This document outlines deliverables and submission dates for an inmate management services contract. Key deliverables include sign-in sheets, permits, certificates of insurance, fuel and vehicle reports, safety plans and inspections, staffing plans, budgets, and maintenance schedules. Submission dates range from daily to annually, with most deliverables due monthly or quarterly. The contract will provide inmate labor for grounds maintenance, recycling, construction, and facilities maintenance at Naval Air Station Pensacola, Naval Hospital Pensacola, and surrounding areas. The solicitation was issued by the Naval Facilities Engineering Command for the Department of the Navy.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section F – 0200000 Management and Administration
N69450-20-R-0067
Section F 0200000 Deliveries or Performance
DELIVERABLES
Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
2.2.1.2 N/A Request to Work
Outside Government’s Regular Working Hours
At least seven calendar days prior to requested day.
KO and
COR
1 As required
2.3.1 N/A Sign-in Sheets and
Minutes for Review and Comments
Within two working days
KO, COR
and all attendees
1 As Required
2.3.1 N/A Sign-in Sheets and
Minutes Final Revision
Within two working days
KO, COR
and all attendees
1 As Required
2.3.3 N/A Permits and
Licenses
Before work commences and as requested by the KO.
KO and
COR
1 As specified
2.3.4 N/A Certificate of
Insurance
Within 15 calendar days prior to contract start.
KO and
COR
1 As specified
2.3.4 N/A Written Notice of
cancellation or material change in policy coverage
At least 30 calendar days prior to cancellation or material change in policy coverage
KO and
COR
1 As required
2.4.3 N/A Monthly Fuel
Usage Report
15th of each month
KO/COR 2 Monthly
2.4.4 N/A Joint Inventory 90 days after the
start of the contract and each Option Period
KO/COR 2 Annually
2.4.4 N/A Annual Vehicle
Justification
15 days prior to the start of the contract and each Option Period
KO/COR 2 Annually
2.7 N/A Inmate
Discrepancy Report
As required COR 2 As required
2.7 N/A Inmate
Illness/Injury Report
Within 48 hours of Accident
KO/COR 2 As required
N69450-20-R-0067
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
2.7 N/A Initial Job
Orientation
Within 24 hours of Training
Must be submitted to FBOP
Safety and
COR
1 for each inmate
As required
2.7 N/A Safety Training
Report
10th of each month
Must be submitted to FBOP
Safety and
COR
1 for each detail
Monthly
2.7 N/A Detail Progress
Report
Daily KO/COR 1 for each detail
Daily
2.7 N/A Work Performance
Report
20th of each quarter
COR 1 for each inmate
Monthly
2.7.8 N/A Status of
Deliverables
Within 30 minutes of the inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours
KO and
COR
1 As required
2.7.9 N/A Service
Interruptions
At least five working days in advance
KO and
COR
1 As required
2.7.10.1 N/A Quality
Management Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As specified
2.7.10.2 N/A QC Inspection File Within five
calendar days of completion/ termination of the contract.
KO and
COR
1 As specified
2.7.10.3 N/A Contractor Quality
Inspection and Surveillance Report
First work day of each month.
KO and
COR
1 Monthly
2.7.11 N/A Property
Management Plan
Within 45 calendar days after award.
KO and
COR
1 As specified
2.7.12 N/A Monthly Meal Cost
Report
15th of each month
KO/COR 2 Monthly
N69450-20-R-0067
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
2.8.1 N/A List of Key
Personnel and Qualifications
Within 15 calendar days prior to contract start
KO and
COR
1 As specified
2.8.1 N/A Organizational
Chart
Within 15 calendar days prior to contract start
KO and
COR
1 As specified
2.8.2.6 N/A Proof of Legal
Residency
Prior to be admitted to site of work.
KO and
COR
1 As specified
2.8.3 N/A Contractor Labor
Hours (eCMRA) Report
No later than 31 October
KO and
COR
1 Annually for labor executed during the period of performanc e during each Governmen t fiscal year
(FY)
2.9.1 N/A Employee List Within 15
calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As required
2.9.7.1 N/A Fingerprint card
(FD87), and an
OF-306
Declaration for Federal Employment
Prior to commencement of work
KO, COR,
and
Security Manager
1 As required
2.10.2 N/A Accident
Prevention Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As specified
2.10.3 N/A Activity Hazard
Analysis
Together with the Accident Prevention Plan and for changes.
KO and
COR
1 As specified
N69450-20-R-0067
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
2.10.4 N/A Compliance Plans, Programs, and Procedures
Together with the Accident Prevention Plan and for changes.
KO and
COR
1 As specified
2.10.4 J-0200000-XX NAVFAC
Contractor Incident Reporting System
(CIRS)
Within five calendar days of accident.
KO and
COR
1 As required
2.10.4 J-0200000-XX Weight Handling
Equipment Accident Report
Within 15 working days of accident.
KO and
COR
1 As required
2.10.4 J-0200000-XX Crane and Rigging
Gear Near Miss Report
Within 15 working days of accident.
KO and
COR
1 As required
2.10.6 N/A Monthly On-Site
Labor Report
First work day of each month.
KO and
COR
1 Monthly
2.10.7 N/A OSHA Citations
and Violations Corrective Action Report
Within 48 hours after receiving a citation.
KO and
COR
1 As required
2.10.8 N/A Safety Inspection
and Monitoring Report
Upon request. KO and
COR
1 As required
2.10.9 N/A Safety
Certifications
Within 15 calendar days prior to contract start and as old certifications, expire.
KO and
COR
1 As specified
2.11 N/A EMS Goals and
Policy Measurement Information
Upon request. KO and
COR
1 As required
2.11.1.1 N/A Water
Conservation Plan
Within 15 calendar days after award and for changes.
KO and
COR
1 As specified
2.11.2.4 N/A Emergency
Planning and Community Right- To-Know Act (EPCRA) Report
Within 15 calendar days prior to contract start and not less than 10 working days prior to planned use of hazardous material.
KO and
COR
N69450-20-R-0067
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
2.11.2.4 J-0200000-XX Contractor
Hazardous Material Inventory Log
Within 15 calendar days after the end of each calendar year and at termination of the contract.
KO and
COR
1 Annually
2.11.2.8 N/A Asbestos
Containing Material (ACM)
Verbally notify the KO and COR within one hour and follow-up with written Notification within 24 hours
KO and
COR
1 As specified
2.11.3 N/A Sustainable
Procurement and Practices Plan
Within 15 calendar days prior to contract start and within 15 calendar days after exercised option periods.
KO and
COR
1 Annually
2.11.3 N/A Sustainable
Delivery of Services Report
Within five calendar days after each contract period.
KO and
COR
1 Annually
2.11.3.2 N/A Recovered
Material Certification
As specified KO and
COR
1 When a product containing recovered materials is equal to or better than the original and could be used.
2.12 N/A Mission Essential
Contractor Services Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As Required
2.12 N/A Mission
Critical/Mission Essential Personnel
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
N69450-20-R-0067
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
2.15.2 N/A 5-Yr Equipment
Replacement Plan
15 days prior to commencement of Contract Start
COR 2 Annually
2.15.3 N/A Equipment
Maintenance Plan
15 days prior to commencement of Contract Start
COR 2 Annually
2.17.1.1 N/A Non-Recurring
Work Proposals
Within two working days following receipt of request
KO 1 As required
2.17.4 N/A Work Status
Updates
Weekly and within 30 minutes of request by the Government.
KO and
COR
Required
*Any form not identified in Section F but is identified in the Performance Work Statement (PWS) shall be submitted to the COR and the KO within the specified timeframe identified in the PWS
Section F – 1502000 Facility Investment
N69450-20-R-0067
DELIVERABLES
Spec Item
Form Attachment
Number Deliverable Title Date (s) of
Submission
Distribution
Frequency Original / Copies
Number of Copies
(including original)
3.1 N/A Facility Investment
Recurring Operations Budget Program and Plan
Within 20 days after Receiving budget from KO/ Annually
KO/COR 2 Annually
*Any form not identified in Section F but is identified in the Performance Work Statement (PWS) shall be submitted
Section F – 1503050 Grounds Maintenance and Landscaping
N69450-20-R-0067
1503030 – Integrated Solid Waste Management
Form Attachment
Number Deliverable
Title Date (s) of
Submission
Distribution
Frequency Original/
Copies
Number of Copies (including original)
2.3.1 N/A Revenue
Receipts
As specified
KO 12 With invoice/Monthly
2.3.2 N/A Weight Tickets As
specified
KO 12 With invoice/Monthly
3.1 N/A Recycling
Collection Schedule
As specified
KO 1 15 days after award/Annually
*Any form not identified in Section F but is identified in the Performance Work Statement (PWS) shall be submitted
N69450-20-R-0067
Spec Item
Form Attachment
Number Deliverable
Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
2.2.1 N/A Certification, Training, and Licensing
Within 15 calendar days prior to start of work. Copies of renewed certifications shall also be submitted.
KO/COR 2 Annually and as required by Section H – Special Contract Requirements, FAC 5252.237-
9301 Substitutions of Key Personnel
(JUN 1994)
2.3.4 N/A Property
Damage Management
15 days prior to commencement of the contract/Annually
KO/COR 2 As required
2.3.8.1 N/A Water
Conservation Plan
Within 15 calendar days prior to contract start
KO/COR 2 Annually and five calendar days prior to implementing changes to the schedule
3 N/A SDS sheets, catalog cut sheets, samples of all proposed fertilizers, and mulch
Prior to bringing on-board installation and prior to use
KO/COR 2 As Required
3 N/A Contractor Weekly Work Schedules
Within 15 calendar days prior to contract start
COR 2 Weekly
3 N/A Contractor Daily Report
Daily COR 2 Daily
3.1.1.4 N/A Soil Analysis
test results and proposed fertilizer
Within 15 days after receipt of the test results by the Contractor
KO/COR 2 Annually
3.1.1.4 N/A Top Dressing
and Over Seeding Seed Type
Within 15 calendar days prior to contract start
KO/COR 2 Annually and five calendar days prior to implementing changes to the schedule
3.1.1, 3.1.2, 3.1.3
N/A Vegetation Control Schedule
15 days prior to commencement of the contract/Annually
COR 2 Annually
N69450-20-R-0067
Spec Item
Form Attachment
Number Deliverable
Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
3.1.1.10 N/A Debris
Removal Schedule
15 days prior to commencement of the contract/Annually
COR 2 Annually
3.1.4 N/A Equipment
Maintenance Plan
15 days prior to commencement of the contract/Annually
KO/COR 2 Annually
3.1.5 N/A Additional
FX Normal Recurring Operations Budget Program and Plan
Within 20 days after Receiving budget from KO/ Annually
KO/COR 2 Annually
*Any form not identified in Section F but is identified in the Performance Work Statement (PWS) shall be submitted