RELEASED N68335-11-R-0020 RFP TPTI.doc

DOC document 1 MB Posted

Attached to
Turboprop Engine Test Instrumentation system (TPTI)
Solicitation number
N68335-11-R-0020
Issued by

About this file

N68335-11-R-0020 Request for Proposal

View the file

Other files

File Type Posted
EXHIBITS A L TPTI CDRLs 3-9-11.doc DOC document
RELEASED 11-R-0020 AMD 0006.doc DOC document
RELEASED 11-R-0020 AMD 0005.doc DOC document
Attach 10 PBP milestones 2-28-11.xls XLS spreadsheet
RELEASED 11-R-0020 AMD 0003.doc DOC document
RELEASED 11-R-0020 AMD 0002.doc DOC document
Attach 10 PBP milestones 2-17-11.xls XLS spreadsheet
RELEASED 11-R-0020 AMD 0001.doc DOC document
EXHIBITS A L TPTI CDRLs 2-10-11.doc DOC document
EXHIBITS A L TPTI CDRLs 7-30-10.doc DOC document
Attach 9 TPTI ILSSOW 10-14-10.doc DOC document
Attach 6 System Software Configuration COTS and GFP.doc DOC document
Attach 10 PBP milestones 11-24-10.xls XLS spreadsheet
Attach 1 TPTI Production SOW 7-30-10.doc DOC document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section A - Solicitation/Contract Form

SECTION A

1. This will be a Fixed-Price Indefinite Delivery/Indefinite Quantity (ID/IQ) contract for the procurement of one (1) pilot production Turboprop Test Instrumentation (TPTI) system; up to eleven (11) TPTI production units; two (2) pilot production Test Program Sets (TPS); up to two (2) TPS production units; technical and logistics data items; package, deliver and install of pilot production and production TPTI and TPS systems; up to 1,300 hours of Engineering Support Services; up to 700 hours of Technical Representative Support Services; up to $75,000 in travel costs for the Technical Representative Support Services; up to 1,200 hours of Integrated Logistics Support (ILS) Contractor Support; and T-19A Site Survey and Analysis in accordance with Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010; Attachment 2, "TPTI Technical Data Package (TDP), T-17A 3654AS7400 Series," dated 16 December 2010; Attachment 3, "TPTI System Acceptance Test Procedure," dated 16 December 2010; Attachment 4, "T56-A-425/427 TPS Acceptance Test Procedure," dated 16 December 2010; Attachment 5, "T56-A-427A TPS Acceptance Test Procedure," dated 16 December 2010; Attachment 6, "System Software Configuration – COTS and GFP," dated 16 December 2010; Attachment 7, "T56-A-425/427 Technical Data Package (TDP) 3654AS7500 Series," dated 16 December 2010; Attachment 8, "T56-A-427A Technical Data Package (TDP) 3654AS8800 Series," dated 16 December 2010; Attachment 9, "Integrated Logistics Support Statement of Work," dated 14 October 2010; Exhibit A, DD Form 1423, CDRLs, dated 30 July 2010; and Exhibit L, DD Form 1423, CDRLs, dated 30 July 2010.

2. A Single-Award contract is intended to be issued for this requirement.

3. The guaranteed minimum for the contract is one (1) Pilot Production TPTI system (CLIN 0001); two (2) Pilot Production Test Program Sets (TPS) (CLINs 0002 and 0003); and package, deliver and install of pilot production TPTI and TPS systems (CLIN 0004). The guaranteed minimum will be met on Delivery Order 0001 upon award of the basic contract.

4. The maximum quantity that may be ordered under the contract is twelve (12) TPTI systems, including Pilot Production Units (PPUs); four (4) TPSs, including PPUs; all technical and logistics data items; package, deliver and install of pilot production and production TPTI and TPS systems; 1,300 hours of Engineering Support Services; 700 hours of Technical Representative Support Services; $75,000 in travel costs for the Technical Representative Support Services; 1,200 hours of Integrated Logistics Support (ILS) Contractor Support; and T-19A Site Survey and Analysis.

5. Delivery Orders may be placed as follows:

Year 1 CLINs 0001 through 0032: at contract award

Year 1 CLIN 0033 through 0046: from date of contract award through 365 days after Government release for production.

Year 1 CLINs 0047 through 0050: from date of contract award through 365 days after contract award (DAC).

Year 2 CLINs 0100 through 0116: from date of Government release for production through 365 days after Government release for production.

Year 2 CLINs 0117 through 0129: from 366 DAC through 730 DAC.

Year 3 CLINs 0200 through 0218: from 366 days after Government release for production through 730 days after Government release for production.

Year 3 CLINs 0219 through 0223: from 730 DAC through 1,095 DAC.

6. The completion of Contractor and Government Pilot Production Testing, Release for Production, and the issuance of delivery orders are separate events. Release for Production must be granted before production may commence. In no case will release for production be granted prior to successful completion of Contractor and Government Pilot Production Testing.

7. For clarification purposes, the term Pilot Production is synonymous with First Article.

8. The Pilot Production Units are not considered part of the production quantity. The contractor will deliver up to 12 TPTI systems (including Pilot Production Units) and four (4) Test Program Sets (including Pilot Production Units).

9. Two (2) pilot production TPS will be ordered in conjunction with the one (1) Pilot Production Unit, and two (2) production TPS will be ordered in conjunction with the first TPTI production unit. The TPS for the remaining TPTI Systems will be developed separately and provided as GFE at a later date.

10. This contract contains export-controlled technical data, subject to disclosure restrictions. Attention is directed to the following clauses contained in this contract:

DFARS 252.204-7008, Requirements for Contracts Involving Export-Controlled Items (Apr 2010)

NAVAIR 5252.227-9507, Notice Regarding the Handling and Dissemination of Export-Controlled Technical Data (NAVAIR)(OCT 2005)

11. In addition to the Government Property identified in NAVAIR clause 5252.245-9500 Government Property for the Performance of this Contract, the Government will also provide Government-furnished software, specifically TPTI DAQ software, as detailed in Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010; see Section J.

12. Proposal validity shall be for 180 days or longer as annotated by the offeror in Block 12 of the cover page of the SF33.

13. The Government point of contact is:

Sarah McCarty

Contract Specialist sarah.mccarty@navy.mil

14. Mail Proposals to:

NAWCAD Contracts Dept.

Attn: Sarah McCarty, Code: 2.5.2.1.1

HWY 547

Bldg, 562-3

Lakehurst, NJ 08733

In accordance with Section L, sealed offers with original and five (5) copies of the Technical, Experience and Past Performance Volumes and one (1) copy of the Price Volume for furnishing the supplies or services in the Schedule are due by 04:00 PM Eastern Time on 25 February 2011. Proposals are not to be submitted via facsimile or electronically via e-mail.

Section B - Supplies or Services and Prices

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Year 1 PPU--TPTI A/E37T-17A

FFP

Mobile Turboprop Engine Test System Pilot Production Unit (PPU), Part Number 3654AS7400-1, in accordance with (IAW) Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010; and Attachment 2, "TPTI Technical Data Package (TDP), T-17A 3654AS7400 Series," dated 16 December 2010.

FOB: Destination

MAX

NET AMT

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Year 1 Pilot Production Unit -- TPS

Pilot Production Unit -- Test Program Set (TPS) for T56-425/-427, Part Number 3654AS7500-1, IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010; and Attachment 7, "T56-A-425/427 TDP 3654AS7500 Series," dated 16 December 2010.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Year 1 Pilot Production Unit -- TPS

Pilot Production Unit -- Test Program Set (TPS) for T56-427A, Part Number 3654AS8800-1, IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010; and Attachment 8, "T56-A-427A TDP 3654AS8800 Series," dated 16 December 2010.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Year 1 Package, Deliver, and Install

A/E37T-17A Mobile Turboprop Engine Test System for CLINs 0001, 0002 and 0003: unite with required TPSs, connect to engine and ancillary equipment, calibrate and provide Navy acceptance testing at/for/to: NAS Norfolk

Including shipping costs for TPTI and TPSs

IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Year 1 Integrated Master Plan

IAW Engineering SOW Paragraph 3.6 and Exhibit A, CDRL A001

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Year 1 Integrated Master Schedule

IAW Engineering SOW Paragraph 3.7 and Exhibit A, CDRL A002

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Year 1 Program Status Reports

IAW Engineering SOW Paragraph 3.8 and Exhibit A, CDRL A003

NOT SEPARATELY PRICED

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Year 1 Meeting Agendas

IAW Engineering SOW Paragraph 3.9 and Exhibit A, CDRL A004

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Year 1 Meeting Minutes

IAW Engineering SOW Paragraph 3.12 and Exhibit A, CDRL A005

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Year 1 Configuration Management Plan

IAW Engineering SOW Paragraph 3.18 and Exhibit A, CDRL A006

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Year 1 Engineering Change Proposal (ECP)

IAW Engineering SOW Paragraph 3.20 and Exhibit A, CDRL A007

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Year 1 Notice of Revision (NOR)

IAW Engineering SOW Paragraph 3.20 and Exhibit A, CDRL A008

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Year 1 Request for Deviation (RFD)

IAW Engineering SOW Paragraph 3.21.1 and Exhibit A, CDRL A009

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Year 1 Conformity Inspection Plan

IAW Engineering SOW Paragraph 3.21.2.1 and Exhibit A, CDRL A010

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Year 1 Conformity Inspection Report

IAW Engineering SOW Paragraph 3.21.2.2 and Exhibit A, CDRL A011

NOT SEPARTELY PRICED

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Year 1 TDP Updates

Technical Data Package (TDP) Updates

IAW Engineering SOW Paragraph 3.23 and Exhibit A, CDRL A012

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Year 1 Quality Assurance (QA) Plan

IAW Engineering SOW Paragraph 3.16 and Exhibit A, CDRL A013

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Year 1 Incident Reports

Incident Reports / Failure Report and Corrective Action (FRACAS)

IAW Engineering SOW Paragraph 3.26 and Exhibit A, CDRL A014

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Year 1 Component Data

IAW Engineering SOW Paragraph 3.35 and Exhibit A, CDRL A015

NOT SEPARTELY PRICED

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Year 1Integration & Production Test Plan

IAW Engineering SOW Paragraph 4.2 and Exhibit A, CDRL A016

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
3
Each

Year 1 Acceptance Test Report -- PPU

Acceptance Test Report -- Pilot Production Unit (PPU)

IAW Engineering SOW Paragraph 4.4 and Exhibit A, CDRL A017

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Year 1 Long Lead Items List

IAW Engineering SOW Paragraph 3.32.1.13 and Exhibit A, CDRL A019

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Year 1 Hazardous Material Management Rpt

IAW Engineering SOW Paragraph 3.29 and Exhibit A, CDRL A020

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Year 1 IUID Plan

Item Unique Identification (IUID) Plan

IAW Engineering SOW Paragraph 3.36.3 and Exhibit A, CDRL A021

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Year 1 Production Manufacturing Review

IAW Engineering SOW Paragraph 3.14 and Exhibit A, CDRL A023

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Year 1 Obsolescence Management Plan

IAW Engineering SOW Paragraph 3.24.1.1 and Exhibit A, CDRL A024

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Year 1 Obsolescence Reports

IAW Engineering SOW Paragraph 3.24.1.2 and Exhibit A, CDRL A025

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Year 1 Trade Study

IAW Engineering SOW Paragraph 3.24.1.4 and Exhibit A, CDRL A026

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Year 1 Regression Test Plan

IAW Engineering SOW Paragraph 3.24.1.5 and Exhibit A, CDRL A027

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Year 1 Vendor Data

IAW Integrated Logistics Support (ILS) SOW Paragraph 1.1.3.3.2 and Exhibit L, CDRL L001

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Year 1 Meeting Agenda, ILSMT

IAW ILSSOW Paragraph 1.1.3.4.2.d and Exhibit L, CDRL L002

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Year 1 Meeting Minutes, ILSMT

IAW ILSSOW Paragraph 1.1.3.4.2.f and Exhibit L, CDRL L003

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
10
Each

Year 1 Production Unit--TPTI A/E37T-17A

Mobile Turboprop Engine Test System, Part Number 3654AS7400-1, in accordance with (IAW) Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010; and Attachment 2, "TPTI Technical Data Package (TDP), T-17A 3654AS7400 Series," dated 16 December 2010.

Range Quantities

Quantity Unit Price

1-4 $

5-7 $

8-10 $

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Year 1 Production Unit--TPS

Production Unit -- Test Program Set (TPS) for T56-425,-427 Turboprop Engine, Part Number 3654AS7500-1, IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010; and Attachment 7, "T56-A-425/427 TDP 3654AS7500 Series," dated 16 December 2010.

This unit will be ordered in conjunction with the first TPTI production unit.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Year 1 Production Unit--TPS

Production Unit -- Test Program Set (TPS) for T56-427A Turboprop Engine, Part Number 3654AS8800-1, IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010; and Attachment 8, " T56-A-427A TDP 3654AS8800 Series," dated 16 December 2010.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Year 1 Package, Deliver, and Install

A/E37T-17A Mobile Turboprop Engine Test System for 1 TPTI system and TPSs from CLINs 0034 and 0035: unite with required TPSs, connect to engine and ancillary equipment, calibrate and provide Navy acceptance testing at/for/to: NWS Pt Mugu, CA

Including shipping costs for TPTI and TPSs

IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Year 1 Package, Deliver, and Install

A/E37T-17A Mobile Turboprop Engine Test System for 1 TPTI system: provide Navy acceptance testing at/for/to: NAS Jacksonville, FL

Including shipping costs for TPTI

IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Year 1 Package, Deliver, and Install

A/E37T-17A Mobile Turboprop Engine Test System for 1 TPTI system: provide Navy acceptance testing at/for/to: NAS Jacksonville, FL

Including shipping costs for TPTI

IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Year 1 Package, Deliver, and Install

A/E37T-17A Mobile Turboprop Engine Test System for 1 TPTI system: provide Navy acceptance testing at/for/to: NAS Whidbey Island, WA

Including shipping costs for TPTI

IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Year 1 Package, Deliver, and Install

A/E37T-17A Mobile Turboprop Engine Test System for 1 TPTI system: provide Navy acceptance testing at/for/to: JRB Fort Worth, TX

Including shipping costs for TPTI

IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Year 1 Package, Deliver, and Install

A/E37T-17A Mobile Turboprop Engine Test System for 1 TPTI system: provide Navy acceptance testing at/for/to: NAS Patuxent River, MD

Including shipping costs for TPTI

IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Year 1 Package, Deliver, and Install

A/E37T-17A Mobile Turboprop Engine Test System for 1 TPTI system: provide Navy acceptance testing at/for/to: MALS-49 Stewart AFB, Newburgh, NY

Including shipping costs for TPTI

IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Year 1 Package, Deliver, and Install

A/E37T-17A Mobile Turboprop Engine Test System for 1 TPTI system: provide Navy acceptance testing at/for/to: MCAS Kaneohe Bay, HI

Including shipping costs for TPTI

IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Year 1 Package, Deliver, and Install

A/E37T-17A Mobile Turboprop Engine Test System for 1 TPTI system: provide Navy acceptance testing at/for/to: NAS JRB New Orleans, LA

Including shipping costs for TPTI

IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Year 1 Package, Deliver, and Install

A/E37T-17A Mobile Turboprop Engine Test System for 1 TPTI system: provide Navy acceptance testing at/for/to: Taiwan

Including shipping costs for TPTI

IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Each

Year 1 Acceptance Test Rpt--Prod Units

Acceptance Test Report--Production Units

IAW Engineering SOW Paragraph 4.6.4 and Exhibit A, CDRL A018

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
500
Hours

Year 1--Engineering Support Services

"Not to Exceed 500 hours"

IAW Paragraph 3.39 of Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
200
Hours

Year 1 Technical Rep Support Services

"Not to Exceed 200 hours"

Technical Representative Support Services IAW Paragraph 3.38 of Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Year 1 Travel for CLIN 0040

COST

"Not to Exceed $25,000" Request for travel and billing against this CLIN shall be submitted to the Navy for approval before travel commences and shall be invoiced individually for each approved travel.

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Year 1 Technical Support Report

IAW Engineering SOW Paragraph 3.38 and Exhibit A, CDRL A033

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
10
Each

Year 2 Production Unit--TPTI A/E37T-17A

Mobile Turboprop Engine Test System, Part Number 3654AS7400-1, in accordance with (IAW) Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010; and Attachment 2, "TPTI Technical Data Package (TDP), T-17A 3654AS7400 Series," dated 16 December 2010.

Range Quantities

Quantity Unit Price

1-4 $

5-7 $

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Year 2 Production Unit--TPS

Production Unit -- Test Program Set (TPS) for T56-425,-427 Turboprop Engine, Part Number 3654AS7500-1, IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010; and Attachment 7, "T56-A-425/427 TDP 3654AS7500 Series," dated 16 December 2010.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Year 2 Production Unit--TPS

Production Unit -- Test Program Set (TPS) for T56-427A Turboprop Engine, Part Number 3654AS8800-1, IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010; and Attachment 8, " T56-A-427A TDP 3654AS8800 Series," dated 16 December 2010.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Year 2 Package, Deliver, and Install

A/E37T-17A Mobile Turboprop Engine Test System for 1 TPTI system and TPSs from CLINs 0101 and 0102: unite with required TPSs, connect to engine and ancillary equipment, calibrate and provide Navy acceptance testing at/for/to: NWS Pt Mugu, CA

Including shipping costs for TPTI and TPSs

IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Year 2 Package, Deliver, and Install

A/E37T-17A Mobile Turboprop Engine Test System for 1 TPTI system: provide Navy acceptance testing at/for/to: NAS Jacksonville, FL

Including shipping costs for TPTI

IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Year 2 Package, Deliver, and Install

A/E37T-17A Mobile Turboprop Engine Test System for 1 TPTI system: provide Navy acceptance testing at/for/to: NAS Jacksonville, FL

Including shipping costs for TPTI

IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Year 2 Package, Deliver, and Install

A/E37T-17A Mobile Turboprop Engine Test System for 1 TPTI system: provide Navy acceptance testing at/for/to: NAS Whidbey Island, WA

Including shipping costs for TPTI

IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Year 2 Package, Deliver, and Install

A/E37T-17A Mobile Turboprop Engine Test System for 1 TPTI system: provide Navy acceptance testing at/for/to: JRB Fort Worth, TX

Including shipping costs for TPTI

IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Year 2 Package, Deliver, and Install

A/E37T-17A Mobile Turboprop Engine Test System for 1 TPTI system: provide Navy acceptance testing at/for/to: NAS Patuxent River, MD

Including shipping costs for TPTI

IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Year 2 Package, Deliver, and Install

A/E37T-17A Mobile Turboprop Engine Test System for 1 TPTI system: provide Navy acceptance testing at/for/to: MALS-49 Stewart AFB, Newburgh, NY

Including shipping costs for TPTI

IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Year 2 Package, Deliver, and Install

A/E37T-17A Mobile Turboprop Engine Test System for 1 TPTI system: provide Navy acceptance testing at/for/to: MCAS Kaneohe Bay, HI

Including shipping costs for TPTI

IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Year 2 Package, Deliver, and Install

A/E37T-17A Mobile Turboprop Engine Test System for 1 TPTI system: provide Navy acceptance testing at/for/to: NAS JRB New Orleans, LA

Including shipping costs for TPTI

IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Year 2 Package, Deliver, and Install

A/E37T-17A Mobile Turboprop Engine Test System for 1 TPTI system: provide Navy acceptance testing at/for/to: Taiwan

Including shipping costs for TPTI

IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Each

Year 2 Acceptance Test Rpt--Prod Units

Acceptance Test Report--Production Units

IAW Engineering SOW Paragraph 4.6.4 and Exhibit A, CDRL A018

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Year 2 Engineering Change Proposal (ECP)

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Year 2 Notice of Revision (NOR)

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Year 2 Request for Deviation (RFD)

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
600
Hours

Year 2 Engineering Support Services

"Not to Exceed 600 hours"

IAW Paragraph 3.39 of Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
200
Hours

Year 2 Technical Rep Support Services

"Not to Exceed 200 hours"

Technical Representative Support Services IAW Paragraph 3.38 of Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Year 2 Travel for CLIN 0112

"Not to Exceed $25,000" Request for travel and billing against this CLIN shall be submitted to the Navy for approval before travel commences and shall be invoiced individually for each approved travel.

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Year 2 Technical Support Report

IAW Engineering SOW Paragraph 3.38 and Exhibit A, CDRL A033

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Year 2 T-19A Site Survey and Analysis

T-19A site survey and functional/requirements analysis IAW Para 3.32.1.3 of Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010

Including travel costs

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Year 2 T-19A Facility Design

IAW Engineering SOW Paragraph 3.32.1.3 and Exhibit A, CDRL A028

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Year 2 T-19A ICD

Installation Control drawings (ICD)

IAW Engineering SOW Paragraph 3.32.1.4 and Exhibit A, CDRL A029

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Year 2 T-19A Installation HW Kit Dwg

Installation Hardware Kit Drawing

IAW Engineering SOW Paragraph 3.32.1.6 and Exhibit A, CDRL A030

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Year 2 Engineering Drawing Package T-19A

IAW Engineering SOW Paragraph 3.32.1.7.2 and Exhibit A, CDRL A031

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Year 2 T-19A Technical Reviews

IAW Engineering SOW Paragraph 3.32.1.8 and Exhibit A, CDRL A032

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Year 2 Update Maintenance Plan Data

IAW ILSSOW Paragraph 1.1.4.1.5 and Exhibit L, CDRL L004

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Year 2 Technical Manual Change Data

IAW ILSSOW Paragraph 1.1.5.1 and Exhibit L, CDRL L005

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
600
Hours

Year 2 Contractor Support (ILS)

"Not to Exceed 600 hours"

IAW Attachment 9, "Integrated Logistics Support Statement of Work," dated 14 October 2010.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
10
Each

Year 3 Production Unit--TPTI A/E37T-17A

Mobile Turboprop Engine Test System, Part Number 3654AS7400-1, in accordance with (IAW) Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010; and Attachment 2, "TPTI Technical Data Package (TDP), T-17A 3654AS7400 Series," dated 16 December 2010.

Range Quantities

Quantity Unit Price

1-4 $

5-7 $

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Year 3 Production Unit--TPS

Production Unit -- Test Program Set (TPS) for T56-425,-427 Turboprop Engine, Part Number 3654AS7500-1, IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010; and Attachment 7, "T56-A-425/427 TDP 3654AS7500 Series," dated 16 December 2010.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Year 3 Production Unit--TPS

Production Unit -- Test Program Set (TPS) for T56-427A Turboprop Engine, Part Number 3654AS8800-1, IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010; and Attachment 8, " T56-A-427A TDP 3654AS8800 Series," dated 16 December 2010.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Year 3 Package, Deliver, and Install

A/E37T-17A Mobile Turboprop Engine Test System for 1 TPTI system and TPSs from CLINs 0201 and 0202: unite with required TPSs, connect to engine and ancillary equipment, calibrate and provide Navy acceptance testing at/for/to: NWS Pt Mugu, CA

Including shipping costs for TPTI and TPSs

IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Year 3 Package, Deliver, and Install

A/E37T-17A Mobile Turboprop Engine Test System for 1 TPTI system: provide Navy acceptance testing at/for/to: NAS Jacksonville, FL

Including shipping costs for TPTI

IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Year 3 Package, Deliver, and Install

A/E37T-17A Mobile Turboprop Engine Test System for 1 TPTI system: provide Navy acceptance testing at/for/to: NAS Jacksonville, FL

Including shipping costs for TPTI

IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Year 3 Package, Deliver, and Install

A/E37T-17A Mobile Turboprop Engine Test System for 1 TPTI system: provide Navy acceptance testing at/for/to: NAS Whidbey Island, WA

Including shipping costs for TPTI

IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Year 3 Package, Deliver, and Install

A/E37T-17A Mobile Turboprop Engine Test System for 1 TPTI system: provide Navy acceptance testing at/for/to: JRB Fort Worth, TX

Including shipping costs for TPTI

IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Year 3 Package, Deliver, and Install

A/E37T-17A Mobile Turboprop Engine Test System for 1 TPTI system: provide Navy acceptance testing at/for/to: NAS Patuxent River, MD

Including shipping costs for TPTI

IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Year 3 Package, Deliver, and Install

A/E37T-17A Mobile Turboprop Engine Test System for 1 TPTI system: provide Navy acceptance testing at/for/to: MALS-49 Stewart AFB, Newburgh, NY

Including shipping costs for TPTI

IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Year 3 Package, Deliver, and Install

A/E37T-17A Mobile Turboprop Engine Test System for 1 TPTI system: provide Navy acceptance testing at/for/to: MCAS Kaneohe Bay, HI

Including shipping costs for TPTI

IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Year 3 Package, Deliver, and Install

A/E37T-17A Mobile Turboprop Engine Test System for 1 TPTI system: provide Navy acceptance testing at/for/to: NAS JRB New Orleans, LA

Including shipping costs for TPTI

IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Year 3 Package, Deliver, and Install

A/E37T-17A Mobile Turboprop Engine Test System for 1 TPTI system: provide Navy acceptance testing at/for/to: Taiwan

Including shipping costs for TPTI

IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Year 3 TPTI A/E37T-19A

Fixed Turboprop Engine Test System, Part Number 3654AS7300-2, in accordance with (IAW) Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Year 3 Package, Deliver, and Install

A/E37T-19A Fixed Turboprop Engine Test System for 1 unit under CLIN 0205: provide Navy acceptance testing at/for/to: NAS Misawa, Japan

Including shipping costs for TPTI

IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
13
Each

Year 3 Acceptance Test Rpt--Prod Units

Acceptance Test Report -- Production Unit

IAW Engineering SOW Paragraph 4.4 and Exhibit A, CDRL A018

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Year 3 Engineering Change Proposal (ECP)

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Year 3 Notice of Revision (NOR)

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Year 3 Request for Deviation (RFD)

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
200
Hours

Year 3 Engineering Support Services

"Not to Exceed 200 hours"

IAW Paragraph 3.39 of Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
300
Hours

Year 3 Technical Rep Support Services

"Not to Exceed 300 hours"

Technical Representative Support Services IAW Paragraph 3.38 of Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Year 3 Travel for CLIN 0214

"Not to Exceed $25,000" Request for travel and billing against this CLIN shall be submitted to the Navy for approval before travel commences and shall be invoiced individually for each approved travel.

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Year 3 Technical Support Report

IAW Engineering SOW Paragraph 3.38 and Exhibit A, CDRL A033

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
600
Hours

Year 3 Contractor Support (ILS)

"Not to Exceed 600 hours"

IAW Attachment 9, "Integrated Logistics Support Statement of Work," dated 14 October 2010.

MAX

Section C - Descriptions and Specifications

SECTION C

Item 0001 – Year 1 – The contractor shall provide Mobile Turboprop Engine Test System, Part Number 3654AS7400-1, in accordance with (IAW) Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010; and Attachment 2, "TPTI Technical Data Package (TDP), T-17A 3654AS7400 Series," dated 16 December 2010.

Item 0002 – Year 1 – The contractor shall provide Pilot Production Unit -- Test Program Set (TPS) for T56-425/-427, Part Number 3654AS7500-1, IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010; and Attachment 7, "T56-A-425/427 Technical Data Package (TDP) 3654AS7500 Series," dated 16 December 2010.

Item 0003 – Year 1 – The contractor shall provide Pilot Production Unit -- Test Program Set (TPS) for T56-427A, Part Number 3654AS8800-1, IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010; and Attachment 8, “T56-A-427A TDP 3654AS8800 Series,” dated 16 December 2010.

Item 0004 – Year 1 – The contractor shall Package, Deliver, and Install the A/E37T-17A Mobile Turboprop Engine Test System for CLINs 0001, 0002, and 0003: unite with required TPSs, connect to engine and ancillary equipment, calibrate and provide Navy acceptance testing at/for/to: NAS Norfolk.

Item 0005 – Year 1 – The contractor shall provide Integrated Master Plan IAW Engineering SOW Paragraph 3.6 and Exhibit A, CDRL A001.

Item 0006 – Year 1 – The contractor shall provide Integrated Master Schedule IAW Engineering SOW Paragraph 3.7 and Exhibit A, CDRL A002.

Item 0007 – Year 1 – The contractor shall provide Program Status Reports IAW Engineering SOW Paragraph 3.8 and Exhibit A, CDRL A003.

Item 0008 – Year 1 – The contractor shall provide Meeting Agendas IAW Engineering SOW Paragraph 3.9 and Exhibit A, CDRL A004.

Item 0009 – Year 1 – The contractor shall provide Meeting Minutes IAW Engineering SOW Paragraph 3.12 and Exhibit A, CDRL A005.

Item 0010 – Year 1 – The contractor shall provide Configuration Management Plan IAW Engineering SOW Paragraph 3.18 and Exhibit A, CDRL A006.

Item 0011 – Year 1 – The contractor shall provide Engineering Change Proposal (ECP) IAW Engineering SOW Paragraph 3.20 and Exhibit A, CDRL A007.

Item 0012 – Year 1 – The contractor shall provide Notice of Revision (NOR) IAW Engineering SOW Paragraph 3.20 and Exhibit A, CDRL A008.

Item 0013 – Year 1 – The contractor shall provide Request for Deviation (RFD) IAW Engineering SOW Paragraph 3.21.1 and Exhibit A, CDRL A009.

Item 0014 – Year 1 – The contractor shall provide Conformity Inspection Plan IAW Engineering SOW Paragraph 3.21.2.1 and Exhibit A, CDRL A010.

Item 0015 – Year 1 – The contractor shall provide Conformity Inspection Report IAW Engineering SOW Paragraph 3.21.2.2 and Exhibit A, CDRL A011.

Item 0016 – Year 1 – The contractor shall provide Technical Data Package (TDP) Updates IAW Engineering SOW Paragraph 3.23 and Exhibit A, CDRL A012.

Item 0017 – Year 1 – The contractor shall provide Quality Assurance (QA) Plan IAW Engineering SOW Paragraph 3.16 and Exhibit A, CDRL A013.

Item 0018 – Year 1 – The contractor shall provide Incident Reports / Failure Report and Corrective Action (FRACAS) IAW Engineering SOW Paragraph 3.26 and Exhibit A, CDRL A014.

Item 0019 – Year 1 – The contractor shall provide Component Data IAW Engineering SOW Paragraph 3.35 and Exhibit A, CDRL A015.

Item 0020 – Year 1 – The contractor shall provide Integration & Production Test Plan IAW Engineering SOW Paragraph 4.2 and Exhibit A, CDRL A016.

Item 0021 – Year 1 – The contractor shall provide Acceptance Test Report -- Pilot Production Unit (PPU) IAW Engineering SOW Paragraph 4.4 and Exhibit A, CDRL A017.

Item 0022 – Year 1 – The contractor shall provide Long Lead Items List IAW Engineering SOW Paragraph 3.32.1.13 and Exhibit A, CDRL A019.

Item 0023 – Year 1 – The contractor shall provide Hazardous Material Management Report IAW Engineering SOW Paragraph 3.29 and Exhibit A, CDRL A020.

Item 0024 – Year 1 – The contractor shall provide Item Unique Identification (IUID) Plan IAW Engineering SOW Paragraph 3.36.3 and Exhibit A, CDRL A021.

Item 0025 – Year 1 – The contractor shall provide Production Manufacturing Review IAW Engineering SOW Paragraph 3.14 and Exhibit A, CDRL A023.

Item 0026 – Year 1 – The contractor shall provide Obsolescence Management Plan IAW Engineering SOW Paragraph 3.24.1.1 and Exhibit A, CDRL A024.

Item 0027 – Year 1 – The contractor shall provide Obsolescence Reports IAW Engineering SOW Paragraph 3.24.1.2 and Exhibit A, CDRL A025.

Item 0028 – Year 1 – The contractor shall provide Trade Study IAW Engineering SOW Paragraph 3.24.1.4 and Exhibit A, CDRL A026.

Item 0029 – Year 1 – The contractor shall provide Regression Test Plan IAW Engineering SOW Paragraph 3.24.1.5 and Exhibit A, CDRL A027.

Item 0030 – Year 1 – The contractor shall provide Vendor Data IAW Integrated Logistics Support (ILS) SOW Paragraph 1.1.3.3.2 and Exhibit L, CDRL L001.

Item 0031 – Year 1 – The contractor shall provide Meeting Agenda, ILSMT IAW ILSSOW Paragraph 1.1.3.4.2.d and Exhibit L, CDRL L002.

Item 0032 – Year 1 – The contractor shall provide Meeting Minutes, ILSMT IAW ILSSOW Paragraph 1.1.3.4.2.f and Exhibit L, CDRL L003.

Item 0033 – Year 1 – The contractor shall provide Mobile Turboprop Engine Test System, Part Number 3654AS7400-1, in accordance with (IAW) Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010; and Attachment 2, "TPTI Technical Data Package (TDP), T-17A 3654AS7400 Series," dated 16 December 2010.

Item 0034 – Year 1 – The contractor shall provide Production Unit -- Test Program Set (TPS) for T56-425,-427 Turboprop Engine, Part Number 3654AS7500-1, IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010; and Attachment 7, "T56-A-425/427 Technical Data Package (TDP) 3654AS7500 Series," dated 16 December 2010.

Item 0035 – Year 1 – The contractor shall provide Production Unit -- Test Program Set (TPS) for T56-427A Turboprop Engine, Part Number 3654AS8800-1, IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010; and Attachment 8, “T56-A-427A TDP 3654AS8800 Series,” 16 December 2010.

Item 0036 – Year 1 – The contractor shall Package, Deliver, and Install A/E37T-17A Mobile Turboprop Engine Test System for 1 TPTI system and TPSs from CLINs 0034 and 0035: unite with required TPSs, connect to engine and ancillary equipment, calibrate and provide Navy acceptance testing at/for/to: NWS Pt Mugu, CA. IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010.

Item 0037 – Year 1 – The contractor shall provide Package, Deliver, and Install A/E37T-17A Mobile Turboprop Engine Test System for 1 TPTI system: provide Navy acceptance testing at/for/to: NAS Jacksonville, FL. IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010.

Item 0038 – Year 1 – The contractor shall Package, Deliver, and Install A/E37T-17A Mobile Turboprop Engine Test System for 1 TPTI system: provide Navy acceptance testing at/for/to: NAS Jacksonville, FL. IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010.

Item 0039 – Year 1 – The contractor shall provide Package, Deliver, and Install A/E37T-17A Mobile Turboprop Engine Test System for 1 TPTI system: provide Navy acceptance testing at/for/to: NAS Whidbey Island, WA. IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010.

Item 0040 – Year 1 – The contractor shall provide Package, Deliver, and Install A/E37T-17A Mobile Turboprop Engine Test System for 1 TPTI system: provide Navy acceptance testing at/for/to: JRB Fort Worth, TX. IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010.

Item 0041 – Year 1 – The contractor shall provide Package, Deliver, and Install A/E37T-17A Mobile Turboprop Engine Test System for 1 TPTI system: provide Navy acceptance testing at/for/to: NAS Patuxent River, MD. IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010.

Item 0042 – Year 1 – The contractor shall Package, Deliver, and Install A/E37T-17A Mobile Turboprop Engine Test System for 1 TPTI system: provide Navy acceptance testing at/for/to: MALS-49 Stewart AFB, Newburgh, NY. IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010.

Item 0043 – Year 1 – The contractor shall Package, Deliver, and Install A/E37T-17A Mobile Turboprop Engine Test System for 1 TPTI system: provide Navy acceptance testing at/for/to: MCAS Kaneohe Bay, HI. IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010.

Item 0044 – Year 1 – The contractor shall Package, Deliver, and Install A/E37T-17A Mobile Turboprop Engine Test System for 1 TPTI system: provide Navy acceptance testing at/for/to: NAS JRB New Orleans, LA. IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010.

Item 0045 – Year 1 – The contractor shall Package, Deliver, and Install A/E37T-17A Mobile Turboprop Engine Test System for 1 TPTI system: provide Navy acceptance testing at/for/to: Taiwan. IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010.

Item 0046 – Year 1 – The contractor shall provide Acceptance Test Report--Production Units IAW Engineering SOW Paragraph 4.6.4 and Exhibit A, CDRL A018.

Item 0047 – Year 1 – The contractor shall provide Engineering Support Services IAW Paragraph 3.39 of Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010.

Item 0048 – Year 1 – The contractor shall provide Technical Rep Support Services Technical Representative Support Services IAW Paragraph 3.38 of Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010.

Item 0049 – Year 1 – The contractor shall provide Travel for CLIN 0040 "Not to Exceed $25,000" Request for travel and billing against this CLIN shall be submitted to the Navy for approval before travel commences and shall be invoiced individually for each approved travel.

Item 0050 – Year 1 – The contractor shall provide Technical Support Report IAW Engineering SOW Paragraph 3.38 and Exhibit A, CDRL A033.

Item 0100 – Year 2 – The contractor shall provide Mobile Turboprop Engine Test System, Part Number 3654AS7400-1, in accordance with (IAW) Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010; and Attachment 2, "TPTI Technical Data Package (TDP), T-17A 3654AS7400 Series," dated 16 December 2010.

Item 0101 – Year 2 – The contractor shall provide Production Unit -- Test Program Set (TPS) for T56-425,-427 Turboprop Engine, Part Number 3654AS7500-1, IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010; and Attachment 7, "T56-A-425/427 Technical Data Package (TDP) 3654AS7500 Series," dated 16 December 2010.

Item 0102 – Year 2 – The contractor shall provide Production Unit -- Test Program Set (TPS) for T56-427A Turboprop Engine, Part Number 3654AS8800-1, IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010; and Attachment 8, “T56-A-427A TDP 3654AS8800 Series,” 16 December 2010.

Item 0103 – Year 2 – The contractor shall Package, Deliver, and Install A/E37T-17A Mobile Turboprop Engine Test System for 1 TPTI system and TPSs from CLINs 0101 and 0102: unite with required TPSs, connect to engine and ancillary equipment, calibrate and provide Navy acceptance testing at/for/to: NWS Pt Mugu, CA. IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010.

Item 0104 – Year 2 – The contractor shall provide Package, Deliver, and Install A/E37T-17A Mobile Turboprop Engine Test System for 1 TPTI system: provide Navy acceptance testing at/for/to: NAS Jacksonville, FL. IAW Attachment 1, "Engineering Statement of Work for the Production of the Turboprop Engine Test Instrumentation (TPTI) System," dated 30 July 2010.

Item 0105 – Year 2 – The contractor shall Package, Deliver, and Install A/E37T-17A Mobile Turboprop Engine Test…