EXHIBITS A L TPTI CDRLs 2-10-11.doc

DOC document 837 KB Posted

Attached to
Turboprop Engine Test Instrumentation system (TPTI)
Solicitation number
N68335-11-R-0020
Issued by

About this file

Exhibit L DD Form 1423 CDRLs dated 10-FEB-2011

View the file

Other files

File Type Posted
EXHIBITS A L TPTI CDRLs 3-9-11.doc DOC document
RELEASED 11-R-0020 AMD 0006.doc DOC document
RELEASED 11-R-0020 AMD 0005.doc DOC document
Attach 10 PBP milestones 2-28-11.xls XLS spreadsheet
RELEASED 11-R-0020 AMD 0003.doc DOC document
RELEASED 11-R-0020 AMD 0002.doc DOC document
Attach 10 PBP milestones 2-17-11.xls XLS spreadsheet
RELEASED 11-R-0020 AMD 0001.doc DOC document
EXHIBITS A L TPTI CDRLs 7-30-10.doc DOC document
Attach 9 TPTI ILSSOW 10-14-10.doc DOC document
RELEASED N68335-11-R-0020 RFP TPTI.doc DOC document
Attach 6 System Software Configuration COTS and GFP.doc DOC document
Attach 10 PBP milestones 11-24-10.xls XLS spreadsheet
Attach 1 TPTI Production SOW 7-30-10.doc DOC document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibits A and L, DD Form 1423, CDRLs 7/30/2010

Exhibits A and L, DD Form 1423, CDRLs
7/30/2010
CONTRACT DATA REQUIREMENTS LIST (1Data Item)
FORM APPROVED OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.

A. Contract Line Item No.

B. Exhibit A

C. Category
TDP
( )
TM
( )
Other

( x ) Engineering data

D. System/Item

TPTI

E. Contract/PR No.
F. Contractor

1. Data Item No.

A001

2. Title of Data Item

Integrated Master Plan

3. Subtitle

4. Authority (Data ID No.)

See Block 16

5. Contract Reference

SOW Paragraph 3.6

6. Requiring Office

13181

7. DD 250 REQ

DD

9. Dist. Statement Req.

C

10. Frequency

ASREQ

12. Date of First Submission

60 DACA

14. Distribution

8. APP Code A

11. As of Date

13. Date of Subsequent Submissions

See Block 16

Address
Draft
Reg.
Repr.
16. Remarks
13181

1/E

Block 4: Contractor Format Is Acceptable
6649

1/E

Block 8: Government approval or disapproval will be provided within 15 days after receipt of the plan.
4812

1/E

Block 13: Updated plan required every two months or as required by IPT Decision.

TOTAL

G. Prepared By:

A. Versaggi

H. Date
I. Approved By:

B. Matushoneck J. Date

17. Price Group
18. Estimated Total Price:
CONTRACT DATA REQUIREMENTS LIST (1Data Item)
FORM APPROVED OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.

A. Contract Line Item No.

B. Exhibit A

C. Category
TDP
( )
TM
( )
Other

( x ) Engineering data

D. System/Item

TPTI

E. Contract/PR No.
F. Contractor

1. Data Item No.

A002

2. Title of Data Item

Integrated Master Schedule

3. Subtitle

4. Authority (Data ID No.)

See Block 16

5. Contract Reference

SOW Paragraph 3.7

6. Requiring Office

13181

7. DD 250 REQ

DD

9. Dist. Statement Req.

C

10. Frequency

ASREQ

12. Date of First Submission

14. Distribution

8. APP Code

11. As of Date

13. Date of Subsequent Submissions

Address
Draft
Reg.
Repr.
16. Remarks
13181

1/E

Block 4: Contractor Format Is Acceptable
6649

1/E

Block 8: Government approval or disapproval will be provided within 15 days after receipt of the schedule.
4812

1/E

Block 13: Updated schedule required every two months or as required by IPT Decision.

TOTAL

G. Prepared By:

H. Date
I. Approved By:

B. Matushoneck J. Date

17. Price Group
18. Estimated Total Price:
CONTRACT DATA REQUIREMENTS LIST (1Data Item)
FORM APPROVED OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.

A. Contract Line Item No.

B. Exhibit A

C. Category
TDP
( )
TM
( )
Other

( x ) Engineering data

D. System/Item

TPTI

E. Contract/PR No.
F. Contractor

1. Data Item No.

A003

2. Title of Data Item

Program Status Reports

3. Subtitle

4. Authority (Data ID No.)

See Block 16

5. Contract Reference

SOW Paragraph 3.8

6. Requiring Office

13181

7. DD 250 REQ

LT

9. Dist. Statement Req.

C

10. Frequency

ASREQ

12. Date of First Submission

14. Distribution

8. APP Code

11. As of Date

13. Date of Subsequent Submissions

MONTHLY

Address
Draft
Reg.
Repr.
16. Remarks
13181

1/E

Block 4: Contractor Format Is Acceptable
6649

1/E

1/E

TOTAL

G. Prepared By:

H. Date
I. Approved By:

B. Matushoneck J. Date

17. Price Group
18. Estimated Total Price:
CONTRACT DATA REQUIREMENTS LIST (1Data Item)
FORM APPROVED OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.

A. Contract Line Item No.

B. Exhibit A

C. Category
TDP
( )
TM
( )
Other

( x ) Engineering data

D. System/Item

TPTI

E. Contract/PR No.
F. Contractor

1. Data Item No.

A004

2. Title of Data Item

Meeting Agendas

3. Subtitle

4. Authority (Data ID No.)

See Block 16

5. Contract Reference

SOW Paragraph 3.9

6. Requiring Office

13181

7. DD 250 REQ

LT

9. Dist. Statement Req.

C

10. Frequency

ASREQ

12. Date of First Submission

14. Distribution

8. APP Code

11. As of Date

13. Date of Subsequent Submissions

Address
Draft
Reg.
Repr.
16. Remarks
4812

1/E

Block 4: Contractor Format Is Acceptable
4868

1/E

Blocks 12 and 13: 10 workdays prior to all meetings and reviews, an agenda and any supporting material shall be provided. Delivery may be either by email or posting to the program website.
6649

1/E

1/E

13181

1/E

TOTAL

G. Prepared By:

H. Date
I. Approved By:

B. Matushoneck J. Date

17. Price Group
18. Estimated Total Price:
CONTRACT DATA REQUIREMENTS LIST (1Data Item)
FORM APPROVED OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.

A. Contract Line Item No.

B. Exhibit A

C. Category
TDP
( )
TM
( )
Other

( x ) Engineering data

D. System/Item

TPTI

E. Contract/PR No.
F. Contractor

1. Data Item No.

A005

2. Title of Data Item

Meeting Minutes

3. Subtitle

4. Authority (Data ID No.)

See Block 16

5. Contract Reference

SOW Paragraph 3.12

6. Requiring Office

13181

7. DD 250 REQ

LT

9. Dist. Statement Req.

C

10. Frequency

See Block 16

12. Date of First Submission

14. Distribution

8. APP Code

11. As of Date

13. Date of Subsequent Submissions

See Block16

Address
Draft
Reg.
Repr.
16. Remarks
13181

1/E

Block 4: Contractor Format Is Acceptable
6649

1/E

Block 10: IPT meetings shall be held every two months for the first year and quarterly thereafter, or more frequently if required
4812

1/E

Blocks 12 and 13: Within 10 workdays following all meetings and reviews, meeting minutes and any supporting material shall be provided. Delivery may be either by email or posting to the program website

Block 14: Meeting minutes shall be sent to all meeting participants

TOTAL

G. Prepared By:

H. Date
I. Approved By:

B. Matushoneck J. Date

17. Price Group
18. Estimated Total Price:
CONTRACT DATA REQUIREMENTS LIST (1Data Item)
FORM APPROVED OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.

A. Contract Line Item No.

B. Exhibit A

C. Category
TDP
( )
TM
( )
Other

( x ) Engineering data

D. System/Item

TPTI

E. Contract/PR No.
F. Contractor

1. Data Item No.

A006

2. Title of Data Item

Configuration Management Plan

3. Subtitle

4. Authority (Data ID No.)

DI-CMAN-80858B

5. Contract Reference

SOW Paragraph 3.18

6. Requiring Office

7. DD 250 REQ

DD

9. Dist. Statement Req.

C

10. Frequency

ONE/R

12. Date of First Submission

30 DAC

14. Distribution

8. APP Code

11. As of Date

13. Date of Subsequent Submissions

ASREQ

Address
Draft
Reg.
Repr.
16. Remarks
4868

1/E

Block 4: DI-CMAN80858 and appendix A of MIL-STD-973 to be used as guidance.
4812

1/E

Block 8: Government approval or disapproval will be provided within 30 days after receipt of the plan.
13181

1/E

Blocks 13: Revision due 30 days after receipt of Government comments.

TOTAL

G. Prepared By:

T. Butler

H. Date
I. Approved By:

B. Matushoneck J. Date

17. Price Group
18. Estimated Total Price:
CONTRACT DATA REQUIREMENTS LIST (1Data Item)
FORM APPROVED OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.

A. Contract Line Item No.

0011, 0114, 0216 B. Exhibit A

C. Category
TDP
( )
TM
( )
Other

( x ) Engineering data

D. System/Item

TPTI

E. Contract/PR No.
F. Contractor

1. Data Item No.

A007

2. Title of Data Item

Engineering Change Proposal (ECP)

3. Subtitle

4. Authority (Data ID No.)

DI-CMAN-80639C

5. Contract Reference

SOW Paragraph 3.20

6. Requiring Office

7. DD 250 REQ

DD

9. Dist. Statement Req.

C

10. Frequency

ASREQ

12. Date of First Submission

14. Distribution

8. APP Code

11. As of Date

ASREQ

13. Date of Subsequent Submissions

ASREQ

Address
Draft
Reg.
Repr.
16. Remarks
4868

1/E

Block 8: Government concurrence is required for Class II classification. Government Comment within 30 days for no cost ECPs. Government Approval or Disapproval within 90 days for cost impact ECPs
4812

1/E

1/E

Block 12: ECPs shall be submitted as required for all Class I and Class II changes to hardware.
6649

1/E

13181

1/E

TOTAL

G. Prepared By:

H. Date
I. Approved By:

B. Matushoneck J. Date

17. Price Group
18. Estimated Total Price:
CONTRACT DATA REQUIREMENTS LIST (1Data Item)
FORM APPROVED OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.

A. Contract Line Item No.

0012, 0115, 0217 B. Exhibit A

C. Category
TDP
( )
TM
( )
Other

( x ) Engineering data

D. System/Item

TPTI

E. Contract/PR No.
F. Contractor

1. Data Item No.

A008

2. Title of Data Item

Notice of Revision (NOR)

3. Subtitle

4. Authority (Data ID No.)

DI-CMAN-80642C

5. Contract Reference

SOW Paragraph 3.20

6. Requiring Office

7. DD 250 REQ

DD

9. Dist. Statement Req.

C

10. Frequency

ASREQ

12. Date of First Submission

14. Distribution

8. APP Code

11. As of Date

13. Date of Subsequent Submissions

Address
Draft
Reg.
Repr.
16. Remarks
4868

1/E

Block 4: Data Item Description (DID) DI-CMAN-80642C shall be used as guidance.
4812

1/E

Block 8: Government has 30 days to review. Contractor has 15 days to submit revisions.
4843

1/E

Block 12: NORs shall be submitted with ECPs as required for all Class I and Class II changes to hardware.
6649

1/E

13181

1/E

TOTAL

G. Prepared By:

H. Date
I. Approved By:

B. Matushoneck J. Date

17. Price Group
18. Estimated Total Price:
CONTRACT DATA REQUIREMENTS LIST (1Data Item)
FORM APPROVED OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.

A. Contract Line Item No.

0013, 0116, 0218 B. Exhibit A

C. Category
TDP
( )
TM
( )
Other

( x ) Engineering data

D. System/Item

TPTI

E. Contract/PR No.
F. Contractor

1. Data Item No.

A009

2. Title of Data Item

Request for Deviation (RFD)

3. Subtitle

4. Authority (Data ID No.)

DI-CMAN-80640C

5. Contract Reference

SOW Paragraph 3.21.1

6. Requiring Office

7. DD 250 REQ

DD

9. Dist. Statement Req.

C

10. Frequency

ASREQ

12. Date of First Submission

14. Distribution

8. APP Code

11. As of Date

ASREQ

13. Date of Subsequent Submissions

ASREQ

Address
Draft
Reg.
Repr.
16. Remarks
4868

1/E

Block 8: Approval required by the Government for format and technical content. Government has 30 days to review. Contractor has 15 days to submit revisions.
4812

1/E

1/E

1/E

13181

1/E

TOTAL

G. Prepared By:

H. Date
I. Approved By:

B. Matushoneck J. Date

17. Price Group
18. Estimated Total Price:
CONTRACT DATA REQUIREMENTS LIST (1Data Item)
FORM APPROVED OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.

A. Contract Line Item No.

B. Exhibit A

C. Category
TDP
( )
TM
( )
Other

( x ) Engineering data

D. System/Item

TPTI

E. Contract/PR No.
F. Contractor

1. Data Item No.

A010

2. Title of Data Item

Conformity Inspection Plan

3. Subtitle

4. Authority (Data ID No.)

DI-RELI-80322

5. Contract Reference

SOW Paragraph 3.21.2.1

6. Requiring Office

7. DD 250 REQ

DD

9. Dist. Statement Req.

C

10. Frequency

ASREQ

12. Date of First Submission

30 DACA

14. Distribution

8. APP Code

11. As of Date

13. Date of Subsequent Submissions

Address
Draft
Reg.
Repr.
16. Remarks
4868

1/E

Block 4: Conformity Inspection Plan shall use DI-RELI-80322 as guidance.
4812

1/E

Block 8: Approval required by the Government for format and technical content. Government has 15 days to review. Contractor has 15 days to submit revisions.
4843

1/E

Block 13: An updated plan shall be submitted 30 days prior to each conformity inspection plan review.
6649

1/E

13181

1/E

TOTAL

G. Prepared By:

H. Date
I. Approved By:

B. Matushoneck J. Date

17. Price Group
18. Estimated Total Price:
CONTRACT DATA REQUIREMENTS LIST (1Data Item)
FORM APPROVED OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.

A. Contract Line Item No.

B. Exhibit

A

C. Category
TDP
( )
TM
( )
Other

( x ) Engineering data

D. System/Item

TPTI

E. Contract/PR No.
F. Contractor

1. Data Item No.

A011

2. Title of Data Item

Conformity Inspection Report

3. Subtitle

4. Authority (Data ID No.)

5. Contract Reference

SOW Paragraph 3.21.2.2

6. Requiring Office

7. DD 250 REQ

LT

9. Dist. Statement Req.

C

10. Frequency

ASREQ

12. Date of First Submission

14. Distribution

8. APP Code

11. As of Date

13. Date of Subsequent Submissions

Address
Draft
Reg.
Repr.
16. Remarks
4868

1/E

Block 4: Conformity Inspection Report shall use EIA-649 and MIL-STD-483 as guidance.
4812

1/E

Blocks 12 and 13: Report shall be submitted within 30 days after each conformity inspection
13181

1/E

1/E

1/E

TOTAL

G. Prepared By:

H. Date
I. Approved By:

B. Matushoneck J. Date

17. Price Group
18. Estimated Total Price:
CONTRACT DATA REQUIREMENTS LIST (1Data Item)
FORM APPROVED OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.

A. Contract Line Item No.

B. Exhibit A

C. Category
TDP
( x)
TM
( )
Other

D. System/Item

TPTI

E. Contract/PR No.
F. Contractor

1. Data Item No.

A012

2. Title of Data Item

Technical Data Package (TDP) Updates

3. Subtitle

A/E37T-17A

4. Authority (Data ID No.)

See Block 16

5. Contract Reference

SOW Paragraph 3.23

6. Requiring Office

7. DD 250 REQ

DD

9. Dist. Statement Req.

C

10. Frequency

ASREQ

12. Date of First Submission

14. Distribution

8. APP Code

11. As of Date

13. Date of Subsequent Submissions

Address
Draft
Reg.
Repr.
16. Remarks
4868

1/E

Block 4: Engineering drawing updates shall be updated in accordance with ASME Y14.100-200 using standard commercial drawing software approved by the IPT.
4812

1/E

Block 8: Government has 30 days to review. Contractor has 15 days to submit revisions.
4843

1/E

Blocks 12 and 13: Technical Data Package updates shall be submitted with ECPs as required for all Class I and Class II changes to hardware.
6649

1/E

13181

1/E

TOTAL

G. Prepared By:

H. Date
I. Approved By:

B. Matushoneck J. Date

17. Price Group
18. Estimated Total Price:
CONTRACT DATA REQUIREMENTS LIST (1Data Item)
FORM APPROVED OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.

A. Contract Line Item No.

B. Exhibit A

C. Category
TDP
( )
TM
( )
Other

( x ) Engineering data

D. System/Item

TPTI

E. Contract/PR No.
F. Contractor

1. Data Item No.

A013

2. Title of Data Item

Quality Assurance (QA) Plan

3. Subtitle

4. Authority (Data ID No.)

DI-QCIC-81794

5. Contract Reference SOW Paragraph 3.16

6. Requiring Office

7. DD 250

LT

9. Dist. Statement Req.

C

10. Frequency

One Time/R

12. Date of First Submission

14. Distribution

8. APP Code

11. As of Date

13. Date of Subsequent Submissions

Address
Draft
Reg.
Repr.
16. Remarks
13181

1/E

Block 4: DI-QCIC-81794 shall be used as guidance.
4812

1/E

1/E

TOTAL

G. Prepared By:

H. Date
I. Approved By:

B Matushoneck

J. Date

17. Price Group
18. Estimated Total Price:
CONTRACT DATA REQUIREMENTS LIST (1Data Item)
FORM APPROVED OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.

A. Contract Line Item No.

B. Exhibit A

C. Category
TDP
( )
TM
( )
Other

( x ) Engineering data

D. System/Item

TPTI

E. Contract/PR No.
F. Contractor

1. Data Item No.

A014

2. Title of Data Item

Incident Reports / Failure Report and Corrective Action

3. Subtitle

4. Authority (Data ID No.)

DI-RELI-80255

5. Contract Reference

SOW Paragraph 3.26

6. Requiring Office

7. DD 250 REQ

DD

9. Dist. Statement Req.

C

10. Frequency

ASREQ

12. Date of First Submission

14. Distribution

8. APP Code

11. As of Date

13. Date of Subsequent Submissions

Address
Draft
Reg.
Repr.
16. Remarks
4812

1/E

Block 4: DI-RELI-80255 shall be used as guidance
4868

1/E

Block 8: Electronic delivery in contractor format is acceptable, satisfaction of requirement subject to Government concurrence
6649

1/E

Blocks 12 and 13: Initial report within 24 hours of incident occurrence. Follow up reports every 30 days until the incident report is closed by the Government
13181

1/E

TOTAL

G. Prepared By:

H. Date
I. Approved By:

B. Matushoneck J. Date

17. Price Group
18. Estimated Total Price:
CONTRACT DATA REQUIREMENTS LIST (1Data Item)
FORM APPROVED OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.

A. Contract Line Item No.

B. Exhibit

A

C. Category
TDP
( )
TM
( )
Other

( x ) Engineering data

D. System/Item

TPTI

E. Contract/PR No.
F. Contractor

1. Data Item No.

A015

2. Title of Data Item

Component Data

3. Subtitle

4. Authority (Data ID No.)

5. Contract Reference

SOW Paragraph 3.35

6. Requiring Office

7. DD 250 REQ

LT

9. Dist. Statement Req.

C

10. Frequency

2TIME

12. Date of First Submission

14. Distribution

8. APP Code

11. As of Date

13. Date of Subsequent Submissions

Address
Draft
Reg.
Repr.
16. Remarks
4868

1/E

Block 4: Contractor Format Is Acceptable
13181

1/E

Blocks 12 & 13: Commercial component data shall be delivered with the installation of the first T-17A system and the T-19A system
4812

1/E

1/E

TOTAL

G. Prepared By:

R. Mey

H. Date
I. Approved By:

B. Matushoneck J. Date

17. Price Group
18. Estimated Total Price:
CONTRACT DATA REQUIREMENTS LIST (1Data Item)
FORM APPROVED OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.

A. Contract Line Item No.

B. Exhibit

A

C. Category
TDP
( )
TM
( )
Other

( x ) Engineering data

D. System/Item

TPTI

E. Contract/PR No.
F. Contractor

1. Data Item No.

A016

2. Title of Data Item

Integration & Production Test Plan

3. Subtitle

4. Authority (Data ID No.)

See Block 16

5. Contract Reference

SOW Paragraph 4.2

6. Requiring Office

7. DD 250 REQ

DD

9. Dist. Statement Req.

C

10. Frequency

One Time

12. Date of First Submission

14. Distribution

8. APP Code

11. As of Date

13. Date of Subsequent Submissions

Address
Draft
Reg.
Repr.
16. Remarks
4868

1/E

Block 4: Contractor Format Is Acceptable
4843

1/E

Block 8: Government has 30 days to review. Contractor has 15 days to submit revisions.
4812

1/E

13181

1/E

TOTAL

G. Prepared By:

H. Date
I. Approved By:

B. Matushoneck J. Date

17. Price Group
18. Estimated Total Price:
CONTRACT DATA REQUIREMENTS LIST (1Data Item)
FORM APPROVED OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.

A. Contract Line Item No.

B. Exhibit

A

C. Category
TDP
( )
TM
( )
Other

( x ) Engineering data

D. System/Item

TPTI

E. Contract/PR No.
F. Contractor

1. Data Item No.

A017

2. Title of Data Item

Acceptance Test Report

3. Subtitle

Pilot Production

4. Authority (Data ID No.)

See Block 16

5. Contract Reference

SOW Paragraph 4.4

6. Requiring Office

7. DD 250 REQ

DD

9. Dist. Statement Req.

C

10. Frequency

See Block 16

12. Date of First Submission

14. Distribution

8. APP Code

11. As of Date

13. Date of Subsequent Submissions

Address
Draft
Reg.
Repr.
16. Remarks
4868

1/E

Block 4: Contractor Format Is Acceptable
4812

1/E

Block 8: Government has 30 days to review. Contractor has 15 days to submit revisions.

Blocks 12 and 13: Report to be provided no later than 30 days after delivery and installation of Pilot Production Unit.

TOTAL

G. Prepared By:

H. Date
I. Approved By:

B. Matushoneck J. Date

17. Price Group
18. Estimated Total Price:
CONTRACT DATA REQUIREMENTS LIST (1Data Item)
FORM APPROVED OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.

A. Contract Line Item No.

0046, 0113, 0215 B. Exhibit

A

C. Category
TDP
( )
TM
( )
Other

( x ) Engineering data

D. System/Item

TPTI

E. Contract/PR No.
F. Contractor

1. Data Item No.

A018

2. Title of Data Item

Acceptance Test Report

3. Subtitle

Production

4. Authority (Data ID No.)

See Block 16

5. Contract Reference

SOW Paragraph 4.6.4

6. Requiring Office

7. DD 250 REQ

DD

9. Dist. Statement Req.

C

10. Frequency

See Block 16

12. Date of First Submission

14. Distribution

8. APP Code

11. As of Date

13. Date of Subsequent Submissions

See block 16

Address
Draft
Reg.
Repr.
16. Remarks
4868

1/E

Block 4: Contractor Format Is Acceptable
4812

1/E

Block 8: Government has 30 days to review. Contractor has 15 days to submit revisions.

Block 10: One report for each Production Unit

Blocks 12 and 13: Report to be provided no later than 30 days after delivery and installation of each Production Unit.

TOTAL

G. Prepared By:

H. Date
I. Approved By:

B. Matushoneck J. Date

17. Price Group
18. Estimated Total Price:
CONTRACT DATA REQUIREMENTS LIST (1Data Item)
FORM APPROVED OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.

A. Contract Line Item No.

B. Exhibit

A

C. Category
TDP
( )
TM
( )
Other

( x ) Engineering data

D. System/Item

TPTI

E. Contract/PR No.
F. Contractor

1. Data Item No.

A019

2. Title of Data Item

Long Lead Items List

3. Subtitle

4. Authority (Data ID No.)

See Block 16

5. Contract Reference

SOW Paragraph 3.32.1.13

6. Requiring Office

13181

7. DD 250 REQ

LT

9. Dist. Statement Req.

C

10. Frequency

As Req

12. Date of First Submission

90 DACA

14. Distribution

8. APP Code

11. As of Date

13. Date of Subsequent Submissions

Yearly

Address
Draft
Reg.
Repr.
16. Remarks
13181

1/E

Block 4: Contractor Format Is Acceptable
6649

1/E

1/E

TOTAL

G. Prepared By:

H. Date
I. Approved By:

B. Matushoneck J. Date

17. Price Group
18. Estimated Total Price:
CONTRACT DATA REQUIREMENTS LIST (1Data Item)
FORM APPROVED OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.

A. Contract Line Item No.

B. Exhibit

A

C. Category
TDP
( )
TM
( )
Other

( x ) Engineering data

D. System/Item

TPTI

E. Contract/PR No.
F. Contractor

1. Data Item No.

A020

2. Title of Data Item

Hazardous Material Management Report

3. Subtitle

4. Authority (Data ID No.)

See Block 16

5. Contract Reference

SOW Paragraph 3.29

6. Requiring Office

7. DD 250 REQ

DD

9. Dist. Statement Req.

C

10. Frequency

One/R

12. Date of First Submission

14. Distribution

8. APP Code

11. As of Date

13. Date of Subsequent Submissions

Address
Draft
Reg.
Repr.
16. Remarks
4868

1+1E

Block 4: In accordance with NAS 411. Contractor format is acceptable. NAS 411 tailoring: Paragraphs 4.4.2 and 4.4.3 (Hazard evaluation and Trade-off analysis) may be limited to a discussion/list of alternative material and process considerations, recommendations and basis for recommendation. HAZMAT identification as discussed in paragraph 4.4.1 will include all information listed in paragraph 3.29 of the SOW. It is the contractor’s responsibility to obtain required information from sub-contractors and vendors.
4812

1+1E

Block 8: Government has 30 days to review. Contractor has 15 days to submit revisions.

Block 13: Contractor will incorporate Government comments and resubmit revised report within 30 days after receiving Government comments. Report will be maintained and updated throughout the life of the contract. As changes occur, change pages shall be submitted within 30 days for Government approval.

Block 14: “E” means Electronic Mail

TOTAL

2+2E

G. Prepared By:

H. Date
I. Approved By:

B. Matushoneck J. Date

17. Price Group
18. Estimated Total Price:
CONTRACT DATA REQUIREMENTS LIST (1Data Item)
FORM APPROVED OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.

A. Contract Line Item No.

B. Exhibit

A

C. Category
TDP
( )
TM
( )
Other

( x ) Logistics data

D. System/Item

TPTI

E. Contract/PR No.
F. Contractor

1. Data Item No.

A021

2. Title of Data Item

Item Unique Identification (IUID) Plan

3. Subtitle

Unique Item Identifier (UID)

4. Authority (Data ID No.)

See Block 16

5. Contract Reference

SOW Paragraph 3.36.3

6. Requiring Office

7. DD 250 REQ

DD

9. Dist. Statement Req.

C

10. Frequency

One Time

12. Date of First Submission

14. Distribution

8. APP Code

11. As of Date

13. Date of Subsequent Submissions

Address
Draft
Reg.
Repr.
16. Remarks
6649

1/E

Block 4: Contractor Format Is Acceptable
13181

1/E

Block 8: Government has 30 days to review. Contractor has 15 days to submit revisions.
4868

1/E

TOTAL

G. Prepared By:

C.Langley

H. Date
I. Approved By:

B. Matushoneck J. Date

17. Price Group
18. Estimated Total Price:
CONTRACT DATA REQUIREMENTS LIST (1Data Item)
FORM APPROVED OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.

A. Contract Line Item No.

B. Exhibit A

C. Category
TDP
( )
TM
( )
Other

( x ) Engineering Data

D. System/Item

TPTI

E. Contract/PR No.
F. Contractor

1. Data Item No.

A023

2. Title of Data Item

Production Manufacturing Review

3. Subtitle

4. Authority (Data ID No.)

5. Contract Reference

SOW Paragraph 3.14

6. Requiring Office

7. DD 250 REQ

LT

9. Dist. Statement Req.

C

10. Frequency

ASREQ

12. Date of First Submission

14. Distribution

8. APP Code

11. As of Date

13. Date of Subsequent Submissions

Address
Draft
Reg.
Repr.

16. Remarks

Block 4: Contractor Format Is Acceptable Blocks 12 and 13::Reviews are scheduled at 30%, 60% and 90% completion.

13181

1/E

1/E

1/E

TOTAL

G. Prepared By:

H. Date
I. Approved By:

B. Matushoneck J. Date

17. Price Group
18. Estimated Total Price:
CONTRACT DATA REQUIREMENTS LIST (1Data Item)
FORM APPROVED OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.

A. Contract Line Item No.

B. Exhibit A

C. Category
TDP
( )
TM
( )
Other

( x ) Logistics Data

D. System/Item

TPTI

E. Contract/PR No.
F. Contractor

1. Data Item No.

A024

2. Title of Data Item

Obsolescence Management Plan

3. Subtitle

4. Authority (Data ID No.)

5. Contract Reference

SOW Paragraph 3.24.1.1

6. Requiring Office

7. DD 250 REQ

LT

9. Dist. Statement Req.

C

10. Frequency

ASREQ

12. Date of First Submission

14. Distribution

8. APP Code

11. As of Date

13. Date of Subsequent Submissions

Quarterly

Address
Draft
Reg.
Repr.

16. Remarks

Block 4: Contractor Format Is Acceptable
6649

1/E

1/E

13181

1/E

TOTAL

G. Prepared By:

C. Langley

H. Date
I. Approved By:

B. Matushoneck J. Date

17. Price Group
18. Estimated Total Price:
CONTRACT DATA REQUIREMENTS LIST (1Data Item)
FORM APPROVED OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.

A. Contract Line Item No.

B. Exhibit A

C. Category
TDP
( )
TM
( )
Other

( x ) Logistics Data

D. System/Item

TPTI

E. Contract/PR No.
F. Contractor

1. Data Item No.

A025

2. Title of Data Item

Obsolescence Reports

3. Subtitle

4. Authority (Data ID No.)

5. Contract Reference

SOW Paragraph 3.24.1.2

6. Requiring Office

7. DD 250 REQ

LT

9. Dist. Statement Req.

C

10. Frequency

ASREQ

12. Date of First Submission

14. Distribution

8. APP Code

11. As of Date

13. Date of Subsequent Submissions

Address
Draft
Reg.
Repr.

16. Remarks

Block 4: Contractor Format Is Acceptable
6649

1/E

1/E

13181

1/E

TOTAL

G. Prepared By:

H. Date
I. Approved By:

B. Matushoneck J. Date

17. Price Group
18. Estimated Total Price:
CONTRACT DATA REQUIREMENTS LIST (1Data Item)
FORM APPROVED OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.

A. Contract Line Item No.

B. Exhibit A

C. Category
TDP
( )
TM
( )
Other

( x ) Engineering Data

D. System/Item

TPTI

E. Contract/PR No.
F. Contractor

1. Data Item No.

A026

2. Title of Data Item

Trade Study

3. Subtitle

4. Authority (Data ID No.)

5. Contract Reference

SOW Paragraph 3.24.1.4

6. Requiring Office

7. DD 250 REQ

LT

9. Dist. Statement Req.

C

10. Frequency

ASREQ

12. Date of First Submission

14. Distribution

8. APP Code

11. As of Date

13. Date of Subsequent Submissions

Address
Draft
Reg.
Repr.

16. Remarks

Block 4: Contractor Format Is Acceptable Block 12: The first trade study shall be submitted within 60 days after obsolescence issue is identified. Each obsolescence issue shall have its own unique trade study submission.

13181

1/E

1/E

TOTAL

G. Prepared By:

H. Date
I. Approved By:

B. Matushoneck J. Date

17. Price Group
18. Estimated Total Price:
CONTRACT DATA REQUIREMENTS LIST (1Data Item)
FORM APPROVED OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.

A. Contract Line Item No.

B. Exhibit A

C. Category
TDP
( )
TM
( )
Other

( x ) Engineering Data

D. System/Item

TPTI

E. Contract/PR No.
F. Contractor

1. Data Item No.

A027

2. Title of Data Item

Regression Testing

3. Subtitle

4. Authority (Data ID No.)

5. Contract Reference

SOW Paragraph 3.24.1.5

6. Requiring Office

7. DD 250 REQ

LT

9. Dist. Statement Req.

C

10. Frequency

See Block 16

12. Date of First Submission

14. Distribution

8. APP Code

11. As of Date

13. Date of Subsequent Submissions

See Block16

Address
Draft
Reg.
Repr.

16. Remarks

Block 4: Contractor Format Is Acceptable Block 10: A test plan shall be submitted after each trade study and prototype testing is approved.

Block 13: 90 days after each trade study and prototype testing are approved.

13181

1/E

1/E

TOTAL

G. Prepared By:

H. Date
I. Approved By:

B. Matushoneck J. Date

17. Price Group
18. Estimated Total Price:
CONTRACT DATA REQUIREMENTS LIST (1Data Item)
FORM APPROVED OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.

A. Contract Line Item No.

B. Exhibit A

C. Category
TDP
( )
TM
( )
Other

( x ) Engineering Data

D. System/Item

TPTI

E. Contract/PR No.
F. Contractor

1. Data Item No.

A028

2. Title of Data Item

T-19A Design

3. Subtitle

4. Authority (Data ID No.)

5. Contract Reference

SOW Paragraph 3.32.1.3

6. Requiring Office

7. DD 250 REQ

DD

9. Dist. Statement Req.

C

10. Frequency

One Time/R

12. Date of First Submission

14. Distribution

8. APP Code

11. As of Date

13. Date of Subsequent Submissions

As required

Address
Draft
Reg.
Repr.

16. Remarks

Block 4: Contractor Format Is Acceptable Block 8: Government has 15 days to review. Contractor has 15 days to submit revisions.

Block 12: 180 days after the order is placed.

Block 13: Due 15 days after receipt of government comments.

13181

1/E

1/E

1/E

TOTAL

G. Prepared By:

H. Date
I. Approved By:

B. Matushoneck J. Date

17. Price Group
18. Estimated Total Price:
CONTRACT DATA REQUIREMENTS LIST (1Data Item)
FORM APPROVED OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .