NOAA Standard Specification MOC-100-1A_Abs Load Line Survey.pdf

PDF 26 KB Posted

Attached to
MO FY27 Thomas Jefferson Drydock REFERENCES and ATTACHMENTS
Solicitation number
1305M226Q0100REF
Issued by

About this file

This is a Standard Specification (MOC-100-1A) for ABS Load Line Survey services issued by the National Oceanic and Atmospheric Administration (NOAA) Marine Operation Center in August 2003, superseding AMC-100-1 from October 1988.

The specification establishes requirements for conducting an American Bureau of Shipping (ABS) Load Line Renewal Survey on NOAA ships to obtain a new Load Line Certificate. Key service requirements include: providing an ABS Surveyor to conduct the survey; furnishing staging, scaffolding, and manlifts for inspections; developing a written survey schedule in consultation with the ABS Surveyor and submitting it to the Contracting Officer's Technical Representative (COTR) within 48 hours of contract start; and conducting ultrasonic thickness (UT) gaging of shell plating, decks, bulkheads, and other structural members at locations specified by the ABS Surveyor and COTR. Workers performing UT gaging must be certified as Level Two craftsmen by the American Society for Non-Destructive Testing per SNT TC-1A (latest edition), with certificates provided to the COTR prior to work performance. UT results must be documented in tables and schematic diagrams submitted in three copies to the COTR.

Tank inspection requirements include opening, cleaning, and ventilating specified tanks with gas-free certificates issued by a Marine Chemist certified by the National Fire Protection Association. The contractor must prepare a Liquid Transfer/Removal Plan prior to drydocking and manage fuel and lube oil transfer and storage per specified procedures, including metering removal and return quantities with calibrated meters and laboratory analysis to verify oil quality. Sludge and waste oil tanks must have contents properly disposed of off-ship. After ABS inspection and COTR acceptance, tanks must be closed using new gaskets with renewed fasteners, followed by a 2.0 psig air test. The contractor must submit or ensure ABS submission of the ABS Report of Annual Load Line Inspection form and original and one copy of the new Load Line Certificate to Marine Operations Center - Pacific, Seattle, Washington. The specification notes that most work occurs during ship drydocking, covered under a separate specification item.

View the file

Other files

File Type Posted
04950 - 04950SS 50MM TO 200MM.jpg JPG image
04004139a.pdf PDF
0400382d.PDF PDF
VDT-TM-91534-35 Technical User Manual Davit HN-9003 cover sheet.pdf PDF
TJ-573-01 Cranes Deck and Boom O M.pdf PDF
TJ-573-01 Cranes Deck and Boom O M_weight chart.pdf PDF
TJ-573-01-1_Fwd Crane - hydraulic pump supplemental parts info.pdf PDF
0400427a.pdf PDF
3.1 CERTIFICATE.pdf PDF
0400426f.pdf PDF
0400426.PDF PDF
VDT-IM-91534-35 User manual for installation of davit HN-9003 POEA-133M-15CN-0139MOA2-11(14) rev.00..pdf PDF
602-6634905_Hull Label Plates.pdf PDF
TJ-241-01 Reduction Gear Main Propulstion RS2719S (1).pdf PDF
DirecTV Configuration.pdf PDF
Davit Hose Inventory.xlsx XLSX spreadsheet
TJ-562-001A Rudder Arrangment and Details_102457373.pdf PDF
Steyr Motors Marine Engines Manual.pdf PDF
Valeport Skin Valve Drawing.pdf PDF
Quincy QR-25 Series Model 350.pdf PDF
Register of Lifting Appliances_fillable.pdf PDF
320-6634679_Cableway Arrangement and Details.pdf PDF
TJ-528-010A - Waste Water Tank Structural Modifications_102021653.pdf PDF
NOAA Standard Specification MOC-573-2 Overhaul Repair of Hydraulic Cylinders.pdf PDF
801-6634641_Table of Offsets.pdf PDF
TJ-311-05 Engine Ship_s Service Generator Series 60.pdf PDF
624-6634931 Joiner Door Schedule.pdf PDF
501-6634831_Piping Module No 3.pdf PDF
259-6634766 Engine Exhaust System.pdf PDF
48026A-GI INDUSTRIAL-NOAA T JEFFERSON-POTBD_UTT.pdf PDF
TJ-583-023C Davit Hydraulic Modifications.pdf PDF
625-6634893J_Doors Hatches Windows and Airports.pdf PDF
TJ-436-001 Fire Detection and Alarm System.pdf PDF
eCFR __ 46 CFR Part 160 Subpart 160.151 -- Inflatable Liferafts (SOLAS).pdf PDF
NOAA Standard Specification AMC-634-1A_Deck Coverings.pdf PDF
501-6634830 Piping Module No 2.pdf PDF
NAVSEA Standard Item 009-32_Cleaning and Painting Requirements.pdf PDF
ABS Marine Vessel Rules.pdf PDF
TJ-233-01 Detroit Diesel 6V92.pdf PDF
TJ-651-02 Grease interceptor Gaylord Hood.pdf PDF
TJ-568-004D Bow Thruster Installation.pdf PDF
101-6634869 Structural Module 10.pdf PDF
633-67635_Installation Drawing ICCP Equipment.pdf PDF
TJ-635-6634624_Insulation Layout and Details.pdf PDF
512-6634841_ HVAC Diagram.pdf PDF
261-6634755D Fuel Oil Service Diagram.pdf PDF
436-6634706 Rev C_ACCU elementary wiring diagram - redline.pdf PDF
TJ-311-01 EDG Engine.pdf PDF
NF 57-07-12 - DryDock-UWILD Inspection Checklist (public).pdf PDF
TJ-233-03 EMD Engine 12-645F7B.pdf PDF
Show 40 more

Latest 50 of 214 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MOC-100-1A

August 2003

Superceding

AMC-100-1

October 1988

NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA)

MARINE OPERATION CENTER

STANDARD SPECIFICATION MOC-100-1A

ABS LOAD LINE SURVEY

1. SCOPE. This specifications contains the requirements for conducting an American Bureau of Shipping (ABS) Load Line Renewal Survey on NOAA ships.

2. REFERENCES.

None

3. REQUIREMENTS.

3.1 General.

3.1.1 Provide the services of an ABS Surveyor to conduct a

Load Line Renewal Survey to the extent necessary to obtain a new Load Line Certificate.

3.1.2 Provide staging, scaffolding, and manlifts as

required for inspections by the ABS Surveyor and for performing the other work required by this specification.

3.2 Survey Schedule.

3.2.1. Develop, in consultation with the ABS Surveyor, a

written survey schedule that lists the items to be inspected and the scheduled dates and times of the inspections. Submit the survey schedule to the COTR within 48 hours after the start of the contract performance period.

3.2.2 The survey schedule shall list all initial

inspections required by the ABS Surveyor, including a listing of all items which may be covered by other contract items.

3.3 Ultrasonic Tests (UT) for Thickness Gaging.

3.3.1 Conduct UT thickness gagings of shell plating, decks, bulkheads, and other structural members in locations specified by the ABS Surveyor and the COTR.

3.3.2 Prepare the steel surfaces as required to obtain

accurate UT thickness readings. After readings have been taken, restore coating systems to that which existed before the surfaces were prepared.

3.3.3 Workers performing the UT thickness gaging shall be

certified as Level Two craftsmen by the American Society for Non- Destructive Testing in accordance with Recommended Practice No.

SNT TC-1A, (latest edition). Copies of the workers' certificates shall be provided to the COTR prior to performing the gaging.

3.3.4 The results of the UT thickness gaging shall be

recorded as follows:

a. Prepare a table which lists for each gage reading the location, actual thickness, original thickness, percentage of wastage, and recommendations (if any).

b. Prepare schematic diagrams of the shell plating, decks, bulkheads, and other structural members which reflects the approximate location of each reading and the actual reading obtained at each location.

3.3.5 Submit 3 copies of the table and diagrams to the

COTR.

3.3.6 Except for removal and restoration of coatings, or

unless otherwise specified in the Detail Specifications, removal and restoration of deck coverings, insulation, and other interferences are not required in order to take UT readings.

3.4 Tank Inspections.

3.4.1 Open, clean, ventilate, and take all other action

needed to make each specified tank safe for entry of workers.

Post a gas-free certificate, issued by a Marine Chemist certified by the National Fire Protection Association, near the access opening to each tank. Provide a copy of each gas-free certificate to the COTR.

3.4.2 Prior to drydocking the ship, prepare a Liquid

Transfer/Removal Plan outlining a comprehensive procedure for transfer and removal of all liquids in the tanks to be inspected.

Included shall be the quantities and location of liquids to be transferred between tanks and the quantities and location of liquids to be removed, stored, disposed of and returned. If transfer of liquids while the ship is drydocked is planned, the dockmaster shall approve the Plan. A copy of the Plan shall be submitted to the COTR at least 3 work days prior to drydocking the ship.

3.4.3 When fuel and lube oil tanks are required to be

opened for inspection, the following shall apply:

a. When requested by the contractor, NOAA will transfer fuel between onboard available fuel tanks by pumping out the fuel to the low suction level using the ship's installed fuel transfer system. In the event the ship's installed fuel transfer pump or system has been disabled by the contractor in conjunction with other work, the contractor shall transfer the fuel.

b. If circumstances or requirements make transfer between tanks of some or all the fuel to be impracticable, the contractor shall pump the fuel from the tanks to clean moisture-free dockside storage tanks. The contractor may pump and store as much of the fuel off the ship as desired. After the onboard fuel tanks have been closed, return the fuel through filters to the tanks.

c. In lieu of storing the fuel oil, the contractor may elect to properly dispose of the fuel oil removed from the ship.

If so, provide new fuel oil, through fuel filters, of the same quality and the same quantity as that removed.

d. For each lube oil tank required to be opened for inspection, pump all lube oil into clean moisture-free dockside storage tanks and return to the lube oil tank through filters after inspections have been completed.

e. All fuel and lube oil being removed from the ship shall be metered with a calibrated meter during off-loading and during return to verify that the same quantity is returned as was removed. In addition, test samples shall be taken of the oils being removed and the oils being returned. The samples shall be analyzed by a lab to verify the quality of the oils being returned is equal or better than that removed. Provide copies of lab reports to the COTR.

f. Thoroughly clean all opened fuel and lube oil tanks of all sludge, dirt, loose scale, dirt, debris, growth, water, and other contaminants prior to closing.

3.4.4 If sludge or waste oil tanks are required to be

inspected, pump and properly dispose of the contents of the tanks off the ship.

3.4.5 Except as otherwise specified, NOAA will pump down all

tanks to the low suction level of the installed ship's piping system. The contractor shall pump out and properly dispose of all remaining water, fuel, sludge, and other tank contents.

3.4.6 Rig sufficient lighting in each opened tank to allow a

thorough inspection.

3.4.7 After all tanks have been inspected by the ABS

Surveyor and when accepted by the COTR, close each opened tank using new gaskets. Renew all missing and broken fasteners and use dies to rechase all manhole cover stud threads. Notify the COTR at least four hours in advance of closing each tank.

Immediately prior to closing each tank, the COTR or a member of the ship's engineering force will inspect the tanks interior to verify that rags or other residual debris has not been left.

3.4.8 Perform a 2.0 psig air test on each tank after

closing. Hold the pressure and check manhole covers for leaks using a soapy water solution.

3.5 ABS Documents. Submit, or have ABS submit, the following

ABS-prepared documents to Marine Operations Center - Pacific, 1801 Fairview Ave East, Seattle, WA 98102:

3.5.1 Copy of ABS Report of Annual Load Line Inspection

form.

3.5.2 The original and one copy of a new Load Line

Certificate.

4. NOTES.

4.1 The following information will be provided in the Detail

Specification or other procurement document:

4.1.1 The number of UT thickness gage readings required.

4.1.2 The tanks required to be opened for inspections.

4.1.3 The quantity of fuel and lube oil which will be

onboard the ship at the start of the contract performance period.

4.1.4 The total capacity of the ship's fuel tanks.

4.2 Most of the work required by this specification must be

accomplished while the ship is drydocked. A separate specification item will cover the detail requirements for drydocking the ship.

END OF SPECIFICATION