INSTRUCTIONS
| SECTION B - PRICING SHEETS INSTRUCTIONS: | |
| CSI DIVISION WORKSHEETS: | |
| 1 | CSI DIVISION WORKSHEETS ARE LINKED TO THE SUMMARY PAGE. |
| 2 | USE 50 DIVISIONS OF CONSTRUCTION AS DEFINED BY CSI MASTERFORMAT |
| 3 | CREATE A CSI DIVISION WORKSHEET FOR EACH DIVISION OF WORK REQUIRED TO COMPLETE THE PROJECT |
| 4 | ENTER DIVISION NUMBER IN YELLOW CELL (A8); ENTER DIVISION DESCRIPTION IN YELLOW CELL (B8). THIS INFORMATION WILL POPULATE THE SUMMARY PAGE DIVISION NUMBERS AND ITEM DESCRIPTIONS. |
| 5 | LIST EACH WORK ITEM TO BE PERFORMED BY THE PRIME AND ITS ASSOCIATED MATERIAL AND LABOR COSTS. (ADD ADDITIONAL ROWS AS NECESSARY). |
| 6 | IDENTIFY EACH SUBCONTRACTOR, ENTERING SUBCONTRACTOR'S TOTAL MATERIAL AND LABOR COSTS. |
BACKUP SHALL BE PROVIDED FOR EACH SUBCONTRACTOR. (PRIME CONTRACTOR MAY ELECT TO MODIFY THIS SPREADHSHEET TO PROIVDE SUBCONTRACTOR BACK-UP DETAIL SIMILAR TO PRIME CONTRACTOR'S DETAIL.)
| 7 | INSERT A PERCENTAGE (i.e. 5 FOR 5%) FOR OVERHEAD APPLIED TO SUBCONTRACTOR(S) |
| 8 | INSERT A PERCENTAGE (i.e. 5 FOR 5%) FOR PROFIT APPLIED TO SUBCONTRACTOR(S) |
| 9 | A TOTAL DIVISION COST WILL CALCULATE AS COST DATA IS ENTERED FOR PRIME COSTS, SUBCONTRACTOR(S) COSTS AND PERCENTAGE VAULES. |
| SUMMARY PAGE:. | |
| 10 | THE SUMMARY PAGE WORK ITEMS ARE LINKED TO A CORRESPONDING CSI DIVISION WORKSHEET. FOR CONVENIENCE, THREE SAMPLE CSI DIVISION WORKSHEETS HAVE BEEN PROVIDED AND LINKED TO THE SUMMARY PAGE. THE OFFEROR SHALL ADD A NEW LINE ITEM TO THE SUMMARY PAGE FOR EACH ADDITIONAL CSI DIVISION WORKSHEET CREATED. |
| 11 | INSERT A PERCENTAGE (i.e. 10 FOR 10%) FOR OVERHEAD APPLIED TO PRIME WORK |
| 12 | INSERT A PERCENTAGE (i.e. 10 FOR 10%) FOR PROFIT APPLIED TO PRIME WORK |
| 13 | INSERT PRICE OF PREFORMANCE / PAYMENT BOND |
| 14 | A TOTAL CONTRACT PRICE WILL CALCUALTE AS COST DATA IS POPULATED FROM LINKED CSI DIVISION WORKSHEETS. |
SUMMARY PAGE
SOLICITATION NO.: NIHOF2015030 - - ELECTRICAL VAULT 11 TRANSFORMERS AND SWITCHGEAR REPLACEMENT, ACRF, BETHEDA, MD
TABLE B-1 -- PROPOSAL SUMMARY OF COSTS *USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
| DIV. #:* | ITEM DESCRIPTION | |
| (Use CSI Division Worksheet to back-up all pricing information for each Division listed in Table) | (A) | |
| MATERIALS | (B) | |
| LABOR | (C) = (A) + (B) | |
| SUBTOTAL COST | (D) | |
| SUBCONTRACTOR COSTS | (E) = (C) + (D) |
TOTAL COST
| 01 | EXAMPLE - GENERAL REQUIREMENTS | $ 400.00 | $ 9,120.00 | $ 9,520.00 | $ 14,222.25 | $ 23,742.25 |
| 23 | EXAMPLE - HVAC | $ 500.00 | $ 9,120.00 | $ 9,620.00 | $ 16,537.50 | $ 26,157.50 |
| 26 | EXAMPLE - ELECTRICAL | $ 100,000.00 | $ 2,000.00 | $ 102,000.00 | $ 33,075.00 | $ 135,075.00 |
| 02 | LINK TO ADD'L CSI DIVISION WORKSHEET AS REQ'D | $ - 0 | $ - 0 | $ - 0 | ||
| 03 | LINK TO ADD'L CSI DIVISION WORKSHEET AS REQ'D | $ - 0 | $ - 0 | $ - 0 | ||
| 04 | LINK TO ADD'L CSI DIVISION WORKSHEET AS REQ'D | $ - 0 | $ - 0 | $ - 0 | ||
| 05 | LINK TO ADD'L CSI DIVISION WORKSHEET AS REQ'D | $ - 0 | $ - 0 | $ - 0 | ||
| 06 | LINK TO ADD'L CSI DIVISION WORKSHEET AS REQ'D | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | ||||
| SUBTOTAL - 1: | $ 121,140.00 | $ 63,834.75 | $ 184,974.75 |
OVERHEAD (% * subtotal 1 (C)) : (INSERT %) 10% $ 12,114.00
SUBTOTAL- 2 (subtotal 1 (C ) + overhead): $ 133,254.00
PROFIT (% * subtotal 2): (INSERT %) 10% $ 13,325.40
SUBTOTAL - 3 (subtotal 2 + profit): $ 146,579.40
TOTAL SUBCONTRACTOR COSTS (subtotal 1 (D)): $ 63,834.75
SUBTOTAL - 4 (subtotal 3 + total subcontractor costs): $ 210,414.15
PERFORMANCE / PAYMENT BOND: $ 1,000.00
TOTAL CONTRACT PRICE (subtotal 4 + bond): $ 211,414.15
CSI DIVISION WORKSHEET #1
SOLICITATION NO.: NIHOF2015030 - - ELECTRICAL VAULT 11 TRANSFORMERS AND SWITCHGEAR REPLACEMENT, ACRF, BETHEDA, MD
| *USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT | |
| TABLE B-2 -- PRICING WORKSHEET BACKUP | Repeat worksheet for each CSI Division of Construction as required |
DIV. #:* DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)
TOTAL ITEM COST
| 01 | EXAMPLE - GENERAL REQUIREMENTS | (A) | |
| No. Units | (B) | ||
| Unit Meas. | (C) | ||
| $ Per Unit | (D) = (A) *(C) | ||
| Subtotal | (E) | ||
| $ Per Unit | (F) = (A) * (E) |
Subtotal
| ITEM # | PRIME WORK ITEMS | ||||||||
| 1 | Ex - Project Manager | 4 | wks | $ - 0 | $ - 0 | $ 2,280.00 | $ 9,120.00 | $ 9,120.00 | |
| 2 | Ex - Telephone Service | 2 | mos. | $ 200.00 | $ 400.00 | $ - 0 | $ - 0 | $ 400.00 | |
| 3 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 4 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 5 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 6 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 7 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 8 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 9 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 10 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 11 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 12 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 13 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 14 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 15 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 16 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 17 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 18 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 19 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 20 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 21 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 22 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 23 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 24 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 25 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 1 - PRIME SUBTOTAL: | $ 400.00 | $ 9,120.00 | $ 9,520.00 | ||||||
| SUBCONTRACTOR(S) WORK ITEMS* | |||||||||
| (Provide separate back-up for each subcontractor listed) | QUANTITY | MATERIALS | LABOR | (G) = (D) + (F) |
TOTAL ITEM COST
| (A) | ||
| No. Units | (B) | |
| Unit Meas. | (C) | |
| $ Per Unit | (D) = (A) *(C) | |
| Subtotal | (E) | |
| $ Per Unit | (F) = (A) * (E) |
Subtotal
| 1 | Ex - Subcontractor #1 - ABC Mechanical Company | $ 200.00 | $ 5,000.00 | $ 5,200.00 |
| 2 | Ex - Subcontractor #2 - DEF Electrical Corporation | $ 500.00 | $ 6,000.00 | $ 6,500.00 |
| 3 | Ex - Subcontractor #3 - GHI Enterprise, Inc. | $ 200.00 | $ 1,000.00 | $ 1,200.00 |
| 4 | $ - 0 | $ - 0 | $ - 0 | |
| 5 | $ - 0 | $ - 0 | $ - 0 | |
| 2 - SUBCONTRACTOR SUBTOTAL: | $ 900.00 | $ 12,000.00 | $ 12,900.00 |
3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ 645.00
4 - SUBTOTAL (SUM 2 + 3): $ 13,545.00
5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ 677.25
6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ 14,222.25
TOTAL DIVISION (SUM 1 + 6): $ 23,742.25
CSI DIVISION WORKSHEET #2
SOLICITATION NO.: NIHOF2015030 - - ELECTRICAL VAULT 11 TRANSFORMERS AND SWITCHGEAR REPLACEMENT, ACRF, BETHEDA, MD
| *USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT | |
| TABLE B-2 -- PRICING WORKSHEET BACKUP | Repeat worksheet for each CSI Division of Construction as required |
DIV. #:* DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)
TOTAL ITEM COST
| 23 | EXAMPLE - HVAC | (A) | |
| No. Units | (B) | ||
| Unit Meas. | (C) | ||
| $ Per Unit | (D) = (A) *(C) | ||
| Subtotal | (E) | ||
| $ Per Unit | (F) = (A) * (E) |
Subtotal
| ITEM # | PRIME WORK ITEMS | ||||||||
| 1 | EX- Dampers | 4 | ea. | $ 50.00 | $ 200.00 | $ 2,280.00 | $ 9,120.00 | $ 9,320.00 | |
| 2 | Ex - Hydronic piping | 12 | lf | $ 25.00 | $ 300.00 | $ - 0 | $ - 0 | $ 300.00 | |
| 3 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 4 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 5 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 6 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 7 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 8 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 9 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 10 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 11 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 12 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 13 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 14 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 15 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 16 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 17 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 18 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 19 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 20 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 21 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 22 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 23 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 24 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 25 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 1 - PRIME SUBTOTAL: | $ 500.00 | $ 9,120.00 | $ 9,620.00 | ||||||
| SUBCONTRACTOR(S) WORK ITEMS* | |||||||||
| (Provide separate back-up for each subcontractor listed) | QUANTITY | MATERIALS | LABOR | (G) = (D) + (F) |
TOTAL ITEM COST
| (A) | ||
| No. Units | (B) | |
| Unit Meas. | (C) | |
| $ Per Unit | (D) = (A) *(C) | |
| Subtotal | (E) | |
| $ Per Unit | (F) = (A) * (E) |
Subtotal
| 1 | Ex - Subcontractor #1 - ABC Mechanical Company | $ 5,000.00 | $ 10,000.00 | $ 15,000.00 |
| 2 | Ex - Subcontractor #2 - DEF Electrical Corporation | $ - 0 | $ - 0 | $ - 0 |
| 3 | Ex - Subcontractor #3 - GHI Enterprise, Inc. | $ - 0 | $ - 0 | $ - 0 |
| 4 | $ - 0 | $ - 0 | $ - 0 | |
| 5 | $ - 0 | $ - 0 | $ - 0 | |
| 2 - SUBCONTRACTOR SUBTOTAL: | $ 5,000.00 | $ 10,000.00 | $ 15,000.00 |
3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ 750.00
4 - SUBTOTAL (SUM 2 + 3): $ 15,750.00
5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ 787.50
6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ 16,537.50
TOTAL DIVISION (SUM 1 + 6): $ 26,157.50
CSI DIVISION WORKSHEET #3
SOLICITATION NO.: NIHOF2015030 - - ELECTRICAL VAULT 11 TRANSFORMERS AND SWITCHGEAR REPLACEMENT, ACRF, BETHEDA, MD
| *USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT | |
| TABLE B-2 -- PRICING WORKSHEET BACKUP | Repeat worksheet for each CSI Division of Construction as required |
DIV. #:* DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)
TOTAL ITEM COST
| 26 | EXAMPLE - ELECTRICAL | (A) | |
| No. Units | (B) | ||
| Unit Meas. | (C) | ||
| $ Per Unit | (D) = (A) *(C) | ||
| Subtotal | (E) | ||
| $ Per Unit | (F) = (A) * (E) |
Subtotal
| ITEM # | PRIME WORK ITEMS | ||||||||
| 1 | Ex - Dry-type , medium voltage transformer | 1 | ea | $ 100,000.00 | $ 100,000.00 | $ 2,000.00 | $ 2,000.00 | $ 102,000.00 | |
| 2 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 3 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 4 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 5 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 6 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 7 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 8 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 9 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 10 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 11 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 12 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 13 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 14 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 15 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 16 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 17 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 18 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 19 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 20 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 21 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 22 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 23 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 24 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 25 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 1 - PRIME SUBTOTAL: | $ 100,000.00 | $ 2,000.00 | $ 102,000.00 | ||||||
| SUBCONTRACTOR(S) WORK ITEMS* | |||||||||
| (Provide separate back-up for each subcontractor listed) | QUANTITY | MATERIALS | LABOR | (G) = (D) + (F) |
TOTAL ITEM COST
| (A) | ||
| No. Units | (B) | |
| Unit Meas. | (C) | |
| $ Per Unit | (D) = (A) *(C) | |
| Subtotal | (E) | |
| $ Per Unit | (F) = (A) * (E) |
Subtotal
| 1 | Ex - Subcontractor #1 - ABC Mechanical Company | $ - 0 | $ - 0 | $ - 0 |
| 2 | Ex - Subcontractor #2 - DEF Electrical Corporation | $ 20,000.00 | $ 10,000.00 | $ 30,000.00 |
| 3 | Ex - Subcontractor #3 - GHI Enterprise, Inc. | $ - 0 | $ - 0 | $ - 0 |
| 4 | $ - 0 | $ - 0 | $ - 0 | |
| 5 | $ - 0 | $ - 0 | $ - 0 | |
| 2 - SUBCONTRACTOR SUBTOTAL: | $ 20,000.00 | $ 10,000.00 | $ 30,000.00 |
3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ 1,500.00
4 - SUBTOTAL (SUM 2 + 3): $ 31,500.00
5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ 1,575.00
6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ 33,075.00
TOTAL DIVISION (SUM 1 + 6): $ 135,075.00