RELEASED 11-R-0020 AMD 0001.doc
DOC document 63 KB Posted
- Solicitation number
- N68335-11-R-0020
About this file
AMENDMENT 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| EXHIBITS A L TPTI CDRLs 3-9-11.doc | DOC document | |
| RELEASED 11-R-0020 AMD 0006.doc | DOC document | |
| RELEASED 11-R-0020 AMD 0005.doc | DOC document | |
| Attach 10 PBP milestones 2-28-11.xls | XLS spreadsheet | |
| RELEASED 11-R-0020 AMD 0003.doc | DOC document | |
| RELEASED 11-R-0020 AMD 0002.doc | DOC document | |
| Attach 10 PBP milestones 2-17-11.xls | XLS spreadsheet | |
| EXHIBITS A L TPTI CDRLs 2-10-11.doc | DOC document | |
| EXHIBITS A L TPTI CDRLs 7-30-10.doc | DOC document | |
| Attach 9 TPTI ILSSOW 10-14-10.doc | DOC document | |
| RELEASED N68335-11-R-0020 RFP TPTI.doc | DOC document | |
| Attach 6 System Software Configuration COTS and GFP.doc | DOC document | |
| Attach 10 PBP milestones 11-24-10.xls | XLS spreadsheet | |
| Attach 1 TPTI Production SOW 7-30-10.doc | DOC document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
1. The purpose of this amendment is to provide technical clarification to offerors on solicitation N68335-11-R-0020 Turboprop Test Instrumentation (TPTI) system as follows:
QUESTION 1:
SOW Page 2, paragraph 1.2.2 Installations. Should the Taiwan site be added to the table?
ANSWER 1:
The Taiwan site is only a tentative installation and is not planned at this time.
QUESTION 2:
The solicitation requires that all systems and TPSs be shipped FOB Destination. For the Taiwan (Years 1, 2 and 3) and Misawa (Year 3) systems, this requires the successful contractor to provide the costs of shipping the equipment out of the United States. Additionally, it requires the successful contractor to budget and provide schedule time for export license applications from the US State Department.
The alternative would be that the contractor would ship to a US APO and the Navy provides shipping to these locations. The contractor would then meet the systems at the destination for installation and calibration. Is it the intention of the Navy to ship systems via an APO address?
ANSWER 2:
The intention is as it states in the solicitation that it be shipped FOB Destination.
QUESTION 3:
Please provide the following LOGISTICS SUPPORTABILITY DATA referenced in the ILSSOW:
1.1.4.1 Existing Logistics Data
1.1.4.1.3 Update Logistics Support Analysis (LSA) Candidate Lists
1.1.4.1.4 Update Level of Repair Analysis (LORA)
ANSWER 3:
These requirements are for the submission of change data for the LSA, LORA and Technical Manuals due to obsolescence issues or engineering changes that would change operational procedures or change the parts required to maintain the system. Existing LSA, LORA and Technical Manuals will be provided after contract award.
QUESTION 4:
Please provide the TECHNICAL MANUALS referenced in the ILSSOW:
1.1.5.1 Technical Manuals
ANSWER 4:
See Answer to QUESTION 3.
QUESTION 5:
We have received the CDs with the drawing package. After reviewing the package, we determined that the following drawings were not included:
Drawing # 3654AS9220-1 Computer Assy, TPS, SETI 2
Drawing # 3654AS9210-1 Computer Assy, DAQ, SETI 1
ANSWER 5:
3654AS9220-1 Computer Assy., TPS, SETI 2 and 3654AS9210-1 Computer Assy., DAQ, SETI 1 are not included because they are not required for TPTI. The 3654AS9200-2 Test Control Console is used for TPTI and it calls out the 3654AS7417 and 3654AS7418 computers. The 3654AS9200-1 Test Control Console is used for SETI and it calls out the 3654AS9220 and 3654AS9210 computers.
QUESTION 6:
RFP Section L 2.0 PROPOSAL FORMAT. Similar to graphs, can the font in figures and tables also be 10 point as in the graphs?
ANSWER 6:
10 pt font may be used for figures and tables.
QUESTION 7:
SOW Page 18: SOW 3.32.1.13 is Long Lead Items (CDRL A019), but SOW Appendix A (Page 32) indicates that the A019 SOW item is 3.32.2.1.3. This appears to be a typographical error, and the .2 should be deleted from Appendix A. Is this correct?
ANSWER 7:
SOW Appendix A that was posted to the NAVAIR website and FedBizOpps contains the Contract Reference of SOW Paragraph 3.32.1.13.
QUESTION 8:
Section L, 2.0 Proposal Format says, “When foldout pages are used, they must not exceed 11 x 17 inches and will be counted as 1 page.” When are foldout pages authorized?
ANSWER 8:
Foldout pages may be used for program schedules, plant layout, and material flow system.
QUESTION 9:
CDRL L005 – Technical Manual Change Data, references the following:
Block 4: Shall conform to work Package format of Technical manuals (MSWORD) in accordance with Technical Manual Contract requirements (TMCR) provided as attachment.
We cannot locate the attachment entitled, “Technical Manual Contract requirements (TMCR)”. Will this attachment be provided by NAVAIR?
ANSWER 9:
Block 4 of CDRL L005 has been revised. See SECTION J.
2. The solicitation closing date is not extended.
3. Contracts POC: Sarah McCarty, 732-323-4479 or sarah.mccarty@navy.mil
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
| DOCUMENT TYPE |
| DESCRIPTION |
| PAGES |
| DATE |
| Exhibit A |
| Exhibit A, DD Form 1423, CDRLs |
| 32 |
| 30-JUL-2010 |
| Exhibit L |
| Exhibit L, DD Form 1423, CDRLs |
| 5 |
| 30-JUL-2010 |
| Attachment 1 |
| Engineering Statement of Work |
| 38 |
| 30-JUL-2010 |
| Attachment 10 |
| Performance Based Payments Milestones |
| 2 |
| 24-NOV-2010 |
| Attachment 2 |
| TPTI Technical Data Package (TDP), T-17A 3654AS7400 Series |
16-DEC-2010
| Attachment 3 |
| TPTI System Acceptance Test Procedure |
16-DEC-2010
| Attachment 4 |
| T56-A-425/427 TPS Acceptance Test Procedure |
16-DEC-2010
| Attachment 5 |
| T56-A-427A TPS Acceptance Test Procedure |
16-DEC-2010
| Attachment 6 |
| System Software Configuration – COTS and GFP |
16-DEC-2010
| Attachment 7 |
| T56-A-425/427 TDP 3654AS7500 Series |
16-DEC-2010
| Attachment 8 |
| T56-A-427A TDP 3654AS8800 Series |
16-DEC-2010
| Attachment 9 |
| Integrated Logistics Support Statement of Work |
| 4 |
| 14-OCT-2010 |
to:
Exhibit/Attachment Table of Contents
| DOCUMENT TYPE |
| DESCRIPTION |
| PAGES |
| DATE |
| Exhibit A |
| Exhibit A, DD Form 1423, CDRLs |
| 32 |
| 30-JUL-2010 |
| Exhibit L |
| Exhibit L, DD Form 1423, CDRLs |
| 5 |
| 10-FEB-2011 |
| Attachment 1 |
| Engineering Statement of Work |
| 38 |
| 30-JUL-2010 |
| Attachment 10 |
| Performance Based Payments Milestones |
| 2 |
| 24-NOV-2010 |
| Attachment 2 |
| TPTI Technical Data Package (TDP), T-17A 3654AS7400 Series |
16-DEC-2010
| Attachment 3 |
| TPTI System Acceptance Test Procedure |
16-DEC-2010
| Attachment 4 |
| T56-A-425/427 TPS Acceptance Test Procedure |
16-DEC-2010
| Attachment 5 |
| T56-A-427A TPS Acceptance Test Procedure |
16-DEC-2010
| Attachment 6 |
| System Software Configuration – COTS and GFP |
16-DEC-2010
| Attachment 7 |
| T56-A-425/427 TDP 3654AS7500 Series |
16-DEC-2010
| Attachment 8 |
| T56-A-427A TDP 3654AS8800 Series |
16-DEC-2010
| Attachment 9 |
| Integrated Logistics Support Statement of Work |
| 4 |
| 14-OCT-2010 |
File details come from the government source that posted it. Updated .