A09_Indirect_Cost_Worksheet_Sample.xls

XLS spreadsheet 66 KB Posted

Attached to
Electrical Vault 11 Transformer and Switchgear Replacement, ACRF, NIH Bethesda, MD
Solicitation number
NIHOF2015030
Issued by

About this file

Attachment 09

View the file

Other files

File Type Posted
RFP__NIHOF2015030_-_AMEND__00008.pdf PDF
RFP__NIHOF2015030_-_AMEND__00007.pdf PDF
RFP__NIHOF2015030_-_AMEND__00006.pdf PDF
RFP__NIHOF2015030_-_AMEND__00005.pdf PDF
RFP__NIHOF2015030_-_AMEND__00004.pdf PDF
RFP__NIHOF2015030_-_AMEND__00003.pdf PDF
RFP__NIHOF2015030_-_AMEND__00002.pdf PDF
A04_Past_Performance_Questionnaire_Part_I-II.pdf PDF
A18_Rpt_WO_12061908_ver_1_000.pdf PDF
RFP__NIHOF2015030_-_AMEND__00001.pdf PDF
A20_PPP_Vault_11_Access_Forum_06-16-14.pptx PPTX presentation
A19_Other_Transformer_PCB_Results_04-2013.pdf PDF
A09_Indirect_Cost_Worksheet_Sample.pdf PDF
RFP NIHOF2015030 - Final 12-15-2014.pdf PDF
A04_Past_Performance_Questionnaire_Part_I-II.pdf PDF
A01_Packaging_and_Delivery_of_Proposal_NonRD.pdf PDF
RFP__NIHOF2015030_-_Final_12-15-2014.zip ZIP file
A15_HHSAR-352.223-70-Safety-and-Health.pdf PDF
A16_Section_3-1_NIH_Facilities_Dev_Manual.pdf PDF
A03_Small_Business_Subcontracting_Plan.pdf PDF
A12_Offerors_Point_of_Contact.pdf PDF
A10_Proposal_Summary_and_Data_Record_NIH2043.pdf PDF
A08_DBWD_Mo_County.pdf PDF
A13_Disclosure_of_Lobbting_Activites_SFLLL.pdf PDF
A17_ORF_Contractor_Health_Safety_Provisions.pdf PDF
A06_Summary_of_Related_Activities.pdf PDF
A07_Proposal_Cost_Summary_Backup_Info.xlsx XLSX spreadsheet
A05_Similar_Project_Template.pdf PDF
A02_Proposal_Intent_Response_Form.pdf PDF
A11_Cert_Current_Cost.pdf PDF
A14_NIH_RC_2_Invoice_Instructions_FFP.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Wksheet

rb/ts0305
TRIAL BALANCEDIRECTIR&DFRINGEOVERHEADG&AUNALLOWPROOFNotes
ACCOUNTAMOUNT
Labor$ 515,000$ 400,000$ 25,000$ - 0$ 10,000$ 80,000$ - 0$ 515,000
Vacation33,47533,47533,475
Holidays22,14522,14522,145
Sick Leave11,33011,33011,330
Payroll Taxes52,50052,50052,500
401 (k) Plan15,00015,00015,000
Group Insurance36,00036,00036,000
Materials & Supplies33,40028,4005,00033,400
Consultants6,2005,7005006,200
Travel1,6501,4002501,650
Other Direct Costs3,0502,8002503,050
Subcontracts100,000100,000100,000
Rent125,000120,0005,000125,000
Utilities13,20012,0001,20013,200
Telephone6,6006,0006006,600
Depreciation22,00021,0001,00022,000
Direct Equipment Purchases10,00010,00010,000
Equipment Rental5,5005,0005005,500
Expendable Equipment9,0006,0003,0009,000
Repairs & Maintenance5,5005,0005005,500
Office Supplies2,5002,5002,500
General Lab Supplies50,00050,00050,000
Travel5,0001,0004,0005,000
Consultants4,5004,0005004,500
Waste Disposal1,0001,0001,000
Training3,0003,0003,000
Legal30,0005,00025,00030,0001.
Accounting15,00015,00015,000
Liability Insurance900900900
Interest11,50011,50011,5002.
Licenses250250250
Dues & Subscriptions300300300
Postage200200200
Recruitment400400400
Trial Balance Total$ 1,151,100$ 548,300$ 31,000$ 170,450$ 244,000$ 120,850$ 36,500$ 1,151,100
Fringe Benefit Allocation132,3888,274(170,450)3,31026,478- 0
(33.097% of Labor)
Cost Pool Totals$ 1,151,100$ 680,688$ 39,274$ - 0$ 247,310$ 147,328$ 36,500
NOTES:
1. Legal fees for patent costs unallowable.
2. Interest costs unallowable.
STEPS TO COMPLETING WORKSHEET
1. Get the company trial balance for all expense accounts
2. For each expense account identify costs by cost pool (direct, fringe, etc.)
3. Calculate the fringe benefit rate (see example on "Fringe" Sheet)
4. Allocate fringe benefits to each cost pool based on the fringe benefit rate
5. Determine each cost pool and calculate the Overhead and G&A rates
(see "Overhead" and "G&A" sheets)

123 Easy, Inc.

Indirect Cost Worksheet Three Tier

Fringe

rb/ts0305
ELEMENTAMOUNT% OF BASE
POOL:
Vacation$ 33,4756.50%
Holidays22,1454.30%
Sick Leave11,3302.20%
Payroll Taxes52,50010.19%
401(k) Plan15,0002.91%
Group Insurance36,0006.99%
TOTAL (A)$ 170,45033.097%
BASE:
Direct Labor$ 400,000
Overhead Labor10,000
G&A Labor80,000
IR&D Labor25,000
TOTAL (B)$ 515,000
RATE = (A) / (B)33.097%

NOTE:

PAID ABSENCES: For informational purposes: 123 Easy's paid absence policy is as follows:

Vacation: 3 weeks or 120 hours Holidays: 10 days or 80 hours Sick Leave: 5 days or 40 hours 123 Easy, Inc.

FRINGE BENEFITS

(Three Tier Example)

Overhead

rb/ts0305
ELEMENTAMOUNT% OF BASENOTES
POOL:
Overhead Labor$ 10,0001.77%
Overhead Labor Fringe Benefits3,3100.59%1.
Rent120,00021.21%2.
Utilities12,0002.12%2.
Telephone6,0001.06%
Depreciation-Lab Equip21,0003.71%
Equipment Rental5,0000.88%
Expendable Equipment6,0001.06%
Repairs & Maintenance5,0000.88%
General Lab Supplies50,0008.84%
Travel1,0000.18%
Consultants4,0000.71%
Waste Disposal1,0000.18%
Training3,0000.53%
TOTAL (A)$ 247,31043.72%
BASE:
Direct Labor$ 400,000
IR&D Labor25,000
Subtotal$ 425,000
Direct Labor Fringe Benefits132,388
IR&D Fringe Benefits8,274
TOTAL (B)$ 565,662
RATE = (A) / (B)43.72%

NOTES:

1. FRINGE BENEFITS: Fringe benefit rate multiplied by Labor; computed as follows: Overhead: 33.097% x $10,000 = $3,310

2. RENT & UTILITIES: 123 Easy Inc. allocates rent and utilities between Overhead and G&A based on square footage.

123 Easy, Inc.

OVERHEAD

(Three Tier Example)

G&A

rb/ts0305
ELEMENTAMOUNT% OF BASENOTES
POOL:
G&A Labor$ 80,0009.07%
G&A Fringe Benefits26,4783.00%1.
Rent5,0000.57%2.
Utilities1,2000.14%2.
Telephone6000.07%
Depreciation1,0000.11%
Equipment Rental5000.06%
Expendable Equipment3,0000.34%
Repairs & Maintenance5000.06%
Office Supplies2,5000.28%
Travel4,0000.45%
Consultants5000.06%
Legal5,0000.57%
Accounting15,0001.70%
Liability Insurance9000.10%
Licenses2500.03%
Dues & Subscriptions3000.03%
Postage2000.02%
Recruitment/Relocation4000.05%
TOTAL (A)$ 147,32816.70%
BASE (modified cost):3.
Direct Labor$ 400,000
Direct Labor Fringe Benefits132,388
IR&D Labor25,000
IR&D Fringe Benefits8,274
Overhead247,310
Materials & Supplies33,4004.
Consultants6,2004.
Travel1,6504.
Other Direct Costs3,0504.
Equipment10,0004.
Subcontracts100,0004.
SUBTOTAL$ 967,272
Equipment(10,000)3.
Subcontracts > $25,000(75,000)3.
TOTAL (B)$ 882,2723.
RATE = (A) / (B)16.70%

NOTES:

1. FRINGE BENEFITS: Fringe benefit rate multiplied by labor: G&A: 33.097% x $80,000 = $26,478

2. RENT & UTILITIES: 123 Easy, Inc. allocates rent and utilities between Overhead and G&A based on square footage.

3. G&A BASE/MODIFIED COST BASE: The base is total costs (including overhead) excluding equipment and subcontract costs in excess of $25,000 per subcontract per project period.

4. IR&D: It is NIH's/DHHS's policy to exclude IR&D costs from the G&A pool and include it in the G&A base, thus, these values include element costs relating to both "Direct" and IR&D activities.

123 Easy, Inc.

G & A (Three Tier Example)

File details come from the government source that posted it. Updated .