Section E - Inspection and Acceptance
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NNJ16567749R Specialized Engineering, Aeronautics, and Manufacturing Section E
E. INSPECTION AND ACCEPTANCE
E.1 CLAUSES INCORPORATED BY REFERENCE
Clause(s) at the beginning of this Section are incorporated by reference, with the same force and effect as if they were given in full text. Clauses incorporated by reference which require a fill-in by the Government include the text of the affected paragraph(s) only. This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding and complying with the entire clause.
The following contract clauses pertinent to this section are hereby incorporated by reference:
I. FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1)
CLAUSE
| NUMBER | DATE | TITLE | |
| 52.246-2 | AUG 1996 | INSPECTION OF SUPPLIES - FIXED-PRICE | |
| 52.246-4 | AUG 1996 | INSPECTION OF SERVICES - FIXED-PRICE | |
| 52.246-6 | MAY 2001 | INSPECTION - TIME-AND-MATERIAL AND LABOR-HOUR | |
| 52.246-7 | AUG 1996 | INSPECTION OF RESEARCH AND | |
| DEVELOPMENT – FIXED-PRICE | |||
| 52.246-16 | APR 1984 | RESPONSIBILITY FOR SUPPLIES | |
| II. | NASA FAR SUPPLEMENT (48 CFR CHAPTER 18) PROVISIONS |
CLAUSE
NUMBER DATE TITLE
NONE INCORPORATED BY REFERENCE
(End of Clause)
E.2 INSPECTION AND ACCEPTANCE
Final inspection and acceptance shall be accomplished by the Contracting Officer or his/her duly authorized representative.
(End of Clause)
E.3 GOVERNMENT CONTRACT QUALITY ASSURANCE FUNCTIONS (NFS 1852.246-71) (OCT 1988)
In accordance with the inspection clause of this contract, the Government intends to perform the following functions at the locations indicated:
| Quality Assurance Function | Quality Assurance Location | |
| Final Inspection and Acceptance | NASA/JSC, and NASA/JSC Ellington Field, NASA El Paso Forward Operating Location (FOL), Sonny Carter Test Facility, and other locations as defined by task orders |
(End of Clause)
E.4 MATERIAL INSPECTION AND RECEIVING REPORT (NFS 1852.246-72)(APR 2015)
(a) At the time of each delivery to the Government under this contract, the Contractor shall prepare and furnish a Material Inspection and Receiving Report (DD Form 250 series). The forms shall be prepared and distributed as determined by task order.
(b) The Contractor shall prepare the DD Form 250 in accordance with NASA FAR Supplement 1846.6. The Contractor shall enclose the copies of the DD Form 250 in the package or seal them in a waterproof envelope, which shall be securely attached to the exterior of the package in the most protected location.
(c) When more than one package is involved in a shipment, the Contractor shall list on the DD Form 250, as additional information, the quantity of packages and the package numbers. The Contractor shall forward the DD Form 250 with the lowest numbered package of the shipment and print the words "CONTAINS DD FORM 250" on the package.
(End of Clause)
[END OF SECTION]