About this file

This document is an amendment to a solicitation for engineering and support services in support of upgrading, repairing, and maintaining hull, mechanical, and electrical systems for Navy modernization programs. The Naval Sea Systems Command seeks these services for a follow-on procurement to the Big Blue IDIQ MAC contract. The amendment revises language under Factor 8 of the cost proposal instructions to additionally require offerors to provide employee payroll records and contingency hire letters when substantiating direct labor rates and indirect rates. The solicitation number is N64498-18-R-0003. All questions must be submitted in writing to anthony.ricciardi@navy.mil by November 13, 2017 at 4:00 PM Eastern Time.

Amendment 01

View the file

Other files

File Type Posted
Amendment_23.pdf PDF
Amendment_22.pdf PDF
AMENDMENT_21.pdf PDF
DD254_BB_Revision_1.pdf PDF
Amendment_20.pdf PDF
Amednment_19.pdf PDF
Amendment_18.pdf PDF
Amendment_17.pdf PDF
Amendment_16.pdf PDF
Amendment_15.pdf PDF
Amendment_14.pdf PDF
Amendment_13.pdf PDF
Amendment_12.pdf PDF
Amendment_11.pdf PDF
Amendment_10.pdf PDF
Amendment_9.pdf PDF
Amendment_8.pdf PDF
Amendment_7.pdf PDF
Amendment_6.pdf PDF
Attachment_4_-_SBPCD_(Corrected).xlsx XLSX spreadsheet
Amendment_5.pdf PDF
Amendment_4.pdf PDF
AMENDMENT_0003.pdf PDF
Attachment_3_solicitation_Affidavit_non-collusion_rev1.docx DOCX document
Amendment_2.pdf PDF
Attachment_3_solicitation_Affidavit_non-collusion_rev1.docx DOCX document
BB_CDRLs_and_DD254.pdf PDF
Attachment_4_-_SBPCD.xlsx XLSX spreadsheet
Attachment2-CostSummaryFormat.xls XLS spreadsheet
Attachment1-LaborRateSubstantiationTable.xls XLS spreadsheet
BB_RFP.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See Summary of Changes

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Oct-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N64498-18-R-0003

X 9B. DATED (SEE ITEM 11)

23-Oct-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Oct-2017

CODE

NAVAL SURFACE WARFARE CENTER PHILA

CODE 02311, ANTHONY RICCIARDI

215-897-1494, ANTHONY.RICCIARDI@NAVY.MIL

5001 SOUTH BROAD STREET

PHILADELPHIA PA 19112

N64498 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N64498-18-R-0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHANGES (REVISED)

SUMMARY OF CHANGES

1) The purpose of the subject amendment is to revise the language under Factor 8 to add “employee payroll records and contingency hire letters” as follows:

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

PROPOSAL PREPARATION

Section L - Instructions, Conditions and Notices to Bidders

SECTION 3 – COST PROPOSAL

FACTOR 8 - COST (no page limit)

As part of your cost proposal submission, the contractor is required to complete the Labor Rate Substantiation Table (See Section J) and provide all pertinent supporting information (employee payroll records, contingency hire letters, DCAA Audit or rate check information, etc.) to facilitate the cost realism analysis of your proposal’s direct labor rate and all the indirect rates (i.e. G&A, Overhead, Fringe, etc.).

To assist the Government in determining cost reasonableness/realism for this effort, the Offeror shall provide sufficient detailed cost information with the proposal to make this determination. In preparing the cost proposal, it is essential that the Offeror breakout and identify separately for each year of the contract.

2) All other terms and conditions remain unchanged.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .