NOAA Form 57-17-09 - Hot Work Permit.pdf

NOAA Form PDF 135 KB Posted

Attached to
1305M223QNMAN0122 - NOAA's Ship Thomas Jefferson Drydock FY 2024
Solicitation number
1305M223QNMAN0122
Issued by

About this file

This document is a hot work permit template for the National Oceanic and Atmospheric Administration (NOAA). The template requires certification that the hot work operator and equipment are properly trained and equipped with personal protective equipment including respirators. Locations where welding, cutting, brazing, grinding, sandblasting, or chipping will take place must be examined by a competent person to ensure oxygen and gas levels are safe and that ventilation, smoke detectors, fire watches, and fire extinguishing equipment are in place. Approval from the chief marine engineer, officer of the deck, and commanding officer is required before commencing any hot work. Fire watches must be assigned for the full work duration and 30 minutes after, including breaks.

View the file

Other versions and copies of NOAA Form 57-17

Who attaches NOAA Form 57-17

Other files

File Type Posted
Thomas Jefferson - Hull Transducer Suite looking aft FY2022.pdf PDF
101-6634867 Structural Module 8_1.pdf PDF
Thomas Jefferson_FY2024 Drydock Repair Package_20JUN2023_Rev (A).pdf PDF
NOAA Thomas Jefferson Site Survey Telephone Layout Rev1_1.pdf PDF
101-6634861 Structural Module 2.pdf PDF
624-6634931 Joiner Door Schedule.pdf PDF
TJ-085-002G_Booklet_of_General_Plans_1.pdf PDF
iXBlue QUADRANS - User Manual.pdf PDF
Spurs Rope Cutter MV-19_15.pdf PDF
TJ-562-001A Rudder Arrangment and Details_102434736.pdf PDF
NIX-D03066A_NETANSN1_UM_compressed_1.pdf PDF
LM 584 Rev B.pdf PDF
NOAA Thomas Jeffersonr2_XLS_Zenitel.xls XLS spreadsheet
101-6634869 Structural Module 10.pdf PDF
Amendment_0003_1305M223QNMAN0122_(1).pdf PDF
101-6634868 Structural Module 9.pdf PDF
101-6634860 Structural Module 1.pdf PDF
TJ-079-03G - TJ Trim _ Stability Booklet Rev G (4-19)_131122258_131204790.pdf PDF
Amendment_0002_1305M223QNMAN0122_Signed.pdf PDF
TJ-180-001_Generic_Winch_Foundation.pdf PDF
Amendment_0001_1305M223QNMAN0122_Signed.pdf PDF
TJ_FY2024_Fire System Inventory_SCBA Packs.pdf PDF
TJ_FY2024_Fire System Devices.pdf PDF
TJ_FY2024_Fire System_Portable Fire Extinguishers.pdf PDF
436-6634706 Rev C_ACCU elementary wiring diagram - redline.pdf PDF
TJ-583-02A Allied Marine Crane Manual 80-1286.pdf PDF
101-6634906 Structural standards.pdf PDF
TJ-304-001 MCT Locations Rev1.pdf PDF
TJ-593-007 SEWAGE TANK AERATION SYSTEM INSTALLATION_124644075.pdf PDF
Kongsberg124786 Rev -_Gondola Installation Drawing Outline.pdf PDF
TJ-079-03E Trim _ Stability Booklet_101947795.pdf PDF
501-6634830 Piping Module No 2.pdf PDF
NOAA General Technical Requirements (GTR) Rev -.pdf PDF
320-6634679_Cableway Arrangement and Details.pdf PDF
528-6634786D Plumbing and Deck Drain Arrangement.pdf PDF
NOAA Standard Specification AMC-300-1_Overhaul of Electrical Rotating Machinery.pdf PDF
ATTACHMENT D4 U S DOL POSTER.pdf PDF
556-6634805C Hydraulic Systems Info.pdf PDF
TJ-512-004_-_HVAC Makeup Air Modifications.pdf PDF
512-3275003-9 HVAC MODS 2ND DECK _ BLW REV B.pdf PDF
TJ-436-02 FireBoy - Owners Manual _ Install Instructions.pdf PDF
512-3275003-8 HVAC MODS MN DECK REV B.pdf PDF
TJ-331-002 LIGHTING MODS INCID TO SEWAGE TANK AERATION SYSTEM_124586215.pdf PDF
437-6634704 Tank Level Indicating Sys EWD - redline.pdf PDF
426-6634694 Gyro Compass Sys.pdf PDF
501-6634831_Piping Module No 3.pdf PDF
TJ-324-002 POWER MODS INCID TO SEWAGE TANK AERATION SYSTEM_124585409.pdf PDF
TJ-461A-001C Transducer Installation_102018594.pdf PDF
301-001B_Electrical One Line Dia.pdf PDF
321-3274004-2A HVAC Electrical Pwr Mods Incdt HVAC Mods.pdf PDF
Show 40 more

Latest 50 of 226 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. DEPARTMENT OF COMMERCE NOAA Form 57-17-09

(1-17) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION

HOT WORK PERMIT

THIS PERMIT IS VALID FOR NO MORE THAN 12 HOURS FROM THE TIME ISSUED

NOAA SHIP Check one

PRECAUTIONS

Met N/A

PERMIT

ISSUED

DATE TIME

Hot work operator is certified to perform the hot work indicated.

PERMIT

EXPIRES

DATE TIME

Hot work operator is equipped with appropriate PPE, including respirator.

TYPE of HOT WORK PERMITTED

WELDING CUTTING

BRAZING GRINDING

SANDBLASTING CHIPPING

Hot work equipment is fully operable and is in good condition.

Hot work shielding is provided to protect others from arc.

LOCATION of PERMITTED HOT WORK Competent Person measured oxygen and explosive gas levels. Certified area safe for hot work.

Marine Chemist issued a “ Safe for Hotwork” certificate, as required for Confined Space.

HOT WORK OPERATOR Sufficient ventilation is provided to remove smoke and vapor from the hot work area.

CREWMEMBER CONTRACTOR

Local smoke and heat detection system is secured in hot work area (if practical).

FIRE WATCH PERSONNEL

Marine Chemist issued a “Safe for Hot Work” certificate for locations within or near combustible liquid tanks.

Gas cylinders, manifolds and electric arc units are located outside of the confined space designated for hot work.

CREWMEMBER CONTRACTOR

Combustible materials are removed from hot work area, draped with fire proof cloths or protected with metal shields.

RESTRICTIONS / COMMENTS In adjacent spaces, flammable liquids are removed and combustible materials are moved away from the bulkheads.

In the hot work area and adjacent spaces, Fire Watch personnel are assigned, as required.

SIGNATURE of COMPETENT PERSON Fire Watch personnel are supplied with operable fire extinguishing equipment, ready for immediate use.

I verify the above location has been examined, fire prevention precautions have been taken, and permission for hot work is authorized.

Fire Watch personnel are trained in the use of fire extinguishing equipment and sounding the fire alarm.

CHIEF MARINE ENGINEER (CERTIFIES AREA SAFE for HOT WORK) Fire Watch is assigned for the full period of hot work, plus 30 minutes, including all hot work break periods.

OOD (at COMMENCEMENT of HOT WORK) Fire Watch personnel have established radio communications with the hot work operator and the OOD.

COMMANDING OFFICER (APPROVES HOT WORK PERMIT) Electrical equipment in the hot work area is de-energized. Lock out / Tag out notification posted, as required.

NOAA SHIP:
DATE:
TIME:
DATE_2:
TIME_2:
WELDING: Off
BRAZING: Off
SANDBLASTING: Off
CUTTING: Off
GRINDING: Off
CHIPPING: Off
CREWMEMBER: Off
CONTRACTOR: Off
CREWMEMBER_2: Off
CONTRACTOR_2: Off
RESTRICTIONS COMMENTS:
HOT WORK OPERATOR:
LOCATION of PERMITTED HOT WORK:
FIRE WATCH PERSONNEL:
VENT: Off
PERMIT: Off
SHIELD: Off
OPERABLE: Off
EQUIPPED: Off
CERTIFIED: Off
DETECTION: Off
SAFE: Off
CYLINDERS: Off
DRAPED: Off
ADJACENT: Off
FW EQUIP: Off
FW TRAIN: Off
FW 30: Off
FW RADIO: Off
LOTO: Off
RESET:
O2 GAS: Off
FW ASSIGN: Off