Attachment_L-1.1_Sample_Task_Cost_Proposal_Sheet.xls

XLS spreadsheet 64 KB Posted

Attached to
Engineering Support Services
Solicitation number
N6893616R0029
Issued by

About this file

Attachment L-1.1 Sample Task Cost Proposal Sheet

View the file

Other files

File Type Posted
16-R-0029_RFP_Amendment_5.docx DOCX document
RFP_Amendment_4_.docx DOCX document
NAWCWD_Badge_Form.pdf PDF
16-R-0029_RFP_Amendment_3.docx DOCX document
SECNAV_5512_-2.pdf PDF
CDRL.pdf PDF
16-R-0029_RFP_Amendment_2.docx DOCX document
WAGE_DETERMINATIONS.pdf PDF
CONTRACTOR_PERFORMANCE_ASSESSMENT_QUESTIONNAIRE.pdf PDF
16-R-0029_RFP_Amendment.docx DOCX document
CDRLS.pdf PDF
L-5_Cost_Summary_Spreadsheet.xls XLS spreadsheet
Fully_Burdened_Labor_Rates.xlsx XLSX spreadsheet
16-R-0029_RFP_Solicitation.docx DOCX document
Ess-VI_Government_Furnished_Property_GFP.pdf PDF
L-1_ESS-VI_Techical_Sample_Task.doc DOC document
Wage_Determination_Kern_County,_CA.pdf PDF
L-2_Techical_Sample_Task_Estimate.doc DOC document
L-4_Contractor_Performance_Assessment_Que.pdf PDF
Wage_Determination_Ventura_County,_CA.pdf PDF
L-3_Past_Performance_Information_Form.pdf PDF
Surveillance_Activity_Plan_For_Information.doc DOC document
BLS_SOC.xlsx XLSX spreadsheet
Draft_RFP.docx DOCX document
Attachment_L-4_Cost_Summary_Spreadsheet.xls XLS spreadsheet
Attachment_L-6_Government_Furnished_Property_(GFP)_List.xlsx XLSX spreadsheet
Attachment_L-2_Past_Performance_Information_Form.pdf PDF
Attachment_L-3_Contractor_Performance_Assessment_Questionairre.pdf PDF
Attachment_L-1_ESS-VI_Technical_Sample_Task_Order.docx DOCX document
Attachment_L-5_Fully_Burdened_Labor_Rate_Spreadsheet.xls XLS spreadsheet
ESS_Q's_and_A's.pdf PDF
ESS_Powerpoint.ppt PPT presentation
SECNAV_5512.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

directions

Contractors responding to an RFP must submit a cost proposal in addition to a technical proposal. The Government requires that an independent cost estimate be submitted by the technical customer as part of the acquisition requirements package. This document provides the Government’s assessment of the probable hours, supplies, and travel likely to be acquired.
A cost estimate analyzes the individual cost elements of an anticipated proposal and includes overhead rates, general and administrative rates, material handling fees, and other indirect or direct costs.

These estimates should be made by task and relate directly to the statement of work (SOW).

The solid yellow cells are password protected and require input from the offeror. The password is DRAFTRFP sample format

SAMPLE TASK COST PROPOSAL SPREADSHEET
*The Engineering Technician Senior is calculated with an anticipated 300 hours of Overtime
DIRECT LABOR
Labor CategoryIGCE HoursRateTotal
Engineer Scientist Senior9600$0.00$0.00
Engineering Technician Senior*2220$0.00$0.00
Administrative Associate1920$0.00$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Subtotal Direct Labor$0.00
INDIRECTS
Fringe Benefits0%$0.00
Subtotal Direct Labor & Fringe$0.00
Overhead0%$0.00
Total Direct Labor & Fringe & Overehead$0.00
OTHER DIRECT COSTS (ODCs)
Materials
Conference Displays$5,000.00
SPIR Net Renewal$1,750.00
MATLAB Renewal$2,900.00
AirCard$350.00
Subtotal Direct Materials$10,000.00
Subcontracts
$0.00
$0.00
$0.00
Subtotal Subcontracts$0.00
Travel*
Trip #1$0.00
Trip #2$0.00
Trip #3$0.00
Trip #4$0.00
Subtotal Travel$0.00
Trainning
Subtotal Trainning$0.00
Total ODCs$10,000.00
TOTAL DIRECT COSTS$10,000.00
General and Administrative0%$0.00
Estimated Cost$10,000.00
FEE0%$0.00
Total Estimated Cost$10,000.00
* See Next Tab for more detailed information

Travel&Training

IGCE TRIPS
SOW Para.Trip #Travel FromTravel To# of trips# of travelers# of daysPer Day HoteTotal HotelPer Day Per Diem Per PersonTotal Per Diem Per DayTotal Per DiemAirfareTotal Airfare# of Rental VehiclesPer Day RentalTotal RentalTotal
3.21China Lake, CATucson, AZ429$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
3.12China Lake, CAPortsmouth, VA219$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
3.33China Lake, CATyndal AFB, FL125$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0
Training FromTraining To# of
attendeesfee
$0.00
Total Training$0.00
*travel included in estimate above