OIAA_Zero_Emissions_Initial_Phase_1_Bid_Docs__Bid_Items_R.xlsx

XLSX spreadsheet 30 KB Posted

Attached to
Zero Emissions Initiatives Phase 1
Solicitation number
2026-IFB-081
Issued by
San Bernardino County, California

About this file

This is a bid documents file for the Ontario International Airport Authority (OIAA) Zero Emissions Initiatives Phase 1 project, dated April 27, 2026. The project encompasses construction services for the installation of seventeen new electric vehicle charging stations to support Electric Ground Support Equipment (eGSE) operations at Ontario International Airport in California. Work will be performed at Terminal 2 and Terminal 4 apron areas, as well as within existing and new electrical rooms throughout both terminal buildings. The bid items are organized into three categories: General Items (contractor quality control program, mobilization not to exceed 4%, construction staking and survey, and safety and security); Electrical Items (400-ampere and 200-ampere panelboards, various sizes of RGS conduit ranging from 1 inch to 4 inches, multiple wire gauges including #500 MCM through #8G THWN-2/THHN wire, disconnect switches, circuit breakers, surge protection devices, and dual charger units); and Civil Items (removal and installation of pavement markings, concrete pad foundation, and bollards). A bid alternate is included for 12-kilovolt 600-ampere compact modular vacuum switchgear and medium-voltage conductors.

The bid documents present estimated quantities for all line items but show placeholder pricing with unit prices and total costs listed as zero dollars, indicating that this is a template requiring contractor completion. The electrical component represents the substantial portion of the project, with significant quantities of conduit (totaling approximately 6,450 linear feet), wire (totaling approximately 45,900 linear feet), and specialized charging equipment including DVS 400 Dual 40-kilowatt chargers and MVS 800 80-kilowatt chargers. The civil work includes 177 square feet of pavement marking removal, 645 square feet of permanent reflective pavement marking, 240 square feet of concrete pad foundation, and six bollards. No specific contract award date, response deadline, or site visit information is included in this bid documents spreadsheet.

View the file

Other files

File Type Posted
Zero_Emissions_Initiatives_Phase_1_(Addendum_#3_Revision).pdf PDF
Zero_Emissions_Initiatives_Phase_1_(Addendum_#2_Revision).pdf PDF
Pre-Proposal_Meeting_Slide_Deck_5-7-26.pdf PDF
Pre-Proposal_Meeting_Slide_Deck_5-7-26.pdf PDF
Prime_Bidder_Experience_Form.pdf PDF
Prime_Bidder_Experience_Form.pdf PDF
SB_LOI_.pdf PDF
OIAA_Executed_PLA_2021.pdf PDF
OIAA_Executed_PLA_2021.pdf PDF
Performance_and_Payment_Bond_Forms_(1).pdf PDF
Performance_and_Payment_Bond_Forms_(1).pdf PDF
SB_Proposal_Highlight_Template_(2026-02-02).docx DOCX document
SB_LOI_.pdf PDF
SB_Proposal_Highlight_Template_(2026-02-02).docx DOCX document
OIAA_Zero_Emissions_Initial_Phase_1_Bid_Docs__Plans_R1.pdf PDF
OIAA_Zero_Emissions_Initial_Phase_1_Bid_Docs__Plans_R1.pdf PDF
Bid_Bond_Form_.pdf PDF
OIAA_Zero_Emissions_Initial_Phase_1_Bid_Docs__Specs.pdf PDF
F_OIAA_-_Special_Provisions_-_Zero_Emissions_Initiatives_Phase_1.FK.doc DOC document
OIAA_Zero_Emissions_Initial_Phase_1_Bid_Docs__Specs.pdf PDF
OIAA_-_General_Conditions_-Zero_Emissions_Initiatives_Phase_1.FK.docx DOCX document
OIAA_Zero_Emissions_Initial_Phase_1_Bid_Docs__Bid_Items_R.xlsx XLSX spreadsheet
F_OIAA_-_Special_Provisions_-_Zero_Emissions_Initiatives_Phase_1.FK.doc DOC document
Bid_Bond_Form_.pdf PDF
OIAA_-_General_Conditions_-Zero_Emissions_Initiatives_Phase_1.FK.docx DOCX document
FAA_General_Provisions.pdf PDF
Federal_Requirements_Bid_Forms.pdf PDF
FAA_General_Provisions.pdf PDF
Federal_Provisions.pdf PDF
Federal_Provisions.pdf PDF
Federal_Requirements_Bid_Forms.pdf PDF
Questionnaire_for_Projects_Rev._4_1.26.docx DOCX document
Questionnaire_for_Projects_Rev._4_1.26.docx DOCX document
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TAFR

Ontario International Airport Authority
Zero Emissions Initiatives Phase 1Bid Documents
Bid ItemsDate:April 27, 2026
CompanyResponsible for Initial QTOResponsible for BackcheckItemItem DescriptionUnit ofEstimatedEstimatedEstimated
No.MeasureQuantityUnit PriceTotal
General
1Contractor Quality Control Program (QCQP)LS1$ - 0
2Mobilization (NOT TO EXCEED 4%)LS1$ - 0
3Construction Staking and SurveyLS1$ - 0
4Safety and SecurityLS1$ - 0
Subtotal General Items$ - 0
Electrical Items
PBS3400A Nema 3R stainless steel panelboards13$ - 0
PBS4200A Nema 3R stainless steel panelboards12$ - 0
54" RGS conduitLF2,400$ - 0
PBS63" RGS conduitLF900$ - 0
PBS72.5" RGS conduitLF600$ - 0
81.5" RGS conduitLF2,500$ - 0
PBS91" RGS conduitLF250$ - 0
PBS10#500 MCM THWN-2/THHN wireLF36,000$ - 0
PBS11#4/0 THWN-2/THHN wireLF3,600$ - 0
12#1 THWN-2/THHN wireLF750$ - 0
13#1/0G THWN-2/THHN wireLF2,400$ - 0
14#1G THWN-2/THHN wireLF900$ - 0
15#4G THWN-2/THHN wireLF600$ - 0
16#6G THWN-2/THHN wireLF2,500$ - 0
17#8G THWN-2/THHN wireLF250$ - 0
18Fittings, supports, misc (12% of conduit and wire estimated cost)LS1$ - 0
19100A/600V Nema 3R stainless steel fusible disconnect switch14$ - 0
20400A 100KAIC Circuit breaker for 2GSE SWBDs11$ - 0
21480V, 3-phase, 50A Surge Protection Device, Type 215$ - 0
22400A 22KAIC Ciruit breaker for 4G-1HPC SWBD11$ - 0
23DVS 400 Dual 40KW EGSE Posi Charger115$ - 0
24MVS 800 80KW EGSE Posi charger12$ - 0
25Averest 96" Bollard reel for EGSE chargers138$ - 0
Subtotal Electrical Items$ - 0
Civil Items
RS&H26Removal of Existing Pavement MarkingSF177$ - 0
27Permanent Pavement Marking with Reflective MediaSF645$ - 0
RS&H28Concrete Pad FoundationSF240$ - 0
RS&H29BollardEA6$ - 0
Subtotal Civil Items$ - 0
Summary
Electrical Items$ - 0
Civil Items$ - 0
Total$ - 0
BID ALTERNATE NO. 1
112kV 600A Compact Modular Vacumm Switchgear-All materials, installation, labor, supervision, coordination with authorities having jurisdiction (AHJ), testing, commissioning, and all other incidental work required for a complete and operational system shall be included in this itemLS1$ - 0
2MV ConductorsLF100$ - 0
Total$ - 0