B198 Renovations-Electronic Security System (ESS) Specifications (1).pdf

PDF 125 KB Posted

Attached to
Building 198 Renovations onboard NSF Dahlgren, VA
Solicitation number
N4008020R0305
Issued by

View the file

Other files

File Type Posted
198 Renovations_Amendment 0007.doc DOC document
BLDG 198 Renovations_RFI Master list 4.20.20.docx DOCX document
B198 hardware-Option 3.pdf PDF
198 Renovations_Amendment 0006.doc DOC document
Appendix 5_6 FIre Protection Hydrant Flow TEst.pdf PDF
Audio Video System Specifications.pdf PDF
Window Detail photo.pdf PDF
Bldg 198 photo 4.15.20 (Redacted).pdf PDF
198 Renovations_Amendment 0005.doc DOC document
Appendix 5_6 Fire Suppression CALCULATIONS.pdf PDF
1558383 B198 ESS AND AV SYSTEM Drawings 1-22-2020 (1).pdf PDF
BLDG 198 Renovations_RFI Master list 4.23.pdf PDF
01 35 26.pdf PDF
07 53 23.pdf PDF
Window Detail photo 2.pdf PDF
198 Renovations_Amendment 0004.doc DOC document
B198 Renovations-Electronic Security System (ESS) Specifications.pdf PDF
1558383 B198 ESS AND AV SYSTEM Drawings 1-22-2020.pdf PDF
198 Renovations_Amendment 0003.doc DOC document
198 Renovations_Amendment 0002.doc DOC document
198 Renovations_Amendment 0001.doc DOC document
NAVFAC_Dahlgren B198_SID Binder_FINAL_30JAN2020.pdf PDF
RFP for B198 Renovations.docx DOCX document
NAVFAC Dahlgren B198 Renovation - IFC Drawings 20_0130.pdf PDF
NAVFAC Dahlgren B198 Renovation - IFC Specifications 20_0130.pdf PDF
NAVFAC_Dahlgren B198_FFE Binder_FINAL_30JAN2020.pdf PDF
Expected Visitor Requests with instructions.doc DOC document
SECNAV_5512_1_11787 APPROVED AC PASS ID FORM 05282014.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

e Project: 1558383 B198 Renovations-Electronic Security System(ESS) Dahlgren,VA

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 33 00 SUBMITTAL PROCEDURES

general procedures regarding submittals, data normally submitted for review to establish conformance with the design concept and contract documents

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

listing of organizations whose publications are referenced in other sections of the specifications.

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 08 10 ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING

acceptance testing of electronic security systems

28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)

Electronic Security Systems (ESS) consisting of commercial off-the-shelf equipment

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

SECTION TABLE OF CONTENTS

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

SECTION 28 08 10

ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING

05/16 acceptance testing of electronic security systems

PART 1 GENERAL

1.1 SUMMARY

1.2 DEFINITIONS

1.3 SUBMITTALS

1.4 QUALITY ASSURANCE

1.4.1 Qualifications

1.4.1.1 General

1.4.1.2 Test Director

1.4.1.3 Operator

1.4.1.4 Technician

1.4.1.5 Test Intruder

PART 2 PRODUCTS

PART 3 EXECUTION

3.1 TEST PLAN

3.1.1 Personnel

3.1.2 Equipment

3.1.3 Procedures

3.1.4 Special Provisions

3.1.5 Test Logs

3.1.6 Schedule

3.2 PRE-ACCEPTANCE TESTING

3.2.1 Phased Testing

3.2.1.1 Functional Testing Phase

3.2.1.2 Burn-In Testing Phase

3.2.2 Draft Test Report

3.3 SYSTEM ACCEPTANCE

3.3.1 Preparation

3.3.2 Personnel

3.3.3 Visual Inspection

3.3.4 Functional Testing

3.3.5 System Activity Reports

3.3.6 Corrective Actions

3.4 FINAL TEST REPORT

3.4.1 Summary

3.4.2 Personnel

3.4.3 Test Logs

-- End of Section Table of Contents --

SECTION 28 08 10 Page 1

SECTION 28 08 10 Page 2

SECTION 28 08 10

ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING

05/16

PART 1 GENERAL

1.1 SUMMARY

This specification defines the process and procedures for initial acceptance testing of electronic security systems (ESS) to include intrusion detection, access control and video as well as associated power and communications. Requirements to plan, conduct, and document all testing activities are covered along with the Government responsibility to witness testing and review and approve submittals. During the course of the acceptance test, demonstrate that, without exception, the completed and integrated ESS complies with the contract requirements.

1.2 DEFINITIONS

The Government Representative is a qualified individual given specific authority to witness system acceptance testing and evaluate the results.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29.00 20 SUSTAINABILITY REQUIREMENTS. Submit the following in accordance with Section 01 33 00.05

20 CONSTRUCTION SUBMITTAL PROCEDURES:

SD-05 Design Data

Test Plan; G

SD-06 Test Reports

Draft Test Report

Final Test Report; G

SD-07 Certificates

Qualifications

1.4 QUALITY ASSURANCE

1.4.1 Qualifications

1.4.1.1 General

The Test Director, Operator, and Technician must have prior experience with the specific equipment, hardware and software installed under the contract.

SECTION 28 08 10 Page 3

1.4.1.2 Test Director

The Test Director must have at least five years of hands-on ESS experience to include any combination of design, installation, testing and maintenance.

1.4.1.3 Operator

The Operator must have at least two years of hands-on experience installing and maintaining ESS workstations to include both hardware and software.

The Operator must be capable of demonstrating all workstation features and capabilities.

1.4.1.4 Technician

The technician must have at least two years of hands-on experience installing and maintaining ESS field equipment to include sensors, card readers, cameras, local processors, and communications equipment. The Technician must be capable of demonstrating all features and capabilities of ESS field equipment. Qualifications may be met by the individual experience of one technician or by the combined experience of a team of technicians.

1.4.1.5 Test Intruder

The purpose of the test intruder is to activate intrusion sensors in a realistic and repeatable manner. The test intruder must be between 70 and 72 inches tall and weigh between 175 and 190 pounds. The test intruder must possess sufficient physical strength, agility, and endurance to perform movements required for intrusion testing. These movements may include, but are not limited to, walking, running, crawling, jumping, and climbing.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

3.1 TEST PLAN

Clearly establish the scope for ESS testing prior to beginning testing.

Submit a Test Plan that addresses the following topics:

3.1.1 Personnel

Identify the Test Director, Operator, Technician, , and any other personnel that will be performing test activities.

3.1.2 Equipment

List all equipment that is required to support testing. State the purpose of each piece of equipment. Describe equipment that will be used to enable voice communications between the monitoring location and the field.

3.1.3 Procedures

Provide a step-by-step procedure for conducting each functional test.

Describe actions and expected results. Ensure that functional test procedures address performance standards described in contract

SECTION 28 08 10 Page 4 specifications.

Download example procedures from http://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/forms-graphics-t and review for applicability and completeness. Adapt example procedures to meet specific project requirements and develop additional ones as needed. Follow TEST-MASTERTP0023-005 for Air Force projects.

3.1.4 Special Provisions

Discuss any special test provisions such as facility access, safety, integration with existing systems, and coordination with other work.

3.1.5 Test Logs

Provide logs for recording all data from functional testing and burn-in testing.

Download example logs from http://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/forms-graphics-t and review for applicability and completeness. Adapt example logs to meet specific project requirements and develop additional ones as needed.

3.1.6 Schedule

Provide an overall schedule that includes all testing milestones.

3.2 PRE-ACCEPTANCE TESTING

Conduct a complete test of all field equipment, workstations, and central system hardware and software in accordance with the approved Test Plan.

The Test Director must be on site to conduct a pre-test inspection and oversee all testing activities. Prior to testing, visually inspect all ESS components and correct workmanship and neatness deficiencies as needed.

During the pre-test inspection, verify the accuracy of redline drawings and update drawings as needed. Conduct testing in two phases - functional testing followed by burn-in testing.

3.2.1 Phased Testing

3.2.1.1 Functional Testing Phase

During the functional testing phase, verify system performance in accordance with approved Test Plan. Record results in approved Test Logs, and provide a written explanation of each failure to include cause, corrective action, and retest result. Continue functional testing until all tests have been successfully completed with no unresolved failures.

3.2.1.2 Burn-In Testing Phase

Begin burn-in testing after successful completion of all functional testing.During the burn-in testing phase, place the ESS in normal operating mode and evaluate system performance for a continuous 24-hour period.

During this time, the ESS must be fully functional and programmed such that all features can be exercised and evaluated through normal use. Record all system anomalies in approved Test Logs. Include a description of each anomaly along with any actions taken in response. Immediately correct minor deficiencies observed during the course of testing and continue with burn-in testing. Determine the root cause of any failures and make

SECTION 28 08 10 Page 5 necessary repairs or modifications to restore full functionality. After a failure is corrected repeat functional tests for components and features associated with the failure, and repeat the entire burn-in testing phase .

3.2.2 Draft Test Report

Prepare and submit a Draft Test Report detailing the results of the testing. Refer to paragraph FINAL TEST REPORT for required content.

Include a cover letter signed by the Test Director stating that pre-acceptance testing has been completed and that the system is ready for acceptance testing.

3.3 SYSTEM ACCEPTANCE

Test the ESS in accordance with the approved Test Plan in the presence of the Government Representative to certify acceptable performance. Verify that the total system meets all requirements of the specification and complies with the specified standards.

Begin acceptance testing upon arrival of the Government Representative at the project site. Place the ESS in normal operating mode and evaluate system performance during the testing period. Immediately report any deficiencies observed during testing to the Government Representative and discuss possible causes and corrective measures. Obtain Government approval prior to making any adjustments, repairs or modifications. The Government retains the right to terminate testing at any time the ESS is found to be incomplete or fails to perform as specified. Such termination of acceptance testing constitutes a FAILED system acceptance test.

ESS test plan/commissioning shall include established/active IP network connectivity back to the base monitoring location at Dahlgren,VA

3.3.1 Preparation

Nofity the Contracting Officer of system readiness 15 days prior to the expected start date of acceptance testing. Prior to acceptance testing, complete all clean-up and patch work requirements. Ensure that security equipment closets and similar areas are free of accumulation of waste materials or rubbish caused by prior installation work.

3.3.2 Personnel

Ensure that the following personnel are on site to perform test activities: Test Director, Operator, Technician. Ensure that the Quality Control Manager is on site during acceptance testing.

3.3.3 Visual Inspection

Assist the Government Representative in conducting a visual inspection of ESS equipment and wiring. This inspection will focus on the general neatness and quality of workmanship and compliance with applicable codes and manufacturers' recommended installation methods. Provide a comprehensive listing of installed equipment and software along with a complete set of ESS red line drawings to be used during the inspection.

Document deficiencies identified during the inspection.

3.3.4 Functional Testing

Comply with requests from the Government Representative to repeat

SECTION 28 08 10 Page 6 functional tests performed previously during pre-acceptance testing. The Government reserves the right to request the Contractor to repeat all functional tests or a representative sampling thereof as a means of performance verification. Add all test results to approved Test Logs.

3.3.5 System Activity Reports

Retrieve archived data from the system and provide activity reports as requested by the Government Representative. Reports may address any type of activity to include alarms, portal transactions, and video archives.

Assist with analyzing reports to identify trends and anomalies.

3.3.6 Corrective Actions

Correct any deficiencies in coordination with the Government Representative. Maintain a punch list and review status at the end of each day. Work diligently to complete corrective actions the same day that deficiencies are observed. Add deficiencies not corrected on the same day to the rework items list maintained by the Quality Control Manager.

Failure to resolve punch list items to the satisfaction of the Government constitutes a FAILED system acceptance test.

3.4 FINAL TEST REPORT

Submit a Final Test Report following the successful completion of acceptance testing to include resolution of all punch list items. Address the following topics in the Final Test Report:

3.4.1 Summary

Provide a chronological summary of all testing. Describe test activities and results in narrative form.

3.4.2 Personnel

Provide a list of all Contractor and Government personnel who participated in the testing.

3.4.3 Test Logs

Provide all completed test logs along with a test log verification signed by the Test Director.

-- End of Section --

SECTION 28 08 10 Page 7

SECTION TABLE OF CONTENTS

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

SECTION 28 10 05

ELECTRONIC SECURITY SYSTEMS (ESS)

05/16

Electronic Security Systems (ESS) consisting of commercial off-the-shelf equipment

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 QUALITY ASSURANCE

1.3.1 Regulatory Requirements

1.3.2 Standard Products

1.3.2.1 Alternative Qualifications

1.3.2.2 Material and Equipment Manufacturing Date

1.3.2.3 Product Safety

1.3.3 Shop Drawings

1.3.3.1 ESS Components

1.3.3.2 Overall System Schematic

1.3.4 Evidence of Experience and Qualifications

1.3.4.1 Contractor Qualifications

1.3.4.2 Instructor Qualifications

1.4 Environmental Conditions

1.4.1 Interior Conditions

1.4.1.1 Temperature

1.4.1.2 Pressure

1.4.1.3 Relative Humidity

1.4.1.4 Fungus

1.4.1.5 Acoustical Noise

1.5 SYSTEM CALCULATIONS AND ANALYSIS

1.5.1 Backup Battery Capacity Calculations

1.6 ESS SOFTWARE, DATA PACKAGE 4

1.7 AS-BUILT DRAWINGS

PART 2 PRODUCTS

2.1 SYSTEM DESCRIPTION

2.2 PERFORMANCE REQUIREMENTS

2.2.1 Growth Capability

2.2.2 Network Certification

2.2.3 Maintainability

2.2.4 Availablity

2.2.5 Fail-Safe Capability

2.2.6 Line Supervision

2.2.7 Power Loss Detection

2.2.8 Controls and Designations

2.2.9 Special Test Equipment

2.2.10 Electromagnetic Interference (EMI)

SECTION 28 10 05 Page 1

2.2.11 Electromagnetic Radiation (EMR)

2.2.12 Interchangeability

2.3 INTRUSION DETECTION SYSTEM (IDS)

2.3.1 IDS Components

2.3.2 Detection Sensitivity

2.3.3 Detection Alarm and Reporting Capacity

2.3.4 False Alarm Rate

2.3.5 Nuisance Alarm Rate

2.3.6 Premise Control Unit (PCU)

2.3.6.1 PCU Capabilities

2.3.6.2 Overcurrent Protection and Indication

2.3.6.3 Manual and Self-Test

2.3.7 Detection Sensors

2.3.7.1 Interior Sensors

2.3.7.1.1 High Security Balanced Magnetic Switch (BMS)

2.3.7.1.1.1 Level 2 Switch

2.3.7.1.2 Dual Technology Sensors

2.3.7.2 Tamper Switches

2.3.7.2.1 Tamper Switch Performance Requirements

2.4 ACCESS CONTROL SYSTEM (ACS)

2.4.1 ACS Programming

2.4.1.1 Time Schedules

2.4.1.2 Special Days

2.4.1.3 ACU Daylight Savings Time Adjustment

2.4.1.4 Scheduled Events

2.4.1.5 Maximum User Capability

2.4.1.6 Access Groups

2.4.1.7 Active and Expire Dates

2.4.1.8 Maximum Use Settings

2.4.1.9 Door Outputs

2.4.1.10 Anti-Passback

2.4.1.11 User List or Who's In (Muster Reports)

2.4.1.12 Crisis Mode

2.4.1.13 Door Groups

2.4.1.14 Door Interlocking

2.4.1.15 PIN Required

2.4.1.16 Remote Door Control

2.4.1.17 Key Control

2.4.1.18 Reader Disable

2.4.1.19 Disable Event Messages

2.4.1.20 Input and Output Groups

2.4.1.21 Delays

2.4.1.22 Remote Input Control

2.4.1.23 Output Configuration

2.4.1.24 Remote Output Control

2.4.1.25 Remote Reset Command

2.4.1.26 Time Zone

2.4.1.27 User-Selected LED Behavior

2.4.1.28 Traced Cards

2.4.2 Error and Throughput Rates

2.4.3 Access Control Unit(ACU)

2.4.4 Access Control Devices

2.4.4.1 Card Readers

2.4.4.1.1 Contactless Card Readers

2.4.4.1.2 Card Reader Display

2.4.4.1.3 Card Reader Response Time

2.4.4.1.4 Card Reader Power

2.4.4.1.5 Card Reader Mounting Method

2.4.4.2 Keypads

SECTION 28 10 05 Page 2

2.4.4.2.1 Keypad Display

2.4.4.2.2 Keypad Response Time

2.4.4.2.3 Keypad Power

2.4.4.2.4 Keypad Mounting Method

2.4.4.2.5 Keypad Duress Codes

2.4.4.3 Card Readers with Integral Keypad

2.4.4.4 Portal Control Devices

2.4.4.4.1 Push-Button Switches

2.4.4.4.2 Panic Bar

2.4.4.4.2.1 Emergency Egress With Alarm

2.4.4.4.2.2 Normal Egress

2.4.4.4.2.3 Delay Egress With Alarm

2.4.4.4.3 Electric Door Strikes and Bolts

2.4.4.4.3.1 Solenoid

2.4.4.4.3.2 Signal Switches

2.4.4.4.3.3 Tamper Resistance

2.4.4.4.3.4 Size and Weight

2.4.4.4.3.5 Mounting Method

2.4.4.4.3.6 Astragals

2.4.4.4.4 Electrified Mortise Lock

2.4.4.4.4.1 Solenoid

2.4.4.4.4.2 Signal Switches

2.4.4.4.4.3 Hinge

2.4.4.4.4.4 Size and Weight

2.4.4.4.4.5 Mounting Method

2.4.4.4.5 Electromagnetic Lock

2.4.4.4.5.1 Armature

2.4.4.4.5.2 Tamper Resistance

2.4.4.4.5.3 Mounting Method

2.5 COMMUNICATIONS

2.5.1 Link Supervision

2.5.1.1 Hardwire Direct Current Line Supervision

2.5.1.2 Hardwire Alternating Current Supervision

2.5.1.3 Hardwire Digital Supervision

2.5.2 Hardwire

2.5.2.1 Electrical Conductor Lines

2.5.2.2 Communication Link

2.5.3 Data Encryption

2.5.4 Network Switch

2.5.4.1 Inside Plant

2.5.5 ESS Transmission

2.5.6 Wire and Cable

2.5.7 Digital Data Interconnection Wiring

2.5.8 Aboveground Sensor Wiring

2.5.9 Local Area Network (LAN) Cabling

2.5.10 Cable Construction

2.6 BACKUP POWER

2.6.1 Batteries

2.7 SURGE SUPPRESSION DEVICES

2.8 COMPONENT ENCLOSURE

2.8.1 Interior Sensor

2.8.2 Interior Enclosures

2.8.3 Metal Thickness

2.8.4 Doors and Covers

2.8.5 Ventilation

2.8.6 Mounting

2.8.7 Labels

2.8.8 Test Points

2.9 EQUIPMENT CABINET

SECTION 28 10 05 Page 3

2.9.1 Labels

2.10 LOCKS AND KEY LOCK

2.10.1 Lock

2.10.2 Key-Lock Operated Switches

2.10.3 Construction Locks

2.11 FIELD FABRICATED NAMEPLATES

2.11.1 Manufacturer's Nameplate

2.12 FACTORY APPLIED FINISH

PART 3 EXECUTION

3.1 INSTALLATION

3.1.1 Existing Equipment

3.1.2 Software Installation

3.1.3 Enclosure Penetrations

3.1.4 Cable and Wire Runs

3.1.5 Soldering

3.1.6 Galvanizing

3.1.7 Conduits

3.1.8 Field Applied Painting

3.2 ADJUSTMENT, ALIGNMENT, SYNCHRONIZATION, AND CLEANING

3.3 SYSTEM STARTUP

3.4 SUPPLEMENTAL CONTRACTOR QUALITY CONTROL

3.5 ESS SYSTEM TESTING

3.6 ESS TRAINING

3.6.1 ESS Training Outline

3.6.2 Typical Training Day

3.6.3 ESS Administrator Training

3.6.4 ESS Operator Training

3.6.5 Maintenance Personnel Training

3.6.6 Follow-up Training

3.7 NAMEPLATE MOUNTING

-- End of Section Table of Contents --

SECTION 28 10 05 Page 4

SECTION 28 10 05

ELECTRONIC SECURITY SYSTEMS (ESS)

05/16

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)

ASC/X9 X9.52 (1998) Triple Data Encryption Algorithm Modes of Operation

ASTM INTERNATIONAL (ASTM)

ASTM A123/A123M (2017) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products

ASTM B32 (2008; R 2014) Standard Specification for Solder Metal

ASTM D709 (2017) Standard Specification for Laminated Thermosetting Materials

BUILDERS HARDWARE MANUFACTURERS ASSOCIATION (BHMA)

ANSI/BHMA A156.23 (2010) Electromagnetic Locks

INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)

IEEE C2 (2017; Errata 1-2 2017; INT 1 2017) National Electrical Safety Code

INTELLIGENCE COMMUNITY STANDARD (ICS)

ICS 705-1 (2017) Technical Specifications for Construction and Management of Sensitive Compartmentalized Information Facilities

INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)

ANSI ISO/IEC 7816 (R 2009) Identification Cards - Integrated Circuit Cards

NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)

NEMA 250 (2018) Enclosures for Electrical Equipment (1000 Volts Maximum)

NEMA ICS 1 (2000; R 2015) Standard for Industrial Control and Systems: General Requirements

SECTION 28 10 05 Page 5

NEMA ICS 2 (2000; R 2005; Errata 2008) Industrial Control and Systems Controllers, Contactors, and Overload Relays Rated 600 V

NEMA ICS 6 (1993; R 2016) Industrial Control and Systems: Enclosures

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 70 (2017; ERTA 1-2 2017; TIA 17-1; TIA 17-2;

TIA 17-3; TIA 17-4; TIA 17-5; TIA 17-6;

TIA 17-7; TIA 17-8; TIA 17-9; TIA 17-10;

TIA 17-11; TIA 17-12; TIA 17-13; TIA

17-14; TIA 17-15; TIA 17-16; TIA 17-17 )

National Electrical Code

NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST)

NIST FIPS 140-2 (2001) Security Requirements for Cryptographic Modules

NIST FIPS 197 (2001) Advance Encryption Standard

NIST FIPS 201-2 (2013) Personal Identity Verification (PIV) of Federal Employees and Contractors

TELECOMMUNICATIONS INDUSTRY ASSOCIATION (TIA)

TIA-568-C.2 (2009; Errata 2010; Add 2 2014; Add 1 2016) Balanced Twisted-Pair Telecommunications Cabling and Components Standards

TIA-606 (2017c) Administration Standard for the Telecommunications Infrastructure

U.S. DEPARTMENT OF DEFENSE (DOD)

DODI 8500.01 (2014) Cybersecurity

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

47 CFR 15 Radio Frequency Devices

UNDERWRITERS LABORATORIES (UL)

UL 50 (2015) UL Standard for Safety Enclosures for Electrical Equipment, Non-Environmental Considerations

UL 294 (2018; Reprint Oct 2018) UL Standard for Safety Access Control System Units

UL 437 (2013; Reprint Oct 2017) UL Standard for Safety Key Locks

UL 634 (2007; Reprint Mar 2015) Connectors and Switches for Use with Burglar-Alarm Systems

SECTION 28 10 05 Page 6

UL 639 (2007; Reprint May 2012) Standard for Intrusion Detection Units

UL 681 (2014) Installation and Classification of Burglar and Holdup Alarm Systems

UL 796 (2016) UL Standard for Safety Printed-Wiring Boards

UL 969 (2017; Reprint Mar 2018) UL Standard for Safety Marking and Labeling Systems

UL 1037 (2016; Reprint Sep 2017) UL Standard for Safety Antitheft Alarms and Devices

UL 1076 (2018) UL Standard for Safety Proprietary Burglar Alarm Units and Systems

UL 1610 (2016) UL Standard for Safety Central-Station Burglar-Alarm Units

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29.00 20 SUSTAINABILITY REQUIREMENTS. Submit the following in accordance with Section 01 33 00.05

20 CONSTRUCTION SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

ESS Components; G

Overall System Schematic; G

SD-03 Product Data

Premise Control Unit; G

Detection Sensors; G

Access Control Unit; G

Access Control Devices; G

SECTION 28 10 05 Page 7

Communications Interface Devices; G

Network Switch; G

ESS Transmission; G

Batteries; G

Component Enclosure; G

Equipment Rack; G

SD-05 Design Data

Backup Battery Capacity Calculations; G

Access Control Throughput Rates; G

SD-07 Certificates

Contractor Qualifications; G

Instructor Qualifications; G

Data Encryption; G

SD-10 Operation and Maintenance Data

Training Plan; G

Training Content; G

ESS Components and ESS Software: Data Package 4; G

ESS Software and ESS Components: Data Package 4; G

Submit data package in accordance with Section 01 78 23

OPERATION AND MAINTENANCE DATA

SD-11 Closeout Submittals

As-Built Drawings; G

1.3 QUALITY ASSURANCE

1.3.1 Regulatory Requirements

The advisory provisions in each of the publications referred to in this specification are mandatory. Interpret these publications as though the word "must" has been substituted for "should" wherever it appears.

Interpret references in these publications to the "authority having

SECTION 28 10 05 Page 8 jurisdiction," or words of similar meaning, to mean the Contracting Officer.

Equipment, materials, installation, and workmanship must be in accordance with the mandatory and advisory provisions of NFPA 70 unless more stringent requirements are specified or indicated.

1.3.2 Standard Products

Provide materials and equipment that are products of manufacturers regularly engaged in the production of such products which are of equal material, design and workmanship and:

a. Have been in satisfactory commercial or industrial use for 2 years prior to bid opening, and have been utilized in applications of equipment and materials under similar circumstances and of similar size.

b. Have been available on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2-year period.

c. Where two or more items of the same class of equipment are required, provide products of a single manufacturer.

d. Provide commercial off-the-shelf (COTS) products in which the manufacturer allows a network of qualified distributors to sell, install, integrate, maintain, and repair the hardware and software products that make up the system.

1.3.2.1 Alternative Qualifications

Products having less than a 2 year field service record will be acceptable if a certified record of satisfactory field operation for not less than 6000 hours, exclusive of the manufacturers' factory or laboratory tests, is furnished.

1.3.2.2 Material and Equipment Manufacturing Date

Products manufactured more than one year prior to date of delivery to the site are not acceptable.

1.3.2.3 Product Safety

System components are to conform to applicable rules and requirements of NFPA 70. Equip system components with instruction stickers including warnings and cautions describing physical safety, and special or important procedures to be followed in operating and servicing system equipment.

1.3.3 Shop Drawings

1.3.3.1 ESS Components

Submit the ESS Components, Data Package 4 with the ESS Software submittal package in accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA.Submit drawings that clearly and completely indicate each ESS component function that includes:

a. Termination device points

b. Interconnections required for system operation

SECTION 28 10 05 Page 9

c. Interconnections between modules and devices

d. Proposed wireway or conduit systems to be used including:

(1) Locations

(2) Sizes

(3) Types

e. Drawings showing:

(1) Device locations and spacing

(2) Mounting and positioning details

(3) Riser Diagrams with cable sizes and types

(4) Bill of Materials (Device make, model and quantities)

(5) Alarm and access control zones

(6) sensor coverage areas

(7) Spare capacity

1.3.3.2 Overall System Schematic

Indicate the relationship of integrated components on one-line diagram and show:

a. Power source

b. System controls

c. Impedance matches

d. Interconnecting wire data including:

(1) Number

(2) Size

(3) Identification

(4) Maximum lengths

1.3.4 Evidence of Experience and Qualifications

1.3.4.1 Contractor Qualifications

Installation and testing within the US shall be performed by US companies using US citizens. Installer shall meet requirements of ICS 705-1 and UL 2050. Submit experience and certified qualifications data prior to installation. Show that specific installers who will perform the work have a minimum of 2 years of experience successfully installing ESS of the same type and similar design as specified. Include the names, locations, and points of contact of at least two installations of similar type and design as specified in this document where the installer has installed such

SECTION 28 10 05 Page 10 systems. Indicate the type of each system installed. Certify that each system has performed satisfactorily in the manner intended for a period of at least 12 months.

1.3.4.2 Instructor Qualifications

Installation and testing within the US shall be performed by US companies using US citizens. Installer shall meet requirements of ICS 705-1 and UL 2050. Submit the instructor's experience and certified qualifications data prior to installation. Show that the instructor has received a minimum of 24 hours of ESS training from a technical organization such as the National Burglar and Fire Alarm Association, and 2 years experience in installing the specified ESS type.

1.4 Environmental Conditions

1.4.1 Interior Conditions

Equipment installed in environmentally protected interior areas must meet performance requirements specified for the following ambient conditions:

1.4.1.1 Temperature

32 to 120 degrees F. Components installed in unheated security protected areas must meet performance requirements for temperatures as low as 0 degrees F

1.4.1.2 Pressure

Sea level to 15,000 feet above sea level

1.4.1.3 Relative Humidity

5 to 95 percent

1.4.1.4 Fungus

Components must be constructed of nonfungus nutrient materials or be treated to inhibit fungus growth

1.4.1.5 Acoustical Noise

Components must be suitable for use in high noise areas above 100 dB, without adversely affecting their performance

1.5 SYSTEM CALCULATIONS AND ANALYSIS

1.5.1 Backup Battery Capacity Calculations

Submit calculations showing that backup battery capacity exceeds sensor operation, communications supervision, and alarm annunciation power requirements for proposed equipment plus 25 percent spare capcity.

1.6 ESS SOFTWARE, DATA PACKAGE 4

Submit the ESS software, Data Package 4 with the ESS Components submittal package in accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA. Describe the functions of all software in the software manual and include:

SECTION 28 10 05 Page 11

a. All information necessary to enable proper loading, testing, and operation

b. Terms and functions definitions

c. Use of system and application software

d. Procedures for system initialization, start-up and shutdown

e. Alarm reports

f. Reports generation

g. Database format and data entry requirements

h. Directory of all files

i. All communication protocol descriptions, including data formats, command characters, and a sample of each type of data transfer

j. Interface definition

k. List of software keys

1.7 AS-BUILT DRAWINGS

Maintain a separate set of drawings, elementary diagrams, and wiring diagrams of the system to be used for as-built drawings. Keep this set accurately and neatly up-to-date with all changes and additions. This set is not to be used for installation purposes.

Finish the final drawings submitted with the endurance test report in accordance with Section 01 78 00 CLOSEOUT SUBMITTALS for as-built requirements.

PART 2 PRODUCTS

2.1 SYSTEM DESCRIPTION

Provide a complete and integrated electronic security system (ESS) that meets the requirements of Dahlgren Base Standards, IC Tech Spec for ICS 705-1, and UL 2050.. ESS must be compatible with the Installation's central monitoring system and monitored within the secure/protected areaand at the Installation central monitoring station. ESS consisting of the following subsystems and features:

a. Intrusion Detection System (IDS)(LNL-1100)

b. Access Control System (ACS)(LNL-1320)

c. Security Control panel (SCP)(LNL-3300)

d. Tamper Module (LNL-1200)

e. Communications System

f. Power Supply,Batteries, 3SP Network cabinet, Fiber Optic switch, patch panel, Controller cabinet

SECTION 28 10 05 Page 12

g. Include materials not normally furnished by the manufacturer with the ESS equipment as specified in: Section 26 20 00 Interior Distribution System

2.2 PERFORMANCE REQUIREMENTS

Integrate the installed and operating subsystems into the overall ESS system to detect intrusion, control access, provide CCTV surveillance, provide visual verification, and perform as an entity, as specified below. Provide electronic equipment that complies with 47 CFR 15 and are suitable for the environment where they will be installed.

2.2.1 Growth Capability

Provide capability for modular ESS expansion of inputs, outputs, card readers, and remote control stations with minimal equipment modification.

Software must be able to handle design requirements plus 25 percent spare capacity. Growth capability is not to be limited by the provided products.

2.2.2 Network Certification

Certify all Platform Information Technology (PIT) in accordance with DODI 8500.01 and the individual service implementation policy.

2.2.3 Maintainability

Provide components that can be maintained using commercially available tools and equipment. Arrange and assemble components to be readily accessible to maintenance personnel without compromising system defeat resistance and with no degradation in tamper protection, structural integrity, EMI or RFI attenuation, or line supervision after maintenance when it is performed in accordance with manufacturer's instructions.

2.2.4 Availablity

Provide components rated for continuous operation. Provide solid-state electronic components mounted on printed circuit boards, conforming to UL 796. Provide boards that are plug-in, quick-disconnect type. Do not impede maintenance with densely packed circuitry. Provide power-dissipating components with safety margins of not less than 25 percent with respect to dissipation ratings, maximum voltages, and current-carrying capacity. Provide solid-state type or hemetically sealed electromechanical type light duty relays and similar switching devices.

2.2.5 Fail-Safe Capability

Provide fail-safe capability in critical elements of the ESS including, but not be limited to, the capability to monitor communication link integrity and to provide self-test. Provide fault annunciation when diminished functional capabilities are detected. Annunciate fail-safe alarms to clearly distinguish from other types of alarms.

2.2.6 Line Supervision

Provide the same geographic resolution for fault isolation at the systems level as provided for intrusion detection. Provide either a static or dynanmic system with active mode for line supervision of communication links of the ESS.

SECTION 28 10 05 Page 13

a. The static system must represent "no-alarm" always by the same signal, which is different than the originally transmitted signal.

b. The dynamic system must represent "no-alarm" with a signal which continually changes with time.

2.2.7 Power Loss Detection

Detect AC and DC power loss and generate an alarm when a critical component of the system experiences temporary or permanent loss of power. Annunciate the alarm in the Secured Areaandthe Security Command Center to clearly identify the component experiencing power loss.

2.2.8 Controls and Designations

Provide controls and designations as specified in NEMA ICS 1.

2.2.9 Special Test Equipment

Provide all special test equipment, special hardware, software, tools, and programming or initialization equipment needed to start or maintain any part of the system and its components. Special test equipment is defined as any test equipment not normally used in an electronics maintenance facility.

2.2.10 Electromagnetic Interference (EMI)

Configure and provide ESS components employing electromagnetic radiation constructed to provide minimal vulnerability to electronic countermeasures.

2.2.11 Electromagnetic Radiation (EMR)

Provide only ESS communication components which are Federal Communications Commission (FCC) licensed and approved. Provide system components which are electromagnetically compatible.

2.2.12 Interchangeability

Use off-the-shelf components which are physically, electrically, and functionally interchangeable with equivalent components as complete items.

Equivalent, replacement components must not require new or other component modification. Do not use custom designed or one-of-a-kind items.

Interchangeable components or modules must not require trial and error matching in order to meet integrated system requirements, system accuracy, or restore complete system functionality.

2.3 INTRUSION DETECTION SYSTEM (IDS)

The IDS primary function is to detect intrusion into secured areas.

Utilize a single database for all IDS programming data that seamlessly integrates with the ESS under a single operating environment. The IDS events must be viewable as separate or as a combined list of all ESS events. Control the IDS alarm monitoring through software control from the

ESS.

a. Provide both supervised and non-supervised alarm point monitoring.

b. Arm or disarm alarm points both manually and automatically by time of day, day of week or by operator command.

SECTION 28 10 05 Page 14

2.3.1 IDS Components

Provide components:

a. Premise Control Units (PCU)

b. Detection Sensors

c. Tamper Switches

2.3.2 Detection Sensitivity

The sensitivity of the IDS must allow for the following:

a.

a. Locating intrusions at individually protected assets or at an individual portal

b. Locating intrusions within the coverage on a single volumetric sensor

c. Locating failures or tampering at individual sensors

2.3.3 Detection Alarm and Reporting Capacity

Collect, communicate, and display up to 12 sensor zone alarms .

Identify individual sensors in alarm if the sensor zone is a multiple alarm source combination. Annunciate a single alarm within 1 seconds maximum, after sensor transducer or other detection device activation .

2.3.4 False Alarm Rate

The false alarm rate for each interior IDS zone must not exceed one false alarm per 30-day period.

2.3.5 Nuisance Alarm Rate

The nuisance alarm rate for each interior IDS zone must not exceed three nuisance alarms per 30-day period. The nuisance alarm rate for each exterior IDS zone must not exceed three nuisance alarms per 24-hour period.

2.3.6 Premise Control Unit (PCU)

Install the PCU command processor in a tamper resistant enclosure that is specified in paragraph "Component Enclosure". Package the following with the PCU:

a. Power transformer

b. Battery(s)

c. Network connection cable

d. Keypad(s)

e. Keypad connection cable(s)

SECTION 28 10 05 Page 15

f. Additional components as required for full functionality

2.3.6.1 PCU Capabilities

Provide the PCU at a minimum but not limited to, the following capabilities;

a. Expansion to a total of at least 10,000 user codes with 99 user profile definitions.

b. Support 4 keypads with alphanumeric display. Each keypad must be capable of securing and accessing any system area based on a pass code or access control card and or key FOB authorization. Provide keypad alphanumeric display with complete prompt messages during all stages of operation and system programming and display all relevant operating and test data.

c. Four 4 shift schedules per area.

d. A total of at least 100 programmable output relay schedules.

e. 32 individual reporting areas.

f. Data line supervision [or two separate lines of communication].

g. Two-man access code or credentials.

h. Support programming to require the same or different access code entered within a programmed delay time of 1 to 15 minutes after disarming before activating a silent ambush alarm.

i. Support area programming that disables schedule and time-of-day changes while system is armed so that area can only be disarmed during scheduled times.

j. Provide a minimum of a 4,000 event log buffer per PCU. Record and hold alarm activity information in the log buffer until the ESS is connected and receives the information. Provide a software-configurable warning log buffer filling notification for PCU(s) configured with network switch capabilities.

k. Support a Network Interface Card (NIC) plug-in module with built in network router capable of 128 Bit AES Rijndael Encryption process certified by NIST (National Institute of Standards and Technology).

2.3.6.2 Overcurrent Protection and Indication

When overcurrent more than it is rated for is detected by the PCU, communication bus(es) and keypad(s) are to be shut down and an overcurrent notification LED lit to indicate the situation.

2.3.6.3 Manual and Self-Test

All testing from any alphanumeric keypad include testing for: standby battery, alarm bell or siren, and communication to the Security Command Center (SCC). Include provisions for an automatic, daily, weekly, 30 day, or up to 60 day communication link test from the PCU installation site to the SCC. Include a provision for displaying the internal system power and wiring conditions.

SECTION 28 10 05 Page 16

Include the following for internal monitoring points:

a. The bell circuit

b. AC power

c. Battery voltage level

d. Charging voltage

e. Panel box tamper

f. Phone trouble line 1

g. Phone trouble line 2

h. Transmit trouble

i. Network trouble

A battery test must be automatically performed to test the integrity of the standby battery by disconnecting the standby battery from the charging circuit and placing a load on the battery. Perform this test at an interval no greater than 180 days.

2.3.7 Detection Sensors

a. Sensors are to detect facility perimeter or protected zone penetrations by unauthorized personnel or intruders and transmit an alarm signal to the alarm annunciation system upon change detection. Accomplish this with a probability of detection (PD) of 0.9 with a 95 percent confidence level and conforming to UL 639 where applicable.

b. Required sensor power is 12 VDC unless otherwise specified.

c. An interior IDS zone is a room or space within a building that can be armed and disarmed independently from all other zones.

d. Provide line supervision for all sensors with an end-of-line resistor at the sensor or within a tampered junction box with conduit from the junction box to the sensor.

e. Provide sensors and components rated for operation in the installed environment. The sensors must transmit an alarm signal to the alarm annunication system upon change detection. Provide all sensors with a tamper switch and elements housed in a tamper-alarmed enclosure in accordance of paragraph "Component Enclosure".

2.3.7.1 Interior Sensors

2.3.7.1.1 High Security Balanced Magnetic Switch (BMS)

Mount the BMS inside the secure location and on the opening side of the door. BMS sensors do not have the capability to incorporate an end-of-line (EOL) resistor.

2.3.7.1.1.1 Level 2 Switch

UL 634. Level 2 High Security

SECTION 28 10 05 Page 17

2.3.7.1.2 Dual Technology Sensors

UL 639. Provide sensor combining passive infrared (PIR) and microwave sensors configured and manufactured specifically to be mounted in a single tamper alarmed enclosure. The sensor must provide selectable "AND" logic or "OR" logic for alarm indication configured in the "OR" logic state.

Provide sensors that have a local means of indicating detection for use during installation and calibration with a means of disabling the indication.

The sensor is to have an LED walk test indicator which is not visible during normal operations. When visible, the walk test indicator will light when the sensor detects an intruder. Provide a sensor equipped with a manual control, located within the sensor's housing, to enable and disable the test indicator or with the test indicator located within the sensor housing so that it can only be seen when the housing is open or removed.

2.3.7.2 Tamper Switches

a. Corrosion-resistant tamper switches are required for the following IDS equipment with hinged doors or removable covers that contain open circuits:

(1) Enclosures

(2) Cabinets

(3) Housings

(4) Boxes

(5) Raceways

(6) Fittings

(7) Sensors

b. Tamper switches are to initiate an alarm signal when the door or cover is moved as little as 1/4 inch from the normally closed position.

Mechanically mount tamper switches to maximize defeat time when enclosure covers are opened or removed. One second is the minimum amount of time required to depress or defeat the tamper switch after opening or removing the cover. Enclosure and tamper switch must prevent direct line of sight to internal components and prevent switch or circuit tampering. Conceal mounting hardware so switch cannot be observed from enclosure exterior.

c. Tamper switches on doors which are opened to make normal maintenance adjustments to the system and to service power supplies must have a maintenance position.

2.3.7.2.1 Tamper Switch Performance Requirements

Tamper switches are to be:

a. Inaccessible until switch is activated.

b. Under electrical supervision at all times, irrespective of the

SECTION 28 10 05 Page 18 protection mode in which the circuit is operating.

c. Annunciated to be clearly distinguishable from intrusion detection alarms and exempt from being disarmed, shunted, or silenced.

d. Spring-loaded and held in the closed position by the door, or cover protected.

e. Wired to break the circuit when the door or cover is disturbed.

f. Wired so that each sensor and device is annunciated individually at the central reporting processor.

2.4 ACCESS CONTROL SYSTEM (ACS)

Provide an access control system based upon a modular distributed microprocessor architecture complete with access control cards and ready for operation.

a. The ACS shall be compatible with the existing base integrated security application. The ACS card credentials are required to be Common Access Cards (CAC), and CAC cards are being provided by the Government.

Interface system with and provide alarm and other status to the overall ESS. Provide ACS that meets the communications requirements of UL 1076 and UL 294 and has the capability of controlling up to 16 card readers and keypads per card reader controller, 256 alarm inputs, or 256 relay outputs or any components combination.

b. System is to grant or deny access or exit based upon:

(1) Keypad identification data

(2) CAC card identification data

(3) Biometric reader identification data

(4) Smart card identification data

(5) Identification technologies combination

(6) Input through the access control devices compared to data stored within the system

(7) Time of day, day of week, and special day and holiday scheduling with card validation override.

c. Decision to grant or deny access or exit is to be based upon authorization for such data to be input at a specific location for the current time period. Access decisions for high security areas are to be based upon two identification technology combinations: card and keypad or card and biometric.

d. Provide ACS that supports the configuration and simultaneous monitoring of multiple access control devices when TCP/IP communication interfaces are used between the ESS and the primary Access Control Unit (ACU).

The events of the ACS are to be viewable as separate or as a combined list of all ESS events. Provide overall control of the ACS, alarm

SECTION 28 10 05 Page 19 monitoring, and photo identification through software control of the

ESS.

e. Access control, photo imaging, and programming data must reside on a single database and instantly accessible to every networked PC workstation connected to the ESS.

f. Provide both supervised and non-supervised alarm point monitoring.

g. Provide the capability to arm or disarm alarm points both manually and automatically by time of day, day of week or by operator command and the capability to disarm alarm points based on a valid access event.

h. Provide programmable 'delay' setting for all alarm points. The alarm points are not to report an ENTRY type alarm until the delay setting has expired and not report a dwell type alarm condition until the alarm has been active for the full delay period.

i. Provide the capability to place ACU(s) in an off-line mode. In the off-line mode, the ACU(s) must retain a historical summary of all ACU activity transactions, up to the maximum capacity of the ACU memory buffer. Provide the ability for manual operator control of system output relays with the manual functions to energize, de-energize, enable or disable.

2.4.1 ACS Programming

Provide software capable of, but not limited to, the following programming:

2.4.1.1 Time Schedules

Provide up to 256 user-definable time schedules. These time schedules are to determine the day(s) and times that access will be granted or a scheduled event is to occur. Any and all of the time schedules are to be available for defining access privileges and scheduled events. Provide ALWAYS and NEVER schedules that cannot be altered or removed from the system. Each user-defined time schedule must have the option of reacting or not reacting to user-defined special days, with the ability to react uniquely to each type of special day.

2.4.1.2 Special Days

Provide an unlimited number of user definable special days to be used for configuring exceptions to the normal operating rules, typically for specifying holiday operating rules. Allow for each special day to be assigned to a user-defined type.

2.4.1.3 ACU Daylight Savings Time Adjustment

Provide a software-configurable, user defined adjustment for Daylight Savings Time. The ACU must not need to be connected to a PC workstation in order for the adjustment to occur.

SECTION 28 10 05 Page 20

2.4.1.4 Scheduled Events

Any access controlled reader is to be capable of scheduled unlock periods to allow for card-free access. The access controlled reader is to also be capable of requiring one valid access event before beginning a scheduled unlock period.

Any access control point is to be capable of requiring a valid card as well as a PIN code via keypad on a scheduled basis for high security areas. The use of PIN via keypad functions must not reduce the number of card readers or alarm points available in the ACU(s). Any designated alarm input must be able to be scheduled Armed and Disarmed. Any relay output must be capable of scheduled ON and OFF periods to allow for automatic input and output system control.

2.4.1.5 Maximum User Capability

Up to 64,000 individual users may be given access cards or codes and have their access controlled and recorded.

2.4.1.6 Access Groups

Each system user must be assignable to a maximum of 4 of 256 possible access groups. An access group is defined as one or more people who are allowed access to the same areas at the same days and time periods.

2.4.1.7 Active and Expire Dates

Any card or user may be configured with activation and expiration dates.

The card can be assigned to any valid access group and will be activated and expired according to the specified dates.

2.4.1.8 Maximum Use Settings

Any card or user may be configured with maximum number of uses for that card. The card can be assigned to any valid access group and will be expired according to the specified number of card uses.

2.4.1.9 Door Outputs

Provide each access control reader with two dedicated relay outputs. Both relays are to provide Normally Open and Normally Closed contacts. Use the first relay for electric lock control while the second is software configurable to activate for door forced open, door left open too long, duress, passback violations, invalid access attempts and valid unlock conditions. Allow for both relays to be separately programmable for energize times from 1 second to 10 minutes. The second relay must allow a delay time to be specified, causing its activation to be delayed after an activating condition occurs.

2.4.1.10 Anti-Passback

Provide global anti-passback capability. Any door on the system can be linked to one of 256 user defined passback areas or two 2 pre-defined areas. Each door may be set up to automatically forgive passback entries at one of the following intervals:

(1) Never

SECTION 28 10 05 Page 21

(2) Midnight

(3) Every 12 hours (Midnight and Noon)

(4) Every 6 hours

(5) Every 2 hours

(6) Each hour

(7) Every 30 minutes

Each door can be configured to deny or grant access for passback violations and individual users can be exempt to the passback rules.