Section J Attachment 7 July 2011.xls

XLS spreadsheet 28 KB Posted

Attached to
Antarctic Support Contract
Solicitation number
NSF-AIL-DRFP-08-0001
Issued by

About this file

Sectin J Attachment 7 dated July 2011

View the file

Other files

File Type Posted
RFP A.018.pdf PDF
RFP A.017.pdf PDF
A.016.pdf PDF
RFP A.015 .pdf PDF
SF 30 A.014.pdf PDF
SF 30 A.013.pdf PDF
RFP A.012 FINAL signed 3 Jun 2011.pdf PDF
RFP Amendment 011 with SF30.pdf PDF
RFP Amendment 010.pdf PDF
DACS08P2215-A09.pdf PDF
Amendment 008 Attachment L-11 Cost Model Pricing Instructions.docx DOCX document
Amendment 008 - Attachment A - Q A.docx DOCX document
Amendment 008 16 Nov 2010.docx DOCX document
Amendment 008 Attachment L-14 NSF WBS with Non-Labor Budget Estimate.xlsx XLSX spreadsheet
Amendment 008 Attachment L-10 Cost Model Final Template.xlsx XLSX spreadsheet
Amendment 008 Section J Attachment 11 Transition-in SOW Nov 2010.docx DOCX document
Amendment 008 Attachment L-9 Total Costs Prime Contractor.xlsx XLSX spreadsheet
SF 30 for RFP Amendment 008 pdf.pdf PDF
Houston Wage Det. June 2010.txt TXT text file
Los Angeles Long Beach Wage Det. June 2010.txt TXT text file
Los Angeles Long Beach Moving Storage Wage Det June 2010.txt TXT text file
Port Hueneme Ventura Moving Storage Wage Det. June 2010.txt TXT text file
Centennial Arapahoe Wage Det. Sept 2010.txt TXT text file
Port Hueneme Ventura Wage Det. June 2010.txt TXT text file
Section J Attachment 11 Transition-in SOW Oct 2010.docx DOCX document
Attachment L-13 SCA Wage Determination Spreadsheet.xls XLS spreadsheet
Section J Attachment 7 Assignable Subcontracts Leases dated June 2010.xlsx XLSX spreadsheet
Attachment L-12 Sample Bill of Materials —
Attachment L-10 Cost Model Final Template.xlsx XLSX spreadsheet
Amendment 007 22 October 2010.docx DOCX document
Attachment L-11 Cost Model Pricing Instructions.docx DOCX document
Attachments L-1 L-2 L-3.docx DOCX document
Attachment L-15 - Project Proposal Form.docx DOCX document
SF 30 Amendment 007 pdf.pdf PDF
Attachment L-9 Total Costs Prime Contractor.xlsx XLSX spreadsheet
Attachment L - 7 - List of Acronyms.docx DOCX document
Standard Form 30 RFP Amendment 006.doc DOC document
Attachment L-8 Mandatory Crosswalk.xls XLS spreadsheet
Instructions for Completing Attachment L-8 Mandatory Crosswalk.doc DOC document
Air New Zealand PRS-06-12746.pdf PDF
RFP Amendment 005 Attachment.doc DOC document
Standard Form 30 RFP Amendment 005.doc DOC document
PHI Contract OPP-0634685.pdf PDF
KBAL Contract OPP-0413529.doc DOC document
LJT NSFDACSPRSS-06C1005.pdf PDF
RFP Amendment 004 Attachment.doc DOC document
Standard Form 30 RFP Amendment 004.doc DOC document
RFP Amendment 003 Attachment Assignable Subcontracts Leases Sec J Atch 7 dated 9 Jan 2009.xls XLS spreadsheet
Standard Form 30 RFP Amendment 003.doc DOC document
RFP Amendment 003 Attachment Sample Surveillance Plan Outline Sec J Atch 8 dated 9 Jan 2009.doc DOC document
Show 40 more

Latest 50 of 99 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SECTION J, ATTACHMENT 7
ASSIGNABLE SUBCONTRACTS, LEASES, CHARTERS AND OPERATOR AGREEMENT LISTING* DATE: July 2011
ITEM N0.DESCRIPTION & LOCATIONSTART & END DATEGENERAL TERMINATION & OTHER MISCELLANEOUS INFORMATION**
1Lease of Property (presently occupied by the incumbent contractor, Raytheon), HQ Bldg Site, 7400 S. Tuscan Way, Centennial, CO; Subcontract between Raytheon and Koll Bren Fund V L.P.4/16/2002 to 4/30/2012Early termination option was not exercised making the early termination clause no longer applicable.
2Christchurch International Airport Limited (CIAL) Office and Warehouse Complex, 38 Orchard Rd, Christchurch Intl Airport, New Zealand4/01/1998 to 3/30/2018$24,142/mo early termination costs until 2017. No buyout or termination clause.
3Land (Bare) Lease (U.S. Government-Owned buildings reside there), Orchard Rd North, Christchurch Intl Airport, Christchurch, New Zealand10/1/2010 to 7/1/201936 months advance notice required for termination.
4Research Vessel (R/V) NATHANIEL B. PALMER Charter, Subcontract between Raytheon and Edison Chouest Offshore (ECO)3/13/2002 to 3/12/2012***Termination rate is $12,471/day for termination prior to 3/12/2012. If terminated between 3/12/2011 and 3/12/2012 the termination rate could apply for up to 182 days. Termination notice required 90 days prior to termination date. ECO estimates a $3.8M cost for removal of Government Furnished Equipment (GFE).
5Research Vessel (R/V) LAURENCE M. GOULD Charter, Subcontract between Raytheon and ECOBase: 7/17/2010 - 7/16/2015
Option 1: 7/17/2015 - 7/16/2016 Option 2: 7/17/2016 - 7/16/2017 Option 3: 7/17/2017 - 7/16/2018 Option 4: 7/17/2018 - 7/16/2019 Option 5: 7/17/2019 - 7/16/2020No applicable early termination costs. ECO estimates a $1.56M cost for removal of GFE.
6University of Miami - For Satellite OperationsBase: 12/1/2009 - 6/30/2010

Option 1: 7/1/2010 - 6/30/2011 Option 2: 7/1/2011 - 6/30/2012 Option 3: 7/1/2012 - 6/30/2013

Option 4: 7/1/2013 - 6/30/201430 days written notice to terminate.
7AT&T - Provides Intercontinental Satellite Services from Antarctic Palmer Station to Raytheon Polar Services in Denver, CO2/1/2008 to 1/31/2013Term expires Sept 2012. 30 days notice required to terminate after September 2012. Full remaining amount due if terminated. Assignment/Transfer of Service is required.
8SHI International Corporation for Microsoft Enterprise agreement for all Polar licenses including those in Antarctica.8/1/11 to 7/31/12Subscription is paid through 7/31/2012. No termination is required.
9Burlington Environmental, Inc. - Antarctic Hazardous/Radioactive Waste TransportationSubcontract ends 3/31/2012****
10Best Recycling, Inc. - For Hazardous and Low Level Radioactive Waste Management and Disposal Services at the AntarcticSubcontract ends 3/31/2012****
11University of Arizona - For Technical Support Services for South Pole Food Growth Chamber at the South Pole s/c 450035301510/1/07 to 3/31/2012****No termination costs if notified 30 days in advance.
12NANA Services (Subcontract will not be provided in the on-line library due to proprietary issues.)4/1/11 to 3/31/12****No termination charges other than as allowed for termination for convenience.
13Xerox Corporation Multi function (print, copy, scan, fax) capabilities @ RPSC DHQ (Various locations - 7) – 05/31/2013; Multi function (print, copy, scan, fax) capabilities @ RPSC DHQMonth-to-month with no end date30 days notice is required to return each leased machine.
14Xerox - Multi function (print, copy, scan, fax) capabilities @ RPSC DHQ (FEMC - 1) – 07/31/2012.7/1/09 to 7/31/12Remaining amount due upon early termination.
15AGUNSA Port Services11/01/2001 to 3/31/2012****No termination charges other than as allowed for termination for convenience.
16MSN Communications2/1/09 to 1/31/2012****Raytheon will be working on a competitive acquisition to renew this for 1 year
17Wells Fargo - PO # 4500372401 - McMurdo ATM lease $650/month.Lease expires 5/31/12Termination notification required 120 days in advance. Month-to-month hold over allowed but requires 30 days written termination notice to end the tenancy.
*Other than Item No. 1 (leased property located at 7400 S. Tuscan Way, Centennial , CO) the ASC contractor will be required to assume all RFP Section J, Attachment 7 assignable
instruments unless an alternate subcontractor is proposed.
**Information should be confirmed by the ASC contractor upon award.
***NSF acknowledges that the Palmer Charter period of performance end date stated in this document is not consistent with the Palmer Charter period of performance stated
in SubCLIN 0000.3A. NSF will provide direction (post award) regarding any action needed to be taken by the ASC contractor for this requirement.
****These incumbent-negotiated subcontracts are provided for informational purposes and are not assignable to the ASC contractor since they expire prior to April 1, 2012.

Sheet2

Sheet3

File details come from the government source that posted it. Updated .