Attachment L-15 - Project Proposal Form.docx

DOCX document 39 KB Posted

Attached to
Antarctic Support Contract
Solicitation number
NSF-AIL-DRFP-08-0001
Issued by

About this file

RFP Amendment 007 - Section L Attachment L-15

View the file

Other files

File Type Posted
RFP A.018.pdf PDF
RFP A.017.pdf PDF
A.016.pdf PDF
RFP A.015 .pdf PDF
SF 30 A.014.pdf PDF
Section J Attachment 7 July 2011.xls XLS spreadsheet
SF 30 A.013.pdf PDF
RFP A.012 FINAL signed 3 Jun 2011.pdf PDF
RFP Amendment 011 with SF30.pdf PDF
RFP Amendment 010.pdf PDF
DACS08P2215-A09.pdf PDF
Amendment 008 Attachment L-11 Cost Model Pricing Instructions.docx DOCX document
Amendment 008 - Attachment A - Q A.docx DOCX document
Amendment 008 16 Nov 2010.docx DOCX document
Amendment 008 Attachment L-14 NSF WBS with Non-Labor Budget Estimate.xlsx XLSX spreadsheet
Amendment 008 Attachment L-10 Cost Model Final Template.xlsx XLSX spreadsheet
Amendment 008 Section J Attachment 11 Transition-in SOW Nov 2010.docx DOCX document
Amendment 008 Attachment L-9 Total Costs Prime Contractor.xlsx XLSX spreadsheet
SF 30 for RFP Amendment 008 pdf.pdf PDF
Houston Wage Det. June 2010.txt TXT text file
Los Angeles Long Beach Wage Det. June 2010.txt TXT text file
Los Angeles Long Beach Moving Storage Wage Det June 2010.txt TXT text file
Port Hueneme Ventura Moving Storage Wage Det. June 2010.txt TXT text file
Centennial Arapahoe Wage Det. Sept 2010.txt TXT text file
Port Hueneme Ventura Wage Det. June 2010.txt TXT text file
Section J Attachment 11 Transition-in SOW Oct 2010.docx DOCX document
Attachment L-13 SCA Wage Determination Spreadsheet.xls XLS spreadsheet
Section J Attachment 7 Assignable Subcontracts Leases dated June 2010.xlsx XLSX spreadsheet
Attachment L-12 Sample Bill of Materials —
Attachment L-10 Cost Model Final Template.xlsx XLSX spreadsheet
Amendment 007 22 October 2010.docx DOCX document
Attachment L-11 Cost Model Pricing Instructions.docx DOCX document
Attachments L-1 L-2 L-3.docx DOCX document
SF 30 Amendment 007 pdf.pdf PDF
Attachment L-9 Total Costs Prime Contractor.xlsx XLSX spreadsheet
Attachment L - 7 - List of Acronyms.docx DOCX document
Standard Form 30 RFP Amendment 006.doc DOC document
Attachment L-8 Mandatory Crosswalk.xls XLS spreadsheet
Instructions for Completing Attachment L-8 Mandatory Crosswalk.doc DOC document
Air New Zealand PRS-06-12746.pdf PDF
RFP Amendment 005 Attachment.doc DOC document
Standard Form 30 RFP Amendment 005.doc DOC document
PHI Contract OPP-0634685.pdf PDF
KBAL Contract OPP-0413529.doc DOC document
LJT NSFDACSPRSS-06C1005.pdf PDF
RFP Amendment 004 Attachment.doc DOC document
Standard Form 30 RFP Amendment 004.doc DOC document
RFP Amendment 003 Attachment Assignable Subcontracts Leases Sec J Atch 7 dated 9 Jan 2009.xls XLS spreadsheet
Standard Form 30 RFP Amendment 003.doc DOC document
RFP Amendment 003 Attachment Sample Surveillance Plan Outline Sec J Atch 8 dated 9 Jan 2009.doc DOC document
Show 40 more

Latest 50 of 99 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment L-15 Project Proposal Form

National Science Foundation Project Proposal

(Insert Project Title, Project/ Code (assigned in Amendment 007 Cover Letter) in Cost Model, PWS Section and Cost Model WBS)

1. Project Summary: (A description of project)

2. Purpose/Justification: (Reasons for proposing this project, assumptions and constraints)

3. Program Impacts: (Dependencies and risks)

4. Category (Check all that apply)

|_| Technical Management & Administration |_| Science and Technical Project Services |_| Information Technology & Communications |_| Infrastructure, Operations & Professional Services |_| Transportation and Logistics

|_| Outside the Scope of the Antarctic Support Contract but within the United States Antarctic Program (Grantee, other Contractors, General Public, etc.)

Additional Information may be provided here:

5. Project Schedule and Cost Estimate: (Provide milestone schedule and quantify non-recurring project costs, recurring O&M costs, and any one-time set up or start up costs per CLIN. Also Detail offeror resources required from other areas or operations if not specifically priced here.)

6. Funding Source: (Describe the funding source for the project.)

|_|Priced within the Scope of Integrated Operations & Science Support
|_|Investment by the Offeror

|_| Other Methodology – Costs for this project will be recovered through another methodology such as Depreciation, Energy Savings, etc. Note: If other methodology is selected please provide a complete description and note consistency with disclosed accounting practices and compliance with governmental regulations – anti-deficiency)

If multiple funding sources are proposed please provide an estimate by sources.

7. Proposed Projects Outcomes: (The project should either result in cost savings for the ASC or the USAP or provide for increased level of service or support or both.)

7a. Return on Investment: (If the proposed project will reduce the costs to the ASC, quantify the cost benefits or savings (i.e. efficiencies) attributable to the project, by cost model WBS and contract period(s).)

7b. Increase Service or Support: (If the project will not necessarily result in cost savings to NSF but will result in increased/enhanced level of service or support, please describe here.)

8. Resource Requirements: (If the project will require significant resources from other USAP activities or functions, please provide a brief description of those requirements (spaces, power, water, data transfer, heavy equipment, computers use etc.).

9. Impact on Other Organizations: (Identify other USAP participants that could be potentially impacted by this project (e.g. NYANG, AMC, other aviation providers, SPAWAR, MSC,USCG, grantees etc) and the corresponding consequences.)

10.Appendix/Attachments: (List related attachments, trade studies or rationale)
PM-A-1000a, NSF New Project Proposal
Page 1 of 3