OIAA_Zero_Emissions_Initial_Phase_1_Bid_Docs__Bid_Items_R.xlsx

XLSX spreadsheet 30 KB Posted

Attached to
Zero Emissions Initiatives Phase 1
Solicitation number
2026-IFB-081
Issued by
San Bernardino County, California

About this file

This bid document is an itemized worksheet for the Ontario International Airport Authority (OIAA) Zero Emissions Initiatives Phase 1 project, dated April 27, 2026. The project involves the installation of seventeen new electric vehicle charging stations supporting Electric Ground Support Equipment (eGSE) operations at Ontario International Airport in San Bernardino County, California. The scope includes electrical infrastructure components such as stainless steel panelboards (400A and 200A), rigid galvanized steel (RGS) conduit in various sizes totaling approximately 6,650 linear feet, THWN-2/THHN wire in multiple gauges totaling approximately 43,000 linear feet, circuit breakers, surge protection devices, dual 40KW and 80KW EGSE Posi chargers, bollard reels for chargers, and civil work including removal and installation of pavement markings (822 square feet combined), concrete pad foundations (240 square feet), and six protective bollards. A bid alternate is included for a 12kV 600A compact modular vacuum switchgear system with 100 linear feet of medium voltage conductors. The project schedule spans 365 calendar days total, with a pre-proposal meeting scheduled for May 7, 2026 at 10:00 a.m. and a non-mandatory job walk at 11:00 a.m.; Requests for Information are due May 18, 2026 at 2:00 p.m.; and sealed proposals are due June 1, 2026 at 2:00 p.m.

All unit prices and totals in the bid document are currently listed as zero dollars pending contractor submission. Qualified bidders must hold a valid California C-10 Electrical Contractor license and self-perform at least 35 percent of total work, with demonstrated successful completion of three eGSE infrastructure projects within the last ten years at 14 CFR Part 139 medium or large hub airports, including at least one project with networked EV charging equipment rated 50 kilowatts or greater. The project is designated as a Disadvantaged Business Enterprise (DBE) and Small Business Enterprise (SBE) set-aside opportunity with a 0 percent DBE goal under 49 CFR Part 26, though all required DBE documentation must be submitted. Bidders must provide a bid bond equal to 10 percent of the bid amount and performance and payment bonds at 100 percent of contract value. All work must comply with the Project Labor Agreement executed by OIAA in 2021, which mandates prevailing wage requirements under California Labor Code, union representation, apprenticeship participation, and federal Davis-Bacon Act compliance. The estimated project budget is approximately $4 million with an anticipated contract award in the third quarter of 2026, and construction is limited to off-hours operations (midnight to 4:00 a.m.) for switchgear and main electrical work during terminal operations, with liquidated damages of $10,000 per day assessed for delayed work at each terminal.

View the file

Other files

File Type Posted
Zero_Emissions_Initiatives_Phase_1_(Addendum_#3_Revision).pdf PDF
Zero_Emissions_Initiatives_Phase_1_(Addendum_#2_Revision).pdf PDF
Pre-Proposal_Meeting_Slide_Deck_5-7-26.pdf PDF
Pre-Proposal_Meeting_Slide_Deck_5-7-26.pdf PDF
Prime_Bidder_Experience_Form.pdf PDF
Prime_Bidder_Experience_Form.pdf PDF
SB_LOI_.pdf PDF
Performance_and_Payment_Bond_Forms_(1).pdf PDF
OIAA_Executed_PLA_2021.pdf PDF
OIAA_Executed_PLA_2021.pdf PDF
Performance_and_Payment_Bond_Forms_(1).pdf PDF
SB_Proposal_Highlight_Template_(2026-02-02).docx DOCX document
SB_LOI_.pdf PDF
SB_Proposal_Highlight_Template_(2026-02-02).docx DOCX document
OIAA_Zero_Emissions_Initial_Phase_1_Bid_Docs__Plans_R1.pdf PDF
OIAA_Zero_Emissions_Initial_Phase_1_Bid_Docs__Plans_R1.pdf PDF
OIAA_-_General_Conditions_-Zero_Emissions_Initiatives_Phase_1.FK.docx DOCX document
Bid_Bond_Form_.pdf PDF
OIAA_Zero_Emissions_Initial_Phase_1_Bid_Docs__Specs.pdf PDF
F_OIAA_-_Special_Provisions_-_Zero_Emissions_Initiatives_Phase_1.FK.doc DOC document
OIAA_Zero_Emissions_Initial_Phase_1_Bid_Docs__Specs.pdf PDF
F_OIAA_-_Special_Provisions_-_Zero_Emissions_Initiatives_Phase_1.FK.doc DOC document
OIAA_Zero_Emissions_Initial_Phase_1_Bid_Docs__Bid_Items_R.xlsx XLSX spreadsheet
Bid_Bond_Form_.pdf PDF
OIAA_-_General_Conditions_-Zero_Emissions_Initiatives_Phase_1.FK.docx DOCX document
FAA_General_Provisions.pdf PDF
FAA_General_Provisions.pdf PDF
Federal_Provisions.pdf PDF
Federal_Provisions.pdf PDF
Federal_Requirements_Bid_Forms.pdf PDF
Federal_Requirements_Bid_Forms.pdf PDF
Questionnaire_for_Projects_Rev._4_1.26.docx DOCX document
Questionnaire_for_Projects_Rev._4_1.26.docx DOCX document
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TAFR

Ontario International Airport Authority
Zero Emissions Initiatives Phase 1Bid Documents
Bid ItemsDate:April 27, 2026
CompanyResponsible for Initial QTOResponsible for BackcheckItemItem DescriptionUnit ofEstimatedEstimatedEstimated
No.MeasureQuantityUnit PriceTotal
General
1Contractor Quality Control Program (QCQP)LS1$ - 0
2Mobilization (NOT TO EXCEED 4%)LS1$ - 0
3Construction Staking and SurveyLS1$ - 0
4Safety and SecurityLS1$ - 0
Subtotal General Items$ - 0
Electrical Items
PBS3400A Nema 3R stainless steel panelboards13$ - 0
PBS4200A Nema 3R stainless steel panelboards12$ - 0
54" RGS conduitLF2,400$ - 0
PBS63" RGS conduitLF900$ - 0
PBS72.5" RGS conduitLF600$ - 0
81.5" RGS conduitLF2,500$ - 0
PBS91" RGS conduitLF250$ - 0
PBS10#500 MCM THWN-2/THHN wireLF36,000$ - 0
PBS11#4/0 THWN-2/THHN wireLF3,600$ - 0
12#1 THWN-2/THHN wireLF750$ - 0
13#1/0G THWN-2/THHN wireLF2,400$ - 0
14#1G THWN-2/THHN wireLF900$ - 0
15#4G THWN-2/THHN wireLF600$ - 0
16#6G THWN-2/THHN wireLF2,500$ - 0
17#8G THWN-2/THHN wireLF250$ - 0
18Fittings, supports, misc (12% of conduit and wire estimated cost)LS1$ - 0
19100A/600V Nema 3R stainless steel fusible disconnect switch14$ - 0
20400A 100KAIC Circuit breaker for 2GSE SWBDs11$ - 0
21480V, 3-phase, 50A Surge Protection Device, Type 215$ - 0
22400A 22KAIC Ciruit breaker for 4G-1HPC SWBD11$ - 0
23DVS 400 Dual 40KW EGSE Posi Charger115$ - 0
24MVS 800 80KW EGSE Posi charger12$ - 0
25Averest 96" Bollard reel for EGSE chargers138$ - 0
Subtotal Electrical Items$ - 0
Civil Items
RS&H26Removal of Existing Pavement MarkingSF177$ - 0
27Permanent Pavement Marking with Reflective MediaSF645$ - 0
RS&H28Concrete Pad FoundationSF240$ - 0
RS&H29BollardEA6$ - 0
Subtotal Civil Items$ - 0
Summary
Electrical Items$ - 0
Civil Items$ - 0
Total$ - 0
BID ALTERNATE NO. 1
112kV 600A Compact Modular Vacumm Switchgear-All materials, installation, labor, supervision, coordination with authorities having jurisdiction (AHJ), testing, commissioning, and all other incidental work required for a complete and operational system shall be included in this itemLS1$ - 0
2MV ConductorsLF100$ - 0
Total$ - 0