Exhibit A Contract Data Requirements List (CDRL's)

View the file

Other files

File Type Posted
N68335-16-R-0282_P00008_RFP_ARS_PITS.docx DOCX document
PITS_TMCR_CDRLs_dtd_5Aug16.rtf RTF text file
N68335-16-R-0282_P00007_RFP_ARS_PITS.docx DOCX document
PITS_TMCR1_14-003_dtd_5Aug16_updated.pdf PDF
N68335-16-R-0282_P00006_RFP_ARS_PITS.docx DOCX document
N68335-16-R-0282_P00005_RFP_ARS_PITS.docx DOCX document
N68335-16-R-0282-A00004.docx DOCX document
QUESTIONS_AND_ANSWERS__3._docx.docx DOCX document
N68335-16-R-0282_P00002_RFP_PITS.docx DOCX document
PITS_TMCR_14-003_dtd_6Mar14_ATTACHMENT_10.docx DOCX document
03-10JA-34-1.pdf PDF
Q A_2.docx DOCX document
AT-823T0-MIB-000_PITS_ATTACHMENT_9a.pdf PDF
AT-823T0-MRC-000_PITS_MRC_ATTACHMENT_9b.pdf PDF
AT-823T0-MRC-000_Tech_Pub.pdf PDF
N68335-16-R-0282_Questions_and_Answers.docx DOCX document
AT-823T0-MIB-000_Tech_Pub.pdf PDF
N68335-16-R-0282_RFP_ARS_PITS.docx DOCX document
Performance_Spec.pdf PDF
AUP_PITS_SOW_20151028_(TFR)_(2).docx DOCX document
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of the Navy Program Executive Office PMA201 Naval Air Systems Command Patuxent River, Maryland 20670-1161

Contract Data Requirements List (CDRL) Package For Support Equipment To The A/A42R-1 Air Refueling Store Avionics Upgrade Program

Prepared by Naval Air Warfare Center Aircraft Division Code 4.8.1.3 Lakehurst, New Jersey 08733

DISTRIBUTION AUTHORIZED TO DOD COMPONENTS ONLY; CRITICAL TECHNOLOGY; AUGUST 2007. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, AIRCRAFT DIVISION, LAKEHURST, NEW JERSEY 08733-5000

WARNING – THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C. SEC 2751 ET SEQ) OR EXECUTIVE ORDER 12470. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES.

DESTRUCTION NOTICE FOR UNCLASSIFIED, LIMITED DOCUMENTS, DESTROY BY ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF THIS DOCUMENT.

Revision History

Date
Ver.
Remarks
Authors
8 June 2015
Draft
First draft.
T. F. Richardson
12 June 2015
Final
Added CDRLs for Logistics and Maintenance.
T. F. Richardson
27 October 2015
Final
Added CDRL A022 for monthly Contractor IMS.
T. F. Richardson

NAWCADLKE MISC 4.8.1.3.00

#0207 27 October 2015 iii

CONTRACT DATA REQUIREMENTS LIST
Form Approved

CMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY

TDP _____ TM _____ OTHER _

D. SYSTEM/ITEM

ARS Avionics Upgrade Support Equipment

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM:

Meeting Agenda

3. SUBTITLE:

4. AUTHORITY (DATA IDENTIFICATION NO.)

DI-ADMN-81249A

5. CONTRACT REFERENCE

SOW paragraph 3.3.2.4.1 & 3.9.16

6. REQUIRING OFFICE

NAVAIR 1.3.4.1

7. DD 250 REQ

LT

9. DIST STATEMENT REQD.

D

10. FREQUENCY

See Block 16

12. DATE OF FIRST SUBMISSION

See Block 16

14. DISTRIBUTION

a. Addressee
b. Copies

8. APP CODE

N/A

11. AS OF DATE

N/A

13. Date of Subsequent Submission See Block 16

Draft
Final
Reg
Repro
16. REMARKS
1.3.4.1
1
1

Block 4: Contractor format is acceptable.

Block 9: Distribution authorized to U.S. Government agencies and their contractors due to critical technology. All other request shall be referred to PMA-201AA2.

Block 10: Ten (10) work days prior to each Program Management, Systems Engineering Technical Review, or Logistics Review.

Blocks 10, 12 & 13: Government has 5 days to review and comment. Revision due 2 days after receipt of Government comments. Updates as necessary.

Block 14: Editable electronic copies of all data submittals shall be provided in Microsoft Office 2010 file formats, and accessible via on-line access. A Letter of Transmittal (LT) shall be provided by email to the listed Addressees.

4.8.1.3
1
1
6.6.3.1
1
1
6.7.1.1
1
1
6.8.5.1
1
1
15. TOTAL
5
5
0

G. PREPARED BY

T. Richardson

H. DATE

I. APPROVED BY

F. Choudhury

J. DATE

CONTRACT DATA REQUIREMENTS LIST
Form Approved

CMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY

TDP _____ TM _____ OTHER _

D. SYSTEM/ITEM

ARS Avionics Upgrade Support Equipment

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM:

Meeting Minutes

3. SUBTITLE:

4. AUTHORITY (DATA IDENTIFICATION NO.)

DI-ADMN-81250A

5. CONTRACT REFERENCE

SOW paragraph 3.3.2.4.1 & 3.9.16

6. REQUIRING OFFICE

NAVAIR 1.3.4.1

7. DD 250 REQ

LT

9. DIST STATEMENT REQD.

D

10. FREQUENCY

See Block 16

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

a. Addressee
b. Copies

8. APP CODE

N/A

11. AS OF DATE

N/A

13. Date of Subsequent Submission See Block 16

Draft
Final
Reg
Repro
16. REMARKS
1.3.4.1
1
1

Block 4: Contractor format is acceptable.

Block 9: Distribution authorized to U.S. Government agencies and their contractors due to critical technology. All other request shall be referred to PMA-201AA2.

Block 10: Ten (10) work days prior to each Program Management, Systems Engineering Technical Review, or Logistics Review.

Blocks 10, 12 & 13: Government has 30 days to review and comment. Revision due 15 days after receipt of Government comments. Updates as necessary.

Block 14: Editable electronic copies of all data submittals shall be provided in Microsoft Office 2010 file formats, and accessible via on-line access. A Letter of Transmittal (LT) shall be provided by email to the listed Addressees.

4.8.1.3
1
1
6.6.3.1
1
1
6.7.1.1
1
1
6.8.5.1
1
1
15. TOTAL
5
5
0

G. PREPARED BY

T. Richardson

H. DATE

I. APPROVED BY

J. DATE

CONTRACT DATA REQUIREMENTS LIST
Form Approved

CMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY

TDP _____ TM _____ OTHER _

D. SYSTEM/ITEM

ARS Avionics Upgrade Support Equipment

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM:

Configuration Management Plan

3. SUBTITLE:

4. AUTHORITY (DATA IDENTIFICATION NO.)

DI-CMAN-80858

5. CONTRACT REFERENCE

SOW paragraph 3.3.3.3

6. REQUIRING OFFICE

NAVAIR 1.3.4.1

7. DD 250 REQ

DD

9. DIST STATEMENT REQD.

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

30 days prior to PDR

14. DISTRIBUTION

a. Addressee
b. Copies

8. APP CODE

AD

11. AS OF DATE

N/A

13. Date of Subsequent Submission See Block 16

Draft
Final
Reg
Repro
16. REMARKS
1.3.4.1
1
1

Block 4: DID is for guidance only.

Block 9: Distribution authorized to U.S. Government agencies and their contractors due to critical technology. All other request shall be referred to PMA-201AA2.

Blocks 12 & 13: Government has 15 days to review and comment. Revision due 15 days after receipt of Government comments. Updates as necessary.

Block 14: Electronic copies of all data submittals shall be provided and accessible via on-line access.

4.8.1.3
1
1
6.6.3.1
1
1
15. TOTAL
0
0
0

G. PREPARED BY

T. Richardson

H. DATE

I. APPROVED BY

J. DATE

CONTRACT DATA REQUIREMENTS LIST
Form Approved

CMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY

TDP _____ TM _____ OTHER _

D. SYSTEM/ITEM

ARS Avionics Upgrade Support Equipment

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM:

Request for Deviation

3. SUBTITLE:

4. AUTHORITY (DATA IDENTIFICATION NO.)

See Block 16

5. CONTRACT REFERENCE

SOW paragraph 3.3.3.3

6. REQUIRING OFFICE

NAVAIR 1.3.4.1

7. DD 250 REQ

DD

9. DIST STATEMENT REQD.

D

10. FREQUENCY

As Required

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

a. Addressee
b. Copies

8. APP CODE

AD

11. AS OF DATE

N/A

13. Date of Subsequent Submission See Block 16

Draft
Final
Reg
Repro
16. REMARKS
1.3.4.1
1
1

Block 4: MIL-HDBK-61 as guidance

Blocks 12 & 13: Government has 15 days to review and comment. Revision due 15 days after receipt of Government comments. Updates as necessary.

Block 14: Electronic copies of all data submittals shall be provided and accessible via on-line access.

4.8.1.3
1
6.6.3.1
1
15. TOTAL
0
0
0

G. PREPARED BY

T. Richardson

H. DATE

I. APPROVED BY

J. DATE

CONTRACT DATA REQUIREMENTS LIST
Form Approved

CMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY

TDP _____ TM _____ OTHER _

D. SYSTEM/ITEM

ARS Avionics Upgrade Support Equipment

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A005

2. TITLE OF DATA ITEM:

Engineering Change Proposal (ECP)

3. SUBTITLE:

4. AUTHORITY (DATA IDENTIFICATION NO.)

See Block 16

5. CONTRACT REFERENCE

SOW paragraph 3.3.3.3

6. REQUIRING OFFICE

NAVAIR 1.3.4.1

7. DD 250 REQ

DD

9. DIST STATEMENT REQD.

D

10. FREQUENCY

As Required

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

a. Addressee
b. Copies

8. APP CODE

AD

11. AS OF DATE

N/A

13. Date of Subsequent Submission See Block 16

Draft
Final
Reg
Repro
16. REMARKS
1.3.4.1
1

Block 4: MIL-HDBK-61 as guidance.

Blocks 12 & 13: Government has 15 days to review and comment. Revision due 15 days after receipt of Government comments. Updates as necessary.

Block 14: Electronic copies of all data submittals shall be provided and accessible via on-line access

4.8.1.3
1
6.6.3.1
1
15. TOTAL
0
0
0

G. PREPARED BY

T. Richardson

H. DATE

I. APPROVED BY

J. DATE

CONTRACT DATA REQUIREMENTS LIST
Form Approved

CMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY

TDP _____ TM _____ OTHER _

D. SYSTEM/ITEM

ARS Avionics Upgrade Support Equipment

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A006

2. TITLE OF DATA ITEM:

Trade Study Report

3. SUBTITLE:

4. AUTHORITY (DATA IDENTIFICATION NO.)

DI-ILSS-81021

5. CONTRACT REFERENCE

SOW paragraph 3.3.4.1

6. REQUIRING OFFICE

NAVAIR 1.3.4.1

7. DD 250 REQ

DD

9. DIST STATEMENT REQD.

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

a. Addressee
b. Copies

8. APP CODE

AD

11. AS OF DATE

N/A

13. Date of Subsequent Submission See Block 16

Draft
Final
Reg
Repro
16. REMARKS
1.3.4.1
1

Block 4: Contractor format acceptable.

Blocks 12 & 13: 30 work days prior to PDR. Government has 15 days to review and comment. Revision due 15 days after receipt of Government comments. Updates as necessary.

Block 14: Electronic copies of all data submittals shall be provided and accessible via on-line access.

4.8.1.3
1
6.6.3.1
1
15. TOTAL
0
0
0

G. PREPARED BY

T. Richardson

H. DATE

I. APPROVED BY

J. DATE

CONTRACT DATA REQUIREMENTS LIST
Form Approved

CMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY

TDP _____ TM _____ OTHER _

D. SYSTEM/ITEM

ARS Avionics Upgrade Support Equipment

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A007

2. TITLE OF DATA ITEM:

Interface Design Document

3. SUBTITLE:

4. AUTHORITY (DATA IDENTIFICATION NO.)

See Block 16

5. CONTRACT REFERENCE

SOW paragraph 3.3.4.2

6. REQUIRING OFFICE

NAVAIR 1.3.4.1

7. DD 250 REQ

DD

9. DIST STATEMENT REQD.

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

a. Addressee
b. Copies

8. APP CODE

AD

11. AS OF DATE

N/A

13. Date of Subsequent Submission See Block 16

Draft
Final
Reg
Repro
16. REMARKS
1.3.4.1
1

Block 4: Contractor format acceptable.

Blocks 12 & 13: Government has 15 days to review and comment. Revision due 15 days after receipt of Government comments. Updates as necessary.

Block 14: Electronic copies of all data submittals shall be provided and accessible via on-line access.

4.8.1.3
1
6.6.3.1
1
15. TOTAL
0
0
0

G. PREPARED BY

T. Richardson

H. DATE

I. APPROVED BY

J. DATE

CONTRACT DATA REQUIREMENTS LIST

Form Approved CMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY

TDP _____ TM _____ OTHER _

D. SYSTEM/ITEM

ARS Avionics Upgrade Support Equipment

E. CONTRACT/PR NO.

F. CONTRACTOR

TDB

1. DATA ITEM NO.

A008

2. TITLE OF DATA ITEM:

Engineering Design Analysis Report

3. SUBTITLE:

4. AUTHORITY (DATA IDENTIFICATION NO.)

See Block 16

5. CONTRACT REFERENCE

SOW paragraph 3.3.4.3

6. REQUIRING OFFICE

NAVAIR 1.3.4.1

7. DD 250 REQ

DD

9. DIST STATEMENT REQD.

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

a. Addressee
b. Copies

8. APP CODE

AD

11. AS OF DATE

N/A

13. Date of Subsequent Submission See Block 16

Draft
Final
Reg
Repro
16. REMARKS
1.3.4.1
1

Block 4: Contractor format acceptable.

Blocks 12 & 13: Government has 15 days to review and comment. Revision due 15 days after receipt of Government comments. Updates as necessary.

Block 14: Electronic copies of all data submittals shall be provided and accessible via on-line access.

4.8.1.3
1
6.6.3.1
1
15. TOTAL
0
0
0

G. PREPARED BY

T. Richardson

H. DATE

I. APPROVED BY

J. DATE

CONTRACT DATA REQUIREMENTS LIST
Form Approved

CMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY

TDP _____ TM _____ OTHER _

D. SYSTEM/ITEM

ARS Avionics Upgrade Support Equipment

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A009

2. TITLE OF DATA ITEM:

Technical Data Package

3. SUBTITLE:

4. AUTHORITY (DATA IDENTIFICATION NO.)

DI-CMAN-80776, DI-SESS-81625, DI-SESS-81000C, DI-SESS-81001C, DI-SESS-81002D, and DI-SESS-81003C

5. CONTRACT REFERENCE

SOW paragraph 3.3.4.4

6. REQUIRING OFFICE

NAVAIR 1.3.4.1

7. DD 250 REQ

DD

9. DIST STATEMENT REQD.

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

a. Addressee
b. Copies

8. APP CODE

AD

11. AS OF DATE

N/A

13. Date of Subsequent Submission See Block 16

Draft
Final
Reg
Repro
16. REMARKS
1.3.4.1
1

Blocks 12 & 13: Preliminary due 15 work days prior to PDR. Final due 15 work days prior to CDR. Government has 30 days to review and comment. Revision due 15 days after receipt of Government comments. Updates as needed to address any design changes identified during testing.

Block 14: TDP contents shall be delivered in editable AutoCAD 2014, PTC Creo 3.0, and Microsoft Office 2010 file formats. Earlier versions of these file formats will be acceptable. Electronic copies of all data submittals shall be provided and accessible via on-line access. Optionally, Microsoft Windows 7 readable CD or DVD data disks may be used as the data delivery media.

4.8.1.3
1
6.6.3.1
1
15. TOTAL
0
0
0

G. PREPARED BY

T. Richardson

H. DATE

I. APPROVED BY

J. DATE

TDP OPTION SELECTION WORKSHEET

COMMERCIAL DRAWINGS AND ASSOCIATED LISTS

A. CONTRACT NO.

B. EXHIBIT/ATTACHMENT NO.

A

C. CLIN

D. CDRL DATA ITEM NO.

A009

1. DELIVERABLE PRODUCT (and complete X as applicable)

a. ORIGINALS (Specify current design activity's full size reproducible drawing or digital data file(s) on which is kept the revision record recognized as official) (Identify specification, type, grade and class, etc.)

b. REPRODUCTIONS (Identify specification, type, grade and class, etc., and quantity of each)

X

c. DIGITAL DATA (Identify specification, exchange media, etc., and specify original or copy)

Editable electronic copies in AutoCAD, PTC Creo, or Microsoft Office file formats.

2. OTHER TAILORING (Attach additional sheets as necessary).

See SOW Paragraph 3.3.4.4.

(1) Delivery Media: Microsoft Windows 7 readable CD or DVD data disks.

(2) Data Type: Digital data. Acceptable formats are AutoCAD 2014 drawing files, PTC Creo 3.0 data files, Microsoft Word 2010 documents, and Microsoft Excel 2010 spreadsheets. Earlier versions of these file formats will be acceptable as well.

(3) Drawing Sheet Size and Format: NAVAIR format in accordance with ASME Y14.1.

(4) Drawing Detail: Level 3. Multidetail for assembly drawing.

(5) Dimensioning and Tolerancing: In accordance with ASME Y15.5M.

(6) Drawing Notes: Place notes on the drawing.

CONTRACT DATA REQUIREMENTS LIST
Form Approved

CMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY

TDP _____ TM _____ OTHER _

D. SYSTEM/ITEM

ARS Avionics Upgrade Support Equipment

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A010

2. TITLE OF DATA ITEM:

Reliability Predictions

3. SUBTITLE:

4. AUTHORITY (DATA IDENTIFICATION NO.)

DI-RELI-81497A

5. CONTRACT REFERENCE

SOW paragraph 3.3.4.6

6. REQUIRING OFFICE

NAVAIR 1.3.4.1

7. DD 250 REQ

DD

9. DIST STATEMENT REQD.

D

10. FREQUENCY

TWO/R

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

a. Addressee
b. Copies

8. APP CODE

A

11. AS OF DATE

N/A

13. Date of Subsequent Submission 30 days prior to CDR

Draft
Final
Reg
Repro
16. REMARKS
1.3.4.1
1

Block 4: Contractor format is acceptable.

Blocks 12 & 13: Government has 30 days to review and comment. Revision due 15 days after receipt of Government comments. Updates as necessary.

Block 14: Electronic copies of all data submittals shall be provided and accessible via on-line access.

4.8.1.3
1
6.6.3.1
1
15. TOTAL
0
0
0

G. PREPARED BY

T. Richardson

H. DATE

I. APPROVED BY

J. DATE

CONTRACT DATA REQUIREMENTS LIST
Form Approved

CMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY

TDP _____ TM _____ OTHER _

D. SYSTEM/ITEM

ARS Avionics Upgrade Support Equipment

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A012

2. TITLE OF DATA ITEM:

Failure Modes, Effects and Criticality Analysis (FMECA)

3. SUBTITLE:

4. AUTHORITY (DATA IDENTIFICATION NO.)

DI-SESS-81495A

5. CONTRACT REFERENCE

SOW paragraph 3.3.4.7

6. REQUIRING OFFICE

NAVAIR 1.3.4.1

7. DD 250 REQ

DD

9. DIST STATEMENT REQD.

D

10. FREQUENCY

TWO/R

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

a. Addressee
b. Copies

8. APP CODE

A

11. AS OF DATE

N/A

13. Date of Subsequent Submission 30 days prior to CDR

Draft
Final
Reg
Repro
16. REMARKS
1.3.4.1
1

Blocks 12 & 13: Preliminary due 30 days prior to PDR. Final due 30 days prior to CDR. Government has 30 days to review and comment. Revision due 15 days after receipt of Government comments. Updates as necessary.

Block 14: Electronic copies of all data submittals shall be provided and accessible via on-line access.

4.8.1.3
1
6.6.3.1
1
15. TOTAL
0
0
0

G. PREPARED BY

T. Richardson

H. DATE

I. APPROVED BY

J. DATE

CONTRACT DATA REQUIREMENTS LIST
Form Approved

CMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY

TDP _____ TM _____ OTHER _

D. SYSTEM/ITEM

ARS Avionics Upgrade Support Equipment

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A013

2. TITLE OF DATA ITEM:

Failure Reporting, Analysis, and Corrective Action System (FRACAS)

3. SUBTITLE:

4. AUTHORITY (DATA IDENTIFICATION NO.)

DI-R-21597

5. CONTRACT REFERENCE

SOW paragraph 3.3.4.8

6. REQUIRING OFFICE

NAVAIR 1.3.4.1

7. DD 250 REQ

LT

9. DIST STATEMENT REQD.

D

10. FREQUENCY

As Required

12. DATE OF FIRST SUBMISSION

Qtrly

14. DISTRIBUTION

a. Addressee
b. Copies

8. APP CODE

N/A

11. AS OF DATE

N/A

13. Date of Subsequent Submission See Block 16

Draft
Final
Reg
Repro
16. REMARKS
1.3.4.1
LT

Block 4: Contractor format is acceptable. Report will summarize all failures that occurred within the period of the report Blocks 12 & 13: Failure Summary and Analysis Report to be submitted quarterly. Revisions due 15 days after receipt of Government comments.

Block 14: Electronic copies of all data submittals shall be provided and accessible via on-line access. A Letter of Transmittal (LT) shall be provided by email to the listed Addressees.

4.8.1.3
LT
6.6.3.1
LT
15. TOTAL
0
0
0

G. PREPARED BY

T. Richardson

H. DATE

I. APPROVED BY

J. DATE

CONTRACT DATA REQUIREMENTS LIST
Form Approved

CMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY

TDP _____ TM _____ OTHER _

D. SYSTEM/ITEM

ARS Avionics Upgrade Support Equipment

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A014

2. TITLE OF DATA ITEM:

Failure Analysis and Corrective Action Report

3. SUBTITLE:

4. AUTHORITY (DATA IDENTIFICATION NO.)

DI-SESS-81315B

5. CONTRACT REFERENCE

SOW paragraph 3.3.4.8

6. REQUIRING OFFICE

NAVAIR 1.3.4.1

7. DD 250 REQ

LT

9. DIST STATEMENT REQD.

D

10. FREQUENCY

As Required

12. DATE OF FIRST SUBMISSION

24 Hours After Corrective Action

14. DISTRIBUTION

a. Addressee
b. Copies

8. APP CODE

N/A

11. AS OF DATE

N/A

13. Date of Subsequent Submission See Block 16

Draft
Final
Reg
Repro
16. REMARKS
1.3.4.1
LT

Block 4: Contractor format acceptable.

Blocks 12 & 13: Government has 30 days to review and comment. Revision due 15 days after receipt of Government comments. Updates as necessary.

Block 14: Electronic copies of all data submittals shall be provided and accessible via on-line access. A Letter of Transmittal (LT) shall be provided by email to the listed Addressees.

4.8.1.3
LT
6.6.3.1
LT
15. TOTAL
0
0
0

G. PREPARED BY

T. Richardson

H. DATE

I. APPROVED BY

J. DATE

CONTRACT DATA REQUIREMENTS LIST
Form Approved

CMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY

TDP _____ TM _____ OTHER _X

D. SYSTEM/ITEM

ARS Avionics Upgrade Support Equipment

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A015

2. TITLE OF DATA ITEM:

Hazardous Materials Management Program (HMMP) Plan

3. SUBTITLE:

4. AUTHORITY (DATA IDENTIFICATION NO.)

DI-MGMT-81398C

5. CONTRACT REFERENCE

SOW paragraph 3.3.4.10.1

6. REQUIRING OFFICE

NAVAIR 1.3.4.1

7. DD 250 REQ

DD

9. DIST STATEMENT REQD.

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

30 DACA

14. DISTRIBUTION

a. Addressee
b. Copies

8. APP CODE

AD

11. AS OF DATE

N/A

13. Date of Subsequent Submission See Block 16

Draft
Final
Reg
Repro
16. REMARKS
1.3.4.1
1

Block 4: NAS 411 used as guidance. Contractor format is acceptable. NAS 411 tailoring: Paragraphs 4.2.9 and 4.2.11 are not required. Cost/benefit analysis described in paragraph 4.2.5 may be limited to informal discussion.

Blocks 12 & 13: Government has 30 days to review and comment. Revision due 15 days after receipt of Government comments. Updates as necessary.

Block 14: Electronic copies of all data submittals shall be provided and accessible via on-line access.

4.8.1.3
1
6.6.3.1
1
15. TOTAL
0
0
0

G. PREPARED BY

L. Lemig

H. DATE

I. APPROVED BY

J. DATE

CONTRACT DATA REQUIREMENTS LIST
Form Approved

CMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY

TDP _____ TM _____ OTHER _X

D. SYSTEM/ITEM

ARS Avionics Upgrade Support Equipment

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A016

2. TITLE OF DATA ITEM:

Hazardous Materials Management Program (HMMP) Report

3. SUBTITLE:

4. AUTHORITY (DATA IDENTIFICATION NO.)

DI-MISC-81397C

5. CONTRACT REFERENCE

SOW paragraph 3.3.4.10.2

6. REQUIRING OFFICE

NAVAIR 1.3.4.1

7. DD 250 REQ

LT

9. DIST STATEMENT REQD.

D

10. FREQUENCY

See Block 16

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

a. Addressee
b. Copies

8. APP CODE

N/A

11. AS OF DATE

N/A

13. Date of Subsequent Submission See Block 16

Draft
Final
Reg
Repro
16. REMARKS
1.3.4.1
LT

Block 4: NAS 411 used as guidance. Contractor format is acceptable. The report will contain a data list that identifies all hazardous material (HM) as defined in the specification. HM identification data will include as a minimum all information listed in referenced SOW paragraph. It is the contractor’s responsibility to obtain required information from sub-contractor, vendors and suppliers. NAS 411 tailoring: Prohibited HAZMAT are identified as Restricted chemicals per specification paragraph 3.14.2. Restricted HAZMAT are identified as Targeted chemicals per specification paragraph 3.14.3. HAZMAT not identified as Restricted or Targeted in the specification are classified as Tracked HAZMAT IAW NAS 411 paragraph 2.2.13.

Blocks 10, 12 & 13: Initial submission will be 30 days prior to PDR. Second submission will be 30 days prior to CDR. Government comments will be provided no later than 30 days after receipt of each submission. Report will be maintained and updated throughout the life of the contract. As changes occur, change pages shall be submitted within 15 days for Government approval

Block 14: Electronic copies of all data submittals shall be provided and accessible via on-line access. A Letter of Transmittal (LT) shall be provided by email to the listed Addressees.

4.8.1.3
LT
6.6.3.1
LT
15. TOTAL
0
0
0

G. PREPARED BY

L. Lemig

H. DATE

I. APPROVED BY

J. DATE

CONTRACT DATA REQUIREMENTS LIST
Form Approved

CMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY

TDP _____ TM _____ OTHER X_

D. SYSTEM/ITEM

ARS Avionics Upgrade Support Equipment

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A017

2. TITLE OF DATA ITEM:

System Safety Plan

3. SUBTITLE:

4. AUTHORITY (DATA IDENTIFICATION NO.)

DI-SAFT-81626

5. CONTRACT REFERENCE

SOW paragraph 3.3.4.11

6. REQUIRING OFFICE

NAVAIR 1.3.4.1

7. DD 250 REQ

DD

9. DIST STATEMENT REQD.

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

a. Addressee
b. Copies

8. APP CODE

AD

11. AS OF DATE

N/A

13. Date of Subsequent Submission See Block 16

Draft
Final
Reg
Repro
16. REMARKS
1.3.4.1
1

Blocks 12 & 13: Government has 15 days to review and comment. Revision due 15 days after receipt of Government comments. Updates as necessary.

Block 14: Electronic copies of all data submittals shall be provided and accessible via on-line access.

4.8.1.3
1
6.6.3.1
1
15. TOTAL
0
0
0

G. PREPARED BY

T. Richardson

H. DATE

I. APPROVED BY

J. DATE

CONTRACT DATA REQUIREMENTS LIST
Form Approved

CMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY

TDP _____ TM _____ OTHER _

D. SYSTEM/ITEM

ARS Avionics Upgrade Support Equipment

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A018

2. TITLE OF DATA ITEM:

Safety Assessment Report

3. SUBTITLE:

4. AUTHORITY (DATA IDENTIFICATION NO.)

DI-SAFT-80102

5. CONTRACT REFERENCE

SOW paragraph 3.3.4.11

6. REQUIRING OFFICE

NAVAIR 1.3.4.1

7. DD 250 REQ

LT

9. DIST STATEMENT REQD.

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

30 days prior to CDR

14. DISTRIBUTION

a. Addressee
b. Copies

8. APP CODE

N/A

11. AS OF DATE

N/A

13. Date of Subsequent Submission See Block 16

Draft
Final
Reg
Repro
16. REMARKS
1.3.4.1
LT

Blocks 12 & 13: Government has 15 days to review and comment. Revision due 15 days after receipt of Government comments. Updates as necessary.

Block 14: Electronic copies of all data submittals shall be provided and accessible via on-line access. A Letter of Transmittal (LT) shall be provided by email to the listed Addressees.

4.8.1.3
LT
6.6.3.1
LT
15. TOTAL
0
0
0

G. PREPARED BY

T. Richardson

H. DATE

I. APPROVED BY

J. DATE

CONTRACT DATA REQUIREMENTS LIST
Form Approved

CMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY

TDP _____ TM _____ OTHER _

D. SYSTEM/ITEM

ARS Avionics Upgrade Support Equipment

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A019

2. TITLE OF DATA ITEM:

Qualification Test Plans and Procedures

3. SUBTITLE:

4. AUTHORITY (DATA IDENTIFICATION NO.)

DI-NDTI-81307A, DI-QCIC-80553A,

DI-NDTI-80566A, DI-NDTI-80603A,

DI-EMCS-80201C, and DI-EMCS-81541B

5. CONTRACT REFERENCE

SOW paragraph 3.4.2.2

6. REQUIRING OFFICE

NAVAIR 1.3.4.1

7. DD 250 REQ

DD

9. DIST STATEMENT REQD.

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

30 days prior to CTRR

14. DISTRIBUTION

a. Addressee
b. Copies

8. APP CODE

AD

11. AS OF DATE

N/A

13. Date of Subsequent Submission See Block 16

Draft
Final
Reg
Repro
16. REMARKS
1.3.4.1
1

Block 4: Contractor format acceptable.

Blocks 12 & 13: Government has 15 days to review and comment. Revision due 15 days after receipt of Government comments. Updates as necessary.

Block 14: Electronic copies of all data submittals shall be provided and accessible via on-line access.

4.8.1.3
1
6.6.3.1
1
15. TOTAL
0
0
0

G. PREPARED BY

T. Richardson

H. DATE

I. APPROVED BY

J. DATE

CONTRACT DATA REQUIREMENTS LIST
Form Approved

CMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY

TDP _____ TM _____ OTHER _

D. SYSTEM/ITEM

ARS Avionics Upgrade Support Equipment

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A020

2. TITLE OF DATA ITEM:

Qualification Test Reports

3. SUBTITLE:

4. AUTHORITY (DATA IDENTIFICATION NO.)

DI-NDTI-80809B, DI-EMCS-80200C, and

DI-EMCS-81542B

5. CONTRACT REFERENCE

SOW paragraph 3.4.2.3

6. REQUIRING OFFICE

NAVAIR 1.3.4.1

7. DD 250 REQ

LT

9. DIST STATEMENT REQD.

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

a. Addressee
b. Copies

8. APP CODE

N/A

11. AS OF DATE

N/A

13. Date of Subsequent Submission See Block 16

Draft
Final
Reg
Repro
16. REMARKS
1.3.4.1
LT

Block 4: Contractor format acceptable.

Blocks 12 & 13: Report due 15 days after completion of testing. Government has 15 days to review and comment. Revision due 15 days after receipt of Government comments. Updates as necessary.

Block 14: Electronic copies of all data submittals shall be provided and accessible via on-line access. A Letter of Transmittal (LT) shall be provided by email to the listed Addressees.

4.8.1.3
LT
6.6.3.1
LT
15. TOTAL
0
0
0

G. PREPARED BY

T. Richardson

H. DATE

I. APPROVED BY

J. DATE

CONTRACT DATA REQUIREMENTS LIST
Form Approved

CMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY

TDP _____ TM _____ OTHER _

D. SYSTEM/ITEM

ARS Avionics Upgrade Support Equipment

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A021

2. TITLE OF DATA ITEM:

Production Acceptance Test Procedure

3. SUBTITLE:

4. AUTHORITY (DATA IDENTIFICATION NO.)

DI-NDTI-80603A

5. CONTRACT REFERENCE

SOW paragraph 3.5

6. REQUIRING OFFICE

NAVAIR 1.3.4.1

7. DD 250 REQ

DD

9. DIST STATEMENT REQD.

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

30 days prior to PRR

14. DISTRIBUTION

a. Addressee
b. Copies

8. APP CODE

AD

11. AS OF DATE

N/A

13. Date of Subsequent Submission See Block 16

Draft
Final
Reg
Repro
16. REMARKS
1.3.4.1
1

Block 4: Contractor format acceptable.

Blocks 12 & 13: Government has 15 days to review and comment. Revision due 15 days after receipt of Government comments. Updates as necessary.

Block 14: Electronic copies of all data submittals shall be provided and accessible via on-line access.

4.8.1.3
1
6.6.3.1
1
15. TOTAL
0
0
0

G. PREPARED BY

T. Richardson

H. DATE

I. APPROVED BY

J. DATE

CONTRACT DATA REQUIREMENTS LIST
Form Approved

CMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY

TDP _____ TM _____ OTHER _

D. SYSTEM/ITEM

ARS Avionics Upgrade Support Equipment

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A022

2. TITLE OF DATA ITEM:

Integrated Master Schedule

3. SUBTITLE:

4. AUTHORITY (DATA IDENTIFICATION NO.)

DI-MGMT-81650

5. CONTRACT REFERENCE

SOW paragraph 3.3.2.3

6. REQUIRING OFFICE

NAVAIR 1.3.4.1

7. DD 250 REQ

LT

9. DIST STATEMENT REQD.

D

10. FREQUENCY

MTHLY

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

a. Addressee
b. Copies

8. APP CODE

N/A

11. AS OF DATE

N/A

13. Date of Subsequent Submission See Block 16

Draft
Final
Reg
Repro
16. REMARKS
1.3.4.1
LT

Block 10: Contractor inputs to the Integrated Master Schedule (IMS) are due on the first business day of each month.

Blocks 12 & 13: Government has 15 days to review and comment. Revision due on the first business day of the next month. Updates as necessary.

Block 14: Editable electronic copies of all IMS submittals shall be provided in Microsoft Project 2010 file formats, and accessible via on-line access. A Letter of Transmittal (LT) shall be provided by email to the listed Addressees.

4.8.1.3
LT
6.6.3.1
LT
15. TOTAL
0
5
0

G. PREPARED BY

T. Richardson

H. DATE

I. APPROVED BY

J. DATE

CONTRACT DATA REQUIREMENTS LIST
Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:

B

TDP
TM

OTHER SESS

D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

ARS Avionics Upgrade Support Equipment

1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

B004

Logistics Product Data Maintenance Plan LSA-024 Report

4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED

TOTAL PRICE

DI-SESS-81758A
SOW Paragraph 3.7.2
NAWCADLKE-6.7.1.1
7. DD 250 REQ
9. DIST STATEMENT

REQUIRED

10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

DD

ONE/R
60 DAC

b. COPIES

8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Final

AD

N/A
See Block 16
Draft
Reg.
Repro

Block 4: MIL-Standards specified in the DID are for guidance only.

Block 8: Government approval/disapproval will be given within 30 days after receipt. The Contractor shall incorporate all comments within 30 days after receipt of Government response.

Block 9: Distribution authorized to U.S. Government agencies and their contractors due to critical technology. All other request shall be referred to PMA-201AA2.

Block 10: Preliminary and final maintenance plans shall be submitted electronically as either a MS Word or PDF documents, and also submitted electronically as a database file. Each submittal shall include a MS Word or PDF of each of the following reports: LSA-019, LSA-024, and LSA-036.

Block 12 & 13: First draft submittal due 60 days after Government approval of the LMI Candidate List. Second draft (for Government verification) submittal due 60 days after final drawing approval. Final due 30 days after incorporation of Government verification comments.

Block 14: Delivery Media: Distribution of data for all codes shall conform to the following:

Electronic mail (e-mail):

1. Saved as an attached file.

2. MS Word or PDF document compatible with Microsoft Office 2007.

3. Database file shall be compatible with SLICwave and PowerLOG-J.

4. Catalog data sheets for non-stocklisted items shall be PDF format and delivered IAW best contractor value.

NAWCADLKE-6.7.1.1
1
1
0
NAWCADLKE-6.6.3.1M
1
1
0
15. TOTAL
2
2
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

S. McCall

F. Choudhury

CONTRACT DATA REQUIREMENTS LIST
Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .