CEC AIT mod Amendment 3.docx

DOCX document 31 KB Posted

Attached to
Cooperative Engagement Capability (CEC) Alteration Installation Team (AIT)
Solicitation number
N6339421R0504
Issued by

About this file

This document provides an amendment to a solicitation for engineering and technical support services for the Cooperative Engagement Capability (CEC) Alteration Installation Team (AIT) from the Naval Surface Warfare Center Port Hueneme Division (NSWC PHD). The amendment clarifies that the contractor shall provide two resumes each for the Project Coordinator/Manager, Quality Control Manager, Task Leader, Electronics Technician Maintenance III, Welder, and Pipefitter positions located on the east and west coasts, for a total of 17 required key personnel resumes. It also confirms that offerors may submit questions until July 31st, which is 10 days before the revised proposal due date of August 9th. The solicitation seeks these CEC AIT support services from the Naval Sea Systems Command to perform tasks including installation planning, material procurement, execution and reporting based out of NSWC PHD in Port Hueneme, California. It is set aside as a small business total set-aside under NAICS code 336611.

View the file

Other files

File Type Posted
CEC AIT Amendment 5 conformed full.docx DOCX document
CEC AIT Mod Amendment 5.docx DOCX document
CEC AIT Amendment 4 conformed.docx DOCX document
CEC AIT Amendment 4 mod.docx DOCX document
CEC AIT conformed Amendment 3.docx DOCX document
CEC AIT mod Amendment 3.docx DOCX document
Build Connect and Test Cables.xlsx XLSX spreadsheet
CEC AIT mod Amendment 2.docx DOCX document
CEC AIT conformed Amendment 2.docx DOCX document
N63394-21-R-0504_Attachment_JS-8_Cost_summary_format(2).xls XLS spreadsheet
Cable Repair and Test.xlsx XLSX spreadsheet
CEC AIT Amendment 1 mod.docx DOCX document
CEC AIT Amendment 1 conformed.pdf PDF
Exhibit_A_CDRLs Combined PDF.pdf PDF
N63394-21-R-0504_Attachment_JS-8_Cost_summary_format(2).xls XLS spreadsheet
CEC AIT RFP Final.pdf PDF
J-6_ GFI.pdf PDF
JS-9_SCA Wage Determinations.pdf PDF
N63394-21-R-0504_Attachment_JS-10_Past_Performance_Questionnaire(Clean).doc DOC document
J-4_QASP - CEC AIT.docx DOCX document
Exhibit_A_CDRLs Combined PDFs.pdf PDF
N63394-21-R-0504_Attachment_JS-7_DCAA_rate_check_form.xls XLS spreadsheet
N63394-21-R-0504_Attachment_J-3_Staffing_Plan_no_cost.xlsx XLSX spreadsheet
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N6339421R0504

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

The following have been modified:

SUPPLIES AND SERVICES

AMENDMENT 0003 Q&A

QUESTION #1: On the first solicitation, it appeared that the government was looking for 6 key resumes. Two (2) recent questions were asked about Key Personnel and the Government responses were as follows:

“AMENDMENT 0002 Q&A

QUESTION #1: Paragraph 1.2, on page 110 is silent on the quantity of resumes required for each Key Personnel proposed. How many resumes does the government require for each Key Personnel proposed?

Answer:

Project Coordinator/Manager - 1 Resume Quality Control Manager - 1 Resume Task Leader - 4 Resumes Electronics Technician Maintenance III - 3 Resumes Welder - 3 Resumes Pipefitter, Maintenance - 3 Resumes”

· And - “QUESTION #56: Paragraph 1.2, on page 110 is silent on the quantity of resumes required for each Key Personnel proposed. How many resumes does the government require for each Key Personnel proposed?

Answer:

Project Coordinator/Manager - 1 Resume Quality Control Manager - 1 Resume Task Leader - 4 Resumes Electronics Technician Maintenance III - 3 Resumes Welder - 2 Resumes Pipefitter, Maintenance - 2 Resumes”

Can you please confirm if there are 6 total key resumes required as per the solicitation, or if the requirement is for 15 total required key resumes per Question #1 of Amendment 0002 Q&A or 13 total required key resumes per Question 56?

Answer:

Project Coordinator/Manager - 2 Resumes (1 east coast and 1 west coast) Quality Control Manager - 2 Resumes (1 east coast and 1 west coast) Task Leader - 4 Resumes Electronics Technician Maintenance III - 3 Resumes Welder - 3 Resumes Pipefitter, Maintenance - 3 Resumes Total Resumes = 17

QUESTION #2:

The timeframe for questions to be submitted to the Government was, and still is, listed in the solicitation (L-215-H007 SUBMISSION OF QUESTIONS BY OFFERORS) as “(b) The deadline for receipt of questions is 10 days prior to the solicitation closing date. “ Since the closing date has been moved to “Current Date Offers Due, Aug 9, 2021”, will the government be answering questions until 10 days prior to August 9th, with ten days prior to August 9 being July 31st as the last day for questions?

Answer:

Yes, the government will answer questions until 10 days prior to August 9th.

(End of Summary of Changes) image1.wmf

File details come from the government source that posted it. Updated .