Attachment_L-1_ESS-VI_Technical_Sample_Task_Order.docx
DOCX document 38 KB Posted
- Attached to
- Engineering Support Services Federal contract opportunity
- Solicitation number
- N6893616R0029
About this file
Attachment L-1 ESS-VI Technical Sample Task Order
View the file
Other files for this federal contract opportunity
Show all 33
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment L-1 Technical Sample Task
Statement of Work N68936-17-R-0029 Sample Task Order Period of Performance 01 JAN 2018 – 31 DEC 2018 Evolved Sea Sparrow Missile (ESSM) System Analysis and Simulation Version 11/29/2016 Severable Task Order Product Service Code: R425 Applicable Contract SOW Sections 3.1.1, 3.1.2, 3.4.1, 3.5
1.0 SCOPE
This Statement of Work (SOW) covers support in simulation and modeling of missile guidance and control algorithms, as well as Hardware-in-the-Loop (HWiL) testing of the ESSM, NATO SEASPARROW, and related systems. Tasking will include: Design Engineering, Engineering Analysis, System Integration and Progress Reports.
2.0 APPLICABLE DOCUMENTS
The following documents are in the ESSM TPO repository for access and are to be used for reference:
ESSM Quality Plan ESSM Reliability Program Plan ESSM Life Cycle Sustainment Plan ESSM Configuration Management Plan ESSM Item Unique Identification Plan ESSM Block 2 E&MD contract NATO SEASPARROW training curriculum/presentation material 22 CFR 120-130 – International Traffic in Arms Regulations (ITAR)
3.0 PERFORMANCE REQUIREMENTS
In order to support Integrated Product Teams, such as the Producibility and Supportability System Engineering (SE) IPT, as prescribed by the ESSM Block 2 Organizational Structure travel will be required. This travel may occur up to quarterly.
3.1 Design Engineering and Review
3.1.1 The Contractor shall provide written technical recommendations to the Government for use in developing program requirements. The ultimate acquisition strategy, contract preparation, and execution are the responsibility of the Government.
3.1.2 The Contractor shall prepare and deliver to the Government simulations and studies that will assist in the development of the design requirements and capabilities of future missiles. (A005)
3.1.3 The Contractor shall review proposed design changes to hardware and software and provide the Government technical recommendations. The Contractor shall attend ESSM planning meetings, flight tests and post-test meetings and provide analysis of Target Detecting Device Telemetry.
3.1.4 The Contractor shall provide modeling and simulation support to the Offensive Anti-surface Weapon (OASuW) Project Office. This support shall include reviewing prime contractor simulations data used by OASuW, supporting the team in understanding, running, and documenting the simulations used by the Project Office to support the program. The Contractor shall also participate in simulation planning meetings and peer reviews along with simulation data analysis reviews.
3.2 Engineering Analysis
3.2.1 The Contractor shall support ESSM CIL analysis tool development. Specifically, the Data Analysis GUI has a static library for loading HIL files and this tool is being upgraded so that the library can be updated whenever a new telemetry format is developed. The Contractor shall increase the tool's capability for use in post flight analysis. The Contractor shall provide Data Analysis GUI tool updates to the Government.
3.2.2 The Contractor shall participate in the maintenance and updating of the simulation tools used in the analysis of ESSM capabilities. The ESSM suite of models include:
| • | ESSM Block 1 Common 6-DoF |
| • | ESSM Block 1 Code-in-the-Loop Simulation |
| • | ESSM Block 2 Tactical Simulation (ETS) |
| • | HLA/Enterprise Test Bed Laboratory |
| • | ESSM Block 1 International Simulation (INTSIM) |
| • | ESSM Block 2 International Simulation (EIS) |
| • | Target Detecting Device Fuze Simulation (GENSIM/FUZSIM) |
| • | N-Point RCS Model Development, |
| • | Target Vulnerability and Lethality Modeling (JSEM and AJEM) |
| • | Other Simulation/Analysis Models as needed |
The specialty areas for ESSM Simulation Support include, but are not limited to:
| • | RF Modeling & Analysis |
| • | Missile System Modeling & Analysis |
| • | RF Fuze Modeling & Analysis |
| • | Ship Based Fire Control System Modeling & Analysis |
| • | Missile 6 Degree of Freedom (6-DoF) Modeling & Analysis |
| • | Control Theory Modeling & Analysis |
| • | MATLAB Modeling and Analysis |
| • | FORTRAN Software Development |
| • | ADA Software Development |
| • | C++ Software Development |
| • | Custom Embedded Processor Code Development |
| • | Configuration Management (CM) |
| • | High Level Architecture (HLA) development |
| • | Simulation Verification, Validation and Accreditation Support Package development |
| • | Technical Writing |
| • | Information Assurance (IA) |
Missile variants modeled include SEA SPARROW, ESSM Block 1, ESSM Block 2 and notional future ESSM missile variants. This includes developing improvements to GenSim and building new or improving existing N-Point target models. The Contractor shall evaluate possible modifications to existing tactical software for the ESSM Target Detecting Device. The Contractor shall review design changes to the hardware and software proposed by other Government agencies and Contractors. The Contractor shall attend ESSM planning meetings, flight tests and post-test meetings and analyze Target Detecting Device Telemetry. The Contractor shall provide pre- and post- flight analysis.
3.2.3 The Contractor shall support ESSM HWiL engineering and simulation activities. This support shall include, HWiL scenario development and set-up, HWiL simulation results analysis, HWiL trouble-shooting. HWiL upgrade planning and HWiL simulation operation.
3.3 Training
The Contractor shall provide the NATO SEASPARROW training and present information IAW paragraph 2.0 of this SOW. Both government, contractor representatives, and foreign nationals will be present that are part of the NATO SEASPARROW Consortium both within the US and abroad. The participating governments (PGs) that are part of the consortium are Australia, Belgium, Canada, Denmark, Germany, Greece, Netherlands, Norway, Portugal, Spain, and Turkey. The Contractor shall set up and develop a Simulink model working with other engineers. The Contractor shall use the model for the purposes of simulation and running flight predictions and other Monte Carlo runs.
3.4 Technical Administrative Support
The Contractor shall prepare and submit progress reports to the Technical Assistant (TA) documenting the status of ongoing, completed and anticipated future activities, and problem areas in support of the SOW. Progress reports are due by the fifth day of each month. (A00E)
4.0 SPECIAL CONSIDERATIONS
4.1 Contract Status Reporting
4.2 Place of Performance
The primary place of performance for this requirement is at NAWCWD China Lake, California.
5.0 SECURITY
5.1 Personnel Security
Performance of work under this task order will require a clearance level of SECRET. Some work performed under this task order will require a clearance level of TOP SECRET.
6.0 TRAVEL
The Contractor shall be required to travel in performance of this order. The Contractor shall be responsible for all transportation, billeting, and messing for the Contractor personnel except in those cases where Government transportation, billeting, and messing are the only services available. All travel costs will be in accordance with the Joint Travel Regulations. Travel for this Task Order is itemized on the IGCE for this Task Order.
Contract Data Requirements List (CDRL’s) for this Task Order:
| A005 | Technical Report Study/Services (Due as Required); Design Engineering and Review Reports, Chemical | Analyses Reports, Physics Analyses Reports, Environmental Services Reports, Technology Support | Reports, Test Reports |
| A00E | Incurred Cost and Progress Reporting Contractor's Personnel Roster |
Microsoft_Excel_97-2003_Worksheet1.xls Sheet1
Location # of Trips # of Travelers # OF DAYS LODGING RATE MEAL RATE AIRFARE AUTO EXPENSE TOTAL
Tuscon 2 1 3 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Corona 1 1 3 $ - 0 $ - 0 $- $ - 0 $ - 0
TOTAL 3 2 6 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
image1.emf
File details come from the government source that posted it. Updated .