Amendment_1_-_SEAM_Sec_L_-_L_16_3_-_Past_Performance_Questionnaire.docx

DOCX document 56 KB Posted

Attached to
SPECIALIZED ENGINEERING AERONAUTICS AND MANUFACTURING Federal contract opportunity
Solicitation number
NNJ16567749R
Issued by
National Aeronautics and Space Administration Johnson Space Center

About this file

Amendment 1 - SEAM Sec L - L_16_3 - Past Performance Questionnaire

View the file

Other files for this federal contract opportunity

Other files attached to SPECIALIZED ENGINEERING AERONAUTICS AND MANUFACTURING, newest first.
File Type Posted
SEAM_Source_Selection_Statement.pdf PDF
Amendment_3_-_SEAM_Sec_L_-_Instructions_Conditions_and_Notices_to_Offerors.docx DOCX document
Amendment_3_-_SEAM_Questions_and_Answers_Part_3.docx DOCX document
Amendment_3_-_SEAM_NNJ16567749R.pdf PDF
Amendment_3_-_SEAM_Sec_A_-_Coversheet_and_Table_of_Contents.pdf PDF
Amendment_3_-_SEAM_Sec_H_-_Special_Contract_Requirements.docx DOCX document
Amendment_2_-_SEAM_NNJ16567749R.pdf PDF
Amendment_2_-_SEAM_Sec_L_-_Instructions_Conditions_and_Notices_to_Offerors.docx DOCX document
Amendment_2_-_SEAM_Questions_and_Answers_Part_2.docx DOCX document
Amendment_1_-_SEAM_NNJ16567749R.pdf PDF
Amendment_1_-_SEAM_Sec_L_-_Instructions_Conditions_and_Notices_to_Offerors.docx DOCX document
Amendment_1_-_SEAM_Sec_M_-_Evaluation_Factors_for_Award.docx DOCX document
Amendment_1_-_SEAM_Questions_and_Answers_Part_1.docx DOCX document
Amendment_1_-_SEAM_Sec_I_-_Contract_Clauses.docx DOCX document
Amendment_1_-_SEAM_Sec_J_-_List_of_Documents_Exhibits_and_Other_Attachments.docx DOCX document
Amendment_1_-_SEAM_Sec_L_-_L_16_5_-_Price_Templates.xlsx XLSX spreadsheet
Amendment_1_-_SEAM_Sec_A_-_Coversheet_and_Table_of_Contents.pdf PDF
SEAM_Sec_L_-_L_16_2__Past_Performance_Reference_Table.xlsx XLSX spreadsheet
SEAM_Sec_F_-_Deliveries_and_Performance.docx DOCX document
SEAM_Sec_E_-_Inspection_and_Acceptance.docx DOCX document
SEAM_Sec_D_-_Packaging_and_Marking.docx DOCX document
SEAM_Sec_M_-_Evaluation_Factors_for_Award.docx DOCX document
SEAM_Sec_G_-_Contract_Administration_Data.docx DOCX document
SEAM_Sec_H_-_Special_Contract_Requirements.docx DOCX document
SEAM_Sec_A_-_Coversheet_and_Table_of_Contents.pdf PDF
SEAM_Sec_B_-_Supplies_or_Services_and_Prices.docx DOCX document
SEAM_Sec_C_-_Statement_of_Work.docx DOCX document
SEAM_RFP_NNJ16567749R_-_Cover_Letter.pdf PDF
SEAM_Sec_L_-_Instructions _Conditions _and_Notices_to_Offerros.docx DOCX document
SEAM_Sec_L_-_L_16_5_Price_Templates.xlsx XLSX spreadsheet
SEAM_Sec_I_-_Contract_Clauses.docx DOCX document
SEAM_Sec_J_-_List_of_Documents _Exhibits_and_Other_Attachments.docx DOCX document
SEAM_Sec_K_-_Representations _Certifications _and_Other_Statements_to_Offerors.docx DOCX document
SEAM_Sec_L_-_L_16_3__Past_Performance_Questionaire.docx DOCX document
SEAM_Sec_L_-_L_16_1__Relevant_Past_Performance_Matrix.xlsx XLSX spreadsheet
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NNJ16567749R Specialized Engineering, Aeronautics, and Manufacturing Section L – Amendment 1

Attachment L.16.3 - Past Performance Questionnaire

Specialized Engineering, Aeronautics, and Manufacturing (SEAM)
Solicitation No. NNJ16567749R

Delete any capabilities tables in the Appendix for any Task Categories for which you are NOT proposing before transmitting to the reference for completion.

Transmittal Letter to Accompany Present/Past Performance Questionnaire

FROM:

SUBJECT: Present/Past Performance Questionnaire for Contract(s):

We are currently responding to NASA Johnson Space Center’s (JSC’s) Request for Proposal (RFP). This RFP requires Offerors to identify customers and solicit their response regarding our performance.

We are providing present and past performance data to NASA JSC relating to our performance on contract ___________________ (contract name/number). The RFP instructs that we provide our customers with the attached questionnaire and requests that you provide requested data and submit it by Thursday, March 31, 2016, directly to via email:

Contract Name: Specialized Engineering, Aeronautics, and Manufacturing
Attn: Portia Simone Keyes/BR
NASA Johnson Space Center
Email address: portia.s.keyes@nasa.gov

The information contained in the completed Past Performance Questionnaire is considered sensitive and cannot be released to us, the Offeror. If you have any questions about the acquisition or the attached questionnaire, your questions must be directed back to the JSC point of contact identified above. Thank you for your timely assistance.

Sincerely, (Company Official)

OFFEROR IDENTIFICATION

Please provide the following information:

1. Contractor Information Company:

Division:

Mailing Address:

2. Contract Number:

3. Contract Type:

4. Product/Service Description:

5. Contract Award Date:

6. Period of Performance (basic and any options):

7. During this contract period of performance, this firm was the:

|_| Prime Contractor|_| Significant Subcontractor|_| Team Member
|_| Other (please describe): _____________________________

What percentage of the Total Contract Value for this contract did the firm perform, and what is the Total Contract Value?

Percentage of work performed by contractor ___________;

Total contract value ___________

8. Does a corporate or ownership relationship exist between the contractor being evaluated and your organization?

|_| No |_| Yes – If yes, please describe the relationship:_______________________

9. Unusual contract features or conditions: _____________________________________________________

RESPONDENT INFORMATION

1. Name of evaluator: _________________________________________________________

2. Position title: ______________________________________________________________

3. Agency/Company

Name:___________________________________________________
Mailing Address:_______________________________
_______________________________
_______________________________
Telephone Number:_______________________________
Facsimile Number: _______________________________
E-Mail Address:_______________________________

4. Your role in the program/contract:

5. Length of involvement in this program/contract: _____________________

6. Date questionnaire completed: _______________________

Past Performance Evaluation

Based on your knowledge of the contract identified above, please provide your assessment of how well the contractor performed on each of the following questions. It is very important to keep in mind that only performance in the past 5 years is relevant.

Please rate the contractor as described below in the following technical, schedule, contract management and cost performance, and general areas.

Excellent (E) – Of exceptional merit, exemplary performance in a timely, efficient and economical manner, very minor (if any) deficiencies with no adverse effect on overall performance.

Very Good (VG) – Very effective performance, fully responsive to contract requirements; contract requirements accomplished in a timely, efficient, and economical manner for the most part, only minor deficiencies.

Good (G) – Effective performance, fully responsive to contract requirements; reportable deficiencies, but with little identifiable effect on overall performance.

Satisfactory (S) – Meets or slightly exceeds minimum acceptable standards, adequate results; reportable deficiencies with identifiable, but not substantial, effects on overall performance.

Poor/Unsatisfactory (P) – Does not meet minimum acceptable standards in one or more areas; remedial action required in one or more areas; deficiencies in one or more areas which adversely affect overall performance.

Not Applicable – Contractor not required to provide the service or product indicated.

Technical Performance Category
N/A
P
S
G
VG
E

1. Overall quality of technical services, products and/or support

2. Compliance with technical requirements and performance standards

3. Insight in understanding customer requirements and priorities

4. Initiative in identifying and resolving unforeseen technical and schedule problems (causes, impacts, and resolutions)

5. Surveillance, and management of major/critical subcontractors

6. Contractor’s ability to correct performance deficiencies

7. Ability to use metrics and other tools to accurately measure and track project/task

8. Record in demonstrating a thorough understanding of the nature of the work required and the disciplines required to accomplish them

9. Record in identifying and mitigating risks

10. Please give a short narrative as to why you chose the adjective you did for the 9 areas above, especially for those answers that are other than “satisfactory.”

11. Other particular strong/weak points of contractor’s technical performance.

12. Please complete the Capabilities Table provided in the Appendices. There are up to 5 task categories related to the SEAM statement of work.

Schedule Performance Category
N/A
P
S
G
VG
E

1. Ability to provide a qualified workforce to fulfill schedule requirements

2. Content, accuracy, and timeliness of technical reports

3. Adherence to task schedules

4. Timeliness and accuracy of cost and business reports

5. Record in completing technical tasks/milestones, deliverables within established schedules

Contract Management And Cost Performance
N/A
P
S
G
VG
E

1. Adherence to estimated price/costs and contract price/cost targets

2. Ability to effectively plan efforts, provide realistic cost and schedule estimates, etc

3. Ability to forecast and control costs

4. Task order change management (discuss contractor commitment to negotiate and implement changes in a timely manner)

5. Rate the contractor’s record in effectively selecting and managing subcontractors

6. Rate the contractor’s history of reasonable and cooperative behavior and commitment to customer satisfaction

7. Record in managing multiple and diverse projects/tasks from planning through execution phases

8. Record in adhering to or ability to meet goals for Small Business Subcontracting Goals

12. Was there a cost overrun/under-run? |_| No |_| Yes – If yes, what was the magnitude? Please explain:

13. Has the contract been partially or completely terminated for default or convenience? |_| No |_| Yes – If yes, please explain the reason for termination (i.e., inability to meet cost or delivery schedules, performance, etc.:

General
N/A
P
S
G
VG
E

1. Rate the contractor’s record in recruiting, maintaining, and managing a workforce with the required skill mix:

2. Rate the contractor’s compliance with export control requirements:

3. Rate the contractor’s record in complying with safety, health, and environmental procedures/requirements:

4. Record in establishing and maintaining an effective quality assurance program and meeting quality improvement requirements:

5. Did any accidents or industrial illnesses resulting in lost time occur under this contract? |_| No |_| Yes – If yes, please provide details:

6. What practices ensure that the services provided by the offeror protect aircraft maintenance, pilots and employee safety?

7. What quality control program or other methods capable of identifying and correcting deficiencies has the offeror demonstrated?

8. Have any avionics, electronics, mechanical failures or service discrepancies resulted in loss or warranty claims by either the customer or other end user?

Past Performance Capabilities Table

In the Capabilities Table below, please indicate any skills you feel this contractor is capable of performing. Please indicate one of the following: None, Limited, or Extensive to indicate the contractor’s experience for that capability. If you have no experience with them for a skill, indicate Unkown.

Task Category A Aero Structural Engineering and Analysis

Critical Capabilities
Contractor’s Ability to Perform
Comments

Aircraft and Aircraft Systems flight Testing and Support, specifically:

Loads determination

Detailed stress analysis

Detailed dynamic analysis

Fatigue analysis

Random, sine, and shock analysis

Aeroelastic analysis

Damage tolerance assessment (DTA)

Computational Fluid Dynamics, specifically:

Flow simulation, visualization and loads

Testing Services, specifically:

Stress/Strain testing of mechanical of electrical systems/components

Vibration testing

Task Category B Aero Mechanical Systems

Critical Capabilities
Contractor’s Ability to Perform
Comments

System and component obsolescence

Sustainment, alteration and improvement of aircraft mechanical systems, specifically of:

Landing gear, tires, wheels, brakes, anti-skid

Fuel systems

Hydraulics

Air Conditioning and pressurization

Pneumatics

Flight controls

Structural and Dynamic Analysis, specifically:

Loads Determination

Detailed Stress Analysis

Damage tolerance assessment (DTA)

Instructions for continued airworthiness

Task Category C Aero Avionics, Electrical and Software

Critical Capabilities
Contractor’s Ability to Perform
Comments

Avionics integration

Line Replaceable Unit (LRU) design and integration

Circuit design

Wire harness design

Payload electrical interface design

Software design and integration

System and component obsolescence

Instructions for continued airworthiness

Electrical Loads Analysis

Electromagnetic Interference (EMI) or Radio Frequency Interference (RFI) analysis

Troubleshooting using schematics and diagnostic equipment

Task Category D Ground Support Engineering Services

Critical Capabilities
Contractor’s Ability to Perform
Comments

Design modeling and drawing creation using CREO Parametric and AutoCAD software

Engineering analysis and support for mockup Center of Gravity, Center of Buoyancy, Net Buoyancy loads determination and Tip Over Analysis

Stress analysis and report generation

Hydraulic and Electro-Hydraulic systems design and integration for motion control systems

Electrical systems design and integration

Structural design including welded structures

Mechanical system design

Software design and integration

Lighting Systems design, test and integration

Reverse engineering

Manufacturing and Fabrication

Task Category E Fabrication and Provisioning

Critical Capabilities
Contractor’s Ability to Perform
Comments

Machining

Sheet metal work

Additive manufacturing such as ABS 3-D printing

Welding

Finishing

Soft Goods Production (sewing)

Electrical and electronics fabrication and assembly

General fabrication and assembly

Purchasing for projects as required