This document is an Amendment (Number 0001) to Solicitation NAVMWR-25-R-0013 for repairing Fleet Recreation Centers at NAVBASE Kitsap and NAVSTA Everett in Washington state. The amendment modifies two key sections: removing a restriction on prime contractors and replacing the site information section with detailed infrastructure requirements. The updated site information includes specifications for topographic surveys, utility connections, stormwater management, electrical service, fire protection standards, and Wi-Fi infrastructure installation.

The amendment provides comprehensive technical guidance for contractors, including requirements for soils investigation, utility locating, water and sewer connections, electrical transformers, fire protection per NFPA standards, and wireless internet infrastructure. Contractors must coordinate site investigation activities with installation personnel, make final electrical and water connections under Public Works oversight, and ensure compliance with various technical and safety standards for the recreation center repair project.

View the file

Other files

File Type Posted
NAVMWR-25-R-0013 0009.pdf PDF
NAVMWR-25-R-0013 0009.pdf PDF
NAVMWR-25-R-0013 0008.pdf PDF
NAVMWR-25-R-0013 0007.pdf PDF
NAVMWR-25-R-0013 0006 - RFIs.pdf PDF
NAVMWR-25-R-0013 0005 - RFIs.pdf PDF
NAVMWR-25-R-0013 0004.pdf PDF
NAVMWR-25-R-0013 0003.pdf PDF
NAVMWR-25-R-0013 0002.pdf PDF
Pre-Proposal Agenda.pdf PDF
NAVMWR-25-R-0013.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE

CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

1 2

0001 04 June 2025

4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

R24-21 N944 N944

CNIC Facilities and Construction Contracting Alanna Young, Contracting Officer 5720 Integrity Drive, Lassen Building 457 Millington, TN 38055

(901) 574-0848, alanna.g.young.naf@us.navy.mil

7. ADMINISTERED BY (If other than Item 6)

Hubert Stewart, Contract Specialist hubert.l.stewart.naf@us.navy.mil

(901) 237-1677

9A. AMENDMENT OF SOLICITATION

NUMBER

NAVMWR-25-R-0013

9B. DATED (SEE ITEM 11)

03 June 2025

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Repair Fleet Recreation Centers NAVBASE Kitsap, WA and NAVSTA Everett, WA

Continued on page 2.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Alanna Young, Contracting Officer

Block 14 Continued:

A. Change:

1. The first sentence in Section A-4. PROSPECTIVE OFFERORS, "“Only firms specifically included on the Source List may respond to the solicitation as a Prime Contractor." is deleted in it's entirety with no replacement.

2. Section C-3.SITE INFORMATION is deleted in it's entirety and replaced with the following:

C-3. SITE INFORMATION

A. Topographic Survey:

1. The Contractor shall, at their own expense, provide soils investigation and topographic surveys that are necessary to complete the design and/or construct the project. All such site investigation activities shall be coordinated with appropriate Installation personnel through the COR.

2. The Contractor shall retain a local utility locate firm to locate underground utilities at or adjacent to the site.

B. Infrastructure:

1. A utility layout of the existing site is provided in Section J.

2. Potable water: Water service to all areas shall be modified as required per the approved design documents as applicable.

3. Sanitary Sewer: Tie into existing connections as required per the approved design documents as applicable.

4. Storm Water: The site is to be graded to provide positive drainage away from existing adjacent structures, and roadways, utilizing surface flow, new drainage structures as appropriate, and existing drainage patterns. The SDRAR describes additional requirements for stormwater management and drainage structures.

Sediment and erosion control measures shall be as appropriate to meet CATEX requirements (Section J).

5. Electricity: Provide new step-down transformers to provide power from the existing building service per the approved design documents as applicable.

6. The Contractor shall make all final connections to electrical and water under the oversight of PW, through the COR.

7. Fire Protection: Fire protection will be required per NFPA 1194, fire protection standard for Recreational Vehicle Parks and Campgrounds. The water line for the fire suppression will be 6 inches minimum with a flow rate as required by NFPA 291. Provide fire hydrants at a spacing not to exceed 600 ft.

The A/EOR shall verify the quantity and location of hydrants required with NAVFAC Fire Protection Engineer and Installation Fire Dept. Also, confirm if pull stations are required, if required they shall be compatible with existing base reporting system.

8. Wi/Fi: Infrastructure for a wireless internet system shall be installed to supply patrons with wireless internet capabilities.

NAVMWR-25-R-0013 Repair Fleet Rec Center Bundle NAVBASE Kitsap and NAVSTA Everett, WA

Amendment 0001 Page 2 of 2