RFP__NIHOF2015030_-_AMEND__00003.pdf

PDF 662 KB Posted

Attached to
Electrical Vault 11 Transformer and Switchgear Replacement, ACRF, NIH Bethesda, MD
Solicitation number
NIHOF2015030
Issued by

About this file

RFP NIHOF2015030 - AMEND 00003

View the file

Other files

File Type Posted
RFP__NIHOF2015030_-_AMEND__00008.pdf PDF
RFP__NIHOF2015030_-_AMEND__00007.pdf PDF
RFP__NIHOF2015030_-_AMEND__00006.pdf PDF
RFP__NIHOF2015030_-_AMEND__00005.pdf PDF
RFP__NIHOF2015030_-_AMEND__00004.pdf PDF
RFP__NIHOF2015030_-_AMEND__00002.pdf PDF
A04_Past_Performance_Questionnaire_Part_I-II.pdf PDF
A18_Rpt_WO_12061908_ver_1_000.pdf PDF
RFP__NIHOF2015030_-_AMEND__00001.pdf PDF
A20_PPP_Vault_11_Access_Forum_06-16-14.pptx PPTX presentation
A19_Other_Transformer_PCB_Results_04-2013.pdf PDF
A09_Indirect_Cost_Worksheet_Sample.pdf PDF
RFP NIHOF2015030 - Final 12-15-2014.pdf PDF
A04_Past_Performance_Questionnaire_Part_I-II.pdf PDF
A01_Packaging_and_Delivery_of_Proposal_NonRD.pdf PDF
RFP__NIHOF2015030_-_Final_12-15-2014.zip ZIP file
A15_HHSAR-352.223-70-Safety-and-Health.pdf PDF
A16_Section_3-1_NIH_Facilities_Dev_Manual.pdf PDF
A03_Small_Business_Subcontracting_Plan.pdf PDF
A12_Offerors_Point_of_Contact.pdf PDF
A10_Proposal_Summary_and_Data_Record_NIH2043.pdf PDF
A08_DBWD_Mo_County.pdf PDF
A13_Disclosure_of_Lobbting_Activites_SFLLL.pdf PDF
A17_ORF_Contractor_Health_Safety_Provisions.pdf PDF
A06_Summary_of_Related_Activities.pdf PDF
A07_Proposal_Cost_Summary_Backup_Info.xlsx XLSX spreadsheet
A05_Similar_Project_Template.pdf PDF
A02_Proposal_Intent_Response_Form.pdf PDF
A11_Cert_Current_Cost.pdf PDF
A09_Indirect_Cost_Worksheet_Sample.xls XLS spreadsheet
A14_NIH_RC_2_Invoice_Instructions_FFP.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NIHOF2015030 - Electrical Vault 11 Transformer and Switchgear Replacement, ACRF, Bethesda Questions Answers

Site - Visit, December 19, 2014

PO - Project Officer CO - Contracting Officer

No. Response By

1 CO

2 WFT

3 PO

4 CO

5 WFT

6 WFT

7 WFT

8 WFT

9 WFT

10 WFT

11 CO

This is a Best Value selection. All evaluation factors other than cost or price, when combined, are significantly more important than cost. The Government will award the responsible Offeror(s) whose proposal in the Government’s estimation provides the greatest overall benefit in response to the requirement. Refer to Section M - Evaluation Factors for Award.

WFT - A/E

Answer

Yes; however, only in Vault 11 area.

The Government will dispose of the waste. Refer to:1) ARTICLE H.15.4. Material Delivery, Storage Areas, and Debris Removal and 2) Section C - Statement of Work, Complexity of work, Item H. Projects in Building 10/ACRF shall dispose of construction debris and trash in the B-2 level loading dock dumpsters.

Sec - NIH Security Safe - NIH Safety

Is a structural study required for the slab?

Are feeders to be replaced?

Is NIH supplying the crane in Vault 11?

Is the Contractor to leave load banks?

How does the technical proposal weigh vs. the cost proposal?

No, the structural analysis is complete.

Yes, turn over to the Government

Will there be an opportunity for another site visit(s) with subcontractors?

Where is the mezzanine to be located in Vault 11?

Are the transformers sole-sourced?

Please forward this request in writing to the CO. NIH will take request(s) into consideration.

The mezzanine is located across the entire footprint of the Vault.

No

Question

Are photos allowed during the Site Visit

Who keeps the scrap?

Yes, some - refer to the drawings and specs.

No, its part of the Contractor's supplied equipment and will remain permanently with the project.

How defined are the drawings; is nameplate data on the drawings?

The drawings are not defined to that level. The transformers and switchgear are going away; therefore nameplate is not detailed.

Site - Visit, December 19, 2014

No. Response By

Answer

Question

Site - Visit, December 19, 2014

No. Response By

Answer

Question

Scan
Pre-Proposal Walk-thru Q As dated 12-19-14
Sheet1

Site Visit Attendee Lists

File details come from the government source that posted it. Updated .