Appendix 5_6 FIre Protection Hydrant Flow TEst.pdf

PDF 2 MB Posted

Attached to
Building 198 Renovations onboard NSF Dahlgren, VA
Solicitation number
N4008020R0305
Issued by

View the file

Other files

File Type Posted
198 Renovations_Amendment 0007.doc DOC document
BLDG 198 Renovations_RFI Master list 4.20.20.docx DOCX document
B198 hardware-Option 3.pdf PDF
198 Renovations_Amendment 0006.doc DOC document
B198 Renovations-Electronic Security System (ESS) Specifications (1).pdf PDF
Audio Video System Specifications.pdf PDF
Window Detail photo.pdf PDF
Bldg 198 photo 4.15.20 (Redacted).pdf PDF
198 Renovations_Amendment 0005.doc DOC document
Appendix 5_6 Fire Suppression CALCULATIONS.pdf PDF
1558383 B198 ESS AND AV SYSTEM Drawings 1-22-2020 (1).pdf PDF
BLDG 198 Renovations_RFI Master list 4.23.pdf PDF
01 35 26.pdf PDF
07 53 23.pdf PDF
Window Detail photo 2.pdf PDF
198 Renovations_Amendment 0004.doc DOC document
B198 Renovations-Electronic Security System (ESS) Specifications.pdf PDF
1558383 B198 ESS AND AV SYSTEM Drawings 1-22-2020.pdf PDF
198 Renovations_Amendment 0003.doc DOC document
198 Renovations_Amendment 0002.doc DOC document
198 Renovations_Amendment 0001.doc DOC document
NAVFAC_Dahlgren B198_SID Binder_FINAL_30JAN2020.pdf PDF
RFP for B198 Renovations.docx DOCX document
NAVFAC Dahlgren B198 Renovation - IFC Drawings 20_0130.pdf PDF
NAVFAC Dahlgren B198 Renovation - IFC Specifications 20_0130.pdf PDF
NAVFAC_Dahlgren B198_FFE Binder_FINAL_30JAN2020.pdf PDF
Expected Visitor Requests with instructions.doc DOC document
SECNAV_5512_1_11787 APPROVED AC PASS ID FORM 05282014.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hydrant Flow Test Report

Project Name: Dahlgren B198

Project Location: Dahlgren, Virginia

Test Performed by: Mike Owens Date:

Representative of: Jacobs Engineering Time:

Witnessed by: Mark Shelton

Purpose: Determine available flow and pressure for fire suppression sprinkler systems

Notes: Height from gauge hydrant to building finished floor elevation: 0 feet

ID Outlet Size

Gauge Hydrant: 1-1-6 2.5

Flow Hydrant 1 (F1): 1-3-6 2.5

Coefficient Note: Hydrant outlet discharge coefficients shall be determined per NFPA 291 -

Outlet with flow tube (stream straightener): 0.95

Outlet smooth and rounded: 0.90

Outlet square and sharp: 0.80

Outlet square and projecting into barrel: 0.70

Static Pressure: (before test) 62 psig

Static Pressure: (after test) 62 psig

Residual Pressure: 56 psig

Pitot Reading Calculated Flow

Hydrant Flow Rate F1 27 psig 869 gpm

Total Flow: 869 gpm

Available Flow @ 20 psig: 2,485 gpm

Sketch of Location:

April 25, 2019

9:00 AM

(one hydrant flowing)

Outlet Coefficient

0.80

0.80

Jacobs Engineering Page 1 of 1