About this file

This is a NOAA Form 57-17-09 Hot Work Permit template issued by the National Oceanic and Atmospheric Administration (NOAA) for use on NOAA ships. The permit authorizes personnel to conduct hot work operations and is valid for a maximum of 12 hours from the time of issuance.

The permit identifies six types of hot work activities that may be authorized: welding, cutting, brazing, grinding, sandblasting, and chipping. It requires designation of the specific location where hot work will be performed and identification of the hot work operator as either a crewmember or contractor. Fire watch personnel must also be designated and identified by the same categories. The form includes comprehensive precautions that must be met before hot work commences, including certification of the operator, verification of appropriate personal protective equipment, confirmation that equipment is operable and in good condition, provision of shielding, oxygen and explosive gas level measurements by a competent person, Marine Chemist certification where required for confined spaces or combustible liquid tanks, adequate ventilation, removal or protection of combustible materials, assignment of trained fire watch personnel with communications capability, and de-energization of electrical equipment with lockout/tagout notification. The permit requires signatures and authorization from the Competent Person, Chief Marine Engineer, Officer of the Deck at commencement of hot work, and the Commanding Officer.

View the file

Other files for this federal contract opportunity

Other files attached to MO FY27 Thomas Jefferson Drydock REFERENCES and ATTACHMENTS, newest first.
File Type Posted
04950 - 04950SS 50MM TO 200MM.jpg JPG image
NOAA Standard Specification 000-1H General Requirements for Ship Repair Contract Work.pdf PDF
NOAA Standard Specification 630-1 Preservation of Ship Structures.pdf PDF
NOAA Standard Specification AMC-533-1 Potable Water Tank System Disinfection.pdf PDF
NOAA Standard Specification MOC-510-1B HVAC Cleaning.pdf PDF
NOAA Standard Specification MOC-631-2D Coatings for Steel Surfaces.pdf PDF
NOAA Standard Specification MOC-635-1 Thermal Insulation for Piping.pdf PDF
NOAA Standard Specification AMC-573-1C Testing of Davits and Weight Handling Gear.pdf PDF
NOAA Standard Specification AMC-581-A Inspection and Preservation of Ground Tackle.pdf PDF
631-6634619 Paint Schedule.pdf PDF
ABS Steel Vessel Rules.pdf PDF
1102-13 - Gangway Handling (public).docx DOCX document
TJ-311-01 EDG Engine.pdf PDF
TJ-583-02A_Davit Rescue Boat.pdf PDF
TJ-436-01A - Consilium Salwico CS4000 Operations Manual.pdf PDF
ClearFlo Manual v1103.pdf PDF
TJ-436-02 FireBoy - Owners Manual and Install Instructions.pdf PDF
Electro-Motive MI 1722_Maintenance Instruction.pdf PDF
TJ-233-03 EMD Engine_Maintenance Instruction_1722 Rev I.pdf PDF
514-3275003-12 Rev A AC PP INSTALL FCSLE DK and ABV.pdf PDF
633-67635_Installation Drawing ICCP Equipment.pdf PDF
601-6634924 Joiner Arrangement Bridge Deck.pdf PDF
601-6634922 Joiner Arrangement Forecastle Deck.pdf PDF
601-6634923 Joiner Arrangement Upper Deck.pdf PDF
528-6634786D Plumbing and Deck Drain Arrangement.pdf PDF
301-001B_Electrical One Line Dia.pdf PDF
556-6634805C Hydraulic Systems Info.pdf PDF
320-6634677 Cableway Routing and Penetrations - redline.pdf PDF
THOMAS JEFFERSON Diamond System Builder 1-30-1.pdf PDF
N61-T52-01064-1 Rev C - Sensor Alignment Survey.pdf PDF
436-6634706 Rev C_ACCU elementary wiring diagram - redline.pdf PDF
512-004_-_HVAC Makeup Air Modifications.pdf PDF
TJ_85_TJ-085-003_RevA_DOCKING PLANS.pdf PDF
437-6634704 Tank Level Indicating Sys EWD - redline.pdf PDF
101-6634870 Structural Module 11.pdf PDF
101-6634873 Structural Module 14.pdf PDF
320-6634691 Cable Wtrtight Penetrations.pdf PDF
TJ-437-003 TLI Installation Modifications.pdf PDF
514-3275003-11 REV A AC PIPING INSTL MN DK.pdf PDF
101-6634874_Structural Module Assembly No 15.pdf PDF
512-3275003-8 HVAC MODS MN DECK REV B.pdf PDF
581-6634884_Anchor Handling Details.pdf PDF
TJ-551-003C SSDG UPGRADES COMPRESSED AIR MODS.pdf PDF
243-6634745 Shaft Brake Arrngmnt.pdf PDF
512-6634841_ HVAC Diagram.pdf PDF
261-6634755D Fuel Oil Service Diagram.pdf PDF
601-6634920 Joiner Arrangement Lower Deck and Flat.pdf PDF
633-6634726A_Cathodic Protection Elementary Wiring Diagram.pdf PDF
TJ-635-6634624_Insulation Layout and Details.pdf PDF
801-6634640_Hull Lines.pdf PDF
Show all 50

MO FY27 Thomas Jefferson Drydock REFERENCES and ATTACHMENTS has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. DEPARTMENT OF COMMERCE NOAA Form 57-17-09

(1-17) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION

HOT WORK PERMIT

THIS PERMIT IS VALID FOR NO MORE THAN 12 HOURS FROM THE TIME ISSUED

NOAA SHIP Check one

PRECAUTIONS

Met N/A

PERMIT

ISSUED

DATE TIME

Hot work operator is certified to perform the hot work indicated.

PERMIT

EXPIRES

DATE TIME

Hot work operator is equipped with appropriate PPE, including respirator.

TYPE of HOT WORK PERMITTED

WELDING CUTTING

BRAZING GRINDING

SANDBLASTING CHIPPING

Hot work equipment is fully operable and is in good condition.

Hot work shielding is provided to protect others from arc.

LOCATION of PERMITTED HOT WORK Competent Person measured oxygen and explosive gas levels. Certified area safe for hot work.

Marine Chemist issued a “ Safe for Hotwork” certificate, as required for Confined Space.

HOT WORK OPERATOR Sufficient ventilation is provided to remove smoke and vapor from the hot work area.

CREWMEMBER CONTRACTOR

Local smoke and heat detection system is secured in hot work area (if practical).

FIRE WATCH PERSONNEL

Marine Chemist issued a “Safe for Hot Work” certificate for locations within or near combustible liquid tanks.

Gas cylinders, manifolds and electric arc units are located outside of the confined space designated for hot work.

CREWMEMBER CONTRACTOR

Combustible materials are removed from hot work area, draped with fire proof cloths or protected with metal shields.

RESTRICTIONS / COMMENTS In adjacent spaces, flammable liquids are removed and combustible materials are moved away from the bulkheads.

In the hot work area and adjacent spaces, Fire Watch personnel are assigned, as required.

SIGNATURE of COMPETENT PERSON Fire Watch personnel are supplied with operable fire extinguishing equipment, ready for immediate use.

I verify the above location has been examined, fire prevention precautions have been taken, and permission for hot work is authorized.

Fire Watch personnel are trained in the use of fire extinguishing equipment and sounding the fire alarm.

CHIEF MARINE ENGINEER (CERTIFIES AREA SAFE for HOT WORK) Fire Watch is assigned for the full period of hot work, plus 30 minutes, including all hot work break periods.

OOD (at COMMENCEMENT of HOT WORK) Fire Watch personnel have established radio communications with the hot work operator and the OOD.

COMMANDING OFFICER (APPROVES HOT WORK PERMIT) Electrical equipment in the hot work area is de-energized. Lock out / Tag out notification posted, as required.

NOAA SHIP:
DATE:
TIME:
DATE_2:
TIME_2:
WELDING: Off
BRAZING: Off
SANDBLASTING: Off
CUTTING: Off
GRINDING: Off
CHIPPING: Off
CREWMEMBER: Off
CONTRACTOR: Off
CREWMEMBER_2: Off
CONTRACTOR_2: Off
RESTRICTIONS COMMENTS:
HOT WORK OPERATOR:
LOCATION of PERMITTED HOT WORK:
FIRE WATCH PERSONNEL:
VENT: Off
PERMIT: Off
SHIELD: Off
OPERABLE: Off
EQUIPPED: Off
CERTIFIED: Off
DETECTION: Off
SAFE: Off
CYLINDERS: Off
DRAPED: Off
ADJACENT: Off
FW EQUIP: Off
FW TRAIN: Off
FW 30: Off
FW RADIO: Off
LOTO: Off
RESET:
O2 GAS: Off
FW ASSIGN: Off