NAVFAC Dahlgren B198 Renovation - IFC Drawings 20_0130.pdf
PDF 15 MB Posted
- Solicitation number
- N4008020R0305
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4 5
D
C
B
A
NAVAL FACILITIES
ENGINEERING COMMAND ®
D
C
B
A
THE NAVY YARD
WASHINGTON D.C.
G -0
BUILDING 198 RENOVATION
NAVAL FACILITIES ENGINEERING COMMAND, WASHINGTON
FINAL SUBMISSION
JANUARY 30, 2020
CONTRACT NUMBER : N40080-17-D-0018
SOLICITATION NUMBER : -
BUILDING 198
NSF DAHLGREN
DAHLGREN, VIRGINIA
PerezM4 Image
A
B
C
D
1 2 3 4 5
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
A
B
C
D
D E P A R T M E N T
O F
T H E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
DRAWFORM REVISION: 10 MARCH 2009
PM-DM: AM
BRANCH MANAGER: AL
CHIEF ENG/ARCH: AL
FIRE PREVENTIONS: KK
R
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
FAX: 571.218.1600
/3
0/
0:
:2
A M
G -0
D R
A W
IN
G
IN
D
E X
G-002
D
AH
LG
R
EN
VA
13113638
N40080-17-D-0018
1558383
SW MP SW
D R
AW
IN
G
IN
D
EX
N
AV
AL
S U P P O R T
FA
C
IL
IT
Y
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
W
AS
H
IN
G
TO
N
D .C
TH
E
N
AV
Y
YA
R D
INDEX OF DRAWINGS
NAVFAC
DRAWING
NUMBER
SHEET
NUMBER SHEET TITLE
CURRENT
SHEET
NUMBER
PLUMBING
13113683 P-001 PLUMBING LEGEND, ABBREVIATIONS & GENERAL NOTES 47
13113684 PD101 PLUMBING DEMOLITION PLAN - SANITARY WASTE & VENT 48
13113685 PD102 PLUMBING DEMOLITION PLAN - DOMESTIC WATER 49
13113686 P-101 PLUMBING FLOOR PLAN - SANITARY WASTE & VENT 50
13113687 P-102 PLUMBING FLOOR PLAN - DOMESTIC WATER 51
13113688 P-401 PLUMBING ENLARGED PLANS 52
13113689 P-402 PLUMBING ENLARGED PLANS 53
13113690 P-501 PLUMBING DETAILS 54
13113691 P-601 PLUMBING SCHEDULES 55
13113692 P-901 SANITARY WASTE & VENT RISER DIAGRAMS 56
13113693 P-902 DOMESTIC WATER RISER DIAGRAMS 57
MECHANICAL
13113694 M-001 HVAC LEGEND, ABBREVIATIONS & GENERAL NOTES 58
13113695 MD101 MECHANICAL FIRST FLOOR DEMOLITION PLAN 59
13113696 MD102 MECHANICAL SECOND FLOOR DEMOLITION PLAN 60
13113697 MD401 ENLARGED MECHANICAL ROOM DEMOLITION PLAN 61
13113698 M-101 MECHANICAL FIRST FLOOR DUCTWORK PLAN 62
13113699 M-102 MECHANICAL SECOND FLOOR DUCTWORK PLAN 63
13113700 M-103 MECHANICAL HIGH ROOF PLAN 64
13113701 M-201 MECHANICAL FIRST FLOOR PIPING PLAN 65
13113702 M-202 MECHANICAL SECOND FLOOR PIPING PLAN 66
13113703 M-301 MECHANICAL BUILDING SECTIONS 67
13113704 M-401 MECHANICAL ENLARGED PLANS 68
13113705 M-501 MECHANICAL DETAILS 69
13113706 M-502 MECHANICAL DETAILS 70
13113707 M-601 MECHANICAL SCHEDULES 71
13113708 M-602 MECHANICAL SCHEDULES 72
13113709 M-603 MECHANICAL SCHEDULES 73
13113710 M-604 MECHANICAL SCHEDULES 74
13113711 M-701 HOT WATER FLOW DIAGRAM 75
13113712 M-702 CHILLED WATER FLOW DIAGRAM 76
13113713 M-800 CONTROLS LEGEND AND ABBREVIATIONS 77
13113714 M-801 CONTROL DIAGRAMS 78
13113715 M-802 CONTROL DIAGRAMS 79
13113716 M-803 CONTROL DIAGRAMS 80
13113717 M-804 POINT SCHEDULES 81
13113718 M-805 POINT SCHEDULES 82
13113719 M-806 POINT SCHEDULES 83
13113720 M-807 POINT SCHEDULES 84
13113721 M-808 POINT SCHEDULES 85
13113722 M-809 POINT SCHEDULES 86
13113723 M-810 SEQUENCE OF OPERATION 87
13113724 M-811 SEQUENCE OF OPERATION 88
13113725 M-812 BAS NETWORK RISER DIAGRAM 89
ELECTRICAL
13113726 E-001 LEGEND, ABBREVIATIONS, LIGHTING FIXTURE SCHEDULE, AND GENERAL
NOTES
13113727 ED101 FIRST FLOOR DEMOLITION PLAN 91
1311728 ED102 SECOND FLOOR & ROOF DEMOLITION PLAN 92
13125084 E-101 FIRST FLOOR LIGHTING PLAN 93
13125085 E-102 SECOND FLOOR LIGHTING PLAN + FIXTURE SCHEDULE 94
13125086 E-111 FIRST FLOOR POWER PLAN 95
13125087 E-112 SECOND FLOOR AND ROOF POWER PLAN AND REVISED EXISTING PANEL "PA" 96
13125088 E-113 HIGH ROOF POWER PLAN 97
13125089 E-601 RISER DIAGRAMS + EXISTING PANEL "PB" SCHEDULE 98
13125090 E-602 PANEL SCHEDULES 99
TELECOMMUNICATIONS
13125091 ET-101 FIRST FLOOR TELECOMMUNICATION PLAN 100
13125092 ET-102 FIRST FLOOR TELECOMMUNICATION PLAN HIGH BAY 101
13125093 ET-103 SECOND FLOOR TELECOMMUNICATION PLAN 102
13125094 ET-500 TELECOM RACK ELEVATIONS 103
13125095 ET-501 TELECOM OUTLET & TMGB DETAILS 104
13125096 ET-600 TELECOM RISER, ENLARGED PLAN, and TEMPORARY WORK 105
INDEX OF DRAWINGS
NAVFAC
DRAWING
NUMBER
SHEET
NUMBER SHEET TITLE
CURRENT
SHEET
NUMBER
GENERAL
13113637 G-001 COVER SHEET 1
13113638 G-002 DRAWING INDEX 2
13113639 G-003 GENERAL NOTES, ABBREVIATIONS & BUILDING SUMMARY 3
STRUCTURAL
13113640 S-001 GENERAL NOTES AND ABBREVIATIONS 4
13113641 SD101 SLAB DEMOLITION PLAN 5
13113642 SD102 ROOF DEMOLITION PLAN 6
13113643 S-101 SLAB AND FOUNDATION PLAN 7
13113644 S-102 ROOF PLAN 8
13113645 S-501 SECTIONS AND DETAILS 9
13113646 S-502 SECTIONS AND DETAILS 10
ARCHITECTURAL
13113647 AD001 DEMOLITION - FIRST FLOOR 11
13113648 AD002 DEMOLITION - REFLECTED CEILING PLAN - FIRST FLOOR 12
13113649 AD003 DEMOLITION SECOND FLOOR & REFLECTED CEILING PLAN 13
13113650 A-101 FIRST FLOOR PLAN 14
13113651 A-102 FIRST FLOOR REFLECTED CEILING PLAN 15
13113652 A-103 SECOND FLOOR AND REFLECTED CEILING PLANS 16
13113653 A-104 ROOF PLAN 17
13113654 A-200 EXTERIOR ELEVATIONS 18
13113655 A-201 EXTERIOR ELEVATIONS 19
13113656 A-320 WALL DETAILS 20
13113657 A-400 ENLARGED PLANS 21
13113658 A-401 RESTROOMS - ELEVATIONS 22
13113659 A-510 ROOF AND MISCELLANEOUS DETAILS 23
13113660 A-520 WINDOW AND CEILING DETAILS 24
13113661 A-601 PARTITION TYPES 25
13113662 A-603 DOOR SCHEDULE AND DETAILS 26
13113663 A-606 FINISH SCHEDULE 27
INTERIORS
13313664 I-101 FIRST FLOOR FURNITURE PLAN 28
13113665 I-102 SECOND FLOOR FURNITURE PLAN 29
13113666 I-201 FIRST FLOOR - FLOOR FINISH PLAN 30
13113667 I-202 SECOND FLOOR - FLOOR FINISH PLAN 31
FIRE ALARM
13113668 FA001 FIRE ALARM GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS 32
13113669 FAD101 FIRE ALARM - DEMOLITION FIRST FLOOR 33
13113670 FAD102 FIRE ALARM - DEMOLITION SECOND FLOOR 34
13113671 FA101 FIRE ALARM - FIRST FLOOR PLAN 35
13113672 FA102 FIRE ALARM - SECOND FLOOR PLAN 36
13113673 FA501 FIRE ALARM DETAILS 37
FIRE SUPPRESSION
13113674 FX001 FIRE SUPPRESSION GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS 38
13113675 FXD101 FIRE SUPPRESSION - DEMOLITION FIRST FLOOR 39
13113676 FXD102 FIRE SUPPRESSION - DEMOLITION SECOND FLOOR 40
13113677 FX101 FIRE SUPPRESSION - FIRST FLOOR PLAN 41
13113678 FX102 FIRE SUPPRESSION - SECOND FLOOR PLAN 42
13113679 FX501 FIRE SUPPRESSION DETAILS 43
LIFE SAFETY
13113680 LS001 LIFE SAFETY GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS 44
13113681 LS101 LIFE SAFETY - FIRST FLOOR PLAN 45
13113682 LS102 LIFE SAFETY - SECOND FLOOR PLAN 46
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
FE
DRAWING ABBREVIATIONS BUILDING SUMMARY
ANNOTATION CALLOUTS/DRAWING SYMBOLS
GENERAL NOTES
1. THE GC IS RESPONSIBLE FOR SAFETY ON THE WORK
SITE.
2. THE GC SHALL FIELD VERIFY DIMENSIONS PRIOR TO
BEGINNING WORK.
3. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS SHALL TAKE
PRECEDENCE. THE GC SHALL VERIFY ALL DIMENSIONS.
THE GC SHALL NOTIFY COR OF ANY DISCREPANCY. NO
VARIATION FROM THE CONTRACT DOCUMENTS IS PERMISSIBLE.
WITHOUT THE CONSENT OF THE COR..
4. EACH TRADE SHALL BE RESPONSIBLE FOR CLEANING UP AT THE
END OF EACH WORK DAY. THE JOBSITE SHALL BE LEFT BROOM
CLEAN. ALL DEBRIS SHALL BE TAKEN TO AN AREA DESIGNATED
BY THE COR. THE GC IS RESPONSIBLE FOR THE RE-
MOVAL OF DEBRIS FROM THE BUILDING.
5. GC IS RESPONSIBLE FOR MAINTAINING UTILITY
SERVICE TO THE OCCUPIED AREAS OF THE BUILDING. ANY
REQUIRED INTERRUPTION OF SERVICE SHALL NOT OCCUR WITHOUT
PRIOR APPROVAL FROM THE COR.
6. PROTECT EXISTING INDICATED TOREMAIN FROM DAMAGE.
7. THE GC IS RESPONSIBLE FOR THE COORDINATION OF
ALL TRADES AND FOR ENSURING THE QUALITY AND TIMELY
COMPLETION OF THE WORK.
8. THE GC SHALL MAINTAIN FREE AND UNOBSTRUCTED
ACCESS TO ALL FIRE STAIRS.
9. THE GC IS RESPONSIBLE FOR CONTROLLING THE
MIGRATION OF DUST AND DIRT INTO OCCUPIED AREAS OF THE
BUILDING. THE GC SHALL PROVIDE TEMPORARY
PROTECTION, BAFFLES, AND OTHER FILTERING DEVICES AS
REQUIRED.
10. THE GC SHALL PATCH AND REPAIR ALL SURFACES
DISTURBED BY THE REMOVAL, DEMOLITION AND INSTALLATION
OF NEW WORK REGARDLESS OF THE TRADE. THE FINISHING OF
THE REPAIR SHALL MATCH EXISTING CONDITIONS OR AS
INDICATED ON THE DRAWINGS.
11. THE GC SHALL CORRECT ANY VARIATION IN FINISHED
FLOOR ELEVATION CREATED BY THE REMOVAL OF A PARTITION
AND/OR ARCHITECTURAL FINISH.
12. UNLESS OTHERWISE NOTED, CENTER ALL MECHANICAL, ELECT-
RICAL, AND FIRE PROTECTION DEVICES - SURFACE -MOUNTED OR
RECESSED - WITHIN THE FIELD OF THE CEILING PANEL.
13. GRIDS ARE SHOWN FOR REFERENCE ONLY, VERIFY DIMENSIONS
IN FIELD.
DOOR OPENING STANDARD
OPTIONAL LINE ITEMS
GC TO PROVIDE PRICING FOR THE FOLLOWING:
1. EXTERIOR FINISHES: PATCH AND REPAIR DAMAGED
EXTERIOR FINISHES, TO INCLUDE EIFS, CONCRETE
SPALLING. ALL NEW WORK TO MATCH ADJACENT SURFACE
COLORS AND TEXTURE, AND FINISH.
2. REPLACE 14 DOUBLE HUNG WOOD WINDOWS WITH FIXED
HUNG WINDOWS TO MATCH OF APPEARANCE OF EXISTING.
REPLACE EXTERIOR ENTRY DOORS WITH NEW HOLLOW
METAL DOORS AND FRAMED AND SIMILAR DOOR HARDWARE.
3. PROVIDE CARD READERS AT EXTERIOR ENTRY DOORS AND
AS INDICATED AT INTERIOR DOORS.
4. OSS CONFIGURED SPACES AND REQUIRED DEVICES.
NORTH ARROW
ELEVATION
DATUM / BENCH
MARK
SECTION
GRAPHIC SCALE
INTERIOR ELEVATION DESIGNATION
DETAIL BOUNDARY
OUTLINE OF OBJECT ABOVE
BREAK LINES
CENTER LINES
PROPERTY LINES
PLAN/DETAIL/SECTION/ELEVATION TITLE
EXTERIOR ELEVATION
COLUMN LINE GRID DESIGNATION
KEYNOTE (NUMBER DESIGNATION)
REVISION DESIGNATION
PARTITION TYPE SYMBOLS
WINDOW SYMBOLS
FIRE EXTINGUISHER
FIRE EXTINGUISHER CABINET
A
EL. 0'-0"
FLOOR LEVEL
DETAIL NO.
SHEET. ON WHICH DETAIL IS SHOWN
SHEET. ON WHICH INTERIOR
ELEVATION IS SHOWN
DETAIL NO.
NEW WORK DEMO WORK SPECIALITY WORK
TRUE NORTH INDICATOR
A1
A-101
SIM
SCALE: 3"=1'-0"
04 2
A1
A-101
SIM
A101
SIM
PLAN
NORTH
0 0
A101
Ref
DETAIL NO.
A
DETAIL SECTION
A1/A-101 DETAIL NO./SHEET. ON WHICH
DETAIL IS SHOWN
View Name
SCALE: 1/8" = 1'-0"A1 A-1.01
DEMOLITION
SCALE: 1/8" = 1'-0"
FEC
6"
DOOR NUMBER
TYP. DOOR OPENING
TYP. DOOR OPENING OR
WALL LOCATION, UON
DOOR SWING
18"
MIN
UON
A
B
C
D
1 2 3 4 5
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
A
B
C
D
D E P A R T M E N T
O F
T H E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
DRAWFORM REVISION: 10 MARCH 2009
PM-DM: AM
BRANCH MANAGER: AL
CHIEF ENG/ARCH: AL
FIRE PREVENTIONS: KK
R
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
FAX: 571.218.1600
/3
0/
0:
:2
A M
As indicated
G -0
G E
N E
R A
L N
O T
E S
A
B B
R E
V
IA
T
IO
N S
B
U
IL
D
IN
G S
U M
M A
R Y
G-003
D
AH
LG
R
EN
VA
13113639
N40080-17-D-0018
1558383
XXX XXX XXX
G
EN
ER
AL
N O
TE
S
AB
B R
EV
IA
TI
O N S
B U
IL
D
IN
G
S U M M
AR
Y
N
AV
AL
S U P P O R T
FA
C
IL
IT
Y
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
W
AS
H
IN
G
TO
N
D .C
TH
E
N
AV
Y
YA
R D
WLT WATER LEAN-TO
WP WATERPROOF
WS -
WT WEIGHT
Y
YD YARD
PR PAIR
PROP PROPERTY
PSF POUNDS PER SQUARE
FOOT
PSI POUNDS PER SQUARE
INCH
PT PRESSURE TREATED
PVC POLYVINYL CHLORIDE
Q
QTY QUANTITY
R
RAD RADIUS
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REF REFERENCE
REINF REINFORCE(D)
REQ REQUIRED
REV REVISE / REVISION
RH RIGHT HAND
RM ROOM
RO ROUGH OPENING
RT RESILIENT TILE
S
S SOUTH
SC SOLID CORE
SCHED SCHEDULE
SECT SECTION
SF SQUARE FEET
SHT SHEET
SIM SIMILAR
SPEC SPECIFY / SPECIFICATION
SQ SQUARE
SQFT SQUARE FEET
SQIN SQUARE INCH(ES)
SSTL STAINLESS STEEL
SSU SOLID SURFACING
ST STONE
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURE /
STRUCTURAL
SUSP SUSPENDED
SYM SYMMETRICAL
T
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
TBD TO BE DETERMINED
TEL TELEPHONE
TEMP TEMPORARY /
TEMPERATURE
THK THICK
THRU THROUGH
TOC TOP OF CONCRETE
TOS TOP OF SLAB
TOW TOP OF WALL
TYP TYPICAL
U
UNF /
UNFIN
UNFINISHED
UON UNLESS OTHERWISE
NOTED
UTL UTILITY
V
VB VAPOR BARRIER
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VOL VOLUME
VT VINYL TILE
VTR VENT THRU ROOF
W
W/ WITH
WC WATER COOLER
WD WOOD
G
GA GAUGE
GALV GALVANIZE(D)
GC GENERAL CONTRACTOR
GFCI GOVERNMENT
FURNISHED,
CONTRACTOR INSTALLED
GFGI GOVERNMENT
FURNISHED,
GOVERNMENT INSTALLED
GL GLASS / GLAZING
GYP GYPSUM
GYP BD GYPSUM BOARD
H
H / HT HEIGHT
HD HEAVY DUTY
HDR HEADER
HDWR HARDWARE
HM HOLLOW METAL
HOR /
HORIZ
HORIZONTAL
HP HIGH POINT
HVAC HEATING / VENTILATION /
AIR CONDITIONING
I
IN INCH / INCHES
INSUL INSULATE / INSULATION
INT INTERIOR
INV INVERT
J
JAN JANITOR
JST JOIST
JT JOINT
K
KIT KITCHEN
L
LAB LABORATORY
LAM LAMINATE(D)
LAV LAVATORY
LB(S) POUND(S)
LF LINEAR FOOT (FEET)
LH LEFT HAND
LP LOW POINT
M
MAINT MAINTENANCE
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MEZZ MEZZANINE
MFR MANUFACTURE(R)
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MTL METAL
N
N NORTH
NA OR
N/A
NOT AVAILABLE /
APPLICABLE
NIC NOT IN CONTRACT
NO / # NUMBER
NOM NOMINAL
NTS NOT TO SCALE
O
OC ON CENTER
OH OPPOSITE HAND
OPNG OPENING
OSS OPEN SECRET STORAGE
P
PAT PATTERN
PL PLATE
PLAS PLASTER
PLM PLASTIC LAMINATE
PLYWD PLYWOOD
A
ADJ ADJACENT
AFB AIR FORCE BASE
AFF ABOVE FINISHED FLOOR
AP ACCESS PANEL
APC ACOUSTICAL PANEL
CEILING
APPROX APPROXIMATE
ARCH ARCHITECTURAL
AT/FP ANTITERRORISM FORCE
PROTECTION
B
BD BOARD
BLDG BUILDING
BLK BLOCK
BO BLOCK OPENING
BOT BOTTOM
C
CAP CAPACITY
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY
UNIT
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
COR CONTRACTING OFFICER
REPRESENTATIVE
CORR CORRIDOR
CTR CENTER
D
DEMO DEMOLISH, DEMOLITION
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIM DIMENSION
DIV DIVISION
DN DOWN
DS DISTRIBUTION SWITCH
DWG DRAWING
E
EDP ELECTRICAL
DISTRIBUTION PANEL
EL ELEVATION
ELEC ELECTRICAL
EMERG EMERGENCY
EQ EQUAL(LY)
EQUIP EQUIPMENT
EW EYE WASH
EX EXISTING
EXP EXPOSED
EXP JT EXPANSION JOINT
EXT EXTERIOR
F
FA FIRE ALARM
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER
CABINET
FF FINISHED FLOOR
FFE FIXTURES, FURNISHINGS
AND EQUIPMENT
FL FLOOR
FOC FACE OF CONCRETE
FOD FOREIGN OBJECT DEBRIS
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF STUDS
FOW FACE OF WALL
FS FLOOR SINK
FTG FOOTING
FUT FUTURE
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
UP
UP
1 2 3 4 5 6
LL
AA
H
K
F
C
J
G
E
D
B
109' - 2"
TYP
TYP
TYP
TYP
TYP
TYP
6 6
NIC
K.9
E.8
E.1
A.2
7 8
OFFICE
OFFICE
LABORATORYLABORATORY
MECHANICAL ROOM
LABORATORY
OFFICE
OFFICE
OFFICE
COPIER
ROOM
OFFICE
OFFICE
LAB
TECH OFFICE
CONFERENCE
OFFICE
OFFICE
TECH OFFICEOFFICE
OFFICE
CONFERENCE OFFICE
OFFICE
TECH
OFFICE
ROOM
COMM
OFFICETECH
LAB
OFFICE
OFFICE
OFFICE
CORRIDOR CORRIDOR
VEST
PANTRY
OFFICE
OFFICE
OFFICE
VEST
MEN'S
WOMEN'S
TYP
34' - 2"
TYP
TYP
TYP
TYP
A
B
C
D
1 2 3 4 5
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
A
B
C
D
D E P A R T M E N T
O F
T H E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
DRAWFORM REVISION: 10 MARCH 2009
PM-DM: AM
BRANCH MANAGER: AL
CHIEF ENG/ARCH: AL
FIRE PREVENTIONS: KK
R
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
FAX: 571.218.1600
PLAN
NORTH
8 1668
SCALE: 1/8"=1'-0"
4 02
KEYPLAN
/3
0/
0:
:2
A M
1/8" = 1'-0"
A D
1-
D E
M O
LI
T
IO
N
F
IR
S
T F
L O
O R
AD001
10511
D
AH
LG
R
EN
VA
13113647
N40080-17-D-0018
1558383
Designer Author Checker
D
EM
O
LI
TI
O N
FI
R S T
FL
O O R
N
AV
AL
S U P P O R T
FA
C
IL
IT
Y
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
W
AS
H
IN
G
TO
N
D .C
TH
E
N
AV
Y
YA
R D
1/8" = 1'-0"A1 DEMOLITION - FIRST FLOOR
1. REFER TO DRAWING G-003 FOR GENERAL NOTES,
ABBREVIATIONS, AND SYMBOLS.
2. COORDINATE EXTENT OF DEMOLITION WITH WORK
TO BE CONSTRUCTED
3. REFER TO MECHANICAL, PLUMBING, STRUCTURAL,
FIRE PROTECTION, AND ELECTRICAL DRAWINGS FOR
EXTENT OF SYSTEMS DEMOLITION.
4. REMOVE ALL FLOOR AND WALL FINISHES AFFECTED
WITHIN THE AREA OF WORK.
5. HATCHED AREAS ARE NOT IN CONTRACT.
6. PREPARE EXISTING SURFACES TO RECEIVE NEW
WORK.
7. DEMOLISH ALL CASEWORK; BASEBOARD; PANELING,
MOLDINGS, CHAIR RAIL AND TRIM; COLUMN
SURROUNDS; ESCUTCHEON AND COVER
PLATES; AND SOFFIT ASSEMBLIES THROUGHOUT.
1. DEMOLISH DOOR AND FRAME ASSEMBLY.
2. DEMOLISH ALL FLOOR FINISHES, INCLUDING ADHESIVES AND
MECHANICAL CONNECTIONS CLEAR TO CONCRETE SLAB.
3. DEMOLISH PARTITION, TYP
4 ROOF ACCESS LADDER TO REMAIN
5 DEMOLISH ALL PLUMBING FIXTURES.
6 DEMOLISH TOILET PARTITIONS, ACCESSORIES, AND
SUPPORTS TO STRUCTURE.
7 REMOVE THE DOOR, FRAME TO REMAIN
8 DEMOLISH DOUBLE HUNG WINDOW. TYP OF 14.
9 FIXED CASEMENT WINDOWS TO REMAIN.
10 REMOVE CONCRETE WALL AND FURRING FOR NEW DOOR
AND FRAME, REF. NEW WORK A-101
11 OPEN STAIR & LANDING ABOVE TO REMAIN
12 REMOVE DOOR HARDWARE, PREP FOR NEW HARDWARE
13 REMOVE DOOR, DOOR FRAME, AND STOREFRONT SYSTEM.
PREP FOR INFILL PARTITION AND NEW DOOR
GENERAL NOTES
KEY NOTES - DEMOLITION
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
1 2 3 4 5 6
L
A
H
K
F
C
J
G
E
D
B
TYP
TYP
TYP
K.9
E.8
E.1
A.2
7 8
TYP
1 1
A
B
C
D
1 2 3 4 5
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
A
B
C
D
D E P A R T M E N T
O F
T H E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
DRAWFORM REVISION: 10 MARCH 2009
PM-DM: AM
BRANCH MANAGER: AL
CHIEF ENG/ARCH: AL
FIRE PREVENTIONS: KK
R
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
FAX: 571.218.1600
PLAN
NORTH
8 1668
SCALE: 1/8"=1'-0"
4 02
KEYPLAN
/3
0/
0:
:2
A M
1/8" = 1'-0"
A D
2-
D E
M O
LI
T
IO
N
R E
F
LE
C T
E D
C E
IL
IN
G P
LA
N
F
IR
S
T F
LO
O
R
AD002
10512
D
AH
LG
R
EN
VA
13113648
N40080-17-D-0018
1558383
Designer Author Checker
D
EM
O
LI
TI
O N
EF
LE
C
TE
D
C
EI
LI
N G
P
LA
N
FI
R S T
FL
O O R
N
AV
AL
S U P P O R T
FA
C
IL
IT
Y
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
W
AS
H
IN
G
TO
N
D .C
TH
E
N
AV
Y
YA
R D1/8" = 1'-0"A1
DEMOLITION - FIRST FLOOR - REFLECTED
CEILING PLAN
1. REFER TO DRAWING G-003 FOR GENERAL NOTES,
ABBREVIATIONS, AND SYMBOLS.
2. REMOVE ALL LIGHT FIXTURES WITHIN AREA OF
WORK. REFER TO ELECTRICAL DRAWINGS FOR
ADDITIONAL INFORMATION.
3. COORDINATE EXTENT OF DEMOLITION WITH NEW
WORK
4. REFER TO MECHANICAL, PLUMBING, ELECTRICAL,
AND LIFE SAFETY/ FIRE PROTECTION FOR ADDITIONAL
INFORMATION.
1. REMOVE ALL SUSPENDED ACOUSTICAL CEILING
SYSTEMS AND ALL CEILING MOUNTED FIXTURES AND
DEVICES THROUGHOUT.
2. REMOVE PROJECTOR SUPPORTS AND SCREEN
3. REMOVE GWB CEILING AND ALL CEILING MOUNTED
FIXTURES AND DEVICES
4. EXPOSED CEILING TO REMAIN
GENERAL NOTES
DEMOLITION KEY NOTES
NIC
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
1 2
F
C
NIC
NIC
7 6
O P
E N
5 6
NIC
1 2
A
F
C
NIC
NIC
OFFICE
OFFICEOFFICEOFFICE
OFFICE
CORRIDOR
NIC
TYP
TYP
DN
UP
O P
E N2
2 2
A
B
C
D
1 2 3 4 5
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
A
B
C
D
D E P A R T M E N T
O F
T H E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
DRAWFORM REVISION: 10 MARCH 2009
PM-DM: AM
BRANCH MANAGER: AL
CHIEF ENG/ARCH: AL
FIRE PREVENTIONS: KK
R
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
FAX: 571.218.1600
8 1668
SCALE: 1/8"=1'-0"
4 02
KEYPLAN
/3
0/
0:
:2
A M
1/8" = 1'-0"
A D
3-
D E
M O
LI
T
IO
N
S E
C O
N D
F L
O O
R
R E
F L
E C
T E
D C
E
IL
IN
G
P L
A N
AD003
10513
D
AH
LG
R
EN
VA
13113649
N40080-17-D-0018
1558383
Designer Author Checker
D
EM
O
LI
TI
O N
S
EC
O N D
FL
O O R
R
EF
LE
C
TE
D
C
EI
LI
N G
P
LA
N
N
AV
AL
S U P P O R T
FA
C
IL
IT
Y
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
W
AS
H
IN
G
TO
N
D .C
TH
E
N
AV
Y
YA
R D
1/8" = 1'-0"C1
DEMOLITION SECOND FLOOR -
REFLECTED CEILING PLAN
1/8" = 1'-0"A1 DEMOLITION - SECOND FLOOR PLAN
1. REFER TO DRAWING G-003 FOR GENERAL NOTES,
ABBREVIATIONS, AND SYMBOLS.
2. COORDINATE EXTENT OF DEMOLITION WITH WORK TO BE
CONSTRUCTED.
3. REFER TO MECHANICAL, PLUMBING, STRUCTURAL, FIRE
PROTECTION, AND ELECTRICAL DRAWINGS FOR EXTENT
OF SYSTEMS DEMOLITION.
4. REMOVE ALL FLOOR AND WALL FINISHES AFFECTED
WITHIN THE AREA OF WORK.
5. HATCHED AREAS ARE NOT IN CONTRACT.
6. PREPARE EXISTING SURFACES TO RECEIVE NEW WORK.
1. DEMOLISH DOOR AND FRAME ASSEMBLY.
2. DEMOLISH ALL FLOOR FINISHES, INCLUDING ADHESIVES AND
MECHANICAL CONNECTIONS CLEAR TO DECKING.
3. DEMOLISH GYPSUM WALL BOARD AND FRAMING ASSEMBLIES
4. EXISTING DOOR AND FRAME TO REMAIN
5. REMOVE ALL CEILING MOUNTED FIXTURES THROUGHOUT
6. REMOVE ACOUSTIC PANEL CEILING SYSTEMS, TYP.
7. EXISTING BULKHEAD TO REMAIN.
GENERAL NOTES
KEY NOTES - DEMOLITION
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
UP
1 2 3 4 5 6
LL
AA
H
K
F
C
47' - 10" 17' - 0" 10' - 0" 20' - 0" 14' - 4"
109' - 2"
J
G
E
D
B
/2
/2
/2
/2
119A
121120
OPEN OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OSS
CONFERENCE
OFFICE
OFFICE
WOMEN'S
MEN'S
BREAK ROOM
OFFICE
TECH LAB
OFFICE
MECHANICAL
LAB
OFFICE
NIC
/2
/2
K.9
E.8
E.1
A.2
7 8
AA A A
A
A
A
A
A
A
AAA
12' - 9"6' - 6"
V
IF
10' - 11"
A-401
A-200 C1
A-200 A1
A-201 A1
A-201 C1
130B
A-400
A1
OPEN OFFICE
OPEN OFFICE
C O
R R
ID
O
R
OFFICE
VEST
130A
CORR
1 1
A 5
10' - 11"
A-400
A3
" 5
0"
OF
OB
OF
OA
OB
OB OB
OC
OB
OB
OB
OB
OB
OB
OB
OD
OF
OF
OD
0'
1"
8' - 7"
OB
OB
D1
A4
A-320
A-320
A2
SPRINKLER
JANITOR
107 108
9' - 4" A
L
IG
N .
A L
IG
N
VEST
A-201 B1
OB
OB
OB
A-200 D1
1' - 2" 3' - 9"
OB
OB
OB OB
OB
LACTATION
OD
C2
A-510
B
12' - 6"
TYP
SIM
A4
A-320
OB
TYP
TYP
A-510
C4
101A
A-320
A1
OB
A
B
C
D
1 2 3 4 5
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
A
B
C
D
D E P A R T M E N T
O F
T H E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
DRAWFORM REVISION: 10 MARCH 2009
PM-DM: AM
BRANCH MANAGER: AL
CHIEF ENG/ARCH: AL
FIRE PREVENTIONS: KK
R
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
FAX: 571.218.1600
PLAN
NORTH
8 1668
SCALE: 1/8"=1'-0"
4 02
KEYPLAN
/3
0/
0:
:5
A M
1/8" = 1'-0"
A -1
F
IR
S T
F L
O O
R P
L A
N
A-101 10514
D
AH
LG
R
EN
VA
13113650
N40080-17-D-0018
1558383
XXX XXX XXX
FI
R S T
FL
O O R
P
LA
N
N
AV
AL
S U P P O R T
FA
C
IL
IT
Y
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
W
AS
H
IN
G
TO
N
D .C
TH
E
N
AV
Y
YA
R D
1/8" = 1'-0"A1 FIRST FLOOR PLAN
1. REFER TO DRAWING G-003 FOR ARCHITECTURAL SYMBOLS,
ABBREVIATIONS AND LEGENDS.
2. ALL NEW PARTITIONS ARE OA, UNO. SEE DRAWING A-601
FOR PARTITION TYPES.
3. HATCHED AREAS ARE NOT IN CONTRACT.
4. REVIEW CHALK OUTLINES WITH GOVERNMENT
REPRESENTATIVE PRIOR TO CONSTRUCTION OF
PARTITIONS.
5. IF DIMENSIONS CONFLICT, BRING CONFLICT TO ATTENTION
OF GOVERNMENT RESPRESENTATIVE PRIOR TO
PROCEEDING WITH CONSTRUCTION.
6. REFER TO SHEET A-603 FOR DOOR SCHEDULE
7. FOR ADDITIONAL DIMENSIONS REFER TO ENLARGED PLAN
8. REFER TO SHEET A-520 FOR WINDOW REPLACEMENT
INFORMATION
GENERAL NOTES
KEY NOTES
1 ALIGN PARTITION WITH EDGE OF WINDOW JAMB
FIX DOOR IN PLACE, SEAL WEATHER TIGHT
TICKET WINDOW, REFER TO WINDOW SCHEDULE
PROVIDE FURRING ABOVE CEILING AT BUILDING
PERIMETER, TYPICAL. REFER TO B3/A-320
REPLACE DOOR HARDWARE
PLUMBING CHASE, WITH ACCESS PANEL AT 1'-0" AFF
FOLDING WALL SYSTEM.
ROOF ACCESS LADDER
INFILL OPENING WALL TO MATCH EXISTING ADJACENT
FINISH AND COLOR
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
1 2 3 4 5 6
L
AA
F
C
J
G
E
D
B
K.9
E.8
E.1
A.2
7 8
A-400
C1
A-400
C3
NIC
OPEN OFFICE
MECHANICAL
LAB
CORR
OPEN OFFICE
OSS
CORRIDOR
CORRIDOR
CONFERENCE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
TECH LAB
BREAK ROOM
MEN'S
WOMEN'S
OPEN OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
VEST
OFFICE
OFFICE
OFFICE
JANITOR
SPRINKLER
VEST
LACTATION
CONFERENCE
5 5
2 35
2x2 LIGHTING FIXTURE
1x4 LIGHTING FIXTURE
2x4 LIGHTING FIXTURE
2x2 DIFFUSER
EXIT SIGN
LIGHTING FIXTURE
2x2 INTAKE
2x2 CEILING TILE PANEL
GWB CEILING
LIGHTING FIXTURE
PENDANT LIGHT
A
B
C
D
1 2 3 4 5
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
A
B
C
D
D E P A R T M E N T
O F
T H E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
DRAWFORM REVISION: 10 MARCH 2009
PM-DM: AM
BRANCH MANAGER: AL
CHIEF ENG/ARCH: AL
FIRE PREVENTIONS: KK
R
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
FAX: 571.218.1600
PLAN
NORTH
8 1668
SCALE: 1/8"=1'-0"
4 02
KEYPLAN
/3
/2
:2
:2 P
M
1/8" = 1'-0"
A -1
F
IR
S
T F
L O
O R
R E
F L
E C
T E
D C
E
IL
IN
G
P L
A N
A-102 10515
D
AH
LG
R E N
VA
13113651
N40080-17-D-0018
1558383
XXX XXX XXX
FI
R S T
FL
O O R
R
EF
LE
C
TE
D
C E
IL
IN
G
P
LA
N
N
AV
AL
S U P P O R T
FA
C
IL
IT
Y
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
W
AS
H
IN
G
TO
N
D .C
TH
E
N
AV
Y
YA
R D
1/8" = 1'-0"B1
FIRST FLOOR - REFLECTED CEILING PLAN
1. REFER TO PLUMBING, MECHANICAL, ELECTRICAL, FIRE
SUPPRESSION, FIRE ALARM AND TELECOMMUNICATION
DRAWINGS FOR ALL VENTS, SPRINKLER HEADS, GRILLES,
REGISTERS, DIFFUSERS, DUCTS, LIGHTS, DETECTORS,
ETC. AND COORDINATE SAME AS REQUIRED.
2. COORDINATE ALL STRUCTURAL, PLUMBING, MECHANICAL,
FIRE SUPPRESSION, AND ELECTRICAL WORK WITH
CEILING HEIGHTS AND ARCHITECTURAL WORK. WHERE
CONFLICTS IN DEVICES OCCUR, COORDINATE FINAL
LOCATIONS WITH COR.
3. EXTEND ALL PARTITIONS TO UNDERSIDE OF SLAB OR
ROOF DECK (TYPICAL) UNLESS OTHERWISE NOTED.
4. REFER TO ROOM FINISH SCHEDULE FOR CEILING
MATERIALS, FINISHES, AND HEIGHTS.
5. ALL CEILING MOUNTED OR RECESSED ITEMS SHOWN OR
NOT, ON REFLECTED CEILING PLANS, SUCH AS
SPRINKLER HEADS, SPEAKER, GRILLES, LIGHTS, ETC.
SHALL BE CENTERED IN THE LAY-IN PANELS. AT GYPSUM
WALLBOARD CEILINGS, INSTALL IN A CONSISTENT
PATTERN.
6. REFER TO ELECTRICAL FOR LIGHTING FIXTURES TYPE
AND SIZE.
7. REFER TO A-520 FOR TYPICAL CEILING DETAILS AND
FIXTURE LAYOUTS.
8. WHERE CONFLICT IN CEILING DEVICES OCCURS,
COORDINATE WITH THE COR.
9. IF MECHANICAL/ELECTRICAL/PLUMBING REQUIRE AN
ACCESS PANEL IN A GYPSUM WALLBOARD CEILING,
COORDINATE LOCATION WITH COR
10. REFER TO ELECTRICAL FOR LIGHTING FIXTURES TYPE
AND SIZE.
GENERAL NOTES
KEY NOTES
1 NO CEILING, OPEN ABOVE
PROJECTOR MOUNT
MOTORIZED RECESSED PROJECTION SCREEN
PAINTED GWB CEILING, AS SCHEDULED
TV WALL MOUNTED (NIC) PROVIDE BLOCKING
LEGEND
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
DN
A
F
C
OPEN OFFICE
NIC
UP
OFFICE
OA
DN
DN
1 2
A
F
C
OPEN OFFICE
NIC
OFFICE
1OE
NIC
NIC
2x2 LIGHTING FIXTURE
1x4 LIGHTING FIXTURE
2x4 LIGHTING FIXTURE
2x2 DIFFUSER
EXIT SIGN
LIGHTING FIXTURE
2x2 INTAKE
2x2 CEILING TILE PANEL
GWB CEILING
LIGHTING FIXTURE
PENDANT LIGHT
A
B
C
D
1 2 3 4 5
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
A
B
C
D
D E P A R T M E N T
O F
T H E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
DRAWFORM REVISION: 10 MARCH 2009
PM-DM: AM
BRANCH MANAGER: AL
CHIEF ENG/ARCH: AL
FIRE PREVENTIONS: KK
R
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
FAX: 571.218.1600
PLAN
NORTH
8 1668
SCALE: 1/8"=1'-0"
4 02
KEYPLAN
/3
0/
0:
:5
A M
1/8" = 1'-0"
A -1
S E
C O
N D
F
LO
O R
A N
D R
E F
LE
C
T E
D C
E
IL
IN
G
P L
A N
S
A-103 10516
D
AH
LG
R
EN
VA
13113652
N40080-17-D-0018
1558383
XXX XXX XXX
S
EC
O N D
FL
O O R
AN
D
R
EF
LE
C
TE
D
C
EI
LI
N G
P
LA
N S
N
AV
AL
S U P P O R T
FA
C
IL
IT
Y
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
W
AS
H
IN
G
TO
N
D .C
TH
E
N
AV
Y
YA
R D
1/8" = 1'-0"A1 SECOND FLOOR PLAN
1/8" = 1'-0"C1
SECOND FLOOR - REFLECTED CEILING
PLAN
LEGEND
GENERAL NOTES
1. REFER TO PLUMBING, MECHANICAL, ELECTRICAL, FIRE
SUPPRESSION, FIRE ALARM AND TELECOMMUNICATION
DRAWINGS FOR ALL VENTS, SPRINKLER HEADS, GRILLES,
REGISTERS, DIFFUSERS, DUCTS, LIGHTS, DETECTORS,
ETC. AND COORDINATE SAME AS REQUIRED.
2. COORDINATE ALL STRUCTURAL, PLUMBING, MECHANICAL,
FIRE SUPPRESSION, AND ELECTRICAL WORK WITH
CEILING HEIGHTS AND ARCHITECTURAL WORK. WHERE
CONFLICTS IN DEVICES OCCUR, COORDINATE FINAL
LOCATIONS WITH COR.
3. REFER TO ELECTRICAL FOR LIGHTING FIXTURES TYPE
AND SIZE.
4. REFER TO ROOM FINISH SCHEDULE FOR CEILING
MATERIALS, FINISHES, AND HEIGHTS.
5. ALL CEILING MOUNTED OR RECESSED ITEMS SHOWN OR
NOT, ON REFLECTED CEILING PLANS, SUCH AS
SPRINKLER HEADS, SPEAKER, GRILLES, LIGHTS, ETC.
SHALL BE CENTERED IN THE LAY-IN PANELS. AT GYPSUM
WALLBOARD CEILINGS, INSTALL IN A CONSISTENT
PATTERN.
6. NOTIFY COR OF ALL ITEMS NOT SHOWN ON REFLECTED
CEILING PLAN AND LOCATE PER ARCHITECT/ENGINEER
DIRECTION.
7. REFER TO A-520 FOR TYPICAL CEILING DETAILS AND
FIXTURE LAYOUTS.
8. WHERE CONFLICT IN CEILING DEVICES OCCURS,
COORDINATE WITH THE COR.
9. IF MECHANICAL/ELECTRICAL/PLUMBING REQUIRE AN
ACCESS PANEL IN A GYPSUM WALLBOARD CEILING,
COORDINATE LOCATION WITH COR
10. REFER TO ELECTRICAL FOR LIGHTING FIXTURES TYPE
AND SIZE.
GENERAL NOTES
1 EXPOSED TO STRUCTIRE ABOVE
FURRING PARTITION, ABOVE BULKHEAD2
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
1 2 3 4 5 6
LL
AA
H
K
F
C
J
G
E
D
B
MONITOR NO.2MONITOR NO.1
K.9
E.8
E.1
A.2
7 8
A-200 C1
A-200 A1
A-201 A1
A-201 C1
SLOPE
S L O
P E
SLOPE
A-201 B1
A-200 D1
A
B
C
D
1 2 3 4 5
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
A
B
C
D
D E P A R T M E N T
O F
T H E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
DRAWFORM REVISION: 10 MARCH 2009
PM-DM: AM
BRANCH MANAGER: AL
CHIEF ENG/ARCH: AL
FIRE PREVENTIONS: KK
R
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
FAX: 571.218.1600
PLAN
NORTH
8 1668
SCALE: 1/8"=1'-0"
4 02
KEYPLAN
/3
0/
0:
:5
A M
1/8" = 1'-0"
A -1
R O
O F
P L
A N
A-104 10517
D
AH
LG
R
EN
VA
13113653
N40080-17-D-0018
1558383
SJW MP KH
R O O F P
LA
N
N
AV
AL
S U P P O R T
FA
C
IL
IT
Y
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
W
AS
H
IN
G
TO
N
D .C
TH
E
N
AV
Y
YA
R D
1/8" = 1'-0"A1 ROOF PLAN - OVERALL
1. ALL COUNTER FLASHING AND MISCELLANEOUS
METAL FLASHING SHALL HAVE ELASTOMERIC
SEALANT APPLIED AT END CONDITIONS.
2. ALL EXPOSED FASTENERS SHALL BE CORROSION
RESISTANT.
3. AT ALL ROOF PENETRATIONS, FILL AIR GAPS WITH
SPRAY FOAM INSULATION TO MAINTAIN AIR
TIGHTNESS.
4. ALL ROOF SYSTEM MODIFICATIONS SHALL BE
FURNISHED AND INSTALLED PER ROOF
MANUFACTURER'S INSTRUCTIONS AND STANDARDS.
WORK PROVIDED MUST MAINTAIN ANY EXISTING
ROOF WARRANTIES.
GENERAL NOTES
KEY NOTES
1 METAL GUTTERS EXISTING
METAL ROOF ACCESS LADDER, EXISTING, PREP,
PRIME AND PAINT
METAL EGRESS STAIRS, LANDINGS AND HANDRAILS.
EXISTING, PREP, PRIME AND PAINT.
VINYL FASCIA TRIM TO MATCH EXISTING COLOR TYPE AND
DIMENSIONS
ROOF TOP UNIT, REFER MECHANICAL FOR SIZE AND
CONNECTIONS
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
FIRST FLOOR
0' - 0"
SECOND FLOOR
PLAN
14' - 4"
L
HIGH ROOF
32' - 0"
A H KFC
FIRST FLOOR
0' - 0"
SECOND FLOOR
PLAN
14' - 4"
23456
HIGH ROOF
32' - 0"
4 5
6 TYP
FIRST FLOOR
0' - 0"
K.9E.8E.1A.2
VEST
8 TYP
A
B
C
D
1 2 3 4 5
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
A
B
C
D
D E P A R T M E N T
O F
T H E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
DRAWFORM REVISION: 10 MARCH 2009
PM-DM: AM
BRANCH MANAGER: AL
CHIEF ENG/ARCH: AL
FIRE PREVENTIONS: KK
R
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
FAX: 571.218.1600
8 1668
SCALE: 1/8"=1'-0"
4 02
KEYPLAN
/3
0/
0:
:5
A M
1/8" = 1'-0"
A -2
E X
T E
R
IO
R E
LE
V
A T
IO
N
S
A-200 10518
D
AH
LG
R
EN
VA
13113654
N40080-17-D-0018
1558383
Designer Author Checker
EX
TE
R
IO
R
EL
EV
AT
IO
N S
N
AV
AL
S U P P O R T
FA
C
IL
IT
Y
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
W
AS
H
IN
G
TO
N
D .C
TH
E
N
AV
Y
YA
R D
1/8" = 1'-0"C1 EAST ELEVATION
1/8" = 1'-0"A1 NORTH ELEVATION
GENERAL NOTES
KEY NOTES
1 PATCH AND REPAIR CONCRETE SPALLING. APPROX. 10 SF
METAL EGRESS STAIRS LANDINGS AND HANDRAILS
EXISTING, PREP, PRIME AND PAINT
REPLACE WOOD FASCIA IN ITS ENTIRETY WITH MATCHING
COLOR VINYL TRIM.
TOUCH UP / PATCH AND REPAIR AREAS OF EIFS BETWEEN
COLUMNS 6 - 8
PAINT ENTIRE FAḈADE, WITH CONCRETE PAINT TO MATCH
EXISTING COLOR
FIXED REPLACEMENT WINDOWS TYP
EXISTING FIXED WINDOWS TO REMAIN, TYP
REPAINT EIFS FINISH IN ITS ENTIRETY, COLOR TO MATCH
EXISTING
C1
A1
1. REFER TO DRAWING G-003 FOR GENERAL NOTES
2. ORIGINAL WINDOW IS NOTED AS "DOUBLE HUNG
SASH WINDOW.
3. ALL GLASS IN THE EXTERIOR WINDOWS SHALL BE
INSULATED DOUBLE - COLOR TO BE SIMILAR TO
THE ORIGINAL.
4. FINAL COLOR SELECTION BY COR FOR APPROVAL
1/8" = 1'-0"D1 EXTERIOR ELEVATION
D1
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
FIRST FLOOR
0' - 0"
SECOND FLOOR
PLAN
14' - 4"
4 5 6 7 8
2 2
FIRST FLOOR
0' - 0"
SECOND FLOOR
PLAN
14' - 4"
HIGH ROOF
32' - 0"
K.9 E.8 A.2
BEYOND
4 TYP6
FIRST FLOOR
0' - 0"
SECOND FLOOR
PLAN
14' - 4"
L AJ G E D BE.8 E.1
VEST
5 7 3 77
A
B
C
D
1 2 3 4 5
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
A
B
C
D
D E P A R T M E N T
O F
T H E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
DRAWFORM REVISION: 10 MARCH 2009
PM-DM: AM
BRANCH MANAGER: AL
CHIEF ENG/ARCH: AL
FIRE PREVENTIONS: KK
R
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
FAX: 571.218.1600
8 1668
SCALE: 1/8"=1'-0"
4 02
KEYPLAN
/3
0/
0:
:0
A M
1/8" = 1'-0"
A -2
E X
T E
R
IO
R E
LE
V
A T
IO
N
S
A-201 10519
D
AH
LG
R
EN
VA
13113655
N40080-17-D-0018
1558383
SJW MP KH
EX
TE
R
IO
R
EL
EV
AT
IO
N S
N
AV
AL
S U P P O R T
FA
C
IL
IT
Y
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
W
AS
H
IN
G
TO
N
D .C
TH
E
N
AV
Y
YA
R D
1/8" = 1'-0"C1 SOUTH ELEVATION
1/8" = 1'-0"A1 WEST ELEVATION
GENERAL NOTES
KEY NOTES
1 REPLACE WOOD FASCIA IN ITS ENTIRETY WITH MATCHING
COLOR VINYL TRIM.
PATCH AND REPAIR EIFS WITH MATCHING CONSTRUCTION
FINISH AND TEXTURE, APPROX. 40 SF
PAINT ENTIRE FAḈADE, WITH CONCRETE PAINT TO MATCH
EXISTING COLOR
EXISTING FIXED WINDOWS TO REMAIN, TYP
METAL ROOF ACCESS LADDER, EXISTING, PREP, PRIME AND
PAINT.
REPAINT EIFS FINISH IN ITS ENTIRETY. COLOR TO MATCH
EXISTING
FIXED REPLACEMENT WINDOWS, TYP
C1
A1
1. REFER TO DRAWING G-003 FOR GENERAL NOTES
2. ORIGINAL WINDOW IS NOTED AS "DOUBLE HUNG
SASH WINDOW.
3. ALL NEW GLASS IN THE EXTERIOR WINDOWS SHALL
BE INSULATED DOUBLE - COLOR TO BE SIMILAR TO
THE ORIGINAL.
4. FINAL COLOR SELECTION BY COR FOR APPROVAL
1/8" = 1'-0"B1 EXTERIOR ELEVATION
B1
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
12' - 7"
A-520
A2
FOR NEW
WINDOW ONLY
VIF
B
OF
1' - 2"
EQ EQ
E Q
E Q
OF
G
/2
EQ EQ
1' - 2 1/2"
OBOB
OA
ALIGN
A
B
C
D
1 2 3 4 5
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
A
B
C
D
D E P A R T M E N T
O F
T H E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
DRAWFORM REVISION: 10 MARCH 2009
PM-DM: AM
BRANCH MANAGER: AL
CHIEF ENG/ARCH: AL
FIRE PREVENTIONS: KK
R
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
FAX: 571.218.1600
8 1668
SCALE: 1/8"=1'-0"
4 0 11
SCALE: 1 1/2"=1'-0"
01/22
/3
0/
0:
:0
A M
1 1/2" = 1'-0"
A -3
W A
L L
D E
T A
IL
S
A-320 10520
D
AH
LG
R
EN
VA
13113656
N40080-17-D-0018
1558383
XXX XXX XXX
W
AL
L D
ET
AI
LS
N
AV
AL
S U P P O R T
FA
C
IL
IT
Y
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
W
AS
H
IN
G
TO
N
D .C
TH
E
N
AV
Y
YA
R D
1 1/2" = 1'-0"A4 WALL SECTION - BLDG. PERIMETER
1 1/2" = 1'-0"A2 PLAN DETAIL - COLUMN FURRING
1. REFER TO DRAWING G-003 FOR ARCHITECTURAL SYMBOLS,
ABBREVIATIONS AND LEGENDS.
2. IF DIMENSIONS CONFLICT, BRING CONFLICT TO ATTENTION
OF GOVERNMENT RESPRESENTATIVE PRIOR TO
PROCEEDING WITH CONSTRUCTION.
GENERAL NOTES
KEY NOTES
1 CONTINUE GYP BD TO UNDERSIDE OF DECK ON METAL
STUDS FILLED WITH INSULATION, LEVEL 4 FINISH, PAINTED
CEILING AS SCHEDULED
EXTERIOR WALL, EXISTING
WINDOW. REFER TO WINDOW SCHEDULE AND A-101 FOR
NEW WINDOW LOCATIONS
5/8" GYP BD TIGHT TO COLUMN
COLUMN, EXISTING
WINDOW, EXISTING
1 1/2" = 1'-0"B2 PLAN DETAIL
1 1/2" = 1'-0"A1 FIRST FLOOR - Callout 3
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
2 3 4
F
G
E
A-401
MEN'S
106 WOMEN'S
C L C L
C L 1
C L C L
C L
4' - 0"
C L C L
FD
FD
9"
7' - 6"
A-401
A2
A3
A1A4
A-401 B1
B4
B3
B2
BREAK ROOM
D1
5' - 1" 2' - 0" 5' - 1"
8' - 11" 9' - 0"
JANITOR
LACTATION
9' - 4"
A-320
B2
2 3 4
F
G
E
MEN'S
WOMEN'S
5' - 11"
BREAK ROOM
LACTATION
5 6
J
G
CONFERENCE
C2
A-510
6 6
2 3 4
F
G
E
A-401
A-401
A2
A3
A1A4
A-401 B1
B4
B3
B2
MEN'S
WOMEN'S
25 11
4TYP
TYP
10TYP TYP5
D1
BREAK ROOM
JANITOR
A
B
C
D
1 2 3 4 5
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
A
B
C
D
D E P A R T M E N T
O F
T H E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
DRAWFORM REVISION: 10 MARCH 2009
PM-DM: AM
BRANCH MANAGER: AL
CHIEF ENG/ARCH: AL
FIRE PREVENTIONS: KK
R
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
FAX: 571.218.1600
PLAN
NORTH
42 4 8134
SCALE: 1/4"=1'-0"
/3
0/
0:
:0
A M
1/4" = 1'-0"
A -4
E N
L A
R G
E D
P
LA
N S
A-400 10521
D
AH
LG
R
EN
VA
13113657
N40080-17-D-0018
1558383
XXX XXX XXX
EN
LA
R G
ED
P
LA
N S
N
AV
AL
S U P P O R T
FA
C
IL
IT
Y
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
W
AS
H
IN
G
TO
N
D .C
TH
E
N
AV
Y
YA
R D
1/4" = 1'-0"A1
ENLARGED PLAN - RESTROOMS -
(DIMENSIONS)
1/4" = 1'-0"C1
ENLARGED RESTROOMS - REFLECTED
CEILING PLAN
1/4" = 1'-0"C3
REFLECTED CEILING PLAN -
CONFERENCE ROOM
GENERAL NOTES
KEY NOTES
1. REFER TO ELECTRICAL AND MECHANICAL FOR TYPICAL
SYMBOLS AND ADDITIONAL INFORMATION
1. REFER TO DRAWING A-101 FOR GENERAL NOTES.
2. REFER TO DRAWING A-401 FOR ACCESSORY HEIGHTS
3. TOILET COMPARTMENT AND TOILET PARTITION SHALL BE
SOLID COLOR REINFORCED COMPOSITE SYSTEM.
4. TOILET COMPARTMENT DOOR SHALL MATCH TOILET
PARTITION.
5. COAT HOOK (ON BACK OF EACH STALL DOOR), UON.
6. MIN. 2 SURFACE MOUNTED SOAP DISPENSER PER
COUNTER, UON.
7. MULTI-ROLL TOILET TISSUE DISPENSER PER EACH STALL.
8. ALL (WOMEN) STALLS TO HAVE SANITARY NAPKIN
DISPOSAL UNITS.
9. TOILET PARTITION TO BE CEILING MOUNTED, UON.
10. PROVIDE SEAT COVER DISPENSER IN EACH TOILET STALL,
UON.
11. WHERE THERE IS COUNTERTOP, PROVIDE UNDER MOUNT
STAINLESS STEEL SINK THAT MOUNTS TO THE SOLID
SURFACE.
12. ADA/ABA TOILET COMPARTMET'S DOOR SHALL BE 34".
1/4" = 1'-0"A3
ENLARGED PLAN - RESTROOMS
(EQUIPMENT)
ACCESS PANEL
WALL WASHER RECESSED, REFER TO ELECTRICAL
EMERGENCY LIGHTING
MOTORIZED RECESSED PROJECTION SCREEN,
PROJECTOR MOUNT
TV WALL MOUNTED NIC. PROVIDE BLOCKING AS NEEDED.
COORDINATE LOCATION OF OUTLET AND BLOCKING WITH COR
1 MIRROR
2 STAINLESS STEEL GRAB BAR
3 WATER CLOSET
4 URINAL
5 TOILET SEAT COVER DISPENSER
6 MULTI-ROLL TOILET DISPENSER
7 TOILET PARTITION
8 URINAL SCREEN
9 COUNTER TOP SOAP DISPENSER
10 COAT HOOK (MOUNTED ON MACK OF STALL DOOR)
11 SANITARY NAPKIN / TAMPON DISPOSAL UNIT
(WOMEN'S TOILET STALLS ONLY)
TOILET EQUIPMENT SCHEDULE
12 RECESSED COMBINATION TOWEL / WASTE UNITS
13 WATER COOLER
14 BROOM HOLDER
15 MOP SINK
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
VARIES 6" MAX
3'-0"'
MAX
ACCESSIBLE
URINAL
TYPICAL
TOILET
STALL
ACCESSIBLE
TOILET STALL
T O
P O
F R
IM
DOOR
1/ 2"
C L
C L
/2
C L
TPD
M
IN
10 5 12 11 13 1 5
V A
R
IE
S
"3
0"
7EQ. EQ. 1' - 6" 1' - 0"
3' - 4"
3' - 6" 1' - 0"
7"-9"
3 3
FIRST FLOOR
0' - 0"
FIRST FLOOR
0' - 0"
A-520
A1
FIRST FLOOR
0' - 0"
A-520
A1 A-520
A1
OH
FIRST FLOOR
0' - 0"
F EE.1
FIRST FLOOR
0' - 0"
E
D3
A-401
.2 '-1
FIRST FLOOR
0' - 0"
12 6
A-520
A1
FIRST FLOOR
0' - 0"
EE.1
FIRST FLOOR
0' - 0"
3 4
A-520
A1
A-520
A1
OH
FIRST FLOOR
0' - 0"
C3
A-401
C4
A-401
G
BEYOND
G
'-8
E Q
E Q
0' - 8"
'-3
0' - 11"
.2 '-1
A
B
C
D
1 2 3 4 5
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
A
B
C
D
D E P A R T M E N T
O F
T H E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
DRAWFORM REVISION: 10 MARCH 2009
PM-DM: AM
BRANCH MANAGER: AL
CHIEF ENG/ARCH: AL
FIRE PREVENTIONS: KK
R
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
FAX: 571.218.1600
42 4 8134
SCALE: 1/4"=1'-0"
/3
0/
0:
:1
A M
As indicated
A -4
R E
S T
R O
O M
S
E
LE
V
A T
IO
N
S
A-401 10522
D
AH
LG
R
EN
VA
13113658
N40080-17-D-0018
1558383
Designer Author Checker
R
ES
TR
O O M
EL
EV
AT
IO
N S
N
AV
AL
S U P P O R T
FA
C
IL
IT
Y
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
W
AS
H
IN
G
TO
N
D .C
TH
E
N
AV
Y
YA
R D
3/8" = 1'-0"C1
RESTROOM ACCESSORIES - TYP
MOUNTING HEIGHTS
1. REFER TO DRAWING A-101 FOR GENERAL NOTES.
2. TOILET COMPARTMENT, TOILET PARTITION SHALL BE
SOLID COLOR REINFORCED COMPOSITE SYSTEM.
3. TOILET COMPARTMENT DOOR SHALL MATCH TOILET
PARTITION.
4. COAT HOOK (ON BACK OF EACH STALL DOOR), UON.
5. MIN. 2 SURFACE MOUNTED SOAP DISPENSER PER
COUNTER, UON.
6. MULTI-ROLL TOILET TISSUE DISPENSER PER EACH STALL.
7. ALL (WOMEN) STALLS TO HAVE SANITARY NAPKIN
DISPOSAL UNITS.
8. TOILET PARTITION TO BE CEILING MOUNTED, UON.
9. PROVIDE SEAT COVER DISPENSER IN EACH TOILET STALL,
UON.
10. WHERE THERE IS COUNTERTOP, PROVIDE UNDER MOUNT
STAINLESS STEEL SINK THAT MOUNTS TO THE SOLID
SURFACE.
11. ADA/ABA TOILET COMPARTMET'S DOOR SHALL BE 34".
GENERAL NOTES
1 MIRROR
2 STAINLESS STEEL GRAB BAR
3 WATER CLOSET
4 URINAL
5 TOILET SEAT COVER DISPENSER
6 MULTI-ROLL TOILET DISPENSER
7 TOILET PARTITION
8 URINAL SCREEN
9 COUNTER TOP SOAP DISPENSER
10 COAT HOOK (MOUNTED ON MACK OF STALL DOOR)
11 SANITARY NAPKIN / TAMPON DISPOSAL UNIT
(WOMEN'S TOILET STALLS ONLY)
TOILET EQUIPMENT SCHEDULE
12 RECESSED COMBINATION TOWEL / WASTE UNITS
13 WATER COOLER
1/4" = 1'-0"A1 ELEVATION
1/4" = 1'-0"A2 ELEVATION
1/4" = 1'-0"A3 ELEVATION
1/4" = 1'-0"A4 ELEVATION
1/4" = 1'-0"B1 ELEVATION
1/4" = 1'-0"B2 ELEVATION
1/4" = 1'-0"B3 ELEVATION
1/4" = 1'-0"B4 ELEVATION
14 BROOM HOLDER
15 MOP SINK
1/2" = 1'-0"D1 CABINETS ELEVATION
1" = 1'-0"C3 CABINET SECTION
1" = 1'-0"C4 CABINET SECTION
1" = 1'-0"D3 LAVATORY DETAIL
SCALE: 3"=1'-0"
04 2
KEY NOTES:
COUNTER TOP SUPPORT, REFER TO STRUCTURAL
VERTICAL SUPPORTS IN PARTITIONS
3 ANCHOR BOLTS WITHIN PARTITION, REFER TO STRUCTURAL
4 PIPE PROTECTION
5 BLOCKING
6 COUNTER TOP SUPPORT
GYP BD BULKHEAD ALIGNED W/ CABINETS
PLASTIC LAMINATE
9 WIRE PULL TYP
10 PRE-FABRICATED SOLID SURFACE, COUNTER TOP AND
FULL HEIGHT BACK SPLASH
11 WOOD FRAMING
12 DRAIN PIPE REFER TO MECHANICAL
14 UNDER COUNTER KITCHEN SINK TYPE, ADA COMPLIANT
15 DRAWER
16 SCHEDULED CEILING
17 ADJUSTABLE SHELF
18 BACK AND SIDE SPLASH
19 ADA CLEARANCE, MIN
FILLER PANEL AS REQUIRED
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
'-0
M
IN
F L A
S H
IN
G
H E
IG
H
T
NOTES:
1. VENT STACKS AND OTHER PIPES SHOULD HAVE A
MINIMUM OF 12 INCHES OF CLEARANCE ON ALL
SIDES FROM WALLS, CURBS, AND OTHER
PROJECTIONS.
M
IN
F L A
S H
IN
G
H
IG
H T
NOTES:
1. THE PREFABRICATED GALV STEEL CURB, TOP
TREATED WOOD NAILER, AND SEAL STRIP ARE TO BE
PROVIDED BY THE ROOF CURB MANUFACTURER.
2. THE MECHANICAL UNITS SHALL NOT BE SET UNTIL THE
ROOF MEMBRANE AND FLASHING HAVE BEEN
INSTALLED.
NOTE:
GRAB BARS ATTACHMENTS TO PARTITIONS, AND TOILET PARTITIONS WITHSTAND 250 POUNDS (MINIMUM) OF DOWN PRESSURE
0' - 7"
C L
0' - 7"
G
2' - 9" 1' - 0" 1' - 0"
4' - 9"
OA OA
OB
A
B
C
D
1 2 3 4 5
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
A
B
C
D
D E P A R T M E N T
O F
T H E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
DRAWFORM REVISION: 10 MARCH 2009
PM-DM: AM
BRANCH MANAGER: AL
CHIEF ENG/ARCH: AL
FIRE PREVENTIONS: KK
R
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
FAX: 571.218.1600
SCALE: 3"=1'-0"
04 2
/3
0/
0:
:1
A M
As indicated
A -5
R O
O F
A N
D M
IS
C
E L
LA
N
E O
U S
D E
T A
IL
S
A-510 10523
D
AH
LG
R
EN
VA
13113659
N40080-17-D-0018
1558383
SJW MP KH
R O O F
AN
D
M
IS
C
EL
LA
N
EO
U S
D
ET
AI
LS
N
AV
AL
S U P P O R T
FA
C
IL
IT
Y
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
W
AS
H
IN
G
TO
N
D .C
TH
E
N
AV
Y
YA
R D
3" = 1'-0"C1
TYP PIPE PENETRATION ROOF FLASHING
DETAIL
3" = 1'-0"A1 PREFAB METAL ROOF CURB DETAIL
3" = 1'-0"A2 GRAB BAR AT STUD PARTITION
3" = 1'-0"A4 GRAB BAR AT TOILET PARTITION
CERAMIC TILE WHERE OCCURS
5/8" GWB - 1/2" CEMENT BOARD AT CERAMIC TILE
LOCATIONS
METALSTUD PARTITION (DOUBLE STUD)
2 - 2X6 WOOD BLOCKING
KEY NOTES:
5 MOUNTING PLATE BY BAR MANUFACTURER
2" DIAMETER STEEL SLEEVE6
TOILET PARTITION, BY MANUFACTURER
GRAB BAR ANCHORS BY BAR MANUFACTURER
1 1/2" DIAMETER GRAB BAR, REFER TO TOILET
ENLARGEMENT AND ELEVATIONS
WATERTIGHT STAINLESS STEEL RAIN COLLAR
SEALANT AROUND POST
PIPE PENETRATION
STAINLESS STEEL DRAW BAND
MEMBRANE FLASHING
EXISTING ROOF MEMBRANE SYSTEM
HIGH DOMED CAPPED GASKETED FASTENERS MIN 2"
FASTENERS PER SIDE
SHEET METAL FLASHING RECEIVER
REMOVABLE SHEET METAL COUNTER FLASHING
SEALANT AS REQUIRED BY THE SPECIFIC SYSTEM
NAILER IN PRE-MANUFACTURED CURB20
UNDERSIDE OF STRUCTURE. REFER TO STRUCTURAL
GWB ON METAL STUDS WITH 3" SOUND
ATTENUATION BLANKET
CEILING AS SCHEDULED23
TRACK SYSTEM AND BRACKET MOUNT, REFER TO
STRUCTURE FOR SUPPORT PLACEMENT AND SIZING
FOLDING PARTITION25
STEEL BOTTOM FRAME AND DROP SEAL26
FINISH FLOOR27
3" = 1'-0"C2 FOLDING PARTITION - SECTION DETAIL
GWB TO ALIGN WITH SCHEDULED CEILING28
1/2" = 1'-0"C4 ENLARGED PLAN
C CHANNEL, REFER TO STRUCTURAL29
EXISTING COLUMN30
STACKED PANELING AREA31
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
1' - 0"
8"
4 12
3' - 4"
A2/A-520
A2/A-520
B1/A-520
NOTE:
VERIFY ALL DIMENSIONS IN FIELD
C3/A-520
C3/A-520
C2/A-520
TYPE A
TYPE B
2' - 0"
3' -6
A
F F
ALIGN
A
L
IG
N .A L
IG
N
HEAD
SILL
0' - 4"
16 17
CORR
OFFICE
3' - 6"
AFF
0' - 2"
0' - 8"
A
B
C
D
1 2 3 4 5
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
A
B
C
D
D E P A R T M E N T
O F
T H E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
DRAWFORM REVISION: 10 MARCH 2009
PM-DM: AM
BRANCH MANAGER: AL
CHIEF ENG/ARCH: AL
FIRE PREVENTIONS: KK
R
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
FAX: 571.218.1600
SCALE: 1 1/2"=1'-0"
01/2
/3
0/
0:
:1
A M
As indicated
A -5
W
IN
D O
W A
N D
C E
IL
IN
G D
E T
A
IL
S
A-520 10524
D
AH
LG
R
EN
VA
13113660
N40080-17-D-0018
1558383
XXX XXX XXX
W
IN
D O W
AN
D
C
EI
LI
N G
D
ET
AI
LS
N
AV
AL
S U P P O R T
FA
C
IL
IT
Y
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
W
AS
H
IN
G
TO
N
D .C
TH
E
N
AV
Y
YA
R D
1 1/2" = 1'-0"A1 CEILING DETAIL
LIGHT FIXTURE LENS, EGG CRATE
LIGHT FIXTURE AS SCHEDULED, REFER TO ELECTRICAL
2 1/2" METAL STUDS WITH 5/8" GWB
SCHEDULED CEILING
KEY NOTES:
5 SCHEDULED PARTITION
1" = 1'-0"
WINDOW TYPES
3" = 1'-0"B1 JAMB WINDOW DETAIL
3" = 1'-0"A2 HEAD /SILL FIXED WINDOW DETAIL
C1
EXTERIOR WALL
SHIM AS REQUIRED
METAL FLASHING WITH DAM END
BACKER ROD AND SEALANT BOTH SIDES
10 INTEMEDIATE FIXED WINDOW MULLION
1 1/2" = 1'-0"A4 PROJECTOR SCREEN DETAIL
1 1/2" = 1'-0"A5 ACCESS PANEL DETAIL
ACCESS DOOR
MOUNTING BOLT PER MANUFACTURER'S
RECOMMENDATIONS EACH SIDE
13 MOUNTING BRACKETS BY PROJECTOR SCREEN
MANUFACTURER
ELECTRONIC PROJECTION SCREEN, MOUNT AT HEIGHT
TO ALLOW SCREEN DOWEL TO BE ABOVE FINISHED
CEILING WHEN FULLY RETRACTED
METAL CEILING FRAMING OR CONTINUOUS
PERIMETER CHANNEL
FASTEN TO FRAMING
METAL DOOR WITH FLUSH SCREW DRIVER. OPERATED
CAM LATCH AND FLUSH AND CONTINUOUS HINGE. PAINT
TO MATCH CEILING
18 SPEAK THRU
SCALE: 3"=1'-0"
04 2
3" = 1'-0"C3 TICKET WINDOW - SECTION DETAIL
3" = 1'-0"C2 JAMB WINDOW DETAIL
WINDOW MULLION SYSTEM
TELLER WINDOW, WITH SPEAK THRU AND DEAL
OPENING
SNAP LOCK
STAINLESS STEEL SHELF
23 WINDOW BLINDS AS SCHEDULED
24 WINDOW SILL EXTENSION
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
CHASE PARTITION
N/A N/A
2'-0" TYP 2'-0" TYP
/2
"VARIES- SEE PLAN
/2
*4 1/4" 4 1/4"
8 " AT FIRST FLOOR UON.
4" AT SECOND FLOOR UON.
SCHEDULED FLOOR,
REFER TO FINISH
SCHEDULE
3 5/8" METAL STUDS @ 24" O.C.
5/8" GYPSUM BOARD ON BOTH SIDE.
TYPE X @ 24 OC
CONTINUOUS METAL STUD TOP
RUNNER, W/ DEFLECTION TRACK
SYSTEM
ACOUSTIC SELANTS. FILL ALL
VOIDS TIGHTLY WITH
RATED FIRE STOP MATERIAL
SCHEDULED CEILING
3" SOUND ATTENUATION BLANKET.
VINYL BASE, UON
SEALANT ON BOTH SIDES
CONT. METAL STUD FLOOR RUNNER.
UNDERSIDE OF STRUCTURAL
SLAB
FIRE RATING:
STC RATING:
0B
DESIGN:
TEST NO.:
RAL - TL99-10349+ STC
PLAN
SILL
HEAD
3 5/8" METAL STUDS @ 24" O.C.
5/8" GYPSUM BOARD ON
BOTH SIDE.
CONTINUOUS METAL STUD
TOP RUNNER
CONTINUOUS ACOUSTICAL
TAPE.
SCHEDULED CEILING
3" SOUND ATTENUATION BLANKET.
SEALANT @ BOTH SIDES
CONTINUOUS METAL STUD
FLOOR RUNNER
2 1/2" ACOUSTICAL BATT
INSULATION. CENTERED ON
PARTITION
CEILING SUPPORT AS REQ'D
UNDERSIDE OF STRUCTURAL
SLAB
WIDTH: 5 1/4"
FIRE RATING:
STC RATING:
0A
DESIGN:
TEST NO.:
- N/A
N/A-
GYPSUM BOARD PARTITION
PLAN
SILL
HEAD
CL
CL
SCHEDULED FLOOR,
REFER TO FINISH
SCHEDULE
VINYL BASE, UON
FLOOR
STRUCTURE
CEILING
1. LIMITING HEIGHTS INDICATE THE MAXIMUM UNSUPPORTED HEIGHT FOR
THAT PARTITION TYPE BASED ON A DEFLECTION CRITERIA RATIO OF
L/240. WHERE FLOOR TO STRUCTURE HEIGHT OF PARTITION EXCEEDS
THE INDICATED LIMITING HEIGHT, PROVIDE SUPPLEMENTAL BRACING AS
REQUIRED TO MAINTAIN DEFLECTION RATIO WITHIN L/240.
2. PROVIDE MOISTURE RESISTANT GWB AT WET LOCATIONS, WITHOUT
TILE I.E. TOILET ROOMS, MOP SINKS.
3. PROVIDE CEMENTITIOUS BACKER FOR TILE BACK UP AT RESTROOM AREAS.
4. PROVIDE TYPE-X GYPSUM WALL BOARD IN ALL RATED PARTITIONS.
5. PROVIDE BLOCKING WHERE ALL WALL ACCESSORIES AND ARTWORK
ARE LOCATED.
L
IM
IT
IN
G H
E
IG
H T
SUPPLEMENTAL
BRACING
FIRE RATING:
STC RATING:
0E
DESIGN:
TEST NO.:
N/A -
-N/A
HEAD
PLAN
SILL
SEALANT
METAL STUDS - 2 1/2"
@24" O.C.
EXISTING OR NEW CONCRETE
MASONRY WALL
SCHEDULED CEILING
FIRE RATING:
STC RATING:
0F
DESIGN:
TEST NO.:
HEAD
PLAN
SILL
SEALANT
5/8" GWB
METAL STUDS - 2 1/2"
@24" O.C.
SCHEDULE CEILING
C H
A
C O
L U
M N
C H
A S
E O
R C
O L U
M N
C H
A
C O
L
SCALE: NTS
WIDTH: 4 7/8"FULL HEIGHT GYPSUM BOARD PARTITION
SCALE: NTS
FURRING PARTITION
WIDTH: VARIES
SCALE: NTS
FURRING PARTITION WIDTH: VARIES
SCALE: NTS
FIRE RATING: DESIGN:
TEST NO.:STC RATING:
0C
PLAN
SILL
HEAD
SEALANT CONTINUOUS AT
PERIMETER
UNDERSIDE OF STRUCTURE
SCHEDULED CEILING
METAL STUDS - 3 5/8" @ 16" OC
SEALANT
8 " CEMENTITIOUS BD., BOTH SIDES
WALL TILE (WHERE OCCURS)
CERAMIC TILE THINSET OVER
CEMENTITIOUS BACKERBOARD
(WHERE
OCCURS)
NOTE: CERAMIC TILE INSTALLATION SHALL COMPLY WITH
TCA #B412-03 STANDARDS AND REGULATIONS.
15" @ RESTROOM
WIDTH: VARIES
SCALE: NTS
COMPRESSIBLE SEALANT
OC WIDTH:PARTITION (OB) WITH 6" METAL STUDS 7 1/4"
VINYL BASE, UON.
VINYL BASE, UON.
SCHEDULED BASED, BOTH SIDES
5/8" GWB
(PROVIDE IMPACT RESISTANT
GWB AT TOOL ROOMS)
DEFLECTION
TRACK SYSTEM
3" BATT INSULATION
(SOUND ATTENUATION)
DEFLECTION TRACK SYSTEM
HEAD
DEFLECTION TRACK SYSTEM
UNDERSIDE OF STRUCTURAL
SLAB
PARTITION AS SCHEDULED
DEFLECTION TRACK SYSTEM
GENERAL PARTITION INFORMATION
ACOUSTICAL SEALANT
N/A
A
B
C
D
1 2 3 4 5
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
A
B
C
D
D E P A R T M E N T
O F
T H E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
DRAWFORM REVISION: 10 MARCH 2009
PM-DM: AM
BRANCH MANAGER: AL
CHIEF ENG/ARCH: AL
FIRE PREVENTIONS: KK
R
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
FAX: 571.218.1600
/3
0/
0:
:1
A M
3" = 1'-0"
A -6
P A
R T
IT
IO
N T
Y P
E S
A-601 10525
D
AH
LG
R
EN
VA
13113661
N40080-17-D-0018
1558383
XXX XXX XXX
P
AR
TI
TI
O N
TY
P
ES
N
AV
AL
S U P P O R T
FA
C
IL
IT
Y
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
W
AS
H
IN
G
TO
N
D .C
TH
E
N
AV
Y
YA
R D
1. WHERE FIRE TEST IS INDICATED IN PARTITION DESCRIPTION, CONFIGURE AND
INSTALL PARTITION PER TESTING AGENCY CRITERIA OR OTHER TESTS
APPROVED BY LOCAL CODE OFFICIALS. TESTING AGENCY CRITERIA MAY
INCLUDE ADDITIONAL COMPONENTS NOT SPECIFICALLY INDICATED ON
REFERENCED DETAILS.
3. ALL FIRE-RATED PARTITIONS SHALL BE FULL HEIGHT TO DECK ABOVE.
PROVIDE CONTINUOUS FIRE-RATED SEALANT AT ALL EDGES.
4. WHERE A PARTITION IS INDICATED TO BE FIRE-RATED, PROVIDE THROUGH-
PENETRATION FIRE STOPPING (TESTED AND COMPATIBLE WITH LEVEL OF
RATING INDICATED) AT ALL PENETRATIONS THROUGH PARTITION.
5. DUCT PENETRATIONS THROUGH SOUND BARRIER PARTITIONS SHALL
RECEIVE PERIMETER SOUND SEAL BETWEEN DUCT AND WALL FRAMING ON
BOTH SIDES OF GYPSUM WALLBOARD LAYER MEETING DUCT SURFACES.
6. FINISH ALL EXPOSED GYPSUM WALLBOARD CONSTRUCTION. FINISH
SHALL BE IN ACCORDANCE WITH THE ROOM FINISH SCHEDULE AND/OR
FINISH LEVELS NOTED IN THE GYPSUM WALLBOARD ASSEMBLIES
SPECIFICATION SECTION.
7. PARTITION ARE PERPENDICULAR AND/OR PARALLEL TO COLUMN GRID.
UNLESS OTHERWISE NOTED.
8. NOTES TO 'ALIGN' MEAN TO ALIGN FINISH FACE OF PARTITION UNLESS
OTHERWISE NOTED AND SHALL HAVE PRIORITY OVER DIMENSIONED
LOCATIONS.
9. AT ALL ROOMS DESIGNATED AS "TELECOM" PROVIDE 3/4", A/C GRADE OR
BETTER, VOID-FREE FIRE RESISTANT PLYWOOD, KILN-DRIED TO MAXIMUM
MOISTURE CONTENT OF 15%, ON FACE OF PARTITIONS INDICATED ON
TELECOM DRAWINGS. EXTEND PLYWOOD FROM 4" ABOVE FLOOR TO 8'-4" AFF.
FASTEN PLYWOOD THROUGH GYPSUM BOARD TO STEEL STUDS WITH 2"
SCREWS AT 16" O.C., EACH WAY. GYPSUM BOARD CONCELED BY PLAYWOOD
NEED NOT BE PAINTED. FACE 'A' SIDE OF PLYWOOD OUTWARD INTO
ROOM.
10. PROVIDE WATER(MOISTURE)-RESISTANT GYPSUM BOARD AT ALL
PARTITIONS WHERE PLUMBING FIXTURES ARE MOUNTED UNLESS
OTHERWISE NOTED.
11. WHERE FURRED AREA REQUIRES ELECTRICAL COMPONENTS THAT REQUIRE
GREATER CLEARANCE, USE 1-5/8" (20 GAGE) STEEL STUDS AT 16" O.C. IN LIEU
OF 7/8" "HAT SECTIONS".
12. PROVIDE STEEL STUDS OF GAGE AND SPACING ADEQUATE TO SUPPORT
APPLIED LOADS INCLUDING HANDRAILS, GRAB BARS, WALL MOUNTED
FIXTURES, ETC.
13. LIMITING HEIGHTS SHOWN ARE BASED ON MINIMUM STUD SECTION
PROPERTIES AS LISTED IN THE STEEL STUD MANUFACTURER'S
ASSOCIATION PRODUCT TECHNICAL INFORMATION PUBLICATION. WHERE
GYPSUM BOARD IS PROVIDED ON ONE SIDE ONLY LIMITING HEIGHTS ARE
BASED ON NON- COMPOSITE ACTION. WHERE GYPSUM BOARD IS PROVIDED
NO BOTH SIDES LIMITING HEIGHTS ARE BASED ON COMPOSITE ACTION.
14. WHERE NOTED UL DESIGNS REFERENCE PROPRIETARY MATERIALS,
EQUIVALENT MATERIALS FROM OTHER MANUFACTURERS WILL ONLY BE
APPROVED UPON SUBMISSION BY THE CONTRACTOR OF EVIDENCE OR A
SUCCESSFUL FIRE TEST BY AN INDEPENDENT TESTING LABORATOTY OF THE
PROPOSED MANUFACTURER'S ASSEMBLY INDICATING COMPLIANCE WITH THE
LISTED FIRE-RESISTANT RATING.
15. IN PARTITIONS WITH SOUND ATTENUATION BLANKETS LOCATE ELECTRICAL
DEVICES IN DEMISING PARTITION AS INDICATED.
16. PROVIDE WOOD BLOCKING IN ALL STUD AND GYPSUM BOARD PARTITIONS
FOR ALL FIRE PROTECTION CABINETS, CASEWORK, FINISH HARDWARE
ITEMS, GRAB BARS, TOILET ACCESSORIES, TOILET PARTITIONS, HANDRAILS,
CAMERAS, PLUMBING, MECHANICAL, ELECTRICAL ITEMS, ETC. AS REQUIRED.
17. PROVIDE BLOCKING IN ALL INTERIOR PARTITIONS AND EXTERIOR WALLS AS
REQUIRED TO SECURE ALL EQUIPMENT, ACCESSORIES, HANDRAILS,
CASEWORK, ETC.
18. FOR ALL PARTITION TYPES WITH STC RATINGS LISTED PROVIDE
ACOUSTICAL SEALANT AT ALL JOINTS AND INTERSECTIONS WITH
DISSIMILAR MATERIALS AND OTHER LOCATIONS REQUIRING SEALANT.
19. SEALANT IS INDICATED AT PERIMETER OF ACOUSTICAL AND FIRE RATED
PARTITIONS ON PARTITION TYPES. LIFE SAFETY PLANS INDICATE CERTAIN
ROOMS TO HAVE PARTITIONS TO RESIST THE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .