SENSE_RFP_QUESTIONS_AND_RESPONSES__1_rev.pdf
PDF 83 KB Posted
- Attached to
- Space Exploration Networks Services and Evolution (SENSE) Federal contract opportunity
- Solicitation number
- NNG17588638R
About this file
SENSE RFP Questions and Responses #1
View the file
Other files for this federal contract opportunity
Show all 50
Space Exploration Networks Services and Evolution (SENSE) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SENSE RFP QUESTIONS AND RESPONSES #1
!. Several questions were received requesting the status of documentation for the procurement library. Below is a compilation of documents and the status/location of each.
Document(s)
Disposition/Location
A recent SNQR review package, redacted Available in EAR library
List of the title and frequency of all hardware a facilities PMIs Added to elibrary
List of the titles of all work orders closed in the past year Added to elibrary
List of the titles of all open work orders Added to elibrary
SCNS Historical labor rate information Enclosed with RFP
ISS Flight Plan Will not be provided since RTO 3 was removed.
MOBLAS-4 Special Use Permit Available in elibrary MOBLAS-4 Infrastructure Requirements Available in elibrary
Laser Radiation Source Use Approval Available in EAR library
Laser Radiation Source Personnel Approval Added to elibrary
SCNS SLR Operations Center System Requirements Available in EAR library
Space Geodesy Project Information and Configuration Management Procedure
Available in elibrary
SLR Safety Logbook Added to elibrary SLR Safety Handbook Added to elibrary Network Operating Procedures Available in EAR library MOBLAS-4 through -8 Operating Procedures Available in EAR library
Station Operating Procedures for TLR-3/4 Available in EAR library
MOBLAS-4 through -8 Preventive Maintenance Procedures Available in EAR library
MOBLAS-4 through -8 Technical Manual Available in EAR library
TLRS-3/4 Technical Manual Available in EAR library
Consolidated Laser Ranging Data Format version 1.01 Available in elibrary
VLBI Pre-checks and Operations Manual Added to elibrary
VLBI KPGO Antenna System Maintenance Local Operating Procedure
Available in EAR library
SLR site survey report example Available in elibrary 450-PG-1310.1.1J Network Integration Process Available in EAR library
450.1-LIST-NEN Priority: Near Earth Network (NEN) Priority List Available in elibrary
450.1-LIST-SN Priority: Space Network (SN) Priority List Available in elibrary
Alert NO – Alert Notices Available at WSC library SCNS-NEN-LOP 0050 – White Sands One (WS1) Hardware Control (HWCNTRL) Manual Load of Ephemeris
Available at WSC library
SCNS-NEN-LOP 0051 - White Sands One (WS1) Hardware Control (HWCNTRL) Manual Loads and Modifications to Schedules
Available at WSC library
SCNS-NEN-LOP 0052 - White Sands One (WS1) Range Receive Command Processor (RPCP) Failover Procedure
Available at WSC library
SCNS-NEN-LOP 0053 - White Sands One (WS1) Standard Autonomous File System (SAFS) Shutdown/Restart & Server Reboot Procedure
Available at WSC library
SCNS-NEN-LOP 0054 - White Sands One (WS1) Standard Autonomous File System (SAFS) Cluster Manager Failover Procedure
Available at WSC library
SCNS-NEN-LOP 0055 - White Sands One (WS1) Standard Autonomous File System (SAFS) Backup and Restore RMFT Configuration Settings Procedure
Available at WSC library
SCNS-NEN-LOP 0056 - White Sands One (WS1) Programmable Available at WSC library
Telemetry Processor (PTP) Routine Maintenance Procedure
SCNS-NEN-LOP-0100 –
Scheduling Operating Procedures Available at WSC library
SCNS-NEN-LOP-0372 – Wallops Local Operating Procedures for the Operations Shift Supervisors
Available at WSC library
SN LOP X – SN Local Operating Procedures (LOPs) as identified in SN Local Operating Procedures Index Volumes I through XVII
Available at WSC library
SN TSI X – TDRS Special Instructions (TSI) as identified in TOCC Special Instructions
Available at WSC library
Task Order 179 (SMLA – Labor) SOW Available in EAR library
NEN Ka-band Project ESC Overview
This document will not be provided in the procurement library. It is not required for proposal preparation.
ILRS ACS Notifications Example Available in elibrary ILRS Report Card Example Available in elibrary
2. Question: Will the Government please clarify that in addition to the prime, Significant Subcontractors, and only Non-Significant service subcontractors that meet the definition in paragraph (d) of NFS provision 1852.231-71, Determination of Compensation Reasonableness, shall provide Exhibits 13A and 13B.
Response: Yes, the Offeror and ALL (i.e., Significant and Non- Significant) service subcontractors (as defined in paragraph (d) of NFS provision 1852.231-71 Determination of Compensation Reasonableness shall provide Exhibits 13A and 13B. These exhibits fulfill the Total Compensation Plan requirement under FAR provision 52.222-46 for Non-Significant Subcontractors.
3. Question: Per section L.13(a), a significant subcontractor is determined using the total proposed cost of all RTOs inclusive of fee, but exclusive of any Phase-in. Section L.13(5) requires that offerors use non-proposed costs to generate the Prime Offeror’s proposed elements of cost associated with performing each RTO. Please confirm that the non-proposed costs specified in Section L.13(5) are excluded from the calculation of percentage of subcontractor costs for the purposes of determining significant subcontractors.
Response: No, non-proposed costs must be included as part of the total proposed cost of all RTOs for the purpose of determining significant subcontractors.
4. Question: In the December 21, 2017 Answers to Offeror Questions regarding the SENSE DRFP, the Government stated that the dollar value threshold used to determine significant subcontractors for Past Performance as defined in Section L.14(a) would be based on the total value of all RTOs. This clarifying language was not provided in the final RFP.
For clarification of instructions provided in RFP Section L.14(a), will the Government please confirm how the average annual cost/fee $15M threshold is determined (e.g., price of RTOs, Maximum IDIQ Value, or some other factor).
Response: The dollar value threshold used to determine significant subcontractors for Past Performance as defined in Section L.14(a) shall be based on the total value of all RTOs. A RFP amendment is being prepared to include this clarification.