A07_Proposal_Cost_Summary_Backup_Info.xlsx

XLSX spreadsheet 81 KB Posted

Attached to
Electrical Vault 11 Transformer and Switchgear Replacement, ACRF, NIH Bethesda, MD
Solicitation number
NIHOF2015030
Issued by

About this file

Attachment 07

View the file

Other files

File Type Posted
RFP__NIHOF2015030_-_AMEND__00008.pdf PDF
RFP__NIHOF2015030_-_AMEND__00007.pdf PDF
RFP__NIHOF2015030_-_AMEND__00006.pdf PDF
RFP__NIHOF2015030_-_AMEND__00005.pdf PDF
RFP__NIHOF2015030_-_AMEND__00004.pdf PDF
RFP__NIHOF2015030_-_AMEND__00003.pdf PDF
RFP__NIHOF2015030_-_AMEND__00002.pdf PDF
A04_Past_Performance_Questionnaire_Part_I-II.pdf PDF
A18_Rpt_WO_12061908_ver_1_000.pdf PDF
RFP__NIHOF2015030_-_AMEND__00001.pdf PDF
A20_PPP_Vault_11_Access_Forum_06-16-14.pptx PPTX presentation
A19_Other_Transformer_PCB_Results_04-2013.pdf PDF
A09_Indirect_Cost_Worksheet_Sample.pdf PDF
RFP NIHOF2015030 - Final 12-15-2014.pdf PDF
A04_Past_Performance_Questionnaire_Part_I-II.pdf PDF
A01_Packaging_and_Delivery_of_Proposal_NonRD.pdf PDF
RFP__NIHOF2015030_-_Final_12-15-2014.zip ZIP file
A15_HHSAR-352.223-70-Safety-and-Health.pdf PDF
A16_Section_3-1_NIH_Facilities_Dev_Manual.pdf PDF
A03_Small_Business_Subcontracting_Plan.pdf PDF
A12_Offerors_Point_of_Contact.pdf PDF
A10_Proposal_Summary_and_Data_Record_NIH2043.pdf PDF
A08_DBWD_Mo_County.pdf PDF
A13_Disclosure_of_Lobbting_Activites_SFLLL.pdf PDF
A17_ORF_Contractor_Health_Safety_Provisions.pdf PDF
A06_Summary_of_Related_Activities.pdf PDF
A05_Similar_Project_Template.pdf PDF
A02_Proposal_Intent_Response_Form.pdf PDF
A11_Cert_Current_Cost.pdf PDF
A09_Indirect_Cost_Worksheet_Sample.xls XLS spreadsheet
A14_NIH_RC_2_Invoice_Instructions_FFP.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSTRUCTIONS

SECTION B - PRICING SHEETS INSTRUCTIONS:
CSI DIVISION WORKSHEETS:
1CSI DIVISION WORKSHEETS ARE LINKED TO THE SUMMARY PAGE.
2USE 50 DIVISIONS OF CONSTRUCTION AS DEFINED BY CSI MASTERFORMAT
3CREATE A CSI DIVISION WORKSHEET FOR EACH DIVISION OF WORK REQUIRED TO COMPLETE THE PROJECT
4ENTER DIVISION NUMBER IN YELLOW CELL (A8); ENTER DIVISION DESCRIPTION IN YELLOW CELL (B8). THIS INFORMATION WILL POPULATE THE SUMMARY PAGE DIVISION NUMBERS AND ITEM DESCRIPTIONS.
5LIST EACH WORK ITEM TO BE PERFORMED BY THE PRIME AND ITS ASSOCIATED MATERIAL AND LABOR COSTS. (ADD ADDITIONAL ROWS AS NECESSARY).
6IDENTIFY EACH SUBCONTRACTOR, ENTERING SUBCONTRACTOR'S TOTAL MATERIAL AND LABOR COSTS.

BACKUP SHALL BE PROVIDED FOR EACH SUBCONTRACTOR. (PRIME CONTRACTOR MAY ELECT TO MODIFY THIS SPREADHSHEET TO PROIVDE SUBCONTRACTOR BACK-UP DETAIL SIMILAR TO PRIME CONTRACTOR'S DETAIL.)

7INSERT A PERCENTAGE (i.e. 5 FOR 5%) FOR OVERHEAD APPLIED TO SUBCONTRACTOR(S)
8INSERT A PERCENTAGE (i.e. 5 FOR 5%) FOR PROFIT APPLIED TO SUBCONTRACTOR(S)
9A TOTAL DIVISION COST WILL CALCULATE AS COST DATA IS ENTERED FOR PRIME COSTS, SUBCONTRACTOR(S) COSTS AND PERCENTAGE VAULES.
SUMMARY PAGE:.
10THE SUMMARY PAGE WORK ITEMS ARE LINKED TO A CORRESPONDING CSI DIVISION WORKSHEET. FOR CONVENIENCE, THREE SAMPLE CSI DIVISION WORKSHEETS HAVE BEEN PROVIDED AND LINKED TO THE SUMMARY PAGE. THE OFFEROR SHALL ADD A NEW LINE ITEM TO THE SUMMARY PAGE FOR EACH ADDITIONAL CSI DIVISION WORKSHEET CREATED.
11INSERT A PERCENTAGE (i.e. 10 FOR 10%) FOR OVERHEAD APPLIED TO PRIME WORK
12INSERT A PERCENTAGE (i.e. 10 FOR 10%) FOR PROFIT APPLIED TO PRIME WORK
13INSERT PRICE OF PREFORMANCE / PAYMENT BOND
14A TOTAL CONTRACT PRICE WILL CALCUALTE AS COST DATA IS POPULATED FROM LINKED CSI DIVISION WORKSHEETS.

SUMMARY PAGE

SOLICITATION NO.: NIHOF2015030 - - ELECTRICAL VAULT 11 TRANSFORMERS AND SWITCHGEAR REPLACEMENT, ACRF, BETHEDA, MD

TABLE B-1 -- PROPOSAL SUMMARY OF COSTS *USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT

DIV. #:*ITEM DESCRIPTION
(Use CSI Division Worksheet to back-up all pricing information for each Division listed in Table)(A)
MATERIALS(B)
LABOR(C) = (A) + (B)
SUBTOTAL COST(D)
SUBCONTRACTOR COSTS(E) = (C) + (D)

TOTAL COST

01EXAMPLE - GENERAL REQUIREMENTS$ 400.00$ 9,120.00$ 9,520.00$ 14,222.25$ 23,742.25
23EXAMPLE - HVAC$ 500.00$ 9,120.00$ 9,620.00$ 16,537.50$ 26,157.50
26EXAMPLE - ELECTRICAL$ 100,000.00$ 2,000.00$ 102,000.00$ 33,075.00$ 135,075.00
02LINK TO ADD'L CSI DIVISION WORKSHEET AS REQ'D$ - 0$ - 0$ - 0
03LINK TO ADD'L CSI DIVISION WORKSHEET AS REQ'D$ - 0$ - 0$ - 0
04LINK TO ADD'L CSI DIVISION WORKSHEET AS REQ'D$ - 0$ - 0$ - 0
05LINK TO ADD'L CSI DIVISION WORKSHEET AS REQ'D$ - 0$ - 0$ - 0
06LINK TO ADD'L CSI DIVISION WORKSHEET AS REQ'D$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SUBTOTAL - 1:$ 121,140.00$ 63,834.75$ 184,974.75

OVERHEAD (% * subtotal 1 (C)) : (INSERT %) 10% $ 12,114.00

SUBTOTAL- 2 (subtotal 1 (C ) + overhead): $ 133,254.00

PROFIT (% * subtotal 2): (INSERT %) 10% $ 13,325.40

SUBTOTAL - 3 (subtotal 2 + profit): $ 146,579.40

TOTAL SUBCONTRACTOR COSTS (subtotal 1 (D)): $ 63,834.75

SUBTOTAL - 4 (subtotal 3 + total subcontractor costs): $ 210,414.15

PERFORMANCE / PAYMENT BOND: $ 1,000.00

TOTAL CONTRACT PRICE (subtotal 4 + bond): $ 211,414.15

CSI DIVISION WORKSHEET #1

SOLICITATION NO.: NIHOF2015030 - - ELECTRICAL VAULT 11 TRANSFORMERS AND SWITCHGEAR REPLACEMENT, ACRF, BETHEDA, MD

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #:* DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

01EXAMPLE - GENERAL REQUIREMENTS(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1Ex - Project Manager4wks$ - 0$ - 0$ 2,280.00$ 9,120.00$ 9,120.00
2Ex - Telephone Service2mos.$ 200.00$ 400.00$ - 0$ - 0$ 400.00
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
16$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0
21$ - 0$ - 0$ - 0
22$ - 0$ - 0$ - 0
23$ - 0$ - 0$ - 0
24$ - 0$ - 0$ - 0
25$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ 400.00$ 9,120.00$ 9,520.00
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1Ex - Subcontractor #1 - ABC Mechanical Company$ 200.00$ 5,000.00$ 5,200.00
2Ex - Subcontractor #2 - DEF Electrical Corporation$ 500.00$ 6,000.00$ 6,500.00
3Ex - Subcontractor #3 - GHI Enterprise, Inc.$ 200.00$ 1,000.00$ 1,200.00
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ 900.00$ 12,000.00$ 12,900.00

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ 645.00

4 - SUBTOTAL (SUM 2 + 3): $ 13,545.00

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ 677.25

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ 14,222.25

TOTAL DIVISION (SUM 1 + 6): $ 23,742.25

CSI DIVISION WORKSHEET #2

SOLICITATION NO.: NIHOF2015030 - - ELECTRICAL VAULT 11 TRANSFORMERS AND SWITCHGEAR REPLACEMENT, ACRF, BETHEDA, MD

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #:* DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

23EXAMPLE - HVAC(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1EX- Dampers4ea.$ 50.00$ 200.00$ 2,280.00$ 9,120.00$ 9,320.00
2Ex - Hydronic piping12lf$ 25.00$ 300.00$ - 0$ - 0$ 300.00
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
16$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0
21$ - 0$ - 0$ - 0
22$ - 0$ - 0$ - 0
23$ - 0$ - 0$ - 0
24$ - 0$ - 0$ - 0
25$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ 500.00$ 9,120.00$ 9,620.00
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1Ex - Subcontractor #1 - ABC Mechanical Company$ 5,000.00$ 10,000.00$ 15,000.00
2Ex - Subcontractor #2 - DEF Electrical Corporation$ - 0$ - 0$ - 0
3Ex - Subcontractor #3 - GHI Enterprise, Inc.$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ 5,000.00$ 10,000.00$ 15,000.00

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ 750.00

4 - SUBTOTAL (SUM 2 + 3): $ 15,750.00

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ 787.50

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ 16,537.50

TOTAL DIVISION (SUM 1 + 6): $ 26,157.50

CSI DIVISION WORKSHEET #3

SOLICITATION NO.: NIHOF2015030 - - ELECTRICAL VAULT 11 TRANSFORMERS AND SWITCHGEAR REPLACEMENT, ACRF, BETHEDA, MD

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #:* DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

26EXAMPLE - ELECTRICAL(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1Ex - Dry-type , medium voltage transformer1ea$ 100,000.00$ 100,000.00$ 2,000.00$ 2,000.00$ 102,000.00
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
16$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0
21$ - 0$ - 0$ - 0
22$ - 0$ - 0$ - 0
23$ - 0$ - 0$ - 0
24$ - 0$ - 0$ - 0
25$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ 100,000.00$ 2,000.00$ 102,000.00
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1Ex - Subcontractor #1 - ABC Mechanical Company$ - 0$ - 0$ - 0
2Ex - Subcontractor #2 - DEF Electrical Corporation$ 20,000.00$ 10,000.00$ 30,000.00
3Ex - Subcontractor #3 - GHI Enterprise, Inc.$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ 20,000.00$ 10,000.00$ 30,000.00

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ 1,500.00

4 - SUBTOTAL (SUM 2 + 3): $ 31,500.00

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ 1,575.00

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ 33,075.00

TOTAL DIVISION (SUM 1 + 6): $ 135,075.00