For bidding purposes, assume no probe hole will take more than 10 times the theoretical volume of grout.
However, if a probe hole takes more than 10 times the theoretical volume of grout during the grouting operations, notify the contracting officer within 24 hours to allow adjustments to be made to the probing and grouting work plan. This will be handled as an unforeseen condition.
c. Site Preparation Notes (to detect cavities and /or voids) is revised to add Note 5 as follows:
N6274221R1315
Note 5. For bidding purposes, assume no subterranean cavities exist. This will be handled as an unforeseen condition.
7. Drawings B-002 thought B-705 are deleted in their entirety and designated as “Not Used.”
8. All other terms and conditions remain unchanged.
-- End of Amendment --
FY21 MCON PROJECT P-803 INDIVIDUAL COMBAT SKILLS TRAINING 1619790
MARINE CORPS BASE GUAM, FINEGAYAN, GUAM
SECTION 07 56 00 (AMD 0003)
FLUID-APPLIED ROOF MEMBRANE SYSTEM
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D1117 (2001) Evaluating Nonwoven Fabrics
ASTM C1644 (2006; R 2017) Standard Specification for Resilient Connectors Between Reinforced Concrete On-Site Wastewater Tanks and Pipes
ASTM D3787 (2007; R 2011) Bursting Strength of Textiles - Constant-Rate-of-Traverse (CRT), Ball Burst Test
ASTM D2697 (2003; R 2014) Volume Nonvolatile Matter in Clear or Pigmented Coatings
ASTM D5034 (2009; R 2017) Standard Test Method for Breaking Strength and Elongation of Textile Fabrics (Grab Test)
ASTM D2370 (1998; R 2010) Tensile Properties of Organic Coatings
ASTM D624 (2000; R 2020) Standard Test Method for Tear Strength of Conventional Vulcanized Rubber and Thermoplastic Elastomers
ASTM E96/E96M (2016) Standard Test Methods for Water Vapor Transmission of Materials
FM GLOBAL (FM)
FM P7825 (2010) Approval Guide
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
FED-STD-313 (2014; Rev E) Material Safety Data, Transportation Data and Disposal Data for Hazardous Materials Furnished to Government Activities
NATIONAL ROOFING CONTRACTORS ASSOCIATION (NRCA)
NRCA RoofMan (2011 thru 2014) The NRCA Roofing Manual
SECTION 07 56 00 (AMD 000 3 Page 1
1.2 SYSTEM DESCRIPTION
1.2.1 Roofing Systems
Single component, multi-layered application of fluid-applied silicone materials with non-woven polyester reinforced fabric to prevent moisture migration and penetration during rain and high temperature, high humidity thermal cycling. Ceramic granules with back rolled silicone top coat shall be applied for grip. The system shall have Class I Roofing System Recognition as tested by Factory Mutual ( FM P7825 ) or other accredited testing laboratory meeting the roofing assembly system testing requirements of Factory Mutual, incorporate adhesion, impact and abrasion resistance, flexibility and excellent weather resistance. The system shall have a minimum of 5 years successful performance in a high temperature and high humidity environment similar to Guam. Provide systems for the following conditions:
a. Application over concrete.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Material Compatibility
SD-03 Product Data
Fluid-Applied Roof Membrane system
Provide data for fluid-applied roof membrane; reinforcing fabric; ceramic granules; joint and crack sealants; with temperature range for application of waterproofing membrane.
SD-04 Samples
Fluid-Applied Roof Membrane; G
Submit one per component, including primers.
Submit samples of not less than 4 inch by 4 inch in size showing the applied thickness, texture, and standard colors to conform with building color scheme as indicated.
SD-07 Certificates
Fluid-Applied Roof Membrane System
Certify that products meet or exceed specified requirements.
Qualification of Applicator Qualification of Manufacturer
SECTION 07 56 00 (AMD 000 3) Page 2
Certify that the applicator meets requirements specified under paragraph entitled "Qualification of Applicator", and include names and locations of 5 qualified installations and the roofing system manufacturer's approval of the applicator. Certify that the manufacturer meets the requirements specified under paragraph entitled "Qualification of Manufacturer."
SD-08 Manufacturer's Instructions
Application Instructions Manufacturer's Material Safety Data Sheets
SD-11 Closeout Submittals
Information Card Instructions to Government Personnel
For each roofing installation, submit a typewritten card containing the information listed on Form 1 located at the end of this section.
Submit instructions meeting the requirements of paragraph entitled "Instructions to Government Personnel" and include copies of Material Safety Data Sheets for maintenance/repair materials.
1.4 QUALITY ASSURANCE
Perform work in accordance with NRCA RoofMan.
1.5 QUALIFICATIONS
1.5.1 Qualification of Manufacturer
Company specializing in fluid applied silicone roof membrane systems with a minimum of 5 years experience.
1.5.2 Qualification of Applicator
Company specializing in performing the work of this section with minimum of 5 years experience approved as an authorized applicator in writing by manufacturer.
1.6 QUALITY ASSURANCE
1.6.1 Application Instructions
Indicate special procedures and perimeter conditions requiring special attention.
1.6.2 Manufacturer's Material Safety Data Sheets
Submit for fluid-applied roof membrane, solvents, and other potentially hazardous materials, as defined in FED-STD-313
1.6.3 Material Compatibility
Manufacturer's certification that fluid membrane materials are physically and chemically compatible with each other. Materials not certified are not permitted in the work area.
SECTION 07 56 00 (AMD 000 3) Page 3
1.7 PREROOFING CONFERENCE
Prior to starting application of fluid-applied roof membrane system, arrange and attend a preroofing conference to ensure a clear understanding of drawings and specifications. Give the Contracting Officer 7 days advance written notice of the time and place of meeting. Ensure that other trades that may perform other types of work on or over the membrane after installation, attend this conference.
1.8 DELIVERY, STORAGE, AND HANDLING
Deliver fluid-applied roof membrane materials in manufacturer's original, unopened containers, with labels intact and legible. Containers of materials covered by a referenced specification number shall bear the specification number, type, and class of the contents. Deliver materials in sufficient quantity to continue work without interruption. Store and protect materials in accordance with manufacturer's instructions, and use within their indicated shelf life. When hazardous materials are involved, adhere to special precautions of the manufacturer, unless precautions conflict with local, State, and Federal regulations. Promptly remove from the site materials or incomplete work adversely affected by exposure to moisture. Store materials on pallets and cover from top to bottom with canvas tarpaulins.
1.9 ENVIRONMENTAL CONDITIONS
Apply materials when there is no surface moisture or visible dampness on the substrate surface. Moisture test for substrate is specified under paragraph entitled "Moisture Test." The applicator shall not apply any spray material if wind velocities exceed 15 miles per hour (unless suitable wind barriers are employed) or when environmental conditions will not permit a set before rain.
1.10 WARRANTY
Furnish the fluid-appled roof membrane system manufacturer's premium warranty for the roof membrane system. The warranty shall run directly to the Government. In no event shall the warranty period be less than 10 years from the date of the Government's acceptance of the work, notwithstanding roofing applicator's or manufacturer's unpaid invoices for installation, supplies, or service. Where manufacturer's standard warranty exceeds 10 years furnish the longer warranty. Application of warranty must be submitted a minimum of two weeks prior or otherwise required by the manufacturer to the start of the roofing project.
PART 2 PRODUCTS
2.1 FLUID-APPLIED ROOF MEMBRANE SYSTEM MATERIALS
2.1.1 Reinforcing Fabric
Non-woven stitch bonded, heat set firm polyester fabric which shall meet or exceed the following performance properties:
Properties Test Results
Weight --- 2.7 ounce per square yard
SECTION 07 56 00 (AMD 000 3) Page 4
Properties Test Results
Tensile Strength: ASTM D5034 49 lbs
Elongation: ASTM D5034 38 percent
Ball Burst: ASTM D3787 69 lbs
Trapezoid: ASTM D1117 17 lbs
2.1.2 Acrylic Bonding Agent
Acrylic mixture for use with cement and water as a waterproof primer for use over concrete substrates.
2.1.3 Base Coat and Top Coat
Moisture cure, fluid applied, high solids, silicone coating used in conjunction with reinforcing fabric which shall meet or exceed the following performance properties:
Properties Test Results
Tensile Strength: ASTM D2370 275 psi
Elongation: ASTM D2370 425 percent
Tear Resistance ASTM D624 37 lbs/in
Water Vapor Permeability ASTM E96/E96M 4 perms
Weight Solids ASTM C1644 98 +/- 2 percent
Volume Solids ASTM D2697 98 +/- 2 percent
Density 11.0 lbs/gal
Reflectivity 90 percent
Emissivity 90 percent
2.2 ACCESSORIES
2.2.1 Surface Primer
Provide surface primer compatible with concrete substrate as recommended by the fluid-applied roof membrane manufacturer.
2.2.2 Joint and Crack Sealant
One or two component sealant, as recommended by fluid-applied roof membrane manufacturer.
2.2.3 Non-slip Finish
White ceramic granules, No. 11 as recommended by fluid-applied roof membrane manufacturer. Ceramic granules shall be composed of high quality mineral rock with a hardness between 6.0 and 7.0 on the Moh's mineral scale and contain a maximum moisture content of 0.3 percent.
SECTION 07 56 00 (AMD 000 3) Page 5
PART 3 EXECUTION
3.1 EXAMINATION
3.1.1 Surface Condition
Verify substrate surfaces are durable; free of foreign matter, dampness, loose particles, cracks, pits, or projections detrimental to adhesion or application of fluid-applied roof membrane system. Verify that substrate surfaces are smooth, and not detrimental to full contact bond of materials.
3.1.2 Penetrations
Verify items which penetrate surfaces to receive fluid-applied roof membrane are securely installed.
3.2 PREPARATION
3.2.1 General
Coordinate work with that of other trades to ensure that components to be incorporated into the fluid-applied roof membrane system are available when needed. Inspect and approve surfaces immediately before application of materials. Remove sharp projections, grease, oil, dirt, and other contaminants which could adversely affect the complete bonding of the fluid-applied roof membrane system.
3.2.2 Protection
Protect adjacent surfaces to receive other finishes.
3.3 TREATMENT OF ROOF PENETRATIONS
Seal around and along all perimeters of penetrations with elastomeric sealant as recommended by the fluid-applied roof membrane manufacturer.
Seal all joints and cover with application of base coat, reinforcing and second base coat to saturate the fabric.
3.4 APPLICATION
3.4.1 Application Over Concrete
3.4.1.1 Prime Coat
Apply prime coat of acrylic bonding agent, cement, and water in proportions and rate as recommended by the fluid-applied roof membrane manufacturer.
3.4.1.2 Base Membrane
Apply base coat membrane using a roofing brush spray, squeegee, or roller in one uniform coat at approximately rate of 4.0 gallon per 100 square feet minimum or as recommended by the fluid-applied roof membrane manufacturer. Embed reinforcing fabric into coating while still wet.
Follow with additional base coat saturation coat to fully cover fabric.
Allow 16 to 36 hours curing time before applying the next coat.
SECTION 07 56 00 (AMD 000 3) Page 6
3.4.1.3 Top Coat Membrane
After curing of the base membrane, apply the top coats in a minimum of two coat application at an approximate total rate of 2.0 gallon per 100 square feet minimum. First coat shall be white and second coat shall be custom color as indicated. Provide additional custom colored coating to fully cover the white first coat.
3.4.1.4 Total Thickness
The overall dry film thickness of the completed roof membrane system shall average 60 mils, not including skim coat with broadcast white ceramic granules.
3.4.2 Skim Coat with Ceramic Granules and Backrolled Finish Coat
Wait a minimum of 4 hours depending on drying conditions and then apply a skim coat of top coat membrane at an approximate rate of 1.0 gallon per 100 square feet minimum and broadcast white ceramic granules at a minimum rate of 30 to 50 pounds per 100 square feet and backroll with top coat membrane or otherwise recommended by manufacturer.
3.5 FIELD QUALITY CONTROL
3.5.1 Moisture Test
Prior to application of fluid-applied roof membrane, measure moisture content of substrate with a moisture meter in the presence of the Contracting Officer. An acceptable device is the Delmhorst Moisture Meter, Model BD7/2E/CS, Type 21 E. Similar meters by other manufacturers, which are suitable for the purpose, may be used as approved by the Contracting Officer. Do not begin application until meter reading indicates "dry" range.
3.5.2 Film Thickness
Measure wet film thickness every 100 square feet during application by placing flat metal plates on the substrate or using a mil-thickness gage especially manufactured for the purpose.
3.5.3 Instructions to Government Personnel
Furnish written and verbal instructions to designated Government personnel. Instructions shall be given by a competent representative of the fluid-applied roof membrane manufacturer and shall include a minimum of 4 hours on maintenance and emergency repair procedures. Include a demonstration of membrane repair, and give sources of required special tools. Furnish information on safety requirements during maintenance and repair operations.
3.6 INFORMATION CARD
Furnish a typewritten card containing information listed in the attached Form l, framed in a watertight frame under clear glass or plastic for each roofing installation. Furnish framed card and duplicate card. Send a photostatic paper copy to the Contracting Officer.
SECTION 07 56 00 (AMD 000 3) Page 7
FORM 1
FLUID-APPLIED ROOFING SYSTEM COMPONENTS
1. Contract Number:: _____________________________________________________
2. Date Work Completed: ___________________________________________________
3. Project Specification Designation: ____________________________________
4. Substrate Material: ___________________________________________________
5. Slope of Substrate: ___________________________________________________
6. Waterproofing
a. Membrane: _________________________________________________________
b. Sealant: __________________________________________________________
c. Materials Manufacturer(s): ________________________________________
7. Statement of Compliance or Exception:
Contractor's Signature Date Signed
Inspector's Signature Date Signed
-- End of Section --
SECTION 07 56 00 (AMD 000 3) Page 8
| 1619790amend0002spc.pdf |
| 07 56 00 FLUID-APPLIED ROOF MEMBRANE SYSTEM (AMD 0002) |
File details come from the government source that posted it. Updated .