BLDG 198 Renovations_RFI Master list 4.20.20.docx

DOCX document 34 KB Posted

Attached to
Building 198 Renovations onboard NSF Dahlgren, VA
Solicitation number
N4008020R0305
Issued by

View the file

Other files

File Type Posted
198 Renovations_Amendment 0007.doc DOC document
B198 hardware-Option 3.pdf PDF
198 Renovations_Amendment 0006.doc DOC document
Appendix 5_6 FIre Protection Hydrant Flow TEst.pdf PDF
B198 Renovations-Electronic Security System (ESS) Specifications (1).pdf PDF
Audio Video System Specifications.pdf PDF
Window Detail photo.pdf PDF
Bldg 198 photo 4.15.20 (Redacted).pdf PDF
198 Renovations_Amendment 0005.doc DOC document
Appendix 5_6 Fire Suppression CALCULATIONS.pdf PDF
1558383 B198 ESS AND AV SYSTEM Drawings 1-22-2020 (1).pdf PDF
BLDG 198 Renovations_RFI Master list 4.23.pdf PDF
01 35 26.pdf PDF
07 53 23.pdf PDF
Window Detail photo 2.pdf PDF
198 Renovations_Amendment 0004.doc DOC document
B198 Renovations-Electronic Security System (ESS) Specifications.pdf PDF
1558383 B198 ESS AND AV SYSTEM Drawings 1-22-2020.pdf PDF
198 Renovations_Amendment 0003.doc DOC document
198 Renovations_Amendment 0002.doc DOC document
198 Renovations_Amendment 0001.doc DOC document
NAVFAC_Dahlgren B198_SID Binder_FINAL_30JAN2020.pdf PDF
RFP for B198 Renovations.docx DOCX document
NAVFAC Dahlgren B198 Renovation - IFC Drawings 20_0130.pdf PDF
NAVFAC Dahlgren B198 Renovation - IFC Specifications 20_0130.pdf PDF
NAVFAC_Dahlgren B198_FFE Binder_FINAL_30JAN2020.pdf PDF
Expected Visitor Requests with instructions.doc DOC document
SECNAV_5512_1_11787 APPROVED AC PASS ID FORM 05282014.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

198 Renovation RFI’s: (SEE Attached Photo’s, AV Specifications, Additional Specifications, Flow TEST,)

1. Under the work restrictions spec 01 14 00 para 1.5.1.2.2 it mentions that work in the secure area must be completed by U.S Secret-cleared personnel. Please identify the secure area of the project as this is a bid/no bid determining factor for not only our subcontractors, but our team as well.

Gov’t Response: None of the requested work spaces are “secure” areas…meaning none of the requested work areas are SCIF’s, OSS spaces etc.

2. Some of the walls are STC 50 Rated; however, on the door schedule on page A601 they call for standard doors. Please advise.

Gov’t Response: Doors rating are to match the partition ratings where they are found.

3. In the specification 1.5.1.2.2 Finish Work specifies that finish work within the secure area must be done by U.S. SECRET cleared personnel. If this is a correct statement and requirement is Open Office 131 a secure space? Are there any other rooms classified as secure?

Gov’t Response: See response to #1

4. In the specification 01 30 01.00 22 it lists as a submittal the contractors FF&E designer’s Qualifications. In this section it also states that the interior design services must be included in the base bid CLIN. It appears that the FF&E package has been designed and approved per NAVFAC_Dahlgren+B198 FFE+Binder_FINAL_30JAN2020 document. Are there additional design requirements or design meetings required?

Gov’t Response: The FF&E package has been designed and approved by NAVFAC. It is the GC requirement to coordinate with NAVFAC concerning the package and deliverables. FF&E allowance amount is located in the RFP under 0006. The HAR rate is also mentioned in this section.

5. Please confirm that the preconstruction meeting will be held at Indian Head Naval Base and not NSW Dahlgren per specification section 01 30 01.00 22 1.5.1.

Gov’t Response: The preconstruction meeting will be held at NSW Dahlgren.

6. In the specification 01 50 00 – 3.9 Dumpsters it states that the dumpsters need to be painted with the standard installation color. Will this requirement be enforced and if so, what is the standard installation color?

Gov’t Response: This is in reference for permanent dumpsters. Dumpsters for demolition/construction materials do not fall under this requirement.

7. Where will the worker parking be located?

Gov’t Response: Recommend contractor parking be located across the street where we recently added additional parking for B213.

8. Is there access at/close to the building for loading and unloading trucks?

Gov’t Response: Yes

9. Specification 01 32 01.00 10 address the requirements for a P6 construction schedule. Specification section 01 32 16.00 20 address the requirements for a Microsoft Project schedule for small contracts. Which schedule - P6 or Microsoft Project will be used for this project?

Gov’t Response: Microsoft Project is to be used.

10. Specification section 02 81 00 transportation and Disposal of Hazardous Materials has been included the documents, has a hazardous material survey been performed and can it be provided?

Gov’t Response: See HAZMAT Survey at the end of Div 2 of specifications

11. Can we get a contact name and number for the base fire alarm contractor?

Gov’t Response: Please coordinate with Karen Keczmerski ( karen.t.keczmerski@navy.mil) with PW department and she will coordinate with Base fire alarm contractor.

12. Can we get a contact name and number for the base BACnet contractor?

Gov’t Response: Please coordinate with Christopher Jordan (chris.jordan@navy.mil) with the PW department and he will coordinate with Base wide DDC Systems.

13. How many contractor supervisors are required? Is dual hatting allowed on this project? i.e. QC / SSHO same person?

Gov’t Response: No, this project is not required to be a three-hat minimum. The SSHO and the Superintendent can be the same person, but the CQC cannot be the SSHO or Superintendent. This project can be a dual-hat project.

14. Please confirm that the Government will be moving all equipment, furnishings, personal items, tools and/or other Government contents currently contained in each room prior to the start of construction?

Gov’t Response: Yes, the Government will be moving all equipment, furnishings, personal items, tools and/or other Government contents currently contained in each room prior to the start of construction.

15. Please refer to the RFP Price Schedule Note (f) which states; If awarded, Bid Item 0006 will be funded separately after completion of FF&E design review, acceptance of FF&E package, and receipt of appropriate funding. The design for the FF&E itself is performed under the Base Item. Please confirm that this correct and that the Offerors are to include the design for the FF&E itself under the Base Item 0001?

Gov’t Response: Confirmed

16. Please provide revised Price Schedule with the FFE amt and Har line item.

Gov’t Response: Please see section 006 for FF&E and HAR rate.

17. Please provide pictures of all areas walked at Pre-bid for the Interior and Exterior.

Gov’t Response: NAVFAC to provide any/all pictures requested during the pre-bid site visit.

18. The elevation of the Lavatory on A-401/B1 & A4 indicate covered plumbing, however the Section A-401/D3 does not convey that design. Which is correct, please advise?

Gov’t Response: A-401/D3 conveys the design. The piping is not covered.

19. The EY security drawings seem to be missing? “REFER TO "EY" SERIES DRAWINGS FOR SECURITY SYSTEM AND CONTROLLED ACCESS DEVICE LOCATIONS”. Please provide.

Gov’t Response: Please refer to amendment for the ‘Security drawing and specifications’.

20. Under “Time for Completion” in the General Requirements section of the RFP it states there will be 260 day to complete the construction. Under Contract Clause 52.211-10, it states that there is 636 to complete construction. Please confirm construction duration.

Gov’t Response: The RFP has been updated to state 240 days for the construction duration.

21. Spec section 01 11 00 para 1.4 identified scheduling conflicts due to NASA operations. Please confirm if this is applicable to this contract.

Gov’t Response: Reference to NASA operations can be deleted/ignored.

22. Spec Section 01 11 00 states that the building will remain occupied during construction. Please clarify if the work area will be fully vacated for the duration of the project. If any of the work area will remain occupied during the construction and if any specific phasing is required, please clarify and provide specifics.

Gov’t Response: The areas to be renovated will be fully vacated throughout the duration of the project. B198 spaces that will remain in use and occupied during the renovations include the adjoining high bay.

23. Section 011400-1.5.1.2.1 states that “General Construction must be performed by US Firms using US Citizens”, but 1.6.1 mentions foreign nationals. Please clarify if this project is restricted to only US Citizens. Are Legal Residents permitted?

Gov’t Response: NSWCDD does not have specific requirements/limitations concerning this matter. Personnel proposed to perform work on this project must be vetted and approved by base Pass and ID for access to base. If NAVFAC contracts/ACQ. has specific requirements regarding this matter, they too should be followed.

24. Spec section 01 14 00 para 1.5.1.2.2 states that finish work must be completed by U.S. Secret-cleared personnel. Please confirm this requirement and identify what is considered the “secure space”. Please respond to this question ASAP as this will be a bid/no-bid decision for many contractors and subcontractors.

Gov’t Response: Same response to No. 1 and 23 above (none of the requested work spaces are secure areas and any/all personnel proposed to work on this project must be vetted/approved by base Pass/ID).

25. Please provide the A/V concept package referenced in spec section 01 30 01.00 20 para 1.4.3.

Gov’t Response: Refer to AV specification attachment.

26. Please confirm the requirement of a tablet for government use per spec section 01 31 23 para 1.4.3 as this hasn’t been required on any other NAVFAC projects to date.

Gov’t Response: Tablet is required, the stationary interface it only requires a CAT6 wire that ties into the JACE panel. (please see attached)

27. There are two schedule specifications – 013201.0010 and 013216.0020 with conflicts between them. Being that 01 32 01.00 10 is an Army spec, please confirm that only 01 32 16.00 20 will be applicable to the contract.

Gov’t Response: Army spec 013201.0010 should be deleted. Refer to Navy Spec.

28. Spec section 01 33 29 identifies commissioning at para 1.6.1 and calls out a Total Building Commissioning Spec 01 91 00.15, but it is not included in the document. Please confirm if commissioning is required. If so, please provide the required specifications.

Gov’t Response: Commissioning of newly installed systems is required. As this is a renovation, total building commissioning is not required/applicable.

29. Please provide the 01 35 26 Governmental Safety Requirements specifications section referenced in spec section 01 45 00.00 20 para 1.5.1.1 Gov’t Response: Please see attached section that will need to be included into the specifications.

30. There are two Quality Control specifications – 014500.0010 and 014500.0020 with conflicts between the two. Being that 01 45 00.00 10 is an Army spec, please confirm that only 01 45 00.00 20 is applicable to the contract.

Gov’t Response: Army spec should be deleted. Refer to Navy Spec.

31. Please confirm the QC can perform as the SSHO as mentioned in spec section 01 45 00.00 20 para 1.5.1.1. This question is more complicated that than. This is what I would recommend “Section 014500.0020-1.5.1.1 states the QC Manager can also serve as the SSHO. Furthermore, it states that the QC Manager may also perform the duties of the Superintendent. Is the intent that one person may fulfill all three roles (Superintendent, QC Manager and SSHO)? If not, how many separate individuals are required for these roles?”

Gov’t Response: No, this project is not required to be a three-hat minimum. The SSHO and the Superintendent can be the same person, but the CQC cannot be the SSHO or Superintendent. This project can be a dual-hat project.

32. Security Questions:

a. Drawing Sheet ET-101 Key Note #6 refers to “EY” security drawings for door security requirements. The “EY” security drawings are not included in the Final Submission Construction drawings and are not identified in the drawing indexes. Please provide the “EY” series of drawings.

Gov’t Response: Refer to Security plans and specification amendment.

b. There is an ESS Acceptance testing spec 28 08 10, but there is not specification for the security system. Please provide the security specification.

Gov’t Response: Refer to Security plans and specification amendment.

c. The basis of design, page 29, references the design of a security system, but then states that “Systems not included”. Please clarify the scope of the security work.

Gov’t Response: Refer to Security plans and specification amendment.

33. Drawing Sheet A-200 Key Note #1 identifies concrete repairs to the building exterior. Please provide photos of this locations.

Gov’t Response: See attached.

34. Drawing Sheet A-200 Key Note #2 identifies metal egress stairs that are scheduled to be prepped, primed, and painted. Please provide detailed photos identifying the conditions of the stairs.

Gov’t Response: See attached.

35. Drawing Sheet A-200 Key Note #5 identifies painting the exterior of the building. Please provide photos of the building exterior.

Gov’t Response: See attached.

36. Drawing Sheet A-200 Key Note #6 identifies windows for replacement. Please provide detailed photos of a window that is scheduled for replacement.

Gov’t Response: See attached.

37. Drawing Sheet SD102 Key Note #11 identifies locations for duct penetrations at the roof. After reviewing the specifications there is no roofing specification provided for the repairs at these penetrations. Please provide an applicable roof specification.

Gov’t Response: EPDM roof to match existing.

38. Is there an existing warranty on the roof system? If so, please provide contact information for the company holding the warranty.

Gov’t Response: If a roof warranty exists for B198 roof, NAVFAC should have a copy. Recommend checking with NAVFAC Requirements for confirmation. NSWCD does not show having a record of a roof warranty for B198.

39. Price Schedule: Pg 8 of 22 of RFP states: ‘Work is to include new code compliant restrooms, kitchenettes, conference rooms, private offices, copy rooms, storage rooms and open office areas with cubicles (included with FF&E).’ Question: Is the FFE (Cubicles/furniture package) to be included in Bid Item 0001 Gov’t Response: The procurement and installation of FFE items are under Bid Item 0006.

40. Item #0006 Bid Sheet states: “Item 0006 FURNITURE, FIXTURES, AND EQUIPMENT (FF&E)” Question: If this item is awarded as part of the base award will the value of our task order award include $375k in order to purchase and install the FFE package shown regardless of what the actual cost is?

Gov’t Response: FFE amount shown on bid schedule is an estimate to provide Contractor a magnitude of the FFE scope for this project. The actual FFE cost shall be established by the Contractor’s Interior Designer through NAVFAC’s best value process. Separate funds will be provided to procure and install FFE.

a. Additional question to above: If the Item #0006 is not awarded with the task order then will we need to provide proposal for FFE post award and if so what if the dollar amount is higher or lower than the $375k shown Gov’t Response: Bid option 006 is to negotiate the prime contractor’s HAR to handle the procurement and installation of FFE. GC negotiated Handling rate will be applied to the actual FFE cost post award regardless the fluctuation of the amount.

41. Bid Option 0006 FF&E, under ‘Notes’ (d) states the budget amount (of $375,000) “is only an estimated amount”.

a. Will the ‘estimated’ FF&E budget amount of $375,000 be a fixed number for the proposal?

Gov’t Response: See response #40

b. And if the FF&E go’s to “negotiations”, Will the fixed (HAR) that the contractor proposed be applied to the new negotiated FF&E Venders Cost?

Gov’t Response: See response #40

42. Per Drawing E-111 KEY NOTES 18.

a. Will the Motorized Screen, Projector and TV Monitors to be part of the FF&E Bid Op. 0006?

Gov’t Response:

43. The FF&E package seems to already have a Designer and is already designed.

a. Are we to obtain a designer to only oversee the install of the FF&E?

Gov’t Response: Contractor’s ID will be responsible to validate the FFE requirements, conduct best value, develop final FFE package/ cost and oversee the installation per FFE administrative specification

44. Per FF&E: It appears the office furnisher is picked out and with specifics; this limits the Prime Contractor to a specific product line and manufacture.

a. Are you asking us to provide a new quote on the same product lines that is priced out under Gov. Doc. (NAVFAC_Dahlgren+B198_FFE+Binder_FINAL_30JAN2020)?

Gov’t Response: Yes, pricing exercise will be conducted by Contractor. Basis of Design developed by DOR shall be validated and revised before sending out to all NAVY BPA vendors for their pricings/ proposals. Alternate product lines can be the selected proposal as long as their products meet the specifications shown in FFE package.

i. If so, there are only a handful of dealers that work with these produce-lines.

1. Can we go through a different FF&E product dealer to provide similar FF&E that can be a best fit product?

Gov’t Response: See response #44a and the latest NAVY BPAs can be found in following link: https://www.wbdg.org/ffc/navy-navfac/collateral-equipment

45. Bid Option 0006 FF&E, under ‘Notes’ (d) States “The contractor will be given the final budget amount to design the FF&E package during the design phase for FF&E.

a. Are we to provide a designer as part of the base bid?

Gov’t Response: Yes

46. Are we to provide an Architecture and Interior Design Firm to oversee the design phase only?

Gov’t Response: A certified Interior Designer who has experience with this type of facility as well as the NAVFAC process will be acceptable. Refer to #43 for their scopes.

47. Will this project require a third-party Commissioning Firm for project acceptance?

Gov’t Response: Yes this project will require a Third-Party Commissioning Firm for this project.

48. Will building 198 be completely emptied wall to wall at all floor levels and maid free of all existing office debris i.e. desks/chars, storage, storage-boxes, cabinets, workstations, lab equipment, cubicle portions, Etc.?

Gov’t Response: Prior to the start of renovation/demo work, NSWCDD will ensure everything required by the customer will be removed from the spaces. Once the building is turned over to the contract to commence work, any/all loose items (desks, chairs, lab equipment cubicle panels etc.) that may remain can be demo’ed by the contractor. Note: If this response is not sufficient for any reason, NSWCDD is willing to have NAVFAC shops/riggers come in and clear out any/all loose items after NSWCDD has moved out of the spaces and prior to the contractor starting work.

49. Per Demo, AD-003, Second floor (A1) & (C1)

a. We are to remove all walls within this area but, the existing ceiling ‘structure’ is to remain in place.

i. Can you provide the detail that outlines the material type and span-capacity for that ceiling/upper platform area at the second floor?

Gov’t Response: Second floor ceilings are to be removed. Ref. to the new work RCP for extent of APC system.

ii. Will the existing second floor ceiling be able support it’s self once all walls are removed?

Gov’t Response: Second floor ceilings are to be removed. Ref. to the new work RCP for extent of APC system.

iii. Will we be provided designs to support the existing ceiling joist once the walls are removed from the second floor?

Gov’t Response: Second floor ceilings are to be removed. Ref. to the new work RCP for extent of APC system.

iv. Will we need to provide designs to support the existing ceiling joist if needed?

Gov’t Response: Second floor ceilings are to be removed. Ref. to the new work RCP for extent of APC system.

v. Are there bearing walls in this area that will need structural support during demolition? If yes, please provide design for this Gov’t Response: None that are known of at this time.

50. In reference to the security system, on drawings E-001, under (TELECOM/DATA + SECURITY).

a. The Note refers to (“EY” Series Drawings for security), and (EP-101 for control power for security panels) that do not exist with the Gov. provided B198 Renovation drawings we currently have.

Gov’t Response: Refer to Security / AV plans and specification amendment.

i. Can you provide a copy of the (“EY” Series Drawings) and the (“EP-101” for security panels) drawings as well?

Gov’t Response: Refer to Security / AV plans and specification amendment.

ii. Are there specifications for the security equipment? All that is listed under Division 28 is security acceptance testing.

Gov’t Response: Refer to Security / AV plans and specification amendment.

51. Is there a layout/design for the conduit system for the security devices?

Gov’t Response: Refer to Security / AV plans and specification amendment.

52. Within Building 202, can you please provide the exact location of the (JACE panel) for DDC?

Gov’t Response: The existing building controller (JACE/Schneider) in B198 shown on M-812 is located on mezzanine level, by the stairwell, as noted in Key Note 1.

53. Can you provide photos of?

a. Sprinkler mains (2) two locations

i. All labels & tags on Pumps, Valves Etc. for sprinkler mains

b. The Mechanical Room panoramic and existing equipment type/labels

c. JACE panel for DDC in Bldg202 Gov’t Response: See attached.

54. Can you provide last known flow-test and results for the existing sprinkler system?

Gov’t Response: Jacobs included hydrant flow test results in the IFC package. NAVFAC to provide.

55. Does Dahlgren already have their security provider? And if so who?

Gov’t Response: NDW N6

56. Please confirm that the only licensed stamped design needed will be for the fire alarm and fire protection systems Gov’t Response: Please refer to the specifications for requirements on license stamp requirements for fire alarm and fire protection systems.

57. Bldg 198 currently has boxes, furniture, equipment in the work spaces where renovations are to be done. Will the Gov’t remove this before construction begins? If not are we to include removal and storage of same?

Gov’t Response: Same response as question 48 above.

58. In the General Requirements of the RFP the proposal acceptance period is identified as 90 days from receipt of offers. The price schedule states that the offeror’s price is to be valid for 365 days from receipt. Please confirm that proposals shall be valid for 90 days only from receipt.

Gov’t Response: The price schedule is incorrect. The proposals shall be valid for 90 days only from receipt.

59. Reference Drawing A-104 General Note #4.

a. Please identify the manufacturer of the existing roof system.

Gov’t Response: The existing unit is a Trane unit.

b. Please confirm if there is an existing roof warranty in place. If so, please provide a name of the installer.

Gov’t Response: The roof has a warranty, NAVFAC will confirm the manufacture.

60. Reference Drawing G-003 Optional Line Item # 3. This option is for the installation of card readers at interior and exterior doors, but here are discrepancies on the locations and scope throughout the documents among The Price Schedule option description, the Hardware Schedule in Section 087100, the door schedule on sheet A-603 (reference door schedule comment #4), Sheet E-111 (reference key note #5), and Note 6 on ET-101.

a. Please clarify the locations for the card readers.

b. Please provide an updated hardware schedule to match the requirements of hardware at openings to receive card access.

Gov’t Response: See Security plans and specification amendment.

61. Bid Option #3 is for entry door replacement.

a. Please clarify which Door Opening numbers are included in this option.

b. Provide a Door and Hardware schedule for the doors included in this option.

Gov’t Response: Please see attached B198 hardware-Option 3

62. Spec section 08 11 16 identifies requirements for Aluminum Doors and Frames. Per the door schedule on sheet A-603, all frames are be hollow metal and no doors are identified as type “B” which appears to be an aluminum door with glazing. Additionally, frame type F3 with tempered glazing is not identified in the door schedule.

a. Are any aluminum doors or frames required on this project? If so, which openings?

b. The Basis of Design document contains product data on an aluminum entrance which is hurricane and blast rated. If any aluminum doors are required on this project, must they be hurricane and/or blast rated?

Gov’t Response: A. No aluminum doors. b. No aluminum doors. Regarding Frame Type F3, not used on this project.

63. Spec section 03 30 00 CIP Concrete para 1.6.6 states the Concrete QC Manager must be an employee of the Contractor, and 1.6.6.1 states that the quality manager must be a Professional Engineer. Due to the limited scope of concrete on this project this requirement seems excessive. Please confirm that the QC requirements of spec section 01 45 00.00 20 and a 3rd party testing agency identified in 01 45 35 will satisfy the requirements of concrete testing.

Gov’t Response: No, Concrete QC manager will not be required for none structural concrete.

64. Spec section 07 24 00 Exterior Insulation and Finish systems para 1.2.2.1 references two different types of EIFS systems, PM EIFS and PB EIFS. Which type is required?

Gov’t Response: Contractor to verify existing construction and match.

65. Spec section 26 20 00 Interior Distribution para 3.1.1.2 states that MC cable can be installed in accordance with NFPA guidelines. Additionally, pg 24 of the BOD states that MC cable can be used for branch circuits, lighting concealed above ceiling, and withing fixed partitions. Historically, MC cable is not acceptable for use on NAVFAC installations in this region. Please confirm that MC Cable is not acceptable as mentioned above.

Gov’t Response: MC cables are not allowed for the new construction.

66. A-102 shows projection screens and projector mounts. Please confirm that the projection screens and projector mounts are part of the AV Package and is not in the base bid. If the screens and mounts are to be included in the base bid, please provide specifications.

Gov’t Response: Correct, projection screens and projector mounts are part of the AV package.

67. Please identify the existing controls system vendor for the existing mechanical system.

Gov’t Response: The existing building controller/headend is OEM JACE by Schneider Electric.

68. Reference the finish schedule on sheet A-606. Rooms 106, 107, and108 are scheduled to receive RFS-1 Resinous Flooring with integrated wall base. General Note #2 states that these areas are to receive 4” high cove tile base. Please provide clarity of the design intent in these areas.

Gov’t Response: The intent is for all areas where RFS-1 is used, there will be the same RFS Integral Base. General Note #2 is now obsolete since we changed from using Tile floors to RFS in Rooms 106, 107 & 108. Please strike through General Note #2.

69. Reference the finish schedule on sheet A-606. General note #5 states that anti-static flooring shall be installed at the communication room. Per the finish schedule, communications room 112 is schedule to receive resinous flooring. Please provide clarity of the design intent in this space.

Gov’t Response: Room 112 – Telecommunications Room – per the UFC, shall have a floor with anti-static properties. Please disregard the Room Finish Schedule and use the following floor tile in color Sidewalk, along with rubber wall base RB-1 in Room 112. https://commercial.tarkett.com/en_US/collection-C000122-iq-granit-sd/granit-sidewalk-0726

70. Reference the finish schedule on sheet A-606. General note #6 states to provide a 2’ carpet border around rooms. When referring to the finish schedule note 6 isn’t applied to any of the spaces in the note’s column. Please identify what rooms this border is to be applied.

Gov’t Response: General Note #6 on Sheet A-606 is now obsolete per previous changes. This note should have been removed from the sheet. Please strike through General Note #6.

71. Please provide a spec for the walk-off mat identified on drawing I-201 in the Floor Finish Legend.

Gov’t Response: https://matsinc.com/enterprise-tile Use walk-off carpet tiles, wall-to-wall in the Vestibule area.

72. Reference Drawing E-111. Key notes 19 & 20 reference a set of “AV” drawings that have not been included in the drawing package and they are not identified in the drawing index. Please provide the “AV” drawings.

Gov’t Response: See AV drawings for additional information.

73. The Finish Schedule on A-606 lists wall finishes for the restrooms and Lactation Room as “CT/PT-2” which would appear to be a tile wainscot, but the elevations on A-401 show tile full height. Please clarify.

Gov’t Response: Elevations on A-401, indicate full height wall tile around the wet fixture walls and return walls to the area of the compartment partitions. The walls where no tile is indicated (on the elevations), such as above and below the sink/mirror, the walls with the seat cover dispenser, etc. are intended to be PT-2.

74. Note 1, 2 and 3 on A-401 mention structural support framing for the vanities and references the structural drawings. The structural drawings do not show this work. Please issue sketches of the requirements.

Gov’t Response: Drawing intent is for welded 2”x2” tube steel supports spanning underside length of lavatory, welded to vertical 2”x2” supports located within the end walls.

75. Specification Section 230130.41 if for HVAC cleaning of equipment and ductwork. Note 9 in M-001 states to clean and seal existing ductwork. Please clarify the extent of this work.

a. Is this for the entire building or just within the limits of work?

Gov’t Response: JUST WITHIN LIMITS OF WORK.

a. Does this include existing AHU-1 and AHU-4?

Gov’t Response: ONLY AHU-1 AND ASSOCIATED DUCTWORK.

76. Specification Section 097200 is for Wallcoverings, but none could be found on the documents. Where are they required?

Gov’t Response: No wallcoverings.

77. Specification Section 083473 is for Sound Control Door Assemblies bur the Door Schedule on A-603 doesn’t list and sound ratings for any of the openings. Are any required?

Gov’t Response: Door sound ratings are to match the sound ratings of the partitions in which they are located.

78. Specification Section 312300.0020 is for Excavation and Fill. What work involves excavation and fill on this project?

Gov’t Response: Specification section can be removed.

ELECTRONIC SECURITY SYSTEMS (ESS)

1. C2.3.7.1.2 Dual Technology Sensors calls for dual technology motion detectors but security Note 1 on Page 3 of drawing EY-102 calls for CEILING MOUNTED 360° PIR MOTION DETECTORs which are single technology. What type is desired?

Gov’t Response: Dual Technology 60' TRITECH CEILING MOUNT PIR bosch > ADI #: DS-DS9360 Model #: DS9360

2. How does Dahlgren B198 plan on enrolling new & existing users?

Gov’t Response: Though LENEL Onguard systems located at various access control points. NOTE – no LENEL terminal is required in building 198

3. What enrollment system is desired?

Gov’t Response: LENEL Onguard

4. Are Information Assurance services being supplied at this time?

Gov’t Response: Yes by N61

5. Is network QOS being used at this time?

Gov’t Response: Yes

6. Does Dahlgren B198 currently have any standards or policies relating to HSPD12 or FIPS-201? Gov’t Response: Yes, we use FIPS-201 Common Access Cards as required HSPD12

7. Does Dahlgren B198 currently have any standards or policies relating to SP800-116?

Gov’t Response: Yes, The NDW Lenel Enterprise uses the Personal Identity Verification (PIV) Card for Access Control.

8. Will the system be fully compliant at installation or phased approach with FIPS-201?

Gov’t Response: Fully compliant at installation

9. Who will validate FICAM compliance?

Gov’t Response: NDW N6

10. Is there a defined set of test for card validation, revocation, and use?

Gov’t Response: G+D FIPS 201 SCE 7.0, GEMALTO DLGX4 128Kv2, and the IDEMIA Cosmo V8 are the latest series of CAC issued by DMDC for use, they are approved for use on the NDW Lenel Enterprise.

11. Will the system be using OCSP, SCVP or CRL for validation?

Gov’t Response: SCVP Validation

12. If so, do the certs being used have the correct level of assurance needed?

Gov’t Response: Yes

13. Is there a current ATO?

Gov’t Response: eMASS ID 12913

14. Who will validate FISMA compliance?

Gov’t Response: NDW N6

15. Is the existing RMF available for review?

Gov’t Response: Refer to RMF - eMASS ID 12913

16. Who is responsible for the developing & maintain a System Security Plan?

Gov’t Response: NDW N6

17. How will the Certification and Accreditation be done?

Gov’t Response: N/A

18. Is third party monitoring required?

Gov’t Response: Yes, If the End User has an Intrusion Detection System(IDS) requirement, The Customer must validate the Alarm with the NDW Regional Alarm Integration Manager, Chris Merz, and the local Physical Security Officer at Dahlgren Barbara Murphee before it can be added to the Dispatch Center Monitoring Zone.

AV

1. Reference Amendment #4 ESS and AV System Drawings. In note 29 equipment is identified to be incorporated in the design of the AV system, but the specifications are not provided for any of the referenced equipment. In note 46 it states “The AV Contractor shall be responsible to coordinate with the Construction Contractor..” which leads me to believe that they are two different entities.

Gov’t Response: Yes. According to note 46, it is required for the AV contractor to coordinate with the General Contractor to make sure that all the infrastructures are provided by the other subcontractors for complete AV system per drawings and specifications. The Govt. is not responsible for the coordination and any other associated cost.

a. Is the AV system design and install to be included in the base bid? If so, please provide specifications for the reference equipment identified in note 29.

Gov’t Response: The AV system and install shall be included in the bas bid. Please see attached Specifications for AV.

b. Is the AV system to be included in the base bid? If not, please identify where this cost should be carried.

2. Specification Section 013001.0022 – 1.4.3 discusses having a Certified Technology Specialist Designer (CTS-D) to design and prepare the A/V package. Drawings AV-101 through AV-103 issued in Amendment #4 appear to be a fully designed A/V package. Is a CTS-D required? If so, what would the CTS-D perform since the design is already completed?

Gov’t Response: CTS-D shall review the design drawings and is responsible to make sure that the A/V package is complete per the specifications.

3. Spec Section 013001-0022 – 1.3 mentions an A/V Planned Modification CLIN. Our Price Schedule does not contain a separate CLIN for A/V. Spec Section 013001.0022-1.4.3 - states the Audio Visual Package is to be designed and incorporated into the FF&E package Please confirm that we are not to include any costs for the A/V system and equipment in our bids and that it will all be addressed in the FF&E modification process after award. Is the listed FF&E budget is sufficient to include the A/V work as well as the FF&E?

Gov’t Response: The A/V will shall be included in Base Bid.

4. Furthermore, please confirm the only purpose of issuance of AV-101 through AV-103 is for us to know what infrastructure requirements to include in our Base Bid price.

Gov’t Response: The only purpose of issuance of AV-101 through AV-103 is for us to know what infrastructure requirements to include in our Base Bid price.