PITS_TMCR_CDRLs_dtd_5Aug16.rtf
RTF text file 1 MB Posted
- Solicitation number
- N68335-16-R-0282
Text of this file
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
A
C. CATEGORY
ADMN
D. SYSTEM/ITEM
Power Interface Test Set (PITS)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
Conference Minutes / Agenda / Action Items
3. SUBTITLE
See Block 16
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMIN-81250A (See Block 16)
5. CONTRACT REFERENCE
SOW PARAGRAPH XXXXX
6. REQUIRING OFFICE
FRCSW NI 6.8.5.1
7. DD 250
REQ
LT
9. DIST STATEMENT REQUIRED
C (See Block 16)
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
See Block 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION
Reg.
Repro
16. REMARKS
BLOCK 3: Conference Agenda/Minutes for Technical Manual Initial Guidance Conference, In Process Review (IPRs), Validation, and Verification
BLOCK 4: Contractor format is acceptable. Deliver in Microsoft Word.
BLOCK 9: DISTRIBUTION STATEMENT C: Distribution authorized to U. S. Government agencies and their contractors for official use or for administrative or operational purposes. Other requests for this document shall be referred to Commander, Naval Air Systems Command (PMA-201/Fuel Containment),47123 Buse Road, Bldg 2272, Patuxent River, MD 20670-1547
BLOCKS 12 & 13: Submit minutes within twenty-one (21) business days after each meeting or conference. Subsequent submission shall be submitted NLT fourteen (14) calendar days after receipt of government comments. Submit agendas two (2) calendar days prior to each meeting or conference. Action Items are to be part of all minutes.
FRCSW NI 6.8.5.1
PMA-201/FC
15. TOTAL
G. PREPARED BY
Maria Cofey
H. DATE
8/5/2016
I. APPROVED BY
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED.
17. PRICE GROUP
18.ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
A
C. CATEGORY
TM
D. SYSTEM/ITEM
Power Interface Test Set (PITS)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
Logistics Product Data Summaries
3. SUBTITLE
Technical Manual Content and Product Plan
4. AUTHORITY (Data Acquisition Document No.)
TMCR NO. 14-003 (See Block 16)
5. CONTRACT REFERENCE
SOW PARAGRAPH XXXX
6. REQUIRING OFFICE
FRCSW NI 6.8.5.1
7. DD 250
REQ
SD
9. DIST STATEMENT REQUIRED
C (See Block 16)
10. FREQUENCY
N/A
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
16. REMARKS
BLOCK 4: Technical Manual Contract Requirement (TMCR) NO. 14- 003 dated 5 August 2016, Section J of Contract.
BLOCK 9: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors for official use or for administrative or operational purposes. Other requests for this document shall be referred to Commander, Naval Air Systems Command (PMA-201/Fuel Containment), 47123 Buse Road, Bldg 2272, Patuxent River, MD 20670-1547.
BLOCKS 12 & 13: Per TMCR 14-003 guidance, submit in electronic format that is compatible with MICROSOFT OFFICE© Word or ADOBE© PDF within 60 calendar days after contract award. The Government requires 30 calendar days to review and comment. The contractor shall submit final 15 calendar days after receipt of Government comments.
G. PREPARED BY
Maria Cofey
H. DATE
8/5/2016
I. APPROVED BY
18. ESTIMATED TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED.
DD FORM 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED.
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
A
C. CATEGORY
TM
D. SYSTEM/ITEM
Power Interface Test Set (PITS)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
Technical Manual Validation Plan
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
TMCR NO. 14-003 (See Block 16)
5. CONTRACT REFERENCE
SOW PARAGRAPH XXXX
6. REQUIRING OFFICE
AIR-6.8.5
7. DD 250
REQ
LT
9. DIST STATEMENT REQUIRED
C (See Block 16)
10. FREQUENCY
N/A
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
16. REMARKS
BLOCK 4: Technical Manual Contract Requirement (TMCR) NO. 14- 003 dated 5 August 2016, Section J of Contract.
BLOCK 9: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors for official use or for administrative or operational purposes. Other requests for this document shall be referred to Commander, Naval Air Systems Command (PMA-201/Fuel Containment), 47123 Buse Road, Bldg 2272, Patuxent River, MD 20670-1547.
BLOCKS 12 & 13: Submit in electronic format within 90 calendar days of contract award. The Government requires 30 calendar days to review and comment. The contractor shall submit final 15 calendar days after receipt of Government comments.
G. PREPARED BY
Maria Cofey
H. DATE
8/5/2016
18. ESTIMATED
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
A
C. CATEGORY
TM
D. SYSTEM/ITEM
Power Interface Test Set (PITS)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
Technical Manual Validation Certification
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
TMCR NO. 14-003 (See Block 16)
5. CONTRACT REFERENCE
SOW PARAGRAPH XXXX
6. REQUIRING OFFICE
FRCSW NI 6.8.5.1
7. DD 250
REQ
LT
9. DIST STATEMENT REQUIRED
C (See Block 16)
10. FREQUENCY
See Block 16
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
16. REMARKS
BLOCK 4: Technical Manual Contract Requirement (TMCR) NO. 14- 003 dated 5 August 2016, Section J of Contract.
BLOCK 9: The following information shall be included on the deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors for official use or for administrative or operational purposes. Other requests for this document shall be referred to Commander, Naval Air Systems Command (PMA-201/Fuel Containment), 47123 Buse Road, Bldg 2272, Patuxent River, MD 20670-1547.
BLOCKS 10, 12 & 13: Per TMCR NO. 14-003 guidance, submit in electronic format within 5 calendar days after technical manual validation. The Government requires 30 calendar days to review and comment. The contractor shall submit final 15 calendar days after receipt of Government comments.
G. PREPARED BY
Maria Cofey
H. DATE
8/5/2016
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
A
C. CATEGORY
TM
D. SYSTEM/ITEM
Power Interface Test Set (PITS)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
Technical Manuals
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
TMCR NO. 14-003 (See Block 16)
5. CONTRACT REFERENCE
SOW PARAGRAPH XXXX
6. REQUIRING OFFICE
FRCSW NI 6.8.5.1
7. DD 250
REQ
LT
9. DIST STATEMENT REQUIRED
C (See Block 16)
10. FREQUENCY
See Block 16
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
16. REMARKS
BLOCK 4: Technical Manual Contract Requirement (TMCR) NO. 14- 003 dated 5 August 2016, Section J of Contract.
BLOCK 9: The following information shall be included on the deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors for official use or for administrative or operational purposes. Other requests for this document shall be referred to Commander, Naval Air Systems Command (PMA-201/Fuel Containment), 47123 Buse Road, Bldg 2272, Patuxent River, MD 20670-1547.
BLOCKS 10, 12 & 13: Per TMCR NO. 14-003 guidance, submit in electronic format that is compatible with ADOBE© PDF. The Government requires 45 calendar days to review and comment. The contractor shall submit final 30 calendar days after receipt of Government comments.
G. PREPARED BY
Maria Cofey
H. DATE
8/5/2016
17. PRICE GROUP
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
A
C. CATEGORY
TM
D. SYSTEM/ITEM
Power Interface Test Set (PITS)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
Runtime File (IETMS)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
TMCR NO. 14-003 (See Block 16)
5. CONTRACT REFERENCE
SOW PARAGRAPH XXXX
6. REQUIRING OFFICE
FRCSW NI 6.8.5.1
7. DD 250
REQ
LT
9. DIST STATEMENT REQUIRED
C (See Block 16)
10. FREQUENCY
See Block 16
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
16. REMARKS
BLOCK 4: Technical Manual Contract Requirement (TMCR) NO. 14- 003 dated 5 August 2016, Section J of Contract.
BLOCK 9: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors for official use or for administrative or operational purposes. Other requests for this document shall be referred to Commander, Naval Air Systems Command (PMA-201/Fuel Containment), 47123 Buse Road, Bldg 2272, Patuxent River, MD 20670-1547.
BLOCKS 10, 12 & 13: Per TMCR NO. 14-003 guidance, submit in electronic format not later than 120 calendar days after Developmental Test (DT). The Government requires 45 calendar days to review and comment. The contractor shall submit final 30 calendar days after receipt of Government comments.
G. PREPARED BY
Maria Cofey
H. DATE
8/5/2016
DD FORM 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED.
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
A
C. CATEGORY
TM
D. SYSTEM/ITEM
Power Interface Test Set (PITS)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
Technical Manual Quality Assurance Program Plan (QAPP)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
See Block 16
5. CONTRACT REFERENCE
SOW PARAGRAPH XXXX
6. REQUIRING OFFICE
FRCSW NI 6.8.5.1
7. DD 250
REQ
LT
9. DIST STATEMENT REQUIRED
C (See Block 16)
10. FREQUENCY
N/A
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
16. REMARKS
BLOCK 4: Technical Manual Contract Requirement (TMCR) NO. 14- 003 dated 5 August 2016, Section J of Contract.
BLOCK 9: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors for official use or for administrative or operational purposes. Other requests for this document shall be referred to Commander, Naval Air Systems Command (PMA-201/Fuel Containment), 47123 Buse Road, Bldg 2272, Patuxent River, MD 20670-1547.
BLOCKS 12 & 13: Submit in electronic format within 90 calendar days of contract award. The Government requires 30 calendar days to review and comment. The contractor shall submit final 15 calendar days after receipt of Government comments.
G. PREPARED BY
Maria Cofey
H. DATE
8/5/2016
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
TMSS
D. SYSTEM/ITEM
Power Interface Test Set (PITS)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
Commercial-Off-The-Shelf (COTS) Manual and Associated Supplement Data
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-TMSS-80527B (See Block 16)
5. CONTRACT REFERENCE
SOW Paragraph XXXX
6. REQUIRING OFFICE
AIR-6.6.4.5
7. DD 250
REQ
LT
9. DIST STATEMENT REQUIRED
C (See Block 16)
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
90 DAC (See Block 16)
8. APP CODE
A
11. AS OF DATE
N/A
16. REMARKS
BLOCK 4: DI-TMSS-80527B TAILORING : DI-TMSS-80527B , Page 1, Requirements, Item 4 Format : Change last sentence to read Supplemental data shall be in accordance with MIL-PRF-32216A.
BLOCK 9: DISTRIBUTION STATMENT C. Distribution authorized to U.S. Government agencies and their contractors for official use or for administrative or operational purposes. Other requests for this document shall be referred to Commander, Naval Air Systems Command (PMA-201/Fuel Containment), 47123 Buse Road, Bldg 2272, Patuxent River, MD 20670-1547.
BLOCK 12: The Government requires 30 calendar days for review of COTS Manuals. The contractor shall submit final 15 calendar days after receipt of Government comments.
BLOCK 13: Should supplementation be required, the Government will notify the contractor within 60 days after receipt of COTS Manual. The contractor shall provide supplemental data within 60 days of notification by the Government. The Government requires 30 days to review supplementation. Final supplemental data shall be submitted 30 days after receipt and incorporation of Government comments.
AIR-6.6.4.5
G. PREPARED BY
Maria Cofey
H. DATE
8/5/2016
Other files
| File | Type | Posted |
|---|---|---|
| N68335-16-R-0282_P00008_RFP_ARS_PITS.docx | DOCX document | |
| N68335-16-R-0282_P00007_RFP_ARS_PITS.docx | DOCX document | |
| PITS_TMCR1_14-003_dtd_5Aug16_updated.pdf | ||
| N68335-16-R-0282_P00006_RFP_ARS_PITS.docx | DOCX document | |
| N68335-16-R-0282_P00005_RFP_ARS_PITS.docx | DOCX document | |
| N68335-16-R-0282-A00004.docx | DOCX document | |
| QUESTIONS_AND_ANSWERS__3._docx.docx | DOCX document | |
| N68335-16-R-0282_P00002_RFP_PITS.docx | DOCX document | |
| PITS_TMCR_14-003_dtd_6Mar14_ATTACHMENT_10.docx | DOCX document | |
| 03-10JA-34-1.pdf | ||
| Q A_2.docx | DOCX document | |
| AT-823T0-MIB-000_PITS_ATTACHMENT_9a.pdf | ||
| AT-823T0-MRC-000_PITS_MRC_ATTACHMENT_9b.pdf | ||
| AT-823T0-MRC-000_Tech_Pub.pdf | ||
| N68335-16-R-0282_Questions_and_Answers.docx | DOCX document | |
| AT-823T0-MIB-000_Tech_Pub.pdf | ||
| N68335-16-R-0282_RFP_ARS_PITS.docx | DOCX document | |
| Performance_Spec.pdf | ||
| AUP_PITS_SOW_20151028_(TFR)_(2).docx | DOCX document | |
| AUP_PITS_CDRLs_20151027_(TFR)_(3)FINAL.docx | DOCX document |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .