N69450-20-R-0013 0007.pdf

PDF 64 KB Posted

Attached to
Powertrain Facility Machining, Naval Air Station (NAS) Corpus Christi, Texas
Solicitation number
N69450-20-R-0013
Issued by

About this file

This amendment to solicitation N69450-20-R-0013 modifies the solicitation to construct a new 124,670 square foot Aircraft Component Repair Facility and an 82,207 square foot administrative headquarters building at Naval Air Station Corpus Christi, Texas. The amendment provides changes to specifications regarding paints and coatings, pre-functional checklists and functional performance tests, facility electronic operation and maintenance support information, sustainability reporting, and quality control. It also replaces the subcontracting plan attachment. The work includes construction of the facilities, utilities connections, site work, and energy efficiency features.

View the file

Other files

File Type Posted
200528_A312-REV1.pdf PDF
N69450-20-R-0013 0011.pdf PDF
Amendment 11 Attachments.zip ZIP file
N69450-20-R-0013 0010.pdf PDF
Amendment 0010 Attachments.zip ZIP file
N69450-20-R-0013 0009.pdf PDF
Amendment 0009 Attachments.zip ZIP file
Amend 0008 Attachments.zip ZIP file
N69450-20-R-0013 0008.pdf PDF
CCAD Admin Ph1 Spec Section 019113.01, PFC and FPT.pdf PDF
ANNEX OPR_01 91 00.15 25_AppendixA.pdf PDF
eOMSI FDW ANNEX_200513.pdf PDF
Amendment 0006 Attachments.zip ZIP file
Xref_Existing.dwg.zip ZIP file
ACRS.txt TXT text file
DWG.zip ZIP file
N69450-20-R-0013 0006.pdf PDF
Amendment 5 Attachments.zip ZIP file
N69450-20-R-0013 0005.pdf PDF
Amend 4.zip ZIP file
Amend 3.zip ZIP file
N69450-20-R-0013 0003.pdf PDF
N69450-20-R-0013 0004.pdf PDF
N69450-20-R-0013 0002.pdf PDF
Site Visit.pdf PDF
N69450-20-R-0013 0001.pdf PDF
ANNEX IFB DWGS Vol 2.zip ZIP file
P71594 PTPA III ANNEX IFB DWGS Vol 1.pdf PDF
P71594 PTPA III ANNEX IFB SPC 2of2.pdf PDF
P71594 PTPA III ACRS IFB SPC 1of2.pdf PDF
ANNEX IFB Cover page.pdf PDF
N69450-20-R-0013.pdf PDF
P71594 PTPA III ANNEX IFB SPC 1of2.pdf PDF
Attachments.zip ZIP file
P71594 PTPA III ACRS IFB DWGS.pdf PDF
P71594 PTPA III ACRS IFB SPC 2of2.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

AMENDMENT 0007 to N69450-20-R-0013 POWERTRAIN FACILITY - MACHINING NAS CORPUS CHRISTI, TX

Offerors must acknow ledge this amendment in w riting.

See Page 2.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-May-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6945020R0013

X 9B. DATED (SEE ITEM 11)

15-Apr-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-May-2020

CODE

NAVFAC SOUTHEAST

CORE CONSTRUCTION

BLDG 903 YORKTOWN

PO BOX 0030

JACKSONVILLE FL 32212-0030

N69450 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6945020R0013

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The following have been added by full text:

AMENDMENT 0007

The purpose of this amendment is to:

1. Amend ACRS SPECIFICATION SECTION 09 90 00 PAINTS AND COATINGS.

2. ADD ANNEX SPECIFICATION SECTION 01 91 13.01 - PFCs and FPTs and ANNEX Specification Section 01 91 00.15 25_Appendix A OPR.

3. Amend ANNEX SPECIFICATION SECTION 01 78 24.00 25 FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT INFORMATION (eOMSI).

4. Amend ANNEX SPECIFICATION SECTION 01 33 29.00 25 SUSTAINABILITY REPORTING.

5. Amend ANNEX SPECIFICATION SECTION 01 45 00.00 25 QUALITY CONTROL.

6. Amend ACRS SPECIFICATION SECTION 01 45 00.00 25 QUALITY CONTROL

7. Amend Solicitation page 11 of 82.

1. ACRS SPECIFICATION SECTION 09 90 00 PAINTS AND COATINGS

Para 3.11.2 Interior Paint tables

DIVISION 3: INTERIOR CONCRETE PAINT TABLE

Delete:

“ B. New Concrete floors in Process Floor Area CLIN 007, see plans:

1. Epoxy High Build with Slip Resistant Additives New; MPI INT 3.2L-G3-4 (SemiGloss) Primer: Intermediate: Topcoat:

MPI 108 MPI 108 MPI 108

System DFT: 4 mils Note: Primer may be reduced for penetration per manufacturer's instructions.”

2. ADD:

ANNEX SPECIFICATION SECTION 01 91 13.01 - PFCs and FPTs (Pre-functional checklists and Functional Performance Tests), and;

ANNEX Specification Section 01 91 00.15 25_Appendix A OPR (Owner’s Project Requirements)

3. ANNEX SPECIFICATION SECTION 01 78 24.00 25 FACILITY ELECTRONIC OPERATION AND

MAINTENANCE SUPPORT INFORMATION (eOMSI):

ADD: “eOMSI FDW ANNEX_200513.pdf”, which is attached, at the end of specification section 01 78 24.00 25.

The Microsoft Excel file noted in Section 1.2.2 of the specification will be provided after contract award.

4. ANNEX SPECIFICATION SECTION 01 33 29.00 25 SUSTAINABILITY REPORTING

1.6.1 Commissioning

In the sentence, “Commissioning services will be provided by the Government under a separate contract.” Delete: “Commissioning services” REPLACE WITH: Commissioning Authority (CxA) In the next sentence: Refer to Specification 01 91 00.15 25 TOTAL BUILDING COMMISSIONING for more information.” DELETE: “for more information” ADD: “for the roles and responsibilities that are required of the Contractor as part of the

N6945020R0013

Commissioning process.”

5. ANNEX SPECIFICATION SECTION 01 45 00.00 25 QUALITY CONTROL

1.4.1 Commissioning

f. In the sentence, “Commissioning services will be provided by the Government under a separate contract.” Delete: “Commissioning services” REPLACE WITH: Commissioning Authority (CxA) In the next sentence: Refer to Specification 01 91 00.15 25 TOTAL BUILDING COMMISSIONING for more information.” DELETE: “for more information” ADD: “for the roles and responsibilities that are required of the Contractor as part of the Commissioning process.”

6. ACRS SPECIFICATION SECTION 01 45 00.00 25 QUALITY CONTROL

DELETE: Part 1.2 SD-07 “CA Resume” DELETE: Part 1.5.2 ‘Commissioning Authority’ in its entirety

7. Amend Solicitation page 11 of 82.

DELETE: Section 7 – Sub-Contracting Plan (Attachment E).

ADD: Section 7 – Small Business Subcontracting Plan (Attachment D).

(End of Summary of Changes)

File details come from the government source that posted it. Updated .