Surveillance Activity Checklist
View the file
Other files for this federal contract opportunity
Show all 33
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT SURVEILLANCE PLAN (CSP)
FOR
ENGINEERING SUPPORT SERVICES (ESS)-VI
1.
Purpose
This Contract Surveillance Plan (CSP) is a Government developed and applied document used to make sure systematic quality assurance methods are used in the administration of the Level of Effort (LOE) services under the planned contract. The intent is to ensure that the contractor performs in accordance with the performance metrics and the Government receives the quality of services called for in the contract.
This contract requirement as defined in the Statement of Work (SOW) is to provide the basic tasking requirements for contractor systems engineering services to the Naval Air Warfare Center Weapons Division (NAWCWD) and its customers.
The SOW also defines the efforts required to provide weapons systems effectiveness analysis, design adequacy studies and evaluations, test and evaluation support, general engineering, and related documentation for all fleet support, weapons, and weapons related projects supported at NAWCWD China Lake and Point Mugu, California, attached activities, and other locations set forth in individual task orders.
Major projects supported by the Engineering Support Services (ESS) contract include but are not limited to: Sidewinder, Sparrow, High Speed Anti-Radiation Missile (HARM), Cruise Missile, Standard Missile, Rolling Airframe Missile (RAM), Gun Systems, Parachute Systems, Bomb Rack Systems, Full Scale Aerial Target Systems, and Propulsion Systems, Tomahawk, Anti-Radiation Missile (ARM), Sparrow, Advanced Medium-Range Air-to-Air Missile (AMRAAM), Sidewinder, and AIM9X missile systems; miniature munitions; and the Joint Standoff Weapon (JSOW).
2. Authority
Authority for issuance of this CSP is provided by Section E - Inspection and Acceptance, which provides for inspection and acceptance of the services and documentation called for in service contracts, to be executed by the Contracting Officer or a duly authorized representative.
3.
Scope
To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Management Plan and the Contract Surveillance Plan. The contractor, not the Government, is responsible for management and quality control actions necessary to meet the quality standards set forth by the contract.
The CSP on the other hand, is put in place to provide Government surveillance oversight of the contractor’s efforts to assure that they are timely, effective and are delivering the results specified in the contract and documented in the Quality Management Plan.
4.
Government Resources
The following definitions for Government resources are applicable to this plan:
Contracting Officer - A person duly appointed with the authority to enter into (Procuring Contracting Officer, (PCO)) or administer (Administrative Contracting Officer, (ACO)) contracts and make related determination and findings on behalf of the Government. The PCO for this contract is AIR 2.5.4.3. The ACO will be designated in the resulting contract. Contracting Officers are designated via a written warrant, which sets forth limitations of authority.
Contracting Officer’s Representative (COR) - An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the contract. The COR will be appointed in the resulting contract. The limitations of authority are contained in a written letter of appointment.
Technical Assistant (TA) – The Technical Assistant (appointed by the Technical Code) works with the COR to provide technical oversight of specific efforts under the task order.
5.
Responsibilities
The following Government resources shall have responsibility for the implementation of this CSP:
Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer that assures the contractor receives impartial, fair and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Contracting Officer’s Representative (COR) – The COR is responsible for technical surveillance of the contract and assures proper Government oversight of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the contractor deems may affect contract price, terms or conditions shall be referred to the Contracting Officer for action.
Technical Assistant – The Government Project Lead is responsible for assisting in technical oversight of specific efforts under the task order. A Government Project Lead cannot, in any manner, alter the scope of the task order, make commitments or authorize any changes on the Government’s behalf.
6.
Methods of QA Surveillance a.
CSP - The below listed methods of surveillance, Enclosure (1), shall be used by the COR in the execution of this CSP. The surveillance checklist below correlates with the data required to fill out the Contractor Performance Assessment Review (CPAR). This data is used as feeder input when the COR fills out the CPAR. In addition to the below instructions, the form to be used for documentation of quality assurance surveillance for the Semiannual reviews is the Surveillance Activity Checklist provided herein.
7.
Surveillance
The Surveillance Activity Checklist will be provided to the contractor on a semiannual basis, as feedback on their performance of the services provided under this contract.
8.
Documentation
In addition to providing semiannual reports to the Contracting Officer, the COR will maintain a complete Quality Assurance file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the quality assurance function, including the originals of the Quality Assurance Checklists. All such records will be maintained for the life of the contract. The COR shall forward these records to the Contracting Officer semi-annually. The Contracting Officer will retain the records in the contract file to document contractor performance.
9.
Enclosures
Enclosure (1) Surveillance Activity Checklist
Enclosure (1)
SUVEILLANCE ACTIVITY CHECKLIST
All CLIN 0001 tasks will be assessed focusing on the following:
Cost – Assess the contractor’s effectiveness in forecasting, managing, and controlling contract cost. Is the contractor experiencing cost growth or under run? If so, discuss the causes and contractor-proposed solutions for the cost overruns. In addition, the extent to which the contractor demonstrates a sense of cost responsibility, through the efficient use of resources in each work effort will be assessed.
Schedule – Assess the contractor’s adherence to the required delivery schedule by assessing the contractor’s efforts during the assessment period that contribute to or effect the schedule variance. Also address significance of scheduled events, discuss the causes of any delays, and assess the effectiveness of contractor corrective actions.
Quality – Assess the contractor’s effort to transform operational requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of contract execution, the integration of program management specialties, management of interfaces, and the management of a totally integrated effort of all program management concerns to meet cost, performance, and schedule objectives. Assess how successfully the contractor meets the program quality.
Management – Assess the timeliness, completeness and quality of problem identification, corrective action plans, proposal submittals (especially responses to change orders, Engineering Change Proposals or undefinitized contract actions), the contractor's history of reasonable and cooperative behavior, effective business relations, and customer satisfaction. Consider the contractor’s responsiveness to the program as it relates to meeting contract requirements during the period covered by the report.
Data Standards – Assess the contractor’s accuracy and timeliness of each data deliverable. Assess the contractor’s adherence with respect to following the applicable DID and format cited in each CDRL.
The evaluation ratings are as follows:
Exceptional – Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the task and sub-task being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Very Good - Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the task and sub-task being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Satisfactory - Performance meets contractual requirements. The contractual performance of the task and sub-task contain some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal - Performance does not meet contractual requirements. The contractual performance of the task and sub-task being assessed reflect a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the task or sub-task contains a serious problem(s) for which the contractor’s actions appear or were ineffective.
| Task Description |
| Surveillance Method |
| Date Planned |
| Date Completed |
| Cost |
| Schedule |
| Quality |
| Management |
| 3.1.1 Design Engineering and Review. The contractor shall provide engineering designs, fabricate production prototypes, modify original designs, identify and complete design validation testing, and prepare technical data packages of systems, subsystems, equipment, and components. |
| 100% inspection by COR and/or TAs, and customer feedback. |
| TBD |
| 3.1.2 Engineering Analyses. The contractor shall perform engineering analyses and studies for systems development, production, and in-service support activities. |
| 100% inspection by COR and/or TAs, and customer feedback. |
| TBD |
| 3.1.3 Operation Research Services. The contractor shall construct, modify and/or perform statistical and/or analytical investigations of, and with, mathematical simulation models. |
| 100% inspection by COR and/or TAs, and customer feedback. |
| TBD |
| 3.1.4 Field Engineering and Analyses. The contractor shall assist the Government in planning, organizing, and responding to Fleet requests to resolve problems and improve performance. |
| 100% inspection by COR and/or TAs, and customer feedback. |
| TBD |
| 3.1.5 Chemical Analyses. The contractor shall plan, execute, analyze, interpret, and report the results of chemical investigations. |
| 100% inspection by COR and/or TAs, and customer feedback. |
| TBD |
| 3.1.6 Physics Analyses. The contractor shall plan, execute, analyze, interpret, and report the results of investigations. |
| 100% inspection by COR and/or TAs, and customer feedback. |
| TBD |
| 3.1.7 Electromagnetic Analyses. The contractor shall perform and document engineering analyses, studies, and testing concerning the areas of Electromagnetic Interference (EMI), Electromagnetic Compatibility (EMC), and Electromagnetic Pulse (EMP). |
| 100% inspection by COR and/or TAs, and customer feedback. |
| TBD |
| 3.1.8 Environmental Analysis. The contractor shall prepare, conduct analysis, and review studies that support NAWCWD Range objectives relative to range mission, and potential operational considerations as they relate to weapons systems engineering, and conduct of range operational tests. |
| 100% inspection by COR and/or TAs, and customer feedback. |
| TBD |
3.1.9 Production Engineering Analyses. The contractor shall analyze production costs and manufacturing problems; review production changes, waivers, and deviations; attend quality assurance audits and surveys; and identify problems and progress concerning production, costs, and product assurance.
| 100% inspection by COR and/or TAs, and customer feedback. |
| TBD |
| 3.1.10 Technology Studies. The contractor shall perform engineering analyses and conduct technical studies to support research and development of systems engineering and test evaluation technology. |
| 100% inspection by COR and/or TAs, and customer feedback. |
| TBD |
3.1.11 Test Laboratory Design Studies. The contractor shall perform design, review, documentation, and provide input for potential upgrades to the design of test laboratories.
| 100% inspection by COR and/or TAs, and customer feedback. |
| TBD |
| 3.1.12 Human Engineering. The contractor shall prepare, evaluate, and annotate human engineering program plans, analysis reports, test plans and procedures, and other human engineering related documentation. |
| 100% inspection by COR and/or TAs, and customer feedback. |
| TBD |
| 3.2.1 Test Plans and Procedures. The contractor shall provide pre and post-test simulations of expected system performance in test scenarios. |
| 100% inspection by COR and/or TAs, and customer feedback. |
| TBD |
| 3.2.2 Test and Test Support. The contractor shall provide development testing to investigate technical approaches, verify interface interoperability, and evaluate technical performance under controlled conditions and in representative operations environments. |
| 100% inspection by COR and/or TAs, and customer feedback. |
| TBD |
| 3.2.3 Test Analyses and Reports. The contractor shall review test data and perform analyses of the performance of units under test. |
| 100% inspection by COR and/or TAs, and customer feedback. |
| TBD |
3.3.1 Development Item and Prototype Production. The contractor shall produce prototypes and development items in accordance with the authorization and specification package.
| 100% inspection by COR and/or TAs, and customer feedback. |
| TBD |
| 3.3.2 Installation Studies. The contractor shall identify and document installation requirements to ensure system compatibility; identify and provide recommended solutions to interface problems; review and monitor system tolerances; perform system tests to assess performance, safety, operability, reliability and maintainability, for impact on systems interface. |
| 100% inspection by COR and/or TAs, and customer feedback. |
| TBD |
| 3.3.3 Interim Assistance. The contractor shall provide interim operation for development, pre-production, prototype, and LRIP equipment or components, production material, and modification kits during development and deployment. |
| 100% inspection by COR and/or TAs, and customer feedback. |
| TBD |
| 3.4.1 Technical Administrative Services. The contractor shall perform administrative support of the technical organizations to meet NAWCWD mission requirements. |
| 100% inspection by COR and/or TAs, and customer feedback. |
| TBD |
| 3.4.2 Project Planning Services. The contractor shall analyze, make recommendations, provide rationale for the recommendations, and provide technical administrative services in preparing assigned project plans, schedules, cost estimates, and risk analyses. |
| 100% inspection by COR and/or TAs, and customer feedback. |
| TBD |
| 3.4.3 Management Evaluation, Status Reviews and Reports. The Contractor shall review program and project management processes and analyze effectiveness to report on compliance with mission objectives and life cycle requirements. |
| 100% inspection by COR and/or TAs, and customer feedback. |
| TBD |
| 3.5 TRAINING SERVICES. The Contractor shall develop, prepare and present training courses. |
| 100% inspection by COR and/or TAs, and customer feedback. |
| TBD |
Data Products
| Task Description |
| Surveillance Method/Measure |
| Date Planned |
| Date Completed |
| Cost |
| Schedule |
| Quality |
| Management |
| Funds and Man-Hours Expenditure Report (CDRL A001) |
| 100% Inspection by COR or as designated by COR |
| Contractor’s Personnel Roster (CDRL A002) |
| 100% Inspection by COR or as designated by COR |
| Phase-Out Plan (CDRL A003) |
| 100% Inspection by COR or as designated by COR |
| Operations Security (OPSEC) Plan (CDRL A004) |
| 100% Inspection by COR or as designated by COR |
| Technical Report -Study/Services (CDRL A005) |
| 100% Inspection by COR or as designated by COR |
| Electromagnetic Interference Test Report (EMITR) (CDRL A006) |
| 100% Inspection by COR or as designated by COR |
| Engineering Change Proposal (ECP) (CDRL A007) |
| 100% Inspection by COR or as designated by COR |
| Notice of Revision (NOR) (CDRL A008) |
| 100% Inspection by COR or as designated by COR |
| Human Engineering Program Plan (CDRL A009) |
| 100% Inspection by COR or as designated by COR |
| Test Plan (CDRL A00A) |
| 100% Inspection by COR or as designated by COR |
| Technical Data Package (CDRL A00B) |
| 100% Inspection by COR or as designated by COR |
| Training Materials (CDRL A00C) |
| 100% Inspection by COR or as designated by COR |
| Technical Report – Study/Services (Test Facilities Studies) (CDRL A00D) |
| 100% Inspection by COR or as designated by COR |
| Incurred Cost and Progress Reporting for Services (CDRL A00E) |
| 100% Inspection by COR or as designated by COR |